Loading...
HomeMy WebLinkAboutSW6240503_Design Calculations_20240606 r // \ �i \ w ,' / //7,,,,,4,,,, / - DTCH A ----- \ \ \ / :::71-\ z DRAINAGE AREA:1.76 AC / C:0.5 \\ N. \ lie_ / Q10:6.23 CFS \., X. 2/3"7/.? 14Q\` , 11 \ / \ INV.2.`. / / O \ \ 17 / / / X / / i / / / 5 9Lh \ J�y \ / , \ ' �. ' Q / / \ DITCH A �/ / DRAINAGE AREA:0.4 AC \ \ C:0.8 I:7.08 IN/HR / Q10:2.26 CFS \ / / 0 0 0 0 12 / t, \ / \ ♦ / ......\-.,,..., / I I I I I I 1 I I I:\‘'2 2 4 ' w ''''''''''N \ / /‘ Z_ / / \</zi,,,,,„,,,, / � z 0 w \ v '\ \ 11 / \ ♦ N/ \ Ln0 •♦ 2 \ / \ \ / ' / ' / \ / 10 / SHEET NO EXHIBIT t / PRELIMINARY DRAWING-NOT RELEASED FOR CONSTRUCTION Project: Sawyer Ridge Date: 04/16/2024 Channel Design TRAPEZOIDAL SHAPE — T � d Channel Location: Roadside Swale A Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity(in/hr) 7.08 Drainage Area 1.76 ac Qio 6.23 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 6.23 cfs Channel Information: Channel Bottom Width, b 0.0 ft Side Slope(x:1) 2.0 Channel Slope, S 0.006 ft/ft Flow Depth, d 1.20 ft Selected Channel Lining: Selected Channel Lining American Excelsior Curlex 1 Maximum Permissible Velocity{Vmax}(fps) 7 Permissible Shear Stress{tp}(psf) 1.75 Calculations: e 2.4 ft Side Slope Length, m 2.7 ft Top Width, T 4.8 ft Channel Area,A 2.88 sq ft Wetted Perimeter, Pw 5.37 ft Hydraulic Radius, Rh 0.54 ft Mannings"n" 0.035 Calculated Flow Rate, Qcaic 6.27 cfs Calculated Velocity, Vcaic 2.18 fps Calculated Shear Stress, tcaic 0.45 psf V calc<_V max? yes tcalc<_tp? yes Project: Sawyer Ridge Date: 04/16/2024 Channel Design TRAPEZOIDAL SHAPE T m Channel Location: Roadside Swale B Estimate 10-yr Peak Runoff: Rational C 0.80 Intensity(in/hr) 7.08 Drainage Area 0.40 ac Qio 2.27 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 2.27 cfs Channel Information: Channel Bottom Width, b 0.0 ft Side Slope(x:1) 2.0 Channel Slope, S 0.006 ft/ft Flow Depth, d 0.82 ft Selected Channel Lining: Selected Channel Lining American Excelsior Curlex 1 Maximum Permissible Velocity{Vmax}(fps) 7 Permissible Shear Stress{tp}(psf) 1.75 Calculations: e 1.6 ft Side Slope Length, m 1.8 ft Top Width, T 3.3 ft Channel Area,A 1.34 sq ft Wetted Perimeter, Pw 3.67 ft Hydraulic Radius, Rh 0.37 ft Mannings"n" 0.035 Calculated Flow Rate, Qcaic 2.27 cfs Calculated Velocity, Vcaic 1.69 fps Calculated Shear Stress, tcaic 0.31 psf V calc<_V max? yes tcalc<_tp? yes