Loading...
HomeMy WebLinkAbout20240369 Ver 1_CAMA Application_20240530Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 2 (iii) Length 40' & 52' (iv) Width 6' & 6' (v) Floating ❑Yes ®No e. (i) Are Platforms included? ®Yes ❑No If yes: (ii) Number 4 (iii) Length 18' 14' 48' 124' (iv) Width 6' 5' 6' 6' (v) Floating ®Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 9 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k• Typical boat length: 14' to 24' m. (i) Will the facility have tie pilings? ®Yes ❑No (ii) If yes number of tie pilings? 10 El This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ®Yes ❑No If yes: (ii) Number 4 (iii) Length 24' (iv) Width 4' (v) Floating ®Yes ❑No f. (i) Are Boatlifts included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 9 ❑ Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: 1 ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Mixed types I. (i) Will the facility be open to the general public? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ❑This section not applicable a. (i) Number 2 (ii) Length 69' & 45' (iii) Width 1' 5. BREAKWATER (e.g., wood, sheetpile, etc.) ❑This section not applicable a. Length b. Average distance fron NHW NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 2,486' to the southeast, 2,174' to the west Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 436' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 1,580' to the southeast, 1,803' to the west d. Water depth at waterward end of structure at NLW r NWL -5' (9-slip system) -4' (kayak launch) 8. OTHER El This section not applicable a. Give complete description: Resurface and extend the existing boat ramp 11', install a 6' x 52' access pier leading to a 6' x 48' launch/retrieve floating dock 6' x 124' floating dock spine with (4) 4' x 24' floating finger piers with 2 tie pilings in between each set of finger pier to form a total of 9 slips. Also install 2 groins, 1_ & 45' and 1 t@ 69' in lenath (one on each side of the boat ramD). 10/27/23 Revised 5/29/24 Date Figure Eight Island Yb�&t[Cfub Project Name Debbie Wilson Applicant [[Name Applicant Signature 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06