Loading...
HomeMy WebLinkAboutNCG020152_Tier I_20240605 Martin Jay Nivens Marietta Regional Manager Environmental Services East Division June 5, 2024 Submitted via Email DEQ Winston Salem Regional Office Attn: Jack Lawry-Popelka, Engineer II 450 West Hanes Mill Road Winston Salem,NC 27105 jack.lawrypopelkakdeq.nc._og_v RE: Martin Marietta Jamestown Quarry NPDES Permit#NCG020152 Outfall#2 Stormwater Sample Exceedance Report Dear Mr. Lawry-Popelka: This letter is to complete the required sample exceedance notifications as outlined in Part F, Sect. F-7 of the NPDES permit for our Jamestown Quarry located at 5725 Riverdale Drive in Jamestown,NC. I have attached the Stormwater Sample Exceedance Report for the second quarter 2024 stormwater sample which resulted in an exceedance of the Turbidity baseline. Should you have any questions or need any additional information, please contact me at 704- 409-1475 or via e-mail at jay.nivenskmartinmarietta.com Sincerely, Carolina Regional Office 8701 Red Oak Blvd.Suite 540,Charlotte,NC 28217 t.(704)409-1475 m.(980)613-9009 e.jay.nivens@martinmarietta.com www.martinmarietta.com Martin Marietta Stormwater Sample Exceedance Report Site: Jamestown Quarry Date sample was collected: May 7, 2024 Outfall location: Outfall#2- Stormwater Benchmark Parameter Exceeded: • Turbidity—89.5 NTU(Tier I Exceedance for Turbidity benchmark of 50 NTU) Date of Lab Results: May 21, 2024 Date of Stormwater Management Inspection: May 27, 2024 Personnel in attendance: Ryan Balint—Plant Manager, Jamestown Quarry Inspection Observations: • Maintenace performed in March of this year provided additional treatment but has not provided sufficient residency time in the basin to allow for treatment of stormwater. • Additional maintenance needed for stormwater basin and dewatering device. Proposed Actions: • Provide maintenance of basin and skimmer dewatering device to help settling efficiency of basin. • The pit expansion areas within the contributing drainage area for this basin which are not currently being graded will be seeded and stabilized. This stabilization and ground cover will help prevent sediment laden runoff from draining into the basin. Date Actions Implemented: Basin and skimmer maintenance completed by mid-June, seeding and stabilization completed by end of June.