Loading...
HomeMy WebLinkAboutWQ0045453_Application (FTSE)_20240222 . PIERCE & ASSOCIATES, P.A. SURVEYING—LAND PLANNING- MAPPING P.O. BOX 1685 JACKSONVILLE, NC 28541 OFFICE:(910)346-9800 FAX:(910)346-1210 E-MAIL; Or briai nLix,W-112nc cons Letter of Transmittal (a�tlnnc com TO: Tyler Benson DATE: April 29,2924 N.C. Department of Environment ATTENTION: And Natural Resources T ler Benson Re: 127 Cardinal Drive Extension C0untl good Estates Section 1 Wilmin ton NC 28405 COPIES DATE NUMBER 1 DESCRIPTION New forms including one Original and one copy of the Fast Rack Sewer System Extension Application to replace the previously submitted a lication RE NR/DWR 24 Quality Regional operauo ton Regional orrice REMARKS: li SIGNED: Betty Bullock b I CONSENT OF DIRECTORS OF COUNTRYWOOD ESTATES SECTION I HOMEOWNERS ASSOCIATION, INC. TO ACTION WITHOUT MEETING We, the undersigned, being all of the directors, of COUNTRYWOOD ESTATES SECTION I HOMEOWNERS ASSOCIATION, INC., do hereby adopt the following resolutions by signing our written consent thereto. ELECTION OF DIRECTORS RESOLVED, that the following persons be, and the same hereby are, elected as directors of the Corporation to serve as such until their successors shall have been duly elected and qualified: DEBRA R. ROUSE - DIRECTOR JOHN L. PIERCE - DIRECTOR ELECTION OF OFFICERS RESOLVED,that the following persons be,and the same hereby are,elected as officers of the Corporation to serve as such until their successors shall have been duly elected and qualified: DEBRA R. ROUSE - President JOHN L. PIERCE - Secretary RESOLVED FURTHER,that these resolutions shall remain in effect until rescinded or modified by resolution of the Board of Directors of the Corporation. THIS ACTION is effective as of the I" day of January, 2024. (J?- DEBRA R. ROUSE Director JOHN . PIERCE Director State of North Carolina DWR Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 10-23& SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria(Gravity Sewer&Pump Stations/Force Mains) and that plans,specifications and supporting documents have been prepared in accordance with 15A NCAC 02T.15A NCAC 02T.0300 Division policies,and good engineering uractices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be immediately available upon request by the Division. Projects that are deemed permitted(do not require a permit from the Division)are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process(must be submitted for full technical review): ➢ Projects that do not meet any part of the minimum design criteria(MDC)documents; ➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T; ➢ Pressure sewer systems utilizing simplex septic tank-effluent pumps(STEPS)or simplex grinder pumps; ➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems(e.g.force mains); ➢ Vacuum sewer systems. General—When submitting an application,please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional infornation. Failure to submit all required items will necessitate additional processing and review time,and may result in return of the application. Unless otherwise noted,the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy(second copy may be digital)of Application and Supporting DocumentVECEIVED/NCDENR/DWR ® Required unless otherwise noted. Signatures on original must be"wet ink"or secure digital signatures. Please do not submit engineering design plans with the application unless specifically requested. MAY U 12024 B. Cover Letter/Narrative Description(Required for All Application Packages): water QualitY Regional ® List all items included in the application package,as well as a brief description of the requested permitt R. .Sectlon Ong on egional office Be specific as to the system type,number of homes served,flow allocation required,etc. Include the permit number/status of any other required sewer permits(downstream/upstream) If necessary for clarity,include attachments to the application form. If the project is funded by American Rescue Plan Act (ARPA) funds, please include the ARPA project number in the cover letter and in parentheses under Project Name(Section I1.1.of the application). C. Application Fee(All New and Modification Application Packages): ® Submit a check or money order in the amount of$600.00,dated no more than 90 days prior to application submittal. ➢ Payable to North Carolina Department of Environmental Quality(NCDEQ) D. Fast Track Application(Required for All Application Packages, Form FTA 10-23): N Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions,attachments to the application may be made. ® If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. * If the Applicant Type in Item 1.2 is a partnership or d/b/a,enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in item 11.1 shall be consistent with the project name on the flow acceptance letters,agreements,etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. INSTRUCTIONS FOR FORM: FTA 10-23&SUPPORTING DOCUMENTATION Pagel of 3 ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T.0106(b). Per 15A NCAC 02T.0106(c),an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T.0106(b). E. Flow Tracking/Acceptance Form (Form: FTSE 10-23)or Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project-specific FTSE. F. Site Maps(All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area, including the closest surface waters. ➢ General location of the project components(gravity sewer,pump stations,&force main) ➢ Downstream connection points and permit number(if known)for the receiving sewer ❑ Include an aerial location map showing general project area(such as street names or latitude/longitude)so that Division staff can easily locate it in the field. G. Existing Permit(Application Packages for Modifications to an Existing Permit): ❑ Submit a copy of the most recently issued existing permit. ❑ Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit,items to be added,and/or items to be modified(the application form itself should include only include items to be added/modified).The narrative should also include whether any previously permitted items have been certified. ❑ The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in the final permit. H. Power Reliability Plan(Required if portable reliability option utilized for Pump Station): ® Per 15A NCAC 02T.0305(h)(1),submit documentation of power reliability for pumping stations. - This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b))or proposed contractor, stating that"the portable power generation unit or portable, independently-powered pumping units,associated appurtenances and personnel are available for distribution and operation of this pump station." If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided in the case of a multiple station power outage.(Required at time of certification) 1. Certificate of Public Convenience and Necessity(All Application Packages for Privately-Owned Public Utilities): ❑ Per 15A NCAC 02T.0115(a)(1)provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension,or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements(Applications from HOA/POA and Developers for lots to be sold): ® Home/Property Owners'Associations ® Per 15A NCAC 02T.0115(c),submit the properly executed Operational Agreement(FORM:HOA). ® Per 15A NCAC 02T.0115(c),submit a copy of the Articles of Incorporation,Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T.0115(b),submit the properly executed Operational Agreement(FORM:DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 10-23& SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778-8211 Clay, Graham, Haywood, Henderson, Jackson, (828)296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828)299-7043 Fax Rutherford, Swain, Transylvania,Yancey Favetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5095 Montgomery, Moore, Robeson, Richmond, (910)433-3300 Sampson, Scotland (910)486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704)663-1699 Stanly, Union (704)663-6040 Fax Raleigh Regional Office 3800 Barrett Drive Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27609 Granville, Halifax,Johnston, Lee, Nash, (919)791-4200 Northampton, Orange, Person,Vance, Wake, (919)571-4718 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252)946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt,Tyrrell,Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Fender (910)796-7215 (910)350-2004 Fax Winston-Salem Reaional Office 450 W. Hanes Mill Road Alamance,Alleghany,Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga,Wilkes, Yadkin (336)776-9800 (336) 776-9797 Fax INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Countr wood Estates Section 1 Homeowners Association, Inc (company,municipality,HOA,utility,etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately-Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Debra R. Rouse per 15A NCAC 02T.0106(b) Title: President 4. Applicant's mailing address: 405 Johnson Blvd. City: Jacksonville State:NC Zip: 28541- 5. Applicant's contact information: Phone number: (2.LO)346-9800 Email Address: BettyB(cre jlpnc com IL PROJECT INFORMATION: 1. Project name:Abandon Septic Systems and Connection to ONWASA Sewer 2. Application/Project status: ® Proposed(New Permit) ❑ Existing Permit/Project ❑ARPA funded If a modification,provide the existing permit number: WQ00 and issued date: ` For modifications,also attach a detailed narrative description as described in Item G of the checklist. If new construction,but part of a master plan,provide the existing permit number: WQ00 3. County where project is located: Onslow 4. Approximate Coordinates(Decimal Degrees): Latitude: 34.44.34' Longitude: -77.20.39' 5. Parcel ID(if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: David K.Newsom License Number: 18148 Firm: Crystal Coast Engineering Mailing address: 205-3 Ward Road I City: Swansboro State: NC Zip: 28584- Phone number:(910)325-0006 Email Address: david.n@crystalcoastenizineerinp,.com I IV. WASTEWATER TREATMENT FACILITY (WWTF)INFORMATION: 1. Facility Name: Land Treatment Facility—Jacksonville WWTP Permit Number: W00009267 I Owner Name: City of Jacksonville V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ(See below WQCS) 2. Downstream(Receiving) Sewer Information: 6 inch ❑ Gravity ® Force Main 3. System Wide Collection System Permit Number(s)(if applicable): WQCS00249 Owner Name(s): ONWASA/City of Jacksonville FORM: FTA 10-23 Page 1 of 5 j V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached? ❑Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM:DEV)been attached? [:]Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement FORM:HOA)and supplementary documentation as required by 15A NCAC 02T.0115(c)been attached? ® Yes [—]No ❑N/A 4. Origin of wastewater: (check all that apply): ❑Residential(Individually Owned) ❑Retail(stores,centers,malls) ❑Car Wash ®Residential(Leased) ❑Retail with food preparation/service ❑Hotel and/or Motels ❑ School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse ❑Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash ❑Businesses/offices/factories ❑Nursing Home ❑Other(Explain in Attachment) � J,wC 5. Nature of wastewater: 100 %Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20)) If Industrial, is there a Pretreatment Program in effect?❑Yes No 6. Hasa flow reduction been approved under 15A NCAC 02T.0114(fl? ❑Yes ❑No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type(see 02T.0114(f)) Daily Design Flow e.n No. of Units Flow L,1I uf- t S Duplex Dwelling Unit(4 bedrooms) 75 gal/bedroom 164 12,300 GPD ZO A%'45 Quadplex Dwelling Unit(8 bedroom) 75 gal/bedroom 160 12,000 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 24,300 GPD a See 15A NCAC 02T .0114(b),(d). (e)(1)and(e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4). b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified [in table I SA NCAC 02T.0114]shall be determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data. 8. Wastewater generated by project: 24,300 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero,please indicate why: ❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timcframe for permitting upstream sewers with flow. ❑Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑Other(Explain): FORM: FTA 10-23 Page 2 of 5 V11. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewers): l. Summarize gravity sewer to be permitted: Size(inches) Length(feet) Material 6" 4,789' PVC 6" 108' DIP ➢ Section I1&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305& MDC(Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: Pump Station 1 2. Approximate Coordinates(Decimal Degrees):Latitude: 34.44.28' Longitude:-77.29.32' 3. Total number of pumps at the pump station: 2 3. Design flow of the pump station: 0.013920 millions gallons per day(firm capacity) This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s)per pump(s): 50 gallons per minute(GPM)at 38 feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length (feet) Material 2" 212 PVC If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per MDCPSFM Section 2.01C.1.b. ®Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify) 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ® Portable power source with manual activation,quick-connection receptacle and telemetry- or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ^r If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump,including travel timeframes,shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 3 of 5 VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size(inches) Length (feet) Material ➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria Section III contains information related to minimum slopes for gravity sewer(s) `r Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305& MDC(Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: Pump Station 2 2. Approximate Coordinates(Decimal Degrees): Latitude: 34.44.27' Longitude:-77.29.34' 3. Total number of pumps at the pump station: 2 3. Design flow of the pump station: : 0.01344 millions gallons per day(firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s)per pump(s): 50 gallons per minute(GPM)at 38 feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material Y 1,552' PVC 4" 145' PVC If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per MDCPSFM Section 2.01C.l.b. ®Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify) 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ❑ Standby power source or ❑ Standby pump y Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ® Portable power source with manual activation,quick-connection receptacle and telemetry- or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 3 of 5 VI 1. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewers): l. Summarize gravity sewer to be permitted: Size(inches) Length(feet) Material Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Puma Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name:Pump Station 3 2. Approximate Coordinates(Decimal Degrees): Latitude: 34.44.32' Longitude:-77.29.41° 3. Total number of pumps at the pump station: 2 3. Design flow of the pump station: : 0.01392 millions gallons per day(firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s)per pump(s): 50 gallons per minute(GPM)at 38 feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material 2" 399' PVC If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per MDCPSFM Section 2.01 C.l.b. ®Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify) 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ® Portable power source with manual activation,quick-connection receptacle and telemetry- or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: Include docurnentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump,including travel timeframes,shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 3 of 5 iX. SETBACKS&SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(f)&(g)? ®Yes ❑No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below(vertical) 18 inches '--Water mains(vertical-water over sewer preferred,including in benched trenches) 18 inches '-Water mains(horizontal) 10 feet Reclaimed water lines(vertical-reclaimed over sewer) 18 inches Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet **Any private or public water supply source,including any wells,WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet **Waters classified WS(except WS-I or WS-V),B,SA,ORW,HQW,or SB from normal high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet "Any other stream,lake,impoundment,or ground water lowering and surface drainage ditches,as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation(horizontal) 5 feet Any basement(horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade(vertical) 36 inches ➢ If noncompliance with 02T.0305(f)or(g), see Section X.1 of this application *15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(f)cannot be achieved. Please check"yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee 2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A ➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ®Yes ❑No ❑N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑Yes Basin name: ® No If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B.0200? ❑ Yes ❑No ➢ This includes Trout Buffered Streams per 15A NCAC 213.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑Yes ®No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared, have been applied for,or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion and sedimentation control plans,stornmwater management plans,etc.). 7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑ Yes ®No Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters, siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type(aerial line,size,material,and location). High priority lines shall be inspected by the permittee or its representative at least once every six-months and inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit. FORM: FTA 10-23 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T,the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable? ®Yes ❑No If no, for projects requiting a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit and projects requiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the proiect,the full technical review is required 2. Professional Engineer's Certification: 1, ,attest that this application for �� L,�C,p� Ci ,I (P esstona ngfn er's tan a Ir_om_Application Item Ill.1.) (Project Name from Appl'ica'tion Item II.I) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject the North Carolina-licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) ......................................................................................., North Carolina Professional Engineer's seal,signature,and date: o i N /!/11111R<9►�t 3. Applicant's Certification per 15A NCAC 02T .0106(b): I I, hrZ attest that this application for L ' (Signature Authority Name from Application Item 1.3.) ( roject from©ApplScat�ioMy �II.I) attest that this application has been reviewed by me and is accurate and complete to the�Vlbest knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000 as well as civil penalties up to$25,000 per violation. Signature: C J= t44 Date: `� ZZ FORM: FTA 10-23 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-23) Entity Requesting Allocation: Countrywood Estates Section 1 HOA Project Name for which flow is being requested: Abandon septic - Connect to ONWASA More than one FTSE stay be required for a single project if lite owner of the WWTP is not responsible for al/pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit#: All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request .0243 g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm/pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow,MGD MGD Flow Capacity*** *The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)not less than 2.5,per Section 2.02(A)(4)(c)of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is<0. Downstream Facility Name (Sewer): ONWASA Downstream Permit Number: WQCS00249 Page 1 of 6 FTSE 10-23 III. Certification Statement: I Jeffrey Lohr, PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. i6r�- -, i.z - 4/2 A/.;?Ip;Z-4 n ffi Signature Date Engineering Manager Title of Signing Official Page 2 of 6 FTSE 10-23 State of North Carolina W. , ; Department of Environmental Quality Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-23) Entity Requesting Allocation: Countrywood Estates Section I HOA, Project Name for which flow is being requested: Abandon.Septic-Connection tdoNWASA More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for allpump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Nance: City of Jacksonville Land Treatment System b. WWTP Facility Permit ff: WQ009267 All flows are in MGD c. WWTP facility's permitted flow 9.0 d. Estimated obligated flow not yet tributary to the WWTP 0.236 e. WWTP facility's actual avg. flow 4.37 f. Total flow for this specific request 0.024300 g. Total actual and obligated flows to the facility 5.315 h. Percent of permitted flow used 59.05 H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Approx. - Obligated, Total Pump Pump Average Current Not Yet Current Flow Station Station Firm Daily Flow" Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm/po, Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** outhwest WQ0035168 .6120 .2448 .1086 .0754 .1840 .0608 i *The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf) not less than 2.5,per Section 2.02(A)(4)(c)of the Minimum Design Criteria. ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is<0. Downstream Facility Name(Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-23 III. Certification Statement; I Ronald F. Massey certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Date Title of Sig ng Official 4 i Page 2 of 6 FTSE 10-23 PLANNING ASSESSMENT ADDENDUM(PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is<0. Pump Station(Name or Number): Given that: a. The proportion and amount of Obligated,Not Yet Tributary Daily Flow(C)accounts for %and MGD of the Available Capacity(E)in Pump Station ; and that b. The rate of activation of this obligated,not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: r Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over-allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 10-23 f Instructions for Flow Tracking form(FTSE)and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit#: Enter the NPDES or Non-Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non-Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction pro ects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or . [Ter contracts not yet contributing flow to the collection system are also included. For POTWs that implement apretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation.Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records,to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow,MGD: Previous 12 month average. £. Total flow for this specific request,MGD: Enter-the requested flow volume. g. Total actual and obligated flows to the facility,MGD Equals [d+e+f] i h. Percent of permitted flow used: Equals [(g/c)*100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15,2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD ' e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h. = 53.6% The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. =0.102 MGD g. = 3.349 MGD 11. = 55.8% Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 10-23 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C)for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow phis obligated flow(D=B+C)and the available capacity(E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)of not less than 2.5. If the available capacity(E)for any pump station is<0,then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Design Approx. Not Yet Total Current Firm Average Current Avg. Tributary Flow Plus Pump Station Capacity Daily Flow Daily Flow, Daily Flow, Obligated Available (Name or Number) MGD (Firm/pf) MGD MGD Flow Capacity* Kaw Creek PS 0.800 0.320 0.252 0.080 0.332 -0.012 Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 10-23 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is<0. A planning assessment for Kaw Creek PS(see example data above)may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or constriction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion,flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated,not yet tributary flow accounts for 24% and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated,not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity,namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and finding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section 11 above. Therefore: Given reasonably expected conditions and planning information,there is sufficient justification to allow this flow to be permitted,without a significant likelihood of over-allocating capacity in the system infrastructure. t i f i s 1 Page 6 of 6 FTSE 10-23 STATE OF NORTH CAROLINA COUNTY OF On slow Permit No. HOME/PROPERTY OWNERS' OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (d 1) and entered into this day of , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and o a non-profit corporation organized and existing under and by virtue of the laws of the State of North Carolina, hereinafter known as the ASSOCIATION. WITNESSETH: 1. The ASSOCIATION was formed for the purpose, among others, of handling the property, affairs and business of the development known as Countrywond FGt.a tPS SEc.tion T (hereinafter the Development); of operating, maintaining, re-constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System); and of collecting dues and assessment to provide fiends for such operation, maintenance, re-construction and repair. 2. The ASSOCIATION desires, to construct and/or operate a Disposal System to provide sanitary sewage disposal to serve the Development on said lands. 3. The ASSOCIATION has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and/or operate the Disposal System. 4. The Development was created subject to unit ownership in the dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter47C or 47F of the North Carolina General Statutes. 5. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW,THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and ASSOCIATION do hereby mutually agree as follows: 1. The ASSOCIATION shall construct the Disposal System and/or make any additions or modifications to the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The ASSOCIATION shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures bythe Association except for Federal, State, and local taxes and insurance. FORM: HOA 12-23 Page I of 2 3. The ASSOCIATION shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain, or construct the Disposal System beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance fund allocated for the facility and shall be part of the yearly budget. 4. In the event the common expense allocation and separate fiind(s) are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall be provided such that special assessments can be made as necessary at any time. 5. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the ASSOCIATION shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit mayrequire as condition of accepting the Development's wastewater. 6. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the ASSOCIATION to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the ASSOCIATION shall provide in the ASSOCIATION Bylaws that the ASSOCIATION shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION bythe issuance of a permit. 7. The ASSOCIATION shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the ASSOCIATION'S successor. 8. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, and 7 above shall be conditions of any permit issued by the COMMISSION to the ASSOCIATION for the construction, maintenance, repair and operation of the Disposal System. 9. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: Countrywood Estates Section T uOA Inc. Name of ASSOCIATION Bv: L I L Michael Montebello Supervisor,NPDES Branch Chief (Signature) Division of Water Resources Debra R Rou e Print Name and Title d 2Tl?j (Date) (Date) FORM: HOA 12-23 Page 2 of 2 Sewer System Narrative Abandon Septic — Connect to ONWASA Countrywood Estates Countrywood Estates includes multiple duplex and quadplex apartment units that have historically been served by onsite and offsite septic systems. The community HOA now wishes to abandon those offsite septic systems and connect those apartment units to the ONWASA sewer system which fronts the project site on Hwy 53. New collector sewers will be necessary to convey wastewater to 3 new new pumping stations that are necessary to convey wastewater to the ONWASA "Southbranch" forcemain along NC 53. Each of the 3 stations connect to a common 4" forcemain which is to be connected to the existing 6" forcemain along NC 53 that is onwed by ONWASA.. Calculations, as well as a hydraulic analysis, is provided to substantiate that the existing pumping system can accommodate the additional flow associated with this connection. Topography dictates use of 3 separate pump stations to serve the entire project area. As the flow to these pump stations is less than 15,000 gpd in each case, permanent standby generator(s) are not proposed. However, each of the three pump stations will require access to its own portable generator. 1711 0 F; CD QO CU - ti •• 1, i'� _ Q. t •a / ��,p�'r:i +.}\ c, n � 1 •i K r6 LD 1*9 tfi j .'y J. Q nY-.fir-t '!'.. G� •} • - 11` � ` yi h.,.i y • �,�f �� �'�Ir �,�'"�1,� � Via,, 3.F: at t 0.00"W 077'29'30.00"W 077'29'00.00"W / ��- �• _-1•'�._ ._ - ram_- �._ �^_, Kf _..�- 1Blue 1 _ o f� I f� z p CD •ILE 0 ■ r `v ■ °v Mo ' 1 • o ■ r r Justice /» ■ •� ,� L r' . • . Ridge - ' ' ti �,,- • Countrywoo r �`� �, + •■ Estates '� • • + Pump , . �1r. ! 4: ., �. ■ hh •� Station �+ 1 ■ ,. on Z ( A ■ y• ti + �■• Z ■ " l' ,; ■• +; r�■ Freedom o M M ■ . .1 53 } I • Center ,�, 4 M O ■ „ f ■ ■ ■ *r, ` O ■ ■ ■ Mn r, �:e ■ ■ ■ e ■ / • al 410 Z ■ ■ 1/ ff 00 ■ __ r ■ V y�" o r <' o o 1 �j o 0 • - xis M • �„r O :'ram j ■ . .. ; O ■ Coey i ht C 2009 MXTOPC 0.00"W 077'29'30.00"W 077'29'00.00"W SCALE 1:12000 0 1000 2000 3000 FEET