HomeMy WebLinkAboutSW3240302_Application Form_20240607 IV. PROJECT INFORMATION
1. In the space provided below,briefly summarize how the stormwater runoff will be treated.
The proposed storm water collection system will consist of multiple wet ponds within the project boundaries.
The storm system was designed to detain the 10 and 25 year storm events.Proposed water quality/detention
requirements are being met according to the NCDEQ Requirements.
2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:_
b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with:
❑ Coastal SW-1995 ❑ Ph II-Post Construction
3. Stormwater runoff from this project drains to the Catawba River basin.
4. Total Property Area: 107.76 acres 5. Total Coastal Wetlands Area:0 _acres
6. Total Surface Water Area:3.75 acres
7. Total Property Area (4)-Total Coastal Wetlands Area (5) Total Surface Water Area(6) =Total Project
Area*: 104.01 acres
+ Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks of streams and rivers,the area below the Normal High Water(NHW)line or Mean High Water
(MHW)line,and coastal wetlands landward from the NHW(or MHW)line. The resultant project area is used to
calculate overall percent built upon area(BUA). Non-coastal wetlands landward of the NHW(or MHW)line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area /Total Project Area)X 100 =41.15 %
9. How many drainage areas does the project have?6(For high density,count 1 for each proposed engineered
stormwater BMP. For low density and other projects,use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project,attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information Drainage Area 7 Drainage Area 8 Drainage Area 9 Drainage Area 10
Receiving Stream Name _ Rone Branch Rone Branch Rone Branch Rone Branch
Stream Class * C C C C
Stream Index Number* 11-138-4 11-138-4 11-138-4 11-138-4
Total Drainage Area (sf) 620,017 _ 713,193 811,710 524,332
On-site Drainage Area (sf) 620,017 713,193 680,552 263,305
Off-site Drainage Area(sf) 0 0 131,158 261,027
Proposed Impervious Area**(sf) 438,649 484,174 529,650 370,354
%Impervious Area**(total) 70.75 67.89 65.25 70.63
Impervious**Surface Area Drainage Area 7 Drainage Area 8 Drainage Area 9 Drainage Area 10
On-site Buildings/Lots(sf) 319,719 375,500 292,663 76,666
On-site Streets (sf) 70,323 66,131 61,434 20,196
On-site Parking (sf) 0 0 932 0
On-site Sidewalks (sf) 32,993 27,939 28,828 8,296
Other on-site (sf) 15,614 14,604 14,635 4,169
Future(sf) 0 0 0 0
Off-site (sf) 0 0 131,158 261,027
Existing BUA***(sf) 0 0 0 0
Total (sf): 438,649 484,174 529,650 370,354
* Stream Class and Index Number can be determined at: litty://portal.ncdenr.org/webjtversjcsulclassifications
Form SWU-l01 Version Oct. 31,2013 Page 3 of 6
n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations.
o. Drainage areas delineated (included in the main set of plans,not as a separate document).
p. Vegetated buffers(where required).
9. Copy of any applicable soils report with the associated SHWT elevations(Please identify P3 M
elevations in addition to depths)as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"x11"copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs,the report should also
include the soil type,expected infiltration rate,and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO:Schedule a site visit for DEMLR to verify the SHWT prior
to submittal, (910) 796-7378.)
10. A copy of the most current property deed. Deed book:7008 Page No:858 Fim
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC pi_l_'I_
Secretary of State or other official documentation,which supports the titles and positions held
by the persons listed in Contact Information,item la,2a,and/or 3a per 15A NCAC 2H.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State,otherwise the application will be returned.
http://www.secretary.state.nc.us/Corporations/CSearch.aspx
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions,outparcels,and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be
provided as an attachment to the completed and notarized deed restriction form. The appropriate deed
restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.orglwebjlrjstate
stormwater-forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner,it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s)below, the permit holder(s)certify that the recorded property restrictions and
protective covenants for this project,if required,shall include all the items required in the permit and listed
on the forms available on the website,that the covenants will be binding on all parties and persons claiming
under them,that they will run with the land,that the required covenants cannot be changed or deleted
without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a
consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as
addressing requests for additional information).
Consulting Engineer:Frank McMahan,PE
Consulting Firm: LandDesign,Inc
Mailing Address:223 North Graham Street
City:Charlotte State:NC Zip:28202
Phone: (704 ) 333.0325 Fax: ( )
Email:fmcmahan®landdesign.com
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information,item 2 has been filled out,complete this
section)
I, (print or type name of person listed in Contact Information,item 2a) ,certify that I
own the property identified in this permit application,and thus give permission to(print or type name of person
listed in Contact Information, item la) - with(print or type name of organization listed in
Contact Information, item Ia) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal,which indicates the
party responsible for the operation and maintenance of the stormwater system.
Form SWU-l01 Version Oct. 1,2011 Page 5 of 6