HomeMy WebLinkAboutSW6231104_Supplemental Info Review_20240610 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 6/10/2024 3:18:05 PM (Supplemental Submittal)
Accept by Kaitlin Peck 6/11/2024 7:55:05 AM(Supplemental Info Submittal)
• The task was assigned to DEMLR Post-Construction Team 6/10/2024 3:18:06 PM
• The task was assigned to Kaitlin Peck by round robin distribution 6/10/2024 3:18:06 PM
=DEQ •
Submittal from 6/10/2024
Permit Information:
Please provide specific permit details below.
................................................................................................................................................................................................................................................................................................................................................................................................
What Type of Permit? Choose one:
* NPDES Industrial or MS4 Permit
State Stormwater(Post-Construction)Permit
Other
Permit Number* SW6231104
Begins with"SW","NCG",or"NCS"
What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact.
the Primary Contact? Central Office
*
Washington Regional Office(Attn: Carl Dunn)
Wilmington Regional Office(Attn:Christine Hall)
................................................................................................................................................................................................................................................................................................................................................................................................
Project Name* Tractor Supply Store
Owner/Operator* West End Development Group, LLC
County: Moore
Submitter Name:* Branch Smith
Who is submitting this information?
E-mail Address:* BSMITH@PARAMOUNTE-ENG.COM
Phone Number* 9107916707
Additional E-mail for BSMITH@PARAMOUNTE-ENG.COM
Submittal (Optional)
Confirmation:
State Stormwater (Post-Construction) Information Uploads
Choose file type and upload attachment(Reviewer may remove unnecessary submittals)
File Type* Design Calculations
File Upload Click the upload button,or drag and drop files to attach
supplement and calculation.pdf 1.1 MB
Only PDF files are accepted.
File Type* Supplement-EZ Form
File Upload Click the upload button,or drag and drop files to attach
supplement and calculation.pdf 1.1 MB
Only PDF files are accepted.
Is this project funded No
with ARPA grant Yes
funds?*
Uploads contain NO
Confidential YES
Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant
or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided
by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)].
Notes about the attachments:
* By checking the box and signing box below, I certify that:
• I have given true,accurate,and complete information on this form;
• I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the
NC General Statutes(the"Uniform Electronic Transactions Act)
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature;AND
d I intend to electronically sign and submit the Supplemental Information Upload form.
Full Name:* Branch Smith
Signature:
et"elf 6;�Ywn#
Date Submitted: 06/10/2024
Initial Review
Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary.
SW6231104
Who needs a Copy?* Reviewer selections will only be required for offices checked here.
Central Office Staff
Regional Office Stormwater Contact
State Stormwater RO Staff
No Copy Needed
Central Office Reviewer:*
Notifies CO Staff with Email
Brianna Holland
Any Comments or
Added Info for CO
Staff Reviewer?
Review Date* 06/11/2024