HomeMy WebLinkAboutNC0025348_Pretreatment Annual report coverletter_20240607Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included?
ADEQUATE?
POTW noted Corrections?
Narrative
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
PPS Form
® YES
❑
NO
® YES
❑
NO
SNCR
® YES
❑
NO
® YES
❑
NO
IDSF
® YES
❑
NO
® YES
❑
NO
Allocation Table
® YES
❑
NO
® YES
❑
NO
Compliance Schedules
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Public Notice
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
Program Information
® YES
❑
NO
® YES
❑
NO
® YES ❑ NO
Historical SNC
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
❑ YES ❑ NO ® NA
Regional Office: Washington
POTW: New Bern
NPDES Permit No. NCO025348
Report Period:1/1/2023 to 12/31/2023
® Full ❑ Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
If No, check recommendation below;
1. Have at least 90% of SIU permits been issued within 180
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
days of expiration? See Allocation Table).
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form)
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
® Yes ❑ No ❑ NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
SNC, including those causing pass -through or interference? (See
Assessment
Narrative and SNCR Form)
4. Does public notice cover all SIUs in SNC?
❑ Yes ❑ No ❑ NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
vote: txcemions snouia oe expiainea in me comment section Deiow:
Pretreatment Program Info Database sheet:
Remove Tony Hawkins and add Arthur Hough as Plant Manager
Update email: hougha(abnewbernnc.gov
Fax numbers on the Pretreatment Program Info Database sheet needs to be removed
Reviewed By: /���,ga,,g Date: 6/7/2024
Regional Pretreatment Annual Report Review
New Bern 2023 PAR16