HomeMy WebLinkAboutNCC241781_ESC Approval Submitted_20240610 Carlos Banegas
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Monday,June 3, 2024 11:55 AM
To: Sasser Properties, LLC;Aden Stoltzfus
Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0170103
Attachments: Application Report- Monday,June 3, 2024 1150 AM.pdf;ALAMA-2024-0120_Aurora
Acres.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
ocjNESTATFQ>,,
Bey 464
w � ' n
QUAM VI.
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
06-03-2024
Sasser Properties, LLC
4425 Sasser Farms Drive
Gibsonville, NC 27249
RE: Project Name:Aurora Acres
Acres Approved:3.56
Application ID: PA-005254
Permit Number:ALAMA-2024-0120
Address:Stockard Road
City:Snow Camp
County:Alamance
1
River Basin:Cape Fear
Stream Classification: NSW: Nutrient Sensitive Waters;WS-V:Water Supply V
Plan Type: New Plan
Dear Sasser Properties, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page.The Certificate of Approval must be posted at the job site. This plan approval shall expire
three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title
15A NCAC 48 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After
the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form
may be accessed atdeq.nc.gov/NCG01. Please directquestions about the eNOlform totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
newCOC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee.In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Modifications Required for Approval:
2
1. Be advised that any homebuilder would be required to obtain an independent plan approval for lot control
measures after the road is completed. [113A-57(3), 15A NCAC 4B .0118]
2. If curb and gutter are being installed, please provide a location for the concrete washout station with measures.
These should not be located within 50 feet of any storm drain, basin, or stream unless no alternative is feasible.
[G.S. 143-215.1]
3. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
4. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800
and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted
from NC DEQ DEMLR prior to the removal of any ESC measures. All additional permits should be obtained, as
necessary, prior to beginning construction. [GS 113A-51, 15A NCAC 4B .0120]
5. Any off-site borrow and waste required for this project must come from a site with an approved erosion
control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid
Waste Management. Trash/debris from demolition activities or generated by any activities on site must be
disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste
Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
6. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take those
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
7. The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to
yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR
prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure inspection should
not be requested until after the site has achieved full vegetative stabilization and measures have been
removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full
growing season is necessary between initial seeding/mulching and removal of measures. Please plan your
construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised
you may be asked for representative site pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
3
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land
Resources
.D_E Q�� Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 1 Winston-Salem NC,
27105
L `/ 336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
4
CERTIFICATE OF PLAN APPROVAL
TATE
�
Ny, ]q th5 l�' 1
iA� / O 1,
'"t QUAM =7
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
Aurora Acres
Stockard Road Snow Camp, NC 27349
6/3/2024 ALAMA-2024-0120
Date of Plan Approval DEQ Project Identifier
Certificate of Coverage Number: