HomeMy WebLinkAboutNCG020803 DMR WWGENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE:NO. NCG02_b-8 O 3
FACILITY NAME: 0M, 6dr - bngFZ6S TR'gC,-i'
PERSON COLLECTING SAMPLES: •ZOAIC 5
CERTIFIED''LABORATORY: Lab #
Lab #
LIMIT VIOLATIONS? YES ❑ NO 91
Part A: Wastewater Monitoring. Requirements
SAMPLE COLLECTION YEAR: 2m 1
COUNTY: eA-)s'1UEAP
PHONE NO. (757� �rV/— d-rS•-3
ADD TO LLSTSERVE? YES ❑ NOS EMAIL:
INDUSTRIAL SAND'? 9 DISCHARGING TO SA WATERS°? ❑
� Y y
r
u :�. Date Sample ; - zTotalSuspended Turbidtty3 5eftleable'SoLds pi:� �- _�� Fecal"Coltforms``
' All mines must monitor WW discharges for TSS. Only industrial sand mine discharges are subject to TSS limits.
2 If an effluent limit is exceeded; the permittee is required to linstitute monthly monitoring for that parameter for the remaining permit term.
3 The discharge shall not cause an instantaneous measurement of the turbidity,of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs
designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the
Stormwater Discharge Outfall. Alternatively, the permittee may choose tomonitor turbidity in the receiving water, directly -upstream and downstream of the discharge.
4 Only facilities discharging to SA waters are required to monitor for Fecal coliforms.
Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11
Page 1 of 2
' All mines must monitor WW discharges for TSS. Only industrial sand mine discharges are subject to TSS limits.
2 If an effluent limit is exceeded; the permittee is required to linstitute monthly monitoring for that parameter for the remaining permit term.
3 The discharge shall not cause an instantaneous measurement of the turbidity,of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs
designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the
Stormwater Discharge Outfall. Alternatively, the permittee may choose tomonitor turbidity in the receiving water, directly -upstream and downstream of the discharge.
4 Only facilities discharging to SA waters are required to monitor for Fecal coliforms.
Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11
Page 1 of 2
Part A Condnued.. Wastewater Monitoring^Reouiremenk
y: y ♦ � r
' �DateSampleE' Total Flow,> Total:Suspeaded Turbidity FeealyCohforms
UutfallNo n F 3 f 1 s z Settleable Solids pIi
k Collected Solids
_mm/dyrrMG }� _�np NTU ml/t F AStandard�, rti4 eoVmlHI " ' r f
d/
- ....x. ,.�.s.
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
0
"I,eertify, under,,penalty of law, tUt,this';document and'4ll'attaclunent§ were prepared under my direction or supervision in accordance with a: system designed to
tho ee thao` dir edy a Sonnel pe foerly gather n the evaluate
orinattonthe .informationsubmitted. Based on my inquiry of the person or persons who manage the system, or
p _,ter he information submitted is, to the best of my knowledgeland' belief; true, accurate,.and complete.
I am that th n� ' pen es for snbmithng false information, including the possibility of fines and imprisonment for knowing violations."
(Si tore o 'ttee) (Date)
Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11
Page 2 of 2