Loading...
HomeMy WebLinkAbout310039_Compliance Progress Report_20240607Smithfield 600A �00A. TZesponib(�' June 6, 2024 North Carolina Dept. of Environmental Quality Division of Water Resources Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Attn: Christine Lawson Re: Murphy Brown, LLC Benson Farm Facility No. 31-039 Dear Mr. Ravella: Permit No. AWI310039 Project: Progress Report Part V. General Conditions #6 • Construction of the digester began in April 2021. • During construction a new digester mixing system was developed by Smithfield and installed at the site. The new system utilizes a closed loop mixing system, which reduces the potential gas loss from an open top mixing systems. • The digester was functionally complete by end of summer 2021. • The digester became fully operational and producing/collecting biogas in the fall of 2021. • The pilot GUILD NANOGATE on farm gas upgrading unit was installed and commissioned in Fall 2021. • An infuser pump was installed in the original primary lagoon to infuse tail gas and off -spec gas into the open lagoon under the liquid surface. • In the spring of 2024, the Guild pilot unit was replaced with a Guild production unit. • Site is currently part of an ongoing air study with NC State and Duke University that will conclude later this summer/fall. • Construction of the gas collection pipeline is underway and should be completed by fall 2024. • Smithfield plans to request a change to the general permit upon connection to the pipeline this fall. • To date there have been no changes to the operation and maintenance plan for the facility. Please contact me at (910) 293-3434 if you have any questions concerning this package. Sincerely, �G JasonE. Olmstead PE Engineering Project Manager Enclosures