No preview available
HomeMy WebLinkAbout20240588 Ver 1_More Info Received_2024060412. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation BANK HEIGHT I I I F�II Pond/ Normal Water Le i i i i i Shoreline Zone 1 Impact: Zone 1 Replanting Plan: j La ice (At Full Pond/ Normal Water Level) SHORELINE FOOTAGE -------------------------- --------------------------I Full Pond/ Normal Water Level nhoreTne z flsoft. addFti . x onal clearing if necessary E Plan View Nam BELOW NWL 11 ABOVE NWL Zone 2 Impact: La ke (A[ Full Pond/ Normal Water Level) Existing Dock Zone 2 Replanting Plan: 30 ftx7ft 3ftx 150 It Below full pond/NWL Riprap 4ftx 150ft Above full pond/ NWL AMPLE FORM: SSGP 02-2017 Page 3 of 4 Below NWL I --------- --------I I- 7 La Ise (At FulI Pond/ Normal Water Level) C (} L L C) kn Side View U- 10 ft. bank Side Vi Above NWL Temp Corr BANK HEIGHT 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing f necessary Existing Hank AMPLE FORM: SSGP 02-2017 Page 4 of 4