HomeMy WebLinkAbout20201520 Ver 2_B5614_UE_WETLAND_20240605_20240606C
F-
L
N
0
O
a
E
L
a
i
T
S
3
O
L
O
}
C
N
E
C
O
L
C
W
F—
w
(L
N
0
<7N
aoa
L a
o_JC1
in Ta
C7= 5
,1_!O
�Ir}
00
04
•
c:
�d
O'
s
Pa Gilead
tea. 1119
1118
oy BEGIN F
�QreS PROJECT F
1112
Mouth OF Creek Rd.
1118
0
1
3
STATE OF NORTH CAROI[ INA TtANG
PAMLICO DIVISION OF HIGHWAYS B-5614 uE-1
RIVER PRELIMINARY PLANS
to NOT Um FOR WNSTRUGTfON
:ND
'ROJECT
1189 ,a.
nel
god
113F
11112
Gaz
e� 1111
d^ah 1103
' _ F
Ana 1115 C°tt°r, Path Rd.1116
I VICINITY MAP NTS f
BEGIN TIP PROJECT B-56I4
-L- STAII+OOAO
101114 EK R0)
SF S cfk
(00 gLOU /s
UTILITY ENVIRONMENTAL
PERMIT DRAWING
LOCATION: BRIDGE NO. 9 ON SR 1112
OVER BLOUNTS CREEK
TYPE OF WORK: TELECOMMUNICATIONS, POWER RELOCATION,
AND WATERLINE RELOCATION
��/ END CONSTRUCTION
ESRUE-21-1 / —
( —%� STr4.I2f50.00
L��,"B'E'1&0&_ED'
/ \
`t. BLOUNTS BAY
/ SR 1;l12
% � •k '� 0
`� ' • ' •" ' z-\ END BRIDGE
-L- STA27+38.88
BEGIN BRIDGE
GRAPHIC SCALES INDEX OF SHEETS
Law—=_ QENCRIPTION
1 25 0 50 100 I UE-I WETLAND IMPACT TITLE SHEET
UE-2 through UE-S UTILITY WETLAND IMPACTS
PLANS I UE-6 WATER PROFILE SHEET
25 Q SQ 100 I UE-7 POWER BORE PLAN AND PROFILE SHEET
i UE-8 through UE-10 POWER PROFILE SHEET
PROFILE (HORIZONTAL) I
5 0 10 20
it
PROFILE (VERTICAL)
UTILITY OWNERS ON PROJECT
LUMEN (CENTURY LINK) - TELECOMMUNICATIONS
TIDELAND EMC - POWER
WATER AND SEWER
OWNERS ON PROJECT
WATER - BEAUFORT COUNTY
EvSTEWART 46vhb
Engineering NC, P.C. it, 500
40 Main Campus Drive, Suite 500
. Raleigh, NC 2�606
B URNS, PE
PROJECT ENGINEER
ROEMER PROJECT DESIGN ENGINEER
UE-3
END TIP PROJECT B-5614
-L- STA.32+00.00
SR p01NT RpJ
�
SEAL
PERMIT DRAWING
Revised May 21, 2024
I COMPLETE PLANS
NOT USE FOR R/W ACQUISITION
D CUMENT NOT CONSIDERED FINAL
UN ESS ALL SIGNATURES COMPLETED
UTILITIES UNIT
155 MAH, SERVICES CENTER
RALEIGH NC 27699-I555
PHONE (919) 707-6690
FAX (9I9) 250-0I51
HAMDAN UTI77LI77ES REGIONAL ENGINEER
W. STALLINGS UTITILFHES ENGINEER
SAMPSON 11TTT7LITIES AREA COORDINATOR
W. STALLINGS UTITILTTIES COORDINATOR
PROJECT REFERENCE NO. I SHEET NO.
N
0
NOTE:
CONTRACTOR IS REQUIRED TO ENSURE ALL
BENDS UTILIZE JOINT RESTRAINTS.
NOTE:
THE ESTIMATED QUANTITY OF DUCTILE IRON
WATER PIPE FITTINGS ON THIS PLAN SHEET
IS 990 POUNDS. THE ACTUAL QUANTITY AND
TYPE OF FITTINGS WILL VARY BASED ON
FIELD CONDITIONS.
NOTE:
UTILITIES IN BUFFER AREAS HAVE
BEEN QUANTIFIED UNDER BRIDGE
REPLACEMENT ENVIRONMENTAL BUFFER
PERMIT DRAWINGS
TIDELAND EMC TEMPORARY
OVERHEAD POWER LINES
TIDELAND EMC
UNDERGROUND
POWER CABLES TO BE
INSTALLED WHEN
NOTIFIED BY ENGINEER
LF OR
w
a
c TIE TO EXISTING
N WL- Sta. 5+00.00
C \ f
On
o_
o �oODf9 PAC
v 1HE cREE
OSTIAOf /
QP
111E -\\•A �,
EXISTING BRIDGE ABUTMENT REMOVAL DETAIL
(NN to Swl.l
REMOVE ABUTME YI -
EXISTING BRIDGEti TO ELEVATIOBACN=+/-4.0'
rVERTICAL AND SLOPE K TO
/ ABUTMEN=-- NATURAL GRO UND AT
/ A 3:1 SLOPE
TO ELEVATION=+/-4.0'AND SLOPE CHANNEL
BACK TO NATURAL GROUND AT A RETAIN EXISTING EXISTINCJ
3:1 SLOPE BULKHEAD ROAD
TOTAL EXCAVATION-50 CY
TIDELAND EMC TEMPORARY `
OVERHEAD POWER LINES
IIE TO EXISTING
WL- Sta. 8+73.14
PROP 45°BEND
-WL- Sta. 8+63.14
TIDELAND EMC �w\�
TEMPORARY %
POWER POLE
r
- - L --F-%Tt J__ '.
" WATER SERVICE LINE
Be
5T�!Rw+25 `irvFa
PE'(Cl
P °ITE
RAL 'V' DITCH
SEE DETAIL 1
ALPERN trARDS, Jr
p
O V��s ww'
LI. LEWIS. et x 4!�
!i
m sa R ° �� Ao PROP 8 1 TIDELAND EMC
VALVE OVERHEAD aN
N / • POWER LINES o"
U\\
PROP 11.25°BEND
BEGIN TIP PROJECT B-56I4 -WL- Sta. 5+10.00
—L— POT STALH400A0 TIDELAND EMC
y OVERHEAD POWER LINE
_N TO BE INSTALLED
AFTER PROJECT
COMPLETION
SITE 1
E
E
0
0
W
W
a
10
DETAIL 1 DETAIL 2 DETAIL 3
SPECIAL LATERAL DITCH TOE PROTECTION LATERAL V DITCH
I Nw ro Smlej (No110 s.de) (N.11° Scde)
oT N°Nr°I 3.1 °�S� SFill
I
3. �'•` � Fill
Ground b F\ mun .� D 1"R1. slope
D
d Min. D= 1.0 F.
d = 1.5 Ft
Min. D= 1.5 Ft. b- 1.5 F. Geoletlile
Type of Uner= Cl... B Rip-R°p FROM STA. 15+35 TO STA. 17+38 -L- LT
FROM STA. 12+50 TO STA. 13+72 �- RT
FROM STA. +29 TO STA. +63 - RI -
SIT
FROM STA. 11+29 TO STA. 11+63 -DRIVE- LT
TIDELAND EMC TEMPORARY
PROP 8 0 0 OVERHEAD POWER LINES
ALVE TIDELAND EMC N
TEMPORARY�f
POWER POLE
c ° 0
a o
BRIGHT$FLEG OGF
e UNDERGROUND �w
a COMMUNICATIONS is\pGf �0
+° CABLE
C\
Q
GR \ es\' OOP Os
r DITCH T i i .\ 7 SEE EXISTING BRIDGE -ABUTMENT REMOVAL DETAI
Fg°M gz \ Q ROP
5
O
ALPERN a°P oi° T" 9°
EXISTING RI� �Pi
COMMU 71
s`al/ / / �� m eTE °peg TIDELAND EMC
�Rw
/ RIP UNDERGROUND POWER
CLASS ISPuw 1RE ° . EST 2 S -_ �E CABLES TO BE INSTALLED
LBOS DUE sY ABANDONED WHEN NOTIFIED BY
i ce. cvx isEasea ENGINEER
UTILITIES BY OTHERS/UTILITY CONSTRUCTION
NOTE:
ALL PROPOSED UTILITY WORK
SHOWN ON THIS SHEET WILL
BE DONE BY OTHERS
-- n� .smnartinsmm E. 9A0 Mai iPCDus� �E°Ite 50J
STEWART Vnnuu
PRELIMINARY PLANS
/ DO NOT USB FOR DONSTRUMON
PERMIT DRAWING
SHEET 2 OF 11
-e
*
-Rl / *
Lr
ii if pip
2 TONS
7 BY
*
+
T DPERXE 2N OO
* * \ \\ \
/
+00DO
tt�ypE PROTECT
/ V SEE DETAIL 2
\
TOADRAIIII
I
TIDELAND EMC
* * *
* * I
\
OVERHEAD *
* * * D CONSTRUCTION
I
\
POWER LINES
*
* *I
ik
* * * * PROP
45°BEND
-WL-
Sta. 7+79.95
PROP 373 LF SISI
WATER
LINE
TIDELAND EMC
HAS CONFIRMED THEY WILL
OBTAIN THEIR OWN EASEMENT
FOR RELOCATIONS SHOWN
OUTSIDE EXISTING ROW AND
PROPOSED PUE
TEMPORARY J
WORK BRIDGE
40 LF 12
EMENT PIPE!
STEEL
05
HAND CLEARING (NON -GRUBBING)
a
PROJECT REFERENCE NO. SHEET NO.
B-5614 I UE-2
THIS SHEET CORRESPONDS TO RDY-4
EXISTING BRIDGE ABUTMENT REMOVAL DETAIL DETAIL 1 DETAIL 2 DETAIL 3 UTILITIES BY OTHERS/UTILITY CONSTRUCTION
(Na10 xole7 REMOVE ABUTME(IT
SPECIAL LATERAL 'V' DITCH TOE PROTECTION LATERAL Y DITCH
I Nw�o S 1l) INe�le S 16) IN.. Swle) l
EXISTING BRIDGE TO ELEVATION=
VERTICAL AND SLOPE BACNOTE:
ABUTMENT NATURAL GROJNr-rn��� A 3:1 $LOPEI o Nr I\`S\aHlNOTE: LL PROPOSED UTILITY WORK
CONTRACTOR IS REQUIRED TO ENSURE ALL IE`''° ��- d MIO.D- 1oPl. SHOWN ON THIS SHEET WILL
BENDS UTILIZE JOINT RESTRAINTS. 1 I I I J d-,.5 I ��I �°�T h= 1.5 k. Geolegib
I I I�—f—T—f T Min. ,s FL. BE DONE BY OTHERS
Type of user= class BRip-Rnp FROM STA. 15+35 TO STA. 17+38 �- LT a
&REMOVE VERTICAL UTMENT lJlISTING FROM STA. 12+50 TO STA. 13+72 -L- RT FROM STA. 13+71 TO STA. 17+79 -L- RT
NOTE: TO ELEVATION=+/-40AND SLOPE CHANNEL FROM STA. 11+29 TO STA. 11+63 -DRIVE-LT
BACK TO NATURAL GROUND AT A RETAIN EXISTING WSTING VNB Engineerin Nc,
THE ESTIMATED QUANTITY OF DUCTILE IRON 3:15LOPE BULKHEAD ROAD TIDELAND EMC TEMPORARYs,BM.inrouo
�SbS�4s r.
TOTAL EXCAVATION-50 CY O 6 pzieign, nce
WATER PIPE FITTINGS ON THIS PLAN SHEET PROP 8" o ,OVERHEAD POWER LINES o �STEWART
IS 990 POUNDS. THE ACTUAL QUANTITY AND TIDELAND EMC TEMPORARY VALVE TIDELAND EMC _pa
TYPE OF FITTINGS WILL VARY BASED ON 1 OVERHEAD POWER LINES. ' TEMPORARY PRELIMINARY hLANS
1
FIELD CONDITIONS. P POWER POLE oo NO7 UmBDLR DDNSTLR°DTLGN
I IE TO EXISTING ,. � � e`"' t �
WL- Sta. 8+73.14
NOTE: R 2HTSPEE_W N °E ERMIT DRAWING
UTILITIES IN BUFFER AREAS HAVE PROP 45°BEND Ln N1 GROUNND a
BEEN QUANTIFIED UNDER BRIDGE -WL- Sta. 8+63. CQMMAfiiO ° SHEET 3 OF 11
REPLACEMENT ENVIRONMENTAL BUFFER \ \ ABM '
PERMIT DRAWINGS TIDEL
P9., L 0
TIDELAND EMC TEMPORARY �r
OVERHEAD POWER LINES Ew LTt �+ 5°� m P+6 CRP�pPEVN
P PO L E w l ` ° t C P
1 ER
sr vDrtc G 1 � EE EXISTING BRID
� / ETAI Q °
TIDELAND EMC N m T De J Z P°jGtE
UNDERGROUND sF°75 P o
POWER CABLES TO BE
INSTALLED WHEN O I X III
NOTIFIED BYSaJL EN��ER 4. l v`34:I _ I mSTI P°I
\ \�, iL `'S \q N �• RW73 Q to tEL �R ♦; _
N DELANd EMC
8� D 3I p\ c*e�a Q c. -� /i-a� + I I r UNDERGROUND POWER
�B I
\+B 1' '" < In e°E}'LBows 4Fa EST2 SY s' g NO NED CABLES TO BE INSTA 4ED (n
WHEN NOTIFIED BY
_ S� ENG� EE
N1. BOP vO POT cneue wmPOR a LEs— rn
} E_9°• dye <� --oP 7cPaB' 40 I . '1
—.�- J�`,.r, _-•— ,e^ RCP-ul RE Fi SBG +44
OF TO -rn - Q _ ' _I IL DRAIN - _ ll
5 11111k Pi
`er qvl j ° ^ °• e P - _ RE AB ' NED C
BEGIN GI F 1 \ Q
• I S NG n sB� Aso
+0 .00 P '
'I
\r �j
S
CLASS DRIP RA 3 - -..� E E E . E
ST7 SV
/ RW2 iN
O
F - SPECI L _L—STA.
J SEE DET L 1 / ti,
�E�
P P 8 TID LR C Q �. DE EMC
AL OVE I SEA N _,
I g e TV
s P 0 11 EN PROP 40 LF 1 2"
B GlN / B-56/4 8. 5+ 00 " ENCASEMENT PIPE ,�
PaT TIDELAND EMC SiEE=L
17� OVERHEAD POWER fRUF' 45'BEN U
D TO BE INSTALLED ✓ -WL- Sta. 7+79.95
�or AFTER PROJECT
COMPLETION PROP 373 LF 8°
WATER LINE
O J r
a r TIDELAND EMC
'. HAS CONFIRMED THEY WILL
\ \ OBTAIN THEIR OWN EASEMENT
FOR RELOCATIONS SHOWN
OUTSIDE EXISTING ROW AND
PROPOSED PUE
HAND CLEARING (NON —GRUBBING)
z
A
0
AoP
5 B839'4a'
3� f EEXISTING W i % •,,F, {?s RR.38' F,qs N PROP 22.5°BEND
BUTMENT REM *i o tiJ n a -WL2- Sta. 5+10.00
;S m
S i`L
2
\\ Ap/A•5 f2/�Z�./Q�C p9nyp0 ' i
RA/ \ \+4 �BRI TSPEED
9D RGROUND
CO�IMU{^='/ICATIQ-
3 CAN
EXIST.
.t,P��
RIGHT-0F AY N.-. .t. RVII q.,.. ABANDQp D
X \ p, pJ
f
i S2j3 % \ \ ?�31' •'yam' 9E � � 'q.
Bpi N99`BOS'•4• �` \ ?y `qs 1 �
9 _\••9p k UI° \G\\ pB\ \�
COMMG AAE RN00NED
LINE
F
TI 0 EXISTING" \ * °
-WL2- Sta. 5+00.00 s9j/3b �• a '�" \\�� \\\* s `A'
PROP 22.5°BENDo w
-WL2- Sta. 5+28.21 s y\F
n �7N DER +� \
CABLES TO BE INSTALLED s c
n WHEN NOTIFIED BY
rnT Z ENGINEER UNCLASSIFIED STR.EXCAVATION E
" 1 (STR. PAY ITEM) SBG 67
EXCAVATE TO o A
v l R Gor uiG row cneLE ELEV-4.0' Gor ulc R 3
1nnr UIG Pow LE
'71�, 1 WA — TB '2GI
CIv�^tI
n R 15" RCP -IV R E PUE
C y/— PC Sta. /0225J4 CLASS B RIP RAP
(STR. PAY REM) 'b
E E--E— E
JPROP 47 LF 12"
ENCASEMENT PIPE
a `TEMPORALLY STEEL
E WORK BRIDGE
a PROP 90°BEND / SBA +67
-WL2- Sta. 6+12-53
PROP 22.5 ° BEND — STA2i1
IEDn -WL2- Sta. 6+84.47 / �/ �lu.iviw.uv
m PROP 22.5°BEND
a -WL2- Sta. 6+94.53
PROPOSED 18 LF
N 3/4" WATER SERVICE LINE
u,
m
"= RECONNECT WATER METER
°
PROPOSED 18 LF
N 3/ " WATER SERVICE LINE
E
E
o PROPOSED 20 LF
3/4" WATER SERVICE LINE
W
PROPOSED 29 LF
3/" WATER SERVICE LINE
W
PROPOSED 21 LF
3/ " WATER SERVICE LINE
PROJECT REFERENCE NO. SHEET NO.
B-56I4 UE-4
THIS SHEET CORRESPONDS TO RDY-5
DETAIL 1
SPECIAL LATERAL DITCH UTILITIES BY OTHERS/UTILITY CONSTRUCTION
I nol to sol.)
Naluml 1 3.1
NOTE:
G—d3T D R Slop ALL PROPOSED UTILITY WORK
SHOWN ON THIS SHEET WILL
°- ,.5 Ft. SHOWN
DONE BY OTHERS
FROM STA. 10+51 TO STA. 11+50 -YI- LT
PROP 377 LF 8 FROM STA / FROM STA. 29+79 TO STA. 31+00 -L- LT
Ra
\
WATER LINE � �, a"""'���'��b VHBE"9(("eeE"�N, 94U Main Campus3lBe Suile 50U
ww � "'g"• nL z,bob
BANDON 306 LF OF S T E WA R T
8" UTILITY PIPE \ PRELIMINARY PLANS
00 NOT UM FM UONBTRUCTLON
REMOVE WATER METER se s�
PERMIT DRAWING
SHEET 4 OF 11
04 Revised May
Q
4
Jx Q
S�,IM0�2� g Z
ABANDONED NOTE: ��
CONTRACTOR IS REQUIRED TO ENSURE ALL
PC LATE 10EttAND EMC PROP 8 BENDS UTILIZE JOINT RESTRAINTS.
SE ETAIL' OVERHEAD It1S RAP VALVE
LINES // CA B R P RAP ic i END T/f PROJECT B-5614
EST 2 TONS NOTE:
Sp RAP � �S 83.45• EST 7 SY * —L— POT STA32+00.00 THE ESTIMATED QUANTITY OF DUCTILE IRON
C 2 T � ` /10 PECIALLATERAL'v'DRCH � `' �. WATER PIPE FITTINGS ON THIS PLAN SHEET
~\ SEE DETAIL 1 , / IS 1335 POUNDS. THE ACTUAL QUANTITY AND
* , TYPE OF FITTINGS WILL VARY BASED ON
GRADE lU DRAT
Rw9'�� FIELD CONDITIONS.
f? . Rai E NOTE:
\ — ooDED UTILITIES IN BUFFER AREAS HAVE
R / �� BEEN QUANTIFIED UNDER BRIDGE
�F NOR° EL-34*3 "S 6 �� = PffiT` REPLACEMENT ENVIRONMENTAL BUFFER
ul' "eve PERMIT DRAWINGS
18" RCP-
nxG LVM
TIE TO EX STING 53
F E SAD -WL2- Sta. 8+77.21
�\
�� AG POSE
zSFO s 9s� � 'V UIPP 11 .25°BEND 36• Pp &� N DETAIC>WL2 Sta. 8+56 . 6 9
1747 °OOF f 7S CHA/N Ff\ f N' FUFMpN. et �Ir
5 p FT r S �'°q'>rArej3iz,2j. RF�ECCP 9oz PG
N A SPO O
S97p ,\h M h
S / 3g
3�� 32. 933'01•E � ���, 1
3 F 53.05� s xoe* m 3/
����� ALLOWABLE IMPACTS ZONE 2
z
m
'-RETAIN
EXIST.
BULKHEAD
YIN)�." <•. .
n
N n
nmi =
Nrn R
rn tv
�r
O
C L4
n W
I p
'Q O
O
TIE TO EX
-WL2- Sta. 5+
PROP 22.5°B
-WL2- Sta. 5+28.
CABLES TO BE INST.
WHEN NOTIFIE� BY
ENGINEER
F
67
3
47 F 12 ' �
EN SE PIP
STE L
PROP 90°BEND
W 2- Sta. 6+13.53
PROP 22.5°BEND
-WL2- Sta. 6+84.47
PROP 22.5°BEND
-WL2- Sta. 6+94.53
e2
PROPOSED 18 LFI
3/a" WATER SERVICE LINE
" WATER SERVICE LINE
13/4" WATER SERVICE LINE
PROPOSED 21 LF
PROP 22.5°BEND
-WL2- Sta. 5+10.00
PROP 377 LF 8"
WATER LINE
BANDON 306 LF I
8" UTILITY PIPE
BRIGHTSPEED
UNDERGROUND
COMMUNICATIONS
CABLE
ABANDONED
LATE -k1b AND EMC
UL1 I OVERHEAD 9"
TO ELEVATION -+/J.0'AND SLOPE CHANNEL
BACK TO NATURAL GROUND AT A RETAIN EXISTING EXISH
Ll SLOPE - - - BULKHEAD ROAD
BRIGHTSPEED
UNDERGROUND
COMMUNICATIONS
CABLE
i�
#V
,���/ i / i
i • ��'
�c'��
fir
�,
�
Jill
Ic,'•
�'
A
��
y
EXISTING BRIDGE ABUTMENT REMOVAL DETAIL
Nwro W I
REMOVE ABUTMENT —
EXISTING BRIDGE TO ELEVATION=+/-4.0'
VERTICAL — AND SLOPE BACK TO/
I ABUTMENT NATURAL GROUND AT DETAIL 1
_—. _ A 3:1 SLOPE SPECIAL LATERAL V DITCH UTILITIES BY OTHERS/UTILITY CONSTRUCTION
7 No t, sml.l
NOTE:
ALL PROPOSED UTILITY WORK
SHOWN ON THIS SHEET WILL
BE DONE BY OTHERS
FROM STA. 10+51 TO STA. 11+50 -Yl- LT
FROM STA.29+79 TO STA. 31+00 -L- RT
FROM STA. 29+85 TO STA. 31+00 -L- LT nnn
*, wi�95%�5 VHB Engineering NC,
\ ��`i/'yµ�J WMain gh,N�.Se,JSui` SW
STEWART^ " "'"`—
PRELIMINARY PLANS
DO NOT USB POR CONSTRUMON
�\
�•sF ERMIT DRAWING
SHEET 5 OF 11
s
N Rmised May 21, 2024
a \
coo
\
t ux Q
off' ie �
p l 50A5 PG �A,9
aop oe c s��'
ec NOTE :
PROP 8 CONTRACTOR IS REQUIRED TO ENSURE ALL
VALVE BENDS UTILIZE JOINT RESTRAINTS.
ID TIP PROJECT B-56I4 NOTE:
- POT STA32f00.00 THE ESTIMATED QUANTITY OF DUCTILE IRON
�! WATER PIPE FITTINGS ON THIS PLAN SHEET
IS 1335 POUNDS. THE ACTUAL QUANTITY AND
TYPE OF FITTINGS WILL VARY BASED ON
FIELD CONDITIONS.
E NOTE:
1 UTILITIES IN BUFFER AREAS HAVE
BEEN QUANTIFIED UNDER BRIDGE
/ 9
Q/ 4.T REPLACEMENT ENVIRONMENTAL BUFFER
F,v PERMIT DRAWINGS
L
TING
�+77.21
a
O �tr
\ FURMAN. et \
p� '!W
M
N
X M
t 9d ig. h
����� ALLOWABLE IMPACTS ZONE 2
SHEET NO.
PLAN VIEW
G
-SHEET-7 OF-T
-L- S a. 11+ 7.94
Offs 34.9 ` LT w MO 7HOF HE REEK ROAD
-EddWa[er
BZ 2
r Pole
PUrPole ao BLOU NTS CR EK TOD of Se ,r MO OF THEC EEK ROAD
or (ell Lane (Gard °aal s.ro wwn awa __ _ _ — K2
P rPde
m ----- -- ----- ----- Bz, as �mm Patl.
e 12° Pre Eary rC coM a Sp nt Caemms P PT Hai -Curve
As Per
Power ale 20 0' Radius I —
SPnnlCom
PC Haimn ICu
UTH OF TH CREEK ROA
PT Ho bl Curve
900' R dius
s maM1br Ptle
sp [Comms Pe.
Buffer Zone locations
shown on the plans are
approximate and for
PROFILE VIEW informational purposes
only.
0=2 0=
IT Propose I Entry
1r v Daaec e.lt
Tanaea,os.03• iiJ1� ra° °t olss rcwar at apea Rpea
3a• ° r
12°Gu 335.1P 12°Curve 41�
15Uo• 1lus Te 775.53• 1601Y Ratl
UE-7
C
Z
0
m
n�
O
C
Z
0
W
O
X
m
0
M
ram_
1
BRIGHTSPEED
UNDERGROUND iA
PERMIT DRAWING
SHEET 7A OF 11
BORE DETAIL -Y1-
SR 1112
Mouth of the
Creek Road)
ROAD SURFACE
E-35' 724' 30'-)F24�F-18'�
0
NWS = 0.00'
A \ / (- - 'I (1'
0' min below creek bed
C
BORE DETAIL
B-5614 BLOUNTS CREEK, NC
i
BORE PIT
9
UE-7A
50
u
35
30
�H
N Q
25
N
20 n G
J c
15
I0
5
O1
0
0+00
GROUNDLINE
3-
NOTES:
1. ALL POLES UNLESS OTHERWISE NOTED ARE
40', CLASS 4, 6' EMBEDMENT.
2. SAG CURVES ARE FOR TYPICAL DESIGN
TENSIONS FOR CONDUCTORS SHOWN.
ACTUAL STRINGING TENSIONS MAY CAUSE
MINOR DIFFERENCES.
3. GROUND CONTOURS ARE FROM NCDOT
PROJECT B-5614 DRAWING SET AND
BEAUFORT COUNTY GIS DATA.
/4 ACSR
60' INITIAL
g4 ACSR G
120' FINAL
140'
PHASE
NEUTRAL
26.0'
U E-8
PERMIT DRAWING
SHEET 8 OF 11 "T'
9
03 178' 04 � n
1-2-2+50 3+00
PROFILE A -A
50
45
g4 ACSR G q0
60' INITIAL
___ ___ PHASE �G.So'
_______________________________________ __ ___ NEUTRAL 4.00,
1
p4 ACSR
120' FINAL
25
O H
0_ 20
15
U] N
J 0 10
5
GRONNDLINE
0
264'
-5
05
-Io
4+00 4+50 1— 5+50 —o
PROFILE A —A
155 U.S. HWY. 70 WEST TIDELAND ELECTRIC MEMBERSHIP CORP.
N.C. CORP. C-1063
Utility PANTEGO, NORTH CAROLINA
IT �'lectrical MOUTH OF THE CREEK ROAD
onsultants PLAN VIEW
PRELIMINARY Tideland EMC C" PC DRAWN BY: ABB JOB NO.: 22-2162
CHECKED BY: TBP CAD FILE:GLOUNTSCREEKPP SCALE: 1" = 10'
Real People. Real Power. caR PH ,�NORTH 81-14 0LINA APPROVED BY: TBP DATE: 03/03/2022 1 SHEET NO. 2 OF 4
50
45
0.33'
—_— — — --
35 2.83'T
]0
25
1�
J
+
20
T�
w
IS I
J
�
Q
10
GROUNDUNE
5
° oz
-5
-10
O+Oo
PHASE
CROUNDUNE I
31.2' �Ir
.r
J Q
sic.T1�,T:m,.
NOTES:
1. ALL POLES UNLESS OTHERWISE NOTED ARE
40'. CLASS 4, 6' EMBEDMENT.
2. SAG CURVES ARE FOR TYPICAL DESIGN
TENSIONS FOR CONDUCTORS SHOWN.
ACTUAL STRINGING TENSIONS MAY CAUSE
MINOR DIFFERENCES.
J. GROUND CONTOURS ARE FROM NCDOT
PROJECT B-5614 DRAWING SET AND
BEAUFORT COUNTY GIS DATA.
y4 ACSR
60' INITIAL
ACSR m
12
120' ANAL
%-
U E-9
PERMIT DRAWING
SHEET 9 OF 11
15:* ,f,�, A
Z
9' SOIL 011�
,(
I in
Oe
295'
, i
a
1+00
1+50
2+00
2+50
3+00
PROFILE B—B
50
y4 ACSR 0
5
y4 ACSR ®
60' INIIPAL
�0.75'
60' INITIAL
\
--f0.50'
TT
40
4.00' 3. 5'
1
---------- -------
---------- —_ _—_—_—_—_—_—_—_—_—_—_—------
—_—_—_—_—_—___
/
35
y4 ACSR
y4 ACSR ®
120' FINAL
30
120' ANAL
� J
m J
N
25
29.5'
28.3'
� �
� N
20
,O
15
10
GROUNDUNE
5
ASPHALT ROAD
(OLD MOUTH OF THE
<m xaum a mE Howl
CREEK ROAD)
0
09
10
210'
68'
-5
4+00
4+50
5+00
5+50
-10
PROFILE B—B
155 U.S. HWY. 70 WEST TIDELAND ELECTRIC MEMBERSHIP CORP.
N.C. CORP. C-1083
Utility PANTEGO, NORTH CAROLINA
IT F.n..ky"Qnp.ru for �'kctrical MOUTH OF THE CREEK ROAD
onsultants PLAN VIEW
PRELIMINARY Tideland EMC C" PC DRAWN BY: ABB JOB NO.: 22-2162
CHECKED BY: TBP CAD FILE:BLOUNTSCREEKPP SCALE: 1" = 10'
Real People. Real Power. caR PH ,�9 9) 821C;R 0LINA APPROVED BY: TBP DATE: 03/03/2022 1 SHEET NO. 3 OF 4
w
w
r0.s0'
35
____________________________________
}.50
]0
20
O
@
!n y
i0
I5
10
5
GROUNOUNE
0
04
-s
-m
0+00 0+50
02
85'
0+00 0+50
PROFILE D-D
NOTES:
1. ALL POLES UNLESS OTHERWISE NOTED ARE
40', CLASS 4, 6' EMBEDMENT.
2. SAG CURVES ARE FOR TYPICAL DESIGN
TENSIONS FOR CONDUCTORS SHOWN.
ACTUAL STRINGING TENSIONS MAY CAUSE
MINOR DIFFERENCES.
3. GROUND CONTOURS ARE FROM NCDOT
PROJECT B-5614 DRAWING SET AND
BEAUFORT COUNTY GIS DATA.
PERMIT DRAWING
p4 ACSRO UE-10 SHEET 10 -- 41
PHASE
50' INITIAL
--------- -- --
______________ __________________ ----------- __________ _______ _____ _______ ___________ ___ _______ _- __4.00'
_________________________ _______________________ _____ _____ _________ __________ _____ ___— __— ______________ ___ _______ _— ______ _____ _— ________ _— __ 35
E%I51ING 7 ih 30
ACSR ® "LOW ---_t
12 +
120' FINAL ® 29,7'g,Y
I
I
I 25
I
-F
J
28. ' I O 20
2 .8'
I
I
15
I
I
I 10
GROUNOLINE
g
0
f0
-5
307'
-10
I+00 1+50 ]+00 2+50 ]+00
PROFILE C-C
I+00 0+00 0+25
PROFILE E-E
45
w
]5
]0
25
20
15
10
5
0
-5
-10
0+50 0+00
PRELIMINARY
1/0 AM
122'
0+50 1+00
PROFILE F-F
45
w
}5
}0
25
20
15
10
5
0
-5
-10
1+50
WETLAND AND SURFACE WATER IMPACTS SUMMARY
VVETLANDTM7K= SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 14+80 to 14+90
TEMP. OVERHEAD POWER LINES
< 0.01
2
-L- 13+63 to 14+44
OVERHEAD POWER LINES
0.04
2
-L- 15+30 to 17+96
OVERHEAD POWER LINES
0.11
TOTALS*:
j 0.16
j
i
j 0
j 0
j 0
*Rounded totals are sum of actual impacts
NOTES:
Revised May 21, 2024
2018 Feb