Loading...
HomeMy WebLinkAboutSW3240502_O&M Agreement/Plan_20240606 (3) Permit Name: (to be provided by DWQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. - After the first-time fertilization to establish the grass in the swale,fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully,and then re-sod (or plant with other appropriate species)and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re-sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Sage at Marvin BMP drainage area number..Swales 5-8 =Proposed Watershed 2A Print name: FA,,,,f1.9nf WI iikkIlfey/ Title: Mbm4l3&dt/M 4-&f 4SF� Address: .h yO/ (NLA46/ 2I -#- 2 z / f1 t/ort6 NC 2 z Phone: ?('Y 5 Signature. Date: y 2 z- Zozi Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, Ji't-1 Pi'gL , a Notary Public for the State of NOPTI4 'CAP-a LdN.c , County of U NCO f`l , do hereby certify that IPANAIN4 iMeicwa.c...._ personally appeared before me this Z Z. day of ANAL_ , 262 q , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. i tness my hand and official seal, i i . / ��Gomm. '�'. ''s it, r NOTARY ' PUBLIC G' % ,..,1r,WA !ch 16 COON ,0%* ,SEAL My commission expires I44I* 4 (G,2-e2-8 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2