Loading...
HomeMy WebLinkAboutSW6231104_Design Calculations_20240610 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Tractor Supply Store-West End 2 Project Area(ac) 6.12 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? no COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30-ft 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof - 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: J.Branch Smith,PE 28 Organization: Paramounte Engineering,Inc. 29 Street address: 122 Cinema Drive 30 City,State,Zip: Wilmington,NC 28409 31 Phone number(s): 910-791-6707 32 Email: bsmith@paramounte-eng.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer \\`,H1 CAR0 i,�� Qs, • gg /'•' ><(1cf1- : - SEAL 9� _ Sig p ture of Designer 034354 : - G :2• • F••••.. .•• is BRANG\' � 51 2-If Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM PROJECT AREA Infiltration Basin 5 Total drainage area (sq ft) 267458 221500 6 Onsite drainage area (sq ft) 267458 221500 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project(sq ft) 139300 sf 139300 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) .0sf .0sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 139300 sf 139300 sf 11 Offsite BUA(sq ft) .0 sf .0 sf 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) 84100 sf 84100 sf - Sidewalk (sq ft) 28000 sf 28000 sf - Roof(sq ft) 22200 sf 22200 sf - Roadway(sq ft) - Future (sq ft) 5000 sf 5000 sf -Other, please specify in the comment box below (sq ft) .0 sf .0sf New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) - - Existing BUA that will remain (not subject to 15 permitting) (sq ft) - - 16 Existing BUA that is already permitted (sq ft) - - 17 Existing BUA that will be removed (sq ft) 2000 sf 2000 sf 18 Percent BUA 52.10% 62.90% 19 Design storm (inches) 1.50 in 20 Design volume of SCM (cu ft) 17056 cf 21 Calculation method for design volume Simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): a) 0 '05 - 0 0 0 CO U) CA r V) U) a) CO W u) < cn y CD N O a) rn til 0 10 Q `- o >- } v4 z a) >- Q- >- >- } Z >- >- >- >- 0 Z O v rn Z Q L0 N cf) a E 7 Q. N C rL-.• ^. Q) U) O 3 C ED 0 o v 46 7 C a) .«._ a) C.. c.. Q U ^. c Q - U) O 0 C E p O c v oco coO o . Q v m N .a a) + U a) 7 2 a N m U C a) co aa)) a)a) • as c w a p O a) a t c cu c aJ a) N u> a) U) c-. - O U 2-C N co a) u) a) E 0 a) c`o -ccB 0 0 C a) i C a) L (c.... .-. L c co con a) O` E O N a) C �. a) @ ,.., GF (f) o co > O — _CU) O a) o co W U To C 2 N 0 3 �j .Q o C• U c O 8 co CL CD_ 4) C U ui .� C7 c E a _ o U) Q_ = .1 7 O C u) N (n ` c o E o — U u+ cn o :, T o 5. o0 a) ) 0 a y E _� c � o uoi Cl) a) L O r- 09 3 _0UQ. O MI C T N c— .V a) Y -, cn U) — o Z o a) 3 Q ca o cA a) rn aoi c a) O a) u, ca con _o o �.; a) III O E o y co O °) '" o a) c aa)) 'in �• 0) _co 30 cc 0) o C a' ` a) a) U) a) N L — c co o Q O a) G O Q a) 0 Q C O` N c ,_ = a) N "o L o7 t �. .r — N C 2 2 -o 2 a) N > O o o QRI .7 c .N o g E > a) E 3 c .c O U oo ou 2 2 o o a) IA_ (D -C �C N co as 2 Y cn a) o 0 a) .� p O O U u�i u) w a) o cn > = aa) ari I.L a) E cc U U min a) a .E `n ca o r Va a) a) U N co Cl.) ate) a) 0 a) o Ti)" ., C 0) 7 LL Cn .0 ca N _c O a) N m C .� (2 -c -c (n )2a) m L V) fn O L flfl ca) 0 ro Z ' N � C�) '� 1.0 (O N 00 d) C) v N CO Nt 10 CO N- J (0 co C) 2 — N C') V U) Z s— . . a— .- a— LL N- - N N N N N N *' V, Z c 0 0 V v NCO 0 0 . Ot.c O N CO 112 La t N (NiOOp CO C O cO CnCO Cn (C) N r a) L_ 7 U) o = (o a) c 13 o -o +_• C co as E to C O (0 _ C`. a) a) a) c U) a) a) o U C W -o C cam. o a N a) L a m O N C O co .o C -D C a) 1 (o a) U a) co O E coo Q C) X a L a) m a m > co L w •Q o a) a) O U C1 C Z C _ ^ c a? (U C O O Q C Co 0 st a) (o a) o z a) L E Oa) E 2 0 E m `t •- —, N Qc (0 C COv w co C 0 C Co O a) Q ' vC-- Q — O o Q E ZN 1... >.. o o a) a) Cll _ cLo cn cu go w > cv c0 m Q m o - O 3 o e E Q' u) u(°ia>i a) t aa) .�, w o aoi a) , 3 = ccoo 0 a) E'w 6 O a) ��+ Pa o c a) O O Q 0 ,: 0 CT 0 -p LL N C a) oO L c Z D o E l ' w a) to a) ((22 a) N fl c ca 3 O N . E Q O N@ O O N aa) 5) -c O a) a] O a) O \ .CT a) J rn @ N J 'o ea z o o > c o o •t/ UU) ._ a) = o 0 o C0 co G a) E z a) m — cnu_ � mcom '� m co 0 _15a. z1— coco 1 �' I � 0i= 0 � .E a o U. 6. H o ZCO r` j O O •— m N CO ~ V' u0 CO N- 00 O) O .--- N CO E (C) 0 CO N ,_ N N ' N CO CO O CO CO I. CO CO (`') CO M ('7 V' 'Cr V' V. D V• O V• a) }' W U. ►L N 4 :3 _ Project Name: West End TSC Client: West End Development Group pA RA M O UNTF Prepared By: JBS N E E R 1 N G. 1 N G. Date: 5/22/24 Infiltration Basin - DA 1 Soil Type = Sandy Soils EL. At Test Location = 597.50 HA-01 and HA-02 Depth to SHWL = 20.0 ft See ECS Test Report 33:6510-R1 SHWL = 577.50 Min. Bottom EL. = 585.00 Exceeds 24" above SHWL Infiltration Rate = 2.62 in/hr HA-01 Infiltration Rate = 4.12 in/hr HA-02 Infiltration Rate Used = 2.62 in/hr Infiltration Rate = 1.31 in/hr FofS = 2 Drainage Area = 221500 sf DA 1 BUA Area to System = 139300 sf DA 1 % Impervious 62.9% Runoff Coefficent (Rv) = 0.616 in/in Required 1.5" Runoff Volume 17,056 cf (Min. 1.0" Storm Depth per 15A NCAC 02H .1021 Non-Coastal H( Required 1.5" Runoff Elev. 588.30 Elev. Provided Runoff Volume = 17,056 cf SEE HYDROCAD STAGE-STORAGE TABLE Bottom Area of Basin 2,850 sf SA = FS * DV*12 K*T where: SA = required minimum surface area of infiltration system(ft2) FS = factor of safety(minimum of 2 is recommended) DV = design volume(ft3) K = hydraulic conductivity of soil(in/hr) T = maximum dewatering time(72 hours) Min. Surface Area of Basin = 2,170 SF from Equation 2 MDC #5 (above) Drawdown Time = 2.28 days T(days) = Vol/ (Ir x SA) 54.82 hrs Elev Stage Storage Storage Drained Qdarcy Drawdown Time ft ft cf cf cfs sec min hours days 588.3 3.30 17,056 0 0.57040 0.0 0 0 0 587.0 2.00 9,264 7,792 0.34569 22540.1 375.67 6.26 0.26 586.5 1.50 6,289 10,767 0.25927 41528.0 692.13 11.54 0.48 586.0 1.00 3,754 13,302 0.17285 76958.1 1282.64 21.38 0.89 585.5 0.50 1,657 15,399 0.08642 178180.5 2969.67 49.49 2.06 585.0 0.00 0 17,056 0.00000 #DIV/0! #DIV/0! #DIV/0! #DIV/0! Stage-Area -Storage Table: Elevation Surface Area Volume ft sf cf 585 2,850 0 586 4,087 3,469 587 5,433 8,229 588 6,900 14,395 588.30 7,400 17,056 589 8,563 22,127 590 10,396 31,606 591 12,382 42,995 592 14,534 56,453 593 16,707 72,074 594 19,564 90,209 595 21,964 110,884