Loading...
HomeMy WebLinkAbout860028_Compliance Evaluation Inspection_20240603 Division of Water Resources Facility Number - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 1 '/Aj Arrival Time: Departure Time: 77 County: wk Region: " �f Farm Name: �,ti �rl� Owner Email: Owner Name: l` L\�%� �1`�`h� \�����1' Phone: Mailing Address: Alc% VI11,I)i VIA , y.kr( kIX3 . k\�r_ ';)Boa k Physical Address: l 1.`J `Jt ��� i l ( p u 1=l 1�` � Ix, Facility Contact: ,�_� ^ y^�}� Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: �C 1)� VQ 121 3i 12A- Back-up Operator: Our ) ) Certification Number: 1j21jy �Jj Location ppo11f Farm: Latitude: ° ?��;!-"�'t Longitude: � Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer ',X Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish I Layers I I 113eef Stocker Gilts I Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes J&No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes [] No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes XNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes �Io ❑ NA ❑ NE of the State other than from a discharge? Page l of 3 21412015 Continued r r \4 1_> Facili Number: [Date of Inspection: Waste Collection &Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes'TkNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [:] No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: v Designed Freeboard(in): Observed Freeboard(in): E� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion,seepage,etc.) IR 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes -ONo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes'oNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ONo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes `�No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes jgNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes UrNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes JKNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes XNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ' JR1 No ❑ NA ❑ NE Required Records &Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes•�Q No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes �No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If y below ❑ Yes "No ❑ NA ❑ NE Waste Application Weekly Freeboard J�aste Analysis ❑Se4 ❑W2t*e T•ancfers eather Code `Rainfall ZStocking'15?,Crop Yield 120 Minute InspectionsMonthly and V Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ✓ ❑ Yes 'No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No <NA ❑ NE Page 2 of 3 21412015 Continued V' V13 Facility Number: < - Date of Inspection: 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes XNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes )EL'No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes Wo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes JZ�'No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes *�o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes'�Z No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes �No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) \ 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No NA ❑ NE ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,J'No ❑ NA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes 0 No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes JF�No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). 27). S11A&y ,'a1 3 "r► 216 Reviewer/Inspector Name: - `' a I R A vWL Phone: J1P' Reviewer/Inspector Signature: Date: 1.2-+ 0 Page 3 of 3 V,214/2015