Loading...
HomeMy WebLinkAboutWQ0029169_Correspondence_20240611Baker, Caroline D From: Glenn Holland <gholland@townofmountolivenc.com> Sent: Tuesday, June 11, 2024 10:33 AM To: Tankard, Robert; Vinson, Scott; Toppen, Sarah A; Jammie Royall; Jerome Newton; bkornegay@nc.rr.com; Danny Keel Subject: [External] Irrigation System CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Robert As required by law this email is to inform The Town of Mount Olive and DWQ of problems with the Irrigation System Field 4. A control wire from the PLC to the valve station for zone 1 has a short in the system. The system cannot be operated in auto also it does not look like we will be able to record flow to field 4. For the purpose of testing the system. I can override the system and record calculated flows from runtimes and past gpm. Because wire in question was not installed under the Contract 1. After talking with the engineer cost to repair will be on the town. Glenn Holland