HomeMy WebLinkAboutWQ0043785_Application (FTSE)_20240603 NC Department of Environmental Quality
State of North Carolina
APR 4 2024 Department of Environmental Quality
DWR Raleigh Regional Office Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 06-21 &SUPPORTING DOCUMENTATION
WQ0043785 MOD
Application Number: (to be completed byDWR) Additonal Info received
All items must be completed or the application will be returned June 3, 2024
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Smithfield(company,municipality,HOA,utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately-Owned Public Utility
❑ Federal ❑ State/County ®Municipal ❑ Other
3. Signature authority's name:Ted Credle,PE per 15A NCAC 02T.0106(b)
Title: Director of Public Utilities
4. Applicant's mailing address: 230 Hospital Road
City: Smithfield State:NC Zip:27577
5. Applicant's contact information:
Phone number: (919)934-2116 x 1162 Email Address: Ted.CredlekSmithfield-NC.com
II. PROJECT INFORMATION:
1. Project name:Floyd Landing Subdivision
2. Application/Project status: ❑ Proposed(New Permit) ® Existing Permit/Project
If a modification,provide the existing permit number:WQ0043785 and issued date: 11/l/22,
For modifications,also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but part of a master plan,provide the existing permit number:WQ00
3. County where project is located:Johnston
4. Approximate Coordinates(Decimal Degrees):Latitude: 35.536288' Longitude:-78.376791'
5. Parcel ID(if applicable): 15078012, 15077035C, 15077035H, 15079014 (or Parcel ID to closest downstream sewer)
111. CONSULTANT INFORMATION:
l. Professional Engineer:Mark P.Ashness License Number: 18894
Firm: CE Group,Inc.
Mailing address: 301 Glenwood Avenue Suite 220
City: Raleigh State:NC Zip: 27603-
Phone number: (219)606-7704 Email Address: Mark(a)CEGroolnc.com
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name: Central Johnston County Regional WTF Permit Number:NCO030716
Owner Name:Johnston County
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s):WQ016447
2. Downstream(Receiving) Sewer Information: 10 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s)(if applicable):WQCS00270
Owner Name(s): Town of Smithfield
FORM: FTA 06-21 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM: DEV)been attached?
❑Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM:HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential(Individually Owned) ❑Retail(stores,centers,malls) ❑ Car Wash
❑ Residential(Leased) ❑Retail with food preparation/service ❑Hotel and/or Motels
❑ School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect? ❑Yes®No
6. Has a flow reduction been approved under 15A NCAC 02T.0114(f)? ❑Yes ®No
➢ If Yes,provide a cony of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0I14(f)) Daily Design Flow a'" No.of Units Flow
Residential Single-Family(3 Bdr) 225 gal/day/unit 222 49,950 GPD
Residential Single-Family(4 Bdr) 300 gal/person 87 26,100 GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 76,050 GPD
a See 15A NCAC 02T .0114(b),d), (e)(1) and(e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project: 76,050 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1)
)0, Do not include future flows or previously permitted allocations
If permitted flow is zero,please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other(Explain):
FORM: FTA 10-23 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305&MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length(feet) Material
8 8,427 SDR 35 PVC
8 883 DIP
➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: Floyd Landing PlImp Station
2. Approximate Coordinates(Decimal Degrees):Latitude: 35.537149' Longitude: -78.387978'
3. Total number of pumps at the pump station:2
3. Design flow of the pump station: 0.787 millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): 547 gallons per minute(GPM)at 58 feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length(feet) Material
8" 2,500 C-900 PVC
8" 40 DIP
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
® Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump,including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
IX. SETBACKS&SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(fl&(g)? ®Yes [-]No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
zWater mains(vertical-water over sewer preferred,including in benched trenches) 18 inches
zWater mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V),B,SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream,lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(g), see Section X.1 of this application
*I 5A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(f)cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webnage
2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ®Yes [—]No ❑N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name:Neuse River ❑No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ®Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 213.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ®Yes ❑No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No
Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑Yes ®No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes,include an attachment with details for each line,including type(aerial line, size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with 15A NCAC 02T,the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
®Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the auvroval of the permit, and proiects requiring a variance approval may be subject to longer
review times.For proiects requiring two or more variances or where the variance is determined by the Division to be a
sip,nificant portion of the project,the full technical review is required.
2. Professional Engineers Certification:
I, MA(?A<_ T) A4 k ,1 e 6 ,attest that this application for �( ,i
(Professional Engineer's name from Application Item llf I ) (Project ame from Application Item 11.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fast-Track Permitting
of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143!215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties tip to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC!.�A P!r... ..........yta . .
North Carolina Professional Engineer's seal,signature,and date:
i 2y
............... .,11 1. v�'��
3. Applicant's Certification per 15A NCAC 02T.0106(b): 411111
Floyd Landing Subdivision
1, Tg ID 6p,G es L attest that this application for
(Signature Authority Name from Application Item 1.3.) (Project Name from Application Item 11.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included,this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: �-� Cl�. V 't _ Date:�1 z
f
FORM: FTA 10-23 Page 5 of 5
NC Dept c.Er,��if4,=rye�tai�iaali� CE GROUP
301 GLENWOOD AVENUE, SUITE 220
APR 4 2024 RALEIGH, NC 27603
Phone:(919)367-8790
E-Mail.1oe(�ceQrroupf»c.com
Raleigh I<cgio��I Office
Transmittal
TO: NCDENR—DWQ DATE: 4/3/2024
Raleigh Regional Office PROJECT NO: 127_239
3800 Barrett Drive Floyd Landing Subdivision Ph 1-4
Raleigh, NC 27609 Smithfield, NC
ATTENTION: Permitting Permit modification—WQ#0043785
Quantity Drawing No. Description
2 Original / Copy NCDENR DQW Fast-Track Application (FTA 04116)
1 Copy Flow Tracking /Acceptance (FTSE-04/16)Johnston County
1 Copy Flow Tracking /Acceptance (FTSE-04/16) Town of Smithfield
1 Copy Aerial Overlay Map
1 Copy Project Narrative
1 Copy USGS Map
1 Check Permit Review Fee $600.00—Check#12216
1 Copy Permit WQ#0043785
REMARKS Please let us know if you require any additional information.
CC : Mark Ashness, PE C Group, Inc
Signed
oe Faulkner, LA LEED AP
NOW—
PROVIDING1998
Nr Dept OF -,�tiV::Ll:i?:
ROY COOPER
Governor APR
ELIZABETH S.B€SER +.� 4 ZOZ¢
Secretary
RICHARD E.ROGERS,JR. NORTH CAROLINA �i=1��t Re
Director Environmental Quality
�1��'-.�
November 1, 2022
Ted Credle, PE—Director of Public Utilities
Town of Smithfield
230 Hospital Road
Smithfield, NC 27577
Subject: Permit No.WQ0043785
Town of Smithfield
Floyd Landing Subdivision
Wastewater Collection System Extension Permit
Johnston County
Dear Permittee:
In accordance with your application received September 13, 2022 we are forwarding herewith Permit
No. WQ0043785 dated November 1, 2022, to the Town of Smithfield (Permittee) for the construction
and operation upon certification of the subject wastewater collection system extension. This permit
shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and
limitations as specified therein. This cover letter shall be considered a part of this permit and is
therefore incorporated therein by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 02T .0403 or any individual system-wide collection
system permit issued to the Permittee.
Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities,
the completed Engineering Certification form with checklist attached to this permit
shall be submitted with the required supporting documents to the address provided on
the form. Permit modifications are required for any changes resulting in non-
compliance with this permit, regulations, or the Minimum Design Criteria. [15A NCAC
02T.0116j
It shall be responsibility of the Permittee to ensure that the as-constructed project meets the
appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North
Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
D`E NortlSCaakaaDeratastofEa�vommtalQvliA i D►vamnofWaaReowas
RalaAb Reveail Ogee I 3900 Herat Dare i 5Wd*,.Nenh cUQU"2'609
____�� 919'914200
Town of Smithfield
Permit No.WQ0043785
wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right
to request an adjudicatory hearing upon written request within 30 days following receipt of this permit.
This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina
General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
NC 27699-6714. Unless such demands are made,this permit shall be final and binding.
If you need additional information concerning this matter, please contact Jason Robinson via e-mail at
Jason.Robinson@ncdenr.gov.
Sincerely,
EDoeuSipned by:
ce Uws�w
BCDA9D62504A46D
for Richard E. Rogers,Jr.
Director, Division of Water Resources
by Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
cc: Mark P.Ashness, PE: mark@CEGroupinc.com
Johnston County Staff
Raleigh Regional Office Files
DWR Laserfiche
Wake County Health Department
Page 2 of 9
P�a
r` e
NORTH CAROLINA
Env1mnmentd Quapty
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules,and Regulations, permission is hereby granted to the
Town of Smithfield
Johnston County
for the construction and operation of approximately 9,310 linear feet of 8-inch gravity sewer; a 547--
gallon per minute pump station with duplex pumps, on-site audible and visual high water alarms,
telemetry, and a permanent generator with automatic transfer switch as well as approximately 2,540
linear feet of 8-inch force main to serve 163 three-bedroom single-family homes as part of the Floyd
Landing Subdivision project, and the discharge of 44,010 gallons per day of collected domestic
wastewater into the Town of Smithfield and Johnston County's existing sewerage system, pursuant to
the application received September 13, 2022, in conformity with 15A NCAC 02T; the Division's Gravity
Sewer Minimum Design Criteria adopted February 12, 1996 and updated in March 2008, as applicable;
the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains
adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the
Department of Environmental Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
specified conditions and limitations contained therein.
Docu9ipped by:
Scarf Uws�w
BCDA9OB25DAAABD.
for Richard E. Rogers,Jr.
Director, Division of Water Resources
By Authority of The Environmental Management Commission
Permit Number: WQ0043785
Permit Issued: November 1,2022
Page 3 of 9
SUPPLEMENT TO PERMIT COVER SHEET
Town of Smithfield is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension.
The sewage and wastewater collected by this system shall be treated in the Central Johnston County
Regional Wastewater Treatment Facility in accordance with Permit Number NC0030716.
Permitting of this project does not constitute an acceptance of any part of the project that does not
meet 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996
as applicable; and the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations
and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division
approval is based on acceptance of the certification provided by a North Carolina-licensed Professional
Engineer in the application. It shall be the Permittee's responsibility to ensure that the as-constructed
project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
1. This permit shall become voidable unless the agreement between Town of Smithfield and Johnston
County for the collection and final treatment of wastewater is in full force and effect. [15A NCAC
02T.0304(g)]
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0116; G.S 143-215.1(d3)]
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 02T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T.0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system-wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 02T .0403. If an individual
permit is not required,the following performance criteria shall be met:
Page 4 of 9
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or
surface water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e.
365 days per year). Pump stations that are connected to a telemetry system shall be inspected
at least once per week.
e. High-priority sewer lines shall be inspected at least once per every six-months and inspections
are documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in
accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North
Carolina General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease-related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of
three years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Raleigh Regional
Office, telephone number (919) 791-4200, as soon as possible, but in no case more than 24 hours,
following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable of adequate wastewater transport, such as mechanical or electrical failures of
pumps, line blockage or breakage, etc.;or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Page 5 of 9
Voice mail messages or faxed information is permissible, but this shall not be considered as the
initial verbal report. Overflows and spills occurring outside normal business hours may also be
reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919)
733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and
submitting Part I of Form CS-SSO (or the most current Division approved form) within five days
following first knowledge of the occurrence. This report must outline the actions taken or proposed
to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current
Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-
215.lC(al)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities,the completed
Engineering Certification form with checklist attached to this permit shall be submitted with the
required supporting documents to the address provided on the form. A complete certification is
one where the form is fully executed and the supporting documents are provided as applicable. Any
wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Engineer's Certification shall be considered a violation of the permit and shall subject the
Permittee to appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the
Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been
appropriately filed with the applicable County's Register of Deeds office shall be submitted with
the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines &
force mains) of the wastewater collection system extension. Final record drawings should be
clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings
that are marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing,
velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage,
surge protection, detention time in the wet well, and force main, ability to flush low points in
force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power
source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, include travel
timeframes,shall be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings,on the certification
in the space provided,or in written summary form.
Page 6 of 9
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting
in non-compliance with this permit (including but not limited to pipe length changes of 10% or
greater, increased flow, pump station design capacity design increases of 5% or greater, and
Increases in the number/type of connections), regulations, or the Minimum Design Criteria.
Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case-by-
case basis and each on its own merit. Please note that variances to the Minimum Design Criteria
should be requested and approved during the permitting process prior to construction. After-
construction requests are discouraged by the Division and may not be approved, thus requiring
replacement or repair prior to certification &activation. [15A NCAC 02T.0116]
8. Gravity sewers installed greater than ten percent below the minimum required slope per the
Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified
until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case-by-case basis. Resolution of such request shall be evident prior to completing and
submitting the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the individual permit and construction record drawings shall be maintained on file by the
Permittee for the life of the wastewater collection facilities. [15A NCAC 02T.0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 02T; the
Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted
June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an
enforcement action by the Division, in accordance with North Carolina General Statutes§143-215.6A
through §143-215.6C, construction of additional or replacement wastewater collection facilities,
and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. [15A
NCAC 02T.0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or replacement
facilities. [15A NCAC 02T.0110; 15A NCAC 02T.0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or
Local government agencies which have jurisdiction or obtaining other permits which may be
required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-
215.1(b)]
Page 7 of 9
CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116.
Certifying Engineer:
Certification Review Date:
Project Name:
WQ00 Project County:
1) Has permittee information changed since the permit was issued (or last modified): change of mailing address,
change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No
• If yes, please provide either a change of ownership form or new contact information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as-built drawings have been signed,sealed, and dated by an N,C, PE? ❑ Yes ❑ No
3) Final Engineering certification? ❑ Yes ❑ No
• If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase, what was previously certified (if applicable), and what is left to be certified.
4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines.
• Manholes have been installed:At the end of each line, at all changes in grade, size, or alignment, at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet(48-inches).
5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A
• Ensure power reliability option was selected per 15A NCAC 02T.0305(h),
6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers(latest version),and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required in accordance with _15A NCAC_02T.0105 b , prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other
pertinent information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable, specific language regarding the variance
will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines(15A NCAC 02T .0402(2))? ❑ Yes ❑ No
• If yes,ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with
the appropriate language.
8) Are Permit modifications are required for any changes resulting in non-compliance with this permit(including but not
limited to pipe length changes of 10%or greater,change in flow,pump station design capacity design change of 5%or
greater,and/or change in the number/type of connections)? ❑ Yes ❑ No
• If yes,a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.
North Ca•olina Department of Environmental Quality. Division of Water Resources
Raleigh Regional Office 1628 Mail Service Center,Raleigh,NC 27699 1628
Physical Add•ess: 3800 Barrett Drive.Raleigh,NC 27609 919 7914200
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE: Town of Smithfield
PERMIT#: WQ0043785
PROJECT: Floyd Landing Subdivision
ISSUE DATE: November 1, 2022
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation.
It should be submitted in a manner that documents the Division's receipt. Send the required
documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name,Title Signature Date
ENGINEERS CERTIFICATION
I, as a duly registered Professional E�5n eer in the State of North Carolina,
having been authorized to observe (❑ periodically, ❑ weekly, full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that,to the best of
my abilities, due care and diligence was used in the observation of the following construction:
approximately 9,310 linear feet of 8-inch gravity sewer: a 5477gallon per minute pump station with
duplex pumps, on-site audible and visual high water alarms, telemetry, and a permanent generator
with automatic transfer switch as well as approximately 2,540 linear feet of 8-inch force main such
that the construction was observed to be built within substantial compliance of this permit; 15A NCAC
02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of
Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature&date:
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
North Carolina Department of Environmental Quality Division of Water Resources
Raleigh Regional Office 1628 Mad Service Center,Raleigh,NC 2 7 69 9-16 28
Physical Address: 3800 Barrett Drive,Raleigh,NC 27609 919-7914200
OG
`- BUS �Q
-�Johnston 70
,
Regional
Airport
0
u w AMAZON
GRA ITY
SEW R INS (TYP)
PS FORCE
.�. MAIN (TYP)
-hL4- - SI T
*L4-
-4LL jL
44
Bus
70
parr ha Cem �" "'-" - -
FLOYD LANDING
SMITHFIELD, NC
USGS OVERLAY EXHIBIT NORTH
CE GROUP APRIL 2023
301 GLENWOOD AVE.SUITE220
RALEIGHAC 27603 1,000' 500' O 1,000'
PHONE 919-367-8790
www.cegroupfnc.rom
SCALE: 1" = 1 ,000'
,'• ��1r i`�`r'�4i ki{3•t,�f�,,} .j F`�ra. •.
J• � �r
' •i �S
j
r
���1 �r�l�r��l rt ^�M�tcV•�CJ'� + r � r r�• }fai,.�.�c fr,� \
y,'►� ,• �t 2lr,�,f� �,5 I � `�r *�i � Yf •!'� '�r4.1,'• � �i
1
• •r
State of North Carolina
Departnnent of Environmental Quality
Division of Water Resources
DiVI%lun of water.Ro aularCW� Flow Tracking for Seaver Extension Applications
(FTSE 10-23)
Entity Requesting Allocation: Town of Smithfield
Project Name for which flow is being requested: Floyd Landing Subdivision
More than one FTSL rnaj)be required for a single project if the owner of the iV IVTP is not responsible for all ptunp
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: CJCRWWTF
b. WWTP Facility Permit#: NCO030716- Outfall 1
All flows are in MGD
c. WWTP facility's permitted flow 9.5
d. Estimated obligated flow not yet tributary to the WWTP 2.1423
e. WWTP facility's actual avg. flow 6.249 (2023 Influent ADF)
f. Total flow for this specific request 0,07605
g. Total actual and obligated flows to the facility 8.4234
h. Percent of permitted flow used 66%trib, 89%w/paper
11. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Nance or Permit Capacity,* (Firm/pf), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow,MGD MGD Flow Capacity***
*The Firnn Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
**Design Average Daily plow is the firm capacity of the pump station divided by a peaking factor(po not
less than 2.5,per Section 2.02(A)(4)(c)of the Mininuun Design Criteria.
***A Planning Assessment Addendum shall be attached for each puillp station located between the
project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name(Sewer): Neuse River Interceptor Replacement
Downstream Permit Number: Wg016447
Page 1 of 6
FTSE 10-23
III. Certification Statement:
I Ted Credle certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendurns for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing Of Signature (Date
D+re-Jr,r
Title of Signing Official.
X 64 vE MAJ6 6 tY A)c Y
Page 2 of 6
FTSE 10-23
NC Dept of Environmental Qua]iL,j
State of North Carolina
/ . APR 4 2024 Department of Environmental Quality
' Division of Water Resources
Ralelhegi� a Flow Tracking or ewer Extension t)Ivlslon of Water ltesoterces � f S Et i Applications
(FTSE 10-23)
Entity Requesting Allocation: Town of Smithfield
Project Name for which flow is being requested: _Floyd Landing
More than one FTSE Wray be required for ri single project if the owner of the WWTP is not responsible for all prrnrp
slalions along the route of the proposed wasteroaler flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: CJCRWWTF
b. WWTP Facility Permit#: NCO030716 - Outfall 1
All flows are in MGD
c. WWTP facility's permitted flow 9.5
d. Estimated obligated flow not yet tributary to the WWTP 2.1423
e. WWTP facility's actual avg. flow 6.249 (2023 Influent ADF)
f. Total flow far this specific request 0.07605
g. Total actual and obligated flows to the facility 8.4234
h. Percent of permitted flow used 66% trib, 89% w/paper
11. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)—(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm/pl), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow,MGD MGD Flow Capacity**'
*The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(po not
less than 2.5,per Section 2.02(A)(4)(c)of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name (Sewer): Neuse River Interceptor Replacement
Downstream Permit Number: WQ016447
Page 1 of 6
III. Certification Statement:
I Chandra C. Farmer, P.E. certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing Official Signature Dale
aky C(.-V"/ 0� W
Tille of Signing Official
Page 2 of b
r-Tg1= 10-11
PROJECT NARRATIVE
The proposed Floyd Landing Subdivision is a single-family residential project located on
a +/- 147.332 acre tract located off US Hwy. 70 Business within the Town limits of
Smithfield. The ultimate development will consist of the construction of 309 single-
family units (including townhomes) that will include 3-bedroom and 4-bedroom homes.
The first 163 units and pump station were permitted on November 1, 2022 with permit
#WQ0043785 for a flow rate of 44,010 gpd. The purpose of this permit is to update the
number of units and permitted flow rate per below:
Previously Approved Permit
163 units 3-Bedrooms @ 270 gpd/unit=44,010 gpd
New Permit Modification
222 units 3-Bedrooms @ 225 gpd*/unit=49,950 gpd
87 units 4-Bedrooms @ 300 gpd*/unit=26,100 gpd
309 UNITS REVISED PERMITTED FLOW= 76,050 GPD
The revised flow rate per 75 gpd/bedroom has been utilized in this updated flow
calculation. The project consists of a new pump station connecting to an existing 10"
sanitary sewer main located along US Hwy 70 and include approximately 9,310 if of
gravity sewer mains. Downstream Floyd Landing Pump station (included in permit)
design included these future flow rates, so it is sized appropriately. All gravity mains
were included in original permit, this is only a revised flow permit modification
increasing the flow by 32,040 gpd for a modified total of 76,050 gpd to serve 309 units.
Required roadway, utility, and stream and buffer impacts have been approved via 401
DWR#220220143 and 404 SAW-2021-00788.
[External] RE: Floyd Landing Subdivision-Additional Information Request
Mark Ashness <mark@CEGROUPINC.COM>
Mon 6/3/2024 4:09 PM
To:Pasha,Tanvir <tanvir.pasha@deq.nc.gov>;ted.credle@smithfield-nc.com <ted.credle@smithfield-nc.com>
0 3 attachments (1 MB)
FLoyd FTA 2023 - Revised.pdf, PROJECT NARRATIVE-Modified Permit-Rev.pdf;Town FTSE- Revised.pdf;
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Tanvir: Please find attached with responses below.
thx
Mark Ashness
P.E, LEED AP
25
�y YEARS
j 'y/YERSQ
CE GROUP
301 Glenwood Avenue,Suite 220
Raleigh,NC 27603
Phone:(919)367-8790
Cell:(919)606-7704
From: Pasha,Tanvir<tanvir.pasha @deq.nc.gov>
Sent:Tuesday, May 7, 2024 12:22 PM
To:ted.credle@smithfield-nc.com
Cc: Mark Ashness<mark@CEGROUPINC.COM>
Subject: Floyd Landing Subdivision—Additional Information Request
Hello Ted and Mark,
After reviewing the Fast Track Sewer System Extension Application for Floyd Landing Subdivision, additional information
is required in order to further process the application. Please provide the following information by June 5, 2024, and
note that the requested information must be submitted within 30 days of this request, or the applicant will be required
to submit a new application and application fee in accordance with 15A NCAC 02T .0107.
1. Is this an ARPA funded project? If so,_please include the DWI assigned ARPA project number in your
response. No
2. Section V.1 of the FTA does not match the permit number with section II of the FTSE. Revised
3. Section V1.8 will only include the wastewater generated by this project as per 15A NCAC 02T .0114 and
G.S. 143-215.1. Please update the FTSE based on the corrected flow if needed. FTSE flow is correct
4. In your transmittal, you mentioned about two FTSE, one from Town of Smithfield and another one from
Johnston County. I am missing page 1 of the FTSE signed by Ted Credle. Please send that FTSE form. (Note
that we have the most current FTSE 10-23 available now) Please find updated form
5. According to the application, Section IX.5 indicates that a 401/404 authorization is needed. Please provide
the Permit Number/Permitting Status letter for the 404/401 authorization specified in Section IX.5. of the
Fast Track Application. Updated Narrative provided
6. Section X.3 missing project name. Project name added to FTA
15A NCAC 02T.0107 Staff Review and Permit Preparation states:
• "(2) (e) If an application is accepted and later found to be incomplete, the applicant shall be advised how
the application or accompanying supporting information may be modified to make it complete. The staff
shall advise the applicant:
(2) if all required information is not submitted within 30 days, the project will be returned as incomplete.
Any resubmittal of a returned application shall be accompanied with a new application fee."
Please contact me with any questions that you may have regarding this request.
*Please note that the fee for fast track sewer extension permits has increased to$600 as of October 3,2023[as
stipulated in the 2023 House Appropriations Act, House Bill 259, Water Quality and Stormwater Fees,Section
12.14(a)].
Sincerely,
A B M "Tanvir" Pasha (he/him)
Environmental Engineer
Division of Water Resources—Raleigh Regional Office
North Carolina Department of Environmental Quality
3800 Barrett Drive, Raleigh, NC 27609
Office: 919-791-4250; Cell: 984-202-3390
tanvir.pasha@deq.nc.gov
D_E
NORTH CAROLINA �"
Department of Environmental Duality
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.