Loading...
HomeMy WebLinkAbout20160091 Ver 1_Approval Letter_20160212d, �a Water Resources ENVIRONMENTAL QUALITY PAT MCCRORY �l(Jl'C(f]lJY DONALD R VAN DER VAART Secreln�v S JAY ZIMMERMAN Du ec/nr February 12, 2016 Orange County NCDWR Pro�ect No 20l 60091 Bridge 75 on SR 1127 WBS Element 17BP.7 R 86 APPRO�AL of 401 WATElt QUALITY CERTI�'ICATION and Jordan Lake BUFFER AiJTHORIZElTION, with ADDITIONAL CONDITIONS Mr J M Mills, P E, Division Engmeer NCDOT, Division 7 P O Box 14996 Greensboro, NC 27415 Dear Mr Mills. You have our approval, m accordance with the condrtions listed below, for the followmg impacts for the purpose of replacmg Bridge 75 with another bridge over New Hope Creek [Index No 16-41-1-(0 5)] m Orange County Stream 1 L'6:1�Di 23C'�jT �S@f GII Site Dere:►nia! Stream (linear ft) (Dewatering) 1 34 Total I 34 in the Caae Fear River Basin Fermanent Fili in Perennial Stream (line�r ft) Total Stream Impact for Project: 341inear feet. 'i'atal Stream imp2ct (linear ft) 34 34 �i��am i�n�a`ts �dequErer.g Mitigation (linear ft) 0 0 Jorclan I.ake Ri arian Buffer Im acts Site Zone 1 minus = Zone 1 Zone 1�uffer Zone 2 minus = Zone 2 Zone 2 Buffer dmpact Wetlands �uffers (not Mitigation Impact Wetlands Buffers Mitigation (sq ft) in Zone 1 wetlands) Required (sq ft) in Zone 2 (not Required (using (sq ft) (sq ft) (using 3: Y ratio) (sq ft) wetlands) 1.5:1 ratio) 1 2,416 - - - 1,217 - - - Totals 2,416 - - - 1,217 - - - Total Buffer Impact for Project: 3,633 square feet. The pro�ect shall be constructed m accordance wrth your apphcation dated received January 27, 2016 After reviewmg your application, we have decided that these impacts are covered by General Water Quality Certification Number 3883. This certification corresponds to the Nationwide Permrt 3 issued by the Corps of Engineers This a�proval is also valzd for trie Jordan Lake Ripariail Bufier Rules (15A NCAC 02B �2(i7) In addrtion, you should State of North Ca olma �Environmental OuahY� � Wate: Resources i617 Mad Service Center, Raleiah, Nonh Carolina 27659-1617 acqu�re any other federal, state ar local permits before you proceed wrth your pro�ect mcludmg (but not hmrted to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regularions This approval will exp�re wtth the accompanymg 404 permit This approval is valid solely for the purpose and design described m your application (unless modified below). Should your pro�ect change, you must notify the NCDWR and submit a new apphcation If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complymg with all the conditions If total wetland fills for this pro�ect (now or m the future) exceed or.e acre, or ef total unpacts to streams (now or m the future) exceed 150 lmear feet, compensatory imtigation may be requu-ed as described m 15A NCAC 2H 0506 (h) (6) and (7) Addrtional buffer impacts may requ�re compensatory mitigation as described m 15A NCAC 2B 0295 For this approval to remam vahd, you must adhere to the condrtions listed m the attached certification(s) and any additional condrtions listed below Condition(s) of Certification: Project Specific Conditions 1 All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocrties, unless otherwise approved by this certification [15A NCAC 2B 0233(5)] 2 All riparian buffers impacted by the placement of temporary fill or clearmg activrties shall be restored to the preconstruction contours and revegetated Mamtamed buffers shall be permanently revegetated with non-woody species by the end of the growmg season followmg complehon of construction For the purpose of this condition, mamtamed buffer areas are defined as areas withm the transportation corridor that will be sub�ect to regular NCDOT mamtenance activrties mcluding mowmg The area wrth non- mamtamed buffers shall be permanently revegetated with native woody species before the next growmg season followmg completion of construction (15A NCAC 2B 0267) 3 Pursuant to 15A NCAC 2B 0267(9), sedunent and erosion control devices shall not be placed m Zone 1 of any Jordan Lake Buffer without prior approval by the NCDWR. At th�s hme, the NCDWR has appro�ed no sed�ment and erosic�n �ont[�ol devzoes �n Z�ne 1, c��atsic�e of thP appr�ved pro�ect impac+s� anywhere on this project Mareover, sedunent and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow 4. The post-construction removal of any temporary bridge structures must return the pro�ect srte to rts preconstruction contours and elevations The impacted areas shall be revegetated with appropriate nahve species [15A NCAC 02H .0506(b)(2)] 5 As a condrtion of this 401 Water Quality Certification, the bridge demolition and construction must be accomphshed m smct compliance with the most recent version of NCDOT's Best Management Practices for Construction and Mamtenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H 0506(b)(5)] 6 For the 34 lmear feet of streams bemg impacted due to site dewatermg activrties, the site shall be graded to its preconstruction contours and revegetated wrth appropriate native species [15A NCAC 02H.0506(b)(2)] General Conditions Unless otherwise approved m this certification, placement of culverts and other structures m open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 mches, and 20 percent of the culvert diameter for culverts havmg a diameter less than 48 mches, to allow low flow passage of water and aquatic hfe Design and placement of culverts and other structures mcludmg temporary erosion control measures shall not be conducted m a mann�r tha� may result m dis-equilibrium oT wetlands ar streum�eds ar banlcs, ad�acent to cr upstream and downstream of the above structures The applicant is required to provide evidence that the equilibrium is being mamtamed if requested m wrrtmg by NCDWR If this condrtion is unable to be met �ue to �edrock or athc;r limitmg features encountered durmg ccns�-uct�on, please ,;ontact NCDWR for gutdance on hc�w ta pr•oceed and to �ieterm�ne whether or not a per_mit mod�fidat�on wil] be r�quired. [15A NCAC 02H.0506(b)(2)] 2. If concrete is used during construction, a dry work area shall be mamtamed to prevent d�rect contact between curmg concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential far elevated pH and possible aquatic hfe and fish kills. [15A NCAC 02B 0200] 3 Durmg the construction of the pro�ect, no stagmg of equipment of any kmd is permitted in waters of the U.S , or protected riparian buffers [15A NCAC 02H.0506(b)(2)] 4 Tne dunension, pattern and profile or the stream above and below the crossmg shali not be modified Disturbed floodplains and streams shall be restored to natural geomorphic conditions [15A NCAC 02H.0506(b)(2)] 5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic hfe passage. [15A NCAC 02H 0506(b)(2)] 6 The Permittee shall ensure that the fmal design drawmgs adhere to the permit and to the permtt drawmgs submitted for approval [15A NCAC 02H .0507(c) and 15A NCAC 02H 0506 (b)(2) and (�)(2)l 7. All work m or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Mamtenance Activrties manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation m flowmg water [15A NCAC 02H 0506(b)(3) and (c)(3)] 8 Heavy equipment shall be operated from the banks rather than m the stream channel m order to mmimize sedimentation and reduce the introduction of other pollutants mto the stream. [15A NCAC 02H.0506(b)(3)] 9 All mechamzed equipment operated near surface waters must be regularly inspected and mamtamed to prevent contamination of stre3m waters from fuels, lubricants, hydraul�c fluids, or other toxic materials. fISP. riCAC 02H 05�5(b1(3)] 10 No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification [15A NCAC 02H 0506(b)(3)] 11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited [15A NCAC 02H 0506(b)(3)] 12. The permittee and its authorized agents shall conduct its activrties m a manner consistent with State water quahty standards (mcludmg any requirements resulting from compliance with §303(d) ofthe Clean Water Act) and any other appropnate requirements of State and Federal law If the NCDWR determines that such standards ar laws are not bemg met (mcluding the failure to sustam a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification [15A NCAC 02B 0200] 13 All fill slopes located in �urisdictional wetlands shall be placed at slopes no flatter than 3 1, unless otherwise autharized by this certification [15A NCAC 02H 0506(b)(2)] 14 A copy of this Water Quality Certification shall be mamtamed on the construction srte at all tunes. In addition, the Water Qualrty Certification and all subsequent modifications, if any, shall be mamtamed with the Division Engmeer and the on-site project manager [15A NCAC 02H .0507(c) and 15A NCAC 02H 0506 (b)(2) and (c)(2)] 1�. 1'he outside buffe:, wetland ar water boundary located wrtr�m the construction corri�or approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbmg activities Impacts to areas within the fencmg are prohibited unless otherwise authorized by this certificati�n [15A NCAC 02F3 0501 an� .OSQ2] 16 The issuance of this ce!-tification does not exempt the Permittee from complymg wrth any and all statutes, rules, regulations, or ordinances that may be imposed by other g�vernment agencies (t.P local, state, antl federal) havmg �urisdiction, mcludmg but not hmited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc 17 The Permittee shall report any violations of this certification to the Uivision of Water Resources within 24 hours of discovery [15A NCAC 02B 0506(b)(2)] 18 Upon completion of the pro�ect (mcludmg any impacts at associated borrow or waste srtes), the NCDOT Division Engineer (or appomtee) shall complete and return the enclosed "Certificat:on of Completion Form" to notify the NCD`vVR when all work uicluded m the 401 Certification has been compieted [ISA NCAC 02H 0502( fl] 19. Nahve riparian vegetarion must be reestablished m the rtparian areas withm the construction limits of the pro�ect by the end of the growmg season followmg complehon of construction [ 15A NCAC 02B 0267(9)] 20 There shall be no excavation from, or waste disposal mto, �urisdictional wetlands or waters associated wrth this permrt wrthout appropriate modification Should waste or borrow sites, or access roads to waste or borrow srtes, be located m wetlands or streams, compensatory mitigarion will be required smce that is a d�rect unpact from road construction activities [15A NCAC 02H 0506(b)(3) and (c)(3)] 21. Erosion and sediment control practices must be m full compliance with all specifications governmg the proper design, mstallation and operation and mamtenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H 0506(b)(3) and (c)(3]) a The erosion and sedunent control measures for the pro�ect must be designed, installed, operated, and mamtamed m accordance with the most recent version of the North Carolina Sedrment and Erosion Control Plannzng and Design Manual b The design, mstallation, operation, and mamtenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified m the most recent version of the North Carolina Sedzment and Erosion Control Manual The devices shall be mamtamed on all construction sites, borrow srtes, and waste pile (spoil) pro�ects, includmg contractor-owned or leased borrow prts associated wrth the pro�ect. c For bor_row ptt s�tes, the erasion anrl sed�ment con±rcl m�as»res :nust be de�ignPr_l, iT:stall�d, operated, and mamtamed m accordance with the most recent version of the North Carolrna Surface Mznang Manual d The reclamation measures and implementation must comply with the reclamation m accordance with the requirements of the Sedimentation Pollution Control Act 22 Sediment and erosion control measures shall not be placed m wetlands or waters unless otherwise approved by this Certification [15A NCAC 02H 0506(b)(3) and (c)(3)] If you wish to contest any statement m the attached Cert�fication you must file a petrtion for an admmistrative hearmg You may obtam the petrtion form from the office of Admmistrative hearmgs You must file the petrtion wrth the office of Admimstrative Hearmgs withm sixty (60) days of receipt of this notice A petttion is considered filed when rt is recerved m the office of Admimstrative Hearmgs durmg normal office hours The Office of Admmistrative Hearmgs accepts filmgs Monday through Friday between the hoars of 8•OOam and 5 OOpm, except for official state holidays The origmal and one (1) copy of the petrtion must be filed with the Office of Admmistrative Hearmgs The petition may be faxed-provided the origmal and one copy of the document is received by the Office of Admmistrative Hearmgs wrthm five (5) busmess days following the faxed transmission The mailmg address for the Office of Admmistrative Hearmgs is Office of Admmistrative Hearmgs 6714 Mail Service Center Raleigh, NC 27o9a-57 i 4 Telephone (919) 431-3000, Facsimile (919) 431-3100 A copy of the petition must alsa Ue served on DEQ as folla�vs Mr Sam �I Hayes, General Coimsei Department ot F,nvironmental_ Quality 1601 Mail Service Center This letter completes the review of the Diviston of Water Resources under Section 401 of the Clean Water Act If you have any questions, please contact Dave Wanucha at (336)776-9703 or Dave Wanucha@ncdenr.gov Smcerely, r, S Jay immerman, D�rector Division of Water Resources Electromc copy only distribution Dave Bailey, US Army Corps of Engmeers, Raleigh Field Office Jerry Parker, Division 7 Env�ronmental Officer Nicole Thomson, Division 7 Environmental Assistant (n�thomson2@ncdot gov) Travis Wilson, NC Wildlife Resources Commission Fil� Copy 3; � Water Resources ENVIRONMENTAL �UALITY NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certi�cation: County: PAT MCCRORY Ciotielna DONALD R VAN DER VAART sec,rm,y S JAY ZIMMERMAN Un eclor Certificate of Completion Upon completion of all work approved withm the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is requ�red to return this certificate to the 401 Transportation Permittmg Umt, North Carolma Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617 This form may be ret�uned to NCDWR by the applicant, the appli�ant's authonzed agent, or the pro�ect engme�r It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built withm substantial compliance and mtent of the 401 Water Quahty Certification and Buffer Rules, the approved plans and specifications, and other supportmg materials Signatare Date° Agent'� Cert�caticn I, , hereby state that, to the best of my abilrties, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature. Engineer's Certification Partial Final � Date• I, , as a duly registered Professional Engineer m the State of North Carolina, havmg been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construchon was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Registration No Date �tate of North Carolma jEnvu�onmental Qual�ty � Water Resources 1617 Mad Service Center, Raleigh, North Carohna 2i699-1617 Phone 919-8�7-6300