HomeMy WebLinkAbout20240588 Ver 1_More Info Received_2024060412. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
BANK HEIGHT
I
I
I
F�II Pond/ Normal Water Le
i i i i i
Shoreline
Zone 1 Impact:
Zone 1 Replanting Plan: j
La ice
(At Full Pond/ Normal Water Level)
SHORELINE FOOTAGE
-------------------------- --------------------------I
Full Pond/ Normal Water Level
nhoreTne
z flsoft.
addFti . x onal clearing
if necessary
E
Plan View
Nam
BELOW NWL
11 ABOVE NWL
Zone 2 Impact:
La ke
(A[ Full Pond/ Normal Water
Level)
Existing Dock
Zone 2 Replanting Plan:
30 ftx7ft
3ftx 150 It
Below full pond/NWL
Riprap
4ftx 150ft
Above full pond/ NWL
AMPLE
FORM: SSGP 02-2017 Page 3 of 4
Below NWL
I --------- --------I I-
7
La Ise
(At FulI Pond/ Normal Water Level)
C
(}
L
L C)
kn
Side View
U-
10 ft. bank
Side Vi
Above NWL Temp Corr
BANK
HEIGHT
3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing
f necessary
Existing Hank
AMPLE
FORM: SSGP 02-2017 Page 4 of 4