Loading...
HomeMy WebLinkAboutSW6231103_Supplement-EZ Form_20240605 SUPPLEMENT-EZ COVER PAGE E£7RM5 LOADED PROJECT INFORMATION _ 1 Project Name Godwin Subdivision _ 2 Pruject AprEa(ac) 31.53 3 Coastal Wetland Ama•(ac) p 4 Surface Water Area{aC] 0 5 Is this project High or Low Density" Hi,k 6 1 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003.(4) — 7 !Width of vegetated setbacks provided(faaet) _ 30 8 !Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H,1003(4)(c-d)? N/A 10 :Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 i Bioretention Cell 13 Wet Pond 1 14 1Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 'Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Donald L.Curry,Jr., PE/Pro ect Manager 28 Ur an¢ation: Curry Englnee6ng 29 Street address: _ 205 S.Fuqua Fuquay Ave. 30 1Cit.,State,ZIp: ~I Fu ua -Varina,NC 27526 31 !Phone number(s): — — 919-552-0849 32 1 Email: don@curryeng.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Oes_e�ner f' x 1�r Signature of Designer or Sea! Date DRAINAGE AREAS t Is this a hlgh densit project? I Yes 2 If so,number of drainage areas/SCMs 1 1 3 Does this projea have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Tvpe of SCM Wet Pond Wet Pond 5 Total drainage area(sg ft 1142815 1094463 6 Onsite drainage area(sq ft 1142815 1094463 7 Offsite drainage area(sq ft) 0 0 nNew l BUA in ro ect s ft) 496913 sf 496913 sf BUA on subdivided lots(subject to permitting) 348000 sf 348000 sf New BUA not on subdivided lots(subject to 10 ermittin )(sf) 148913 sf 148913 sf 11 Offsite BUA(sq ft) sf sf 12 Breakdown of new BUA not on subdivided lots: Parking(sq ft 2745 sf 2745 sf Sidewalk(sg ft 500 sf 500 sf Roof(sq ft sf sf Roadway s ft 145186 sf 145186 sf Future(sq ft sf sf Other,please specify in the comment box below(sq ft)_ 500 sf 500 sf New infiltrating permeable pavement on 13 subdivided lots(sg ft) sf Sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf sf Existing BUA that will remain(not subject to 15 Permittin )(sq ft) sf sf 16 Existing BUA that is already permitted(sq ft sf sf 17 !Existing BUA that will be removed(sq ft sf sf 18 Percent BUA 45% 45% 19 Desi n storm inches 1.0 in 1.0 in 20 Design volume of SCM cu ft) EHE] 41829 cf 41829 cf 21 Calculation method for design volume Simple Simple ADDITIONAL INFORMATION Please use this epaco to provide any additional information about the 22 ldrainage area(s): Mail kiosk accounts for values under line#12:parking and sidewalk.The ,pump station yard is gravel and therefore not impervious,however,500 sf +was allocated for concrete structures in the yard itself. DRAINAGE AREAS 1 i Is this a high densi project? _ Yes R I 2 If so,number of drainage areas/SCMs 1 3 Does this roject have low density areas? I No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 4 !Type of SCM Wet Pond 5 Total drainage area(sq ft 1142815 6 Onsite drainage areas ft 1142815 7 Offsite drainage area(sq ft 0 8 Total BUA in pr9ject Lsq ft 496913 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft 348000 sf kNew BUA not on subdivided lots(subject to 10 ermittin )(sf) 148913 sf 11 Offsite BUA(sq ft) sf 12 Breakdown of new BUA not on subdivided lots: Parkin s ft 2745 sf Sidewalk(sq ft) 500 sf Roof(sq ft sf Roadway(sq ft 145186 sf i -Future(sq ft sf Other,please specify in the comment box below(sq ft 500 sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) sf New infiltrating permeable pavement not on 14 _subdivided lots(sq ft) sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) sf 16 Existinq BUA that is already permitted(sq ft) sf 17 Exis ing BUA that will be removed(sq ft sf 18 Percent BUA 45% 19 'Design storm inches 1.0 in 20 Design volume of SCM cu ft 41829 cf 21 1 Calculation method for design volume Simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Mail kiosk accounts for values under line#12:parking and sidewalk.The pump station yard is gravel and therefore not impervious,however,500 sf was allocated for concrete structures in the yard itself. WET POND 1 Drainage area number _ 1 2 Mlnimum required treatment volume(cu ft) 41628 cf iGENERAL MSC FROM ON.9rl4ti 3 Is the SCM sized to treat the SW ffom all surfaces at build-out? Yes 4 Is the SCM located away from contaminated sails? Yes 5 What are the side slopes of the SCM H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered Yes side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 6 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewaterin2 the SCM for maintenance? Pum referred 10:If applicable,will the SCM be cleaned out after construction? Yes 11!Does the maintenance access comply with General MDC 8? Yes 12 Does me drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with No 13 General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 151 Is there an O&M Plan that complies with General MDC It 2)? Yes 161 Does the SCM follow the device specific MDC? Yes 17lWas the SCM designed by an NC licensed Rrofimfonall Yes POW tiAOC FROM 02114 IM _ 18 Sizing method used SA/DA j 191 Has a stagielstmage table been prtMcled in the calculations? Yes 201 Elevation of the excavated main pool depth(bottom of sediment 132.50 removal)(frt* 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 133.50 [ 221 Elevation of the bottom of the vegetated shelf fmsl 137.50 _231Elevation.ofthe permanent pool(fmsl) 138.00 241 Elevation of the top of the vegetated shelf(fmsl) 1 138.50 25'Elevatlonofthatempora of(fmsl) 139.30 26 Surface area of the main permanent pool(s uare feet) 25639 27 volume of the main pefmanent poot(cubic feet) 113076 of 28.Average depth of the main pool(feet) _ 4.94 ft 29 Avera a depth equation used Equation 3 301 If using equation 3,main pool perimeter(feet) 699.0 ft 311 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 321VOlume of the forebay(cubic feet) 6286 cf 33 Is this 15-20%of the volume in the mainpool? Yes 34 Clean-out depth for forebay inches 12 in 35 Design volume of SCM(cu ft) 46094 cf 36 Is the outlet an orihoe or a weir? OrMce 37 If orifice,orifice diameter(inches) 3 in 38 If Weil`,weir height Inches) in 39 If weir,weir length(inches) in 40 Drawdown time for ft temporary pool(days) 3.43 41 Are the inlet(s)and outlet located in a manner that avoids short- circuiting? Yes 421Are berms or baffles provided to improve the flow path? No 43 De th.pf Lora at entrance(inches) 36 in 44 Depth of forebay at exit(inches) 30 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H: 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes r,24-hr storm? Are fountains proposed?(If Y,please provide documentation that No 50 MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 521Are the dam and embankment planted in non-clumping turf grass? Yes 53I Species of turf that will be used on the dam and embankment Fescue or Centipede 54 Hasa planting plan been provided for the ve getated shelf? i Yes ,ADDITIONAL INFORMATION 551 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 3:22 PM 6/5/2024