Loading...
HomeMy WebLinkAboutWQCS00200_Application_20240604W May 9, 2024 Mr. Andrew Girgis ester n arohna IVED UNIVERSITY JUN 0 4 2024 NCDEQ/DWR/NPDES NCDEQ 1617 Mail Service Center Raleigh, N.C. 27699-1617 DIVISION OF ADMINISTRATION & FINANCE Subject: Western Carolina University Collection System information requests. Dear Mr. Girgis, Attached for your review are the following items in regards to your email dated March 27, 2024: 1. Updated and Revised Application (CSA 04-16) per your request 2. Section IV.4: High Priority Lines List 3. Section V.4: Annual Budget for Collection System Note: The Wastewater Collection System for Western Carolina University (WCU) does not operate as a stand-alone entity. All revenues and expenditures are captured along with other WCU owned facilities for financial reporting requirements. For fiscal year 2024-25, the WCU total all funds budget totaled $177,573,000 (General Fund only) of which $26,415,325 was allocated to Facilities Management (Copies of each attached). 4. Section V.6: Capital Improvement Plan Note: Capital Improvement planning is performed as a part of the State of North Carolina biennial budget process that begins July 1 of each odd -numbered year and ends on June 30 of the next odd -numbered year (through State Budget Act, G.S. Chapter 143C). Six -year capital plans are developed for major appropriations, non - appropriated, and repair and renovation (R&R) projects. Capital planning for Wastewater Collection system major projects is covered within the R&R planning. Within each biennial planning, and as R&R funding is appropriated, decisions are made on campus as to the prioritization of projects. Further, improvements are made to the system on an as needed basis from the operating budget. (Copy of 2023-29 Six Year Plan attached). 5. Section VI.2 and V1.4: Response Action Plan and Contingency Plans 6. Section VI.6: Comprehensive Collection System Map Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu 7. Section VII: Note: There are no compliance issues. If you should have any further questions, please contact this office. Sincerely, j--w ) wl*\� Jason Turner Director, Operations and Maintenance RECEIVED 0 4 ',' ""4 NCDEQ/DWR/NPDES Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu '# I. APPLICANT INFORMATION: 1. Applicant's name (Municipality, Public Utility, etc): Western Carolina University, State of North Carolina 2. Facility Information: Name: WCU Collection System Permit No.: WQCS00200 3. Applicant type: ❑ Municipal ® State ❑ Privately -Owned Public Utility ❑ County ❑ Other: 4. Signature authority's name: Jason Turner per 15A NCAC 02T .0106(b) Title: Director, Op's and Maintenance 5. Applicant's mailing address: 3476 Old Cullowhee Road City: Cullowhee State: NC Zip: 28723- 6. Applicant's contact information: Phone number: (�28) 227-3563 Fax number: 828 227-7198 Email address: jstumer@,wcu.edu H. CONTACT/CONSULTANT INFORMATION: 1. Contact Name: Jason S. Turner 2. Title/Affiliation: Director, Op's and Maintenance 3. Contact's mailing address: 3476 Old Cullowhee Road 4. City: Cullowhee State: NC Zip: 28723- 5. Contact's information: Phone number: (B28) 227-3563 Fax number: (828) 227-7198 Email address: istumer()wcu.edu III. GENERAL REQUIREMENTS: 1. New Permit or Premit Renewal? ❑ New ® Renewal 2. County System is located in: Jackson County 3. Owner & Name of Wastewater Treatment Facility(ies) receiving wastewater from this collection system: Owner(s) & Name(s): TWSA 4. WWTF Permit Number(s): W00005763 5. What is the wastewater type? 100 % Domestic Ior Commercial % Industrial (See 15A NCAC 02T .0103(20)) Lj Is there a Pretreatment Program in effect? ❑ Yes or ® No 6. Wastewater flow: 0.5 MGD (Current average flow of wastewater generated by collection system) 7. Combined permitted flow of all treatment plants: 0 MGD 8. Explain how the wastewater flow was determined: ❑ 15A NCAC 02T .0114 or ® Representative Data 9. Population served by the collection system: 12,500 IV. COLLECTION SYSTEM INFORMATION: 1. Line Lengths for Collection System: Sewer Line Description Length Gravity Sewer 4 miles Force Main 0 miles Vacuum Sewer 0 miles Pressure Sewer 0 miles APPLICATION CSA 04-16 Page 3 of 5 93 Pump Stations for Collection System: RECEIVED Pump Station Type Numbe Simplex Pump Stations(Serving Single Building) 0 Simplex Pump Stations(Serving Multiple Buildings) Du lex Pump Stations 0 4 2024 WR/NPDES 3. Submit a list of all major (i.e. not simplex pump station serving a single family home) pump stations. Include the following information: ➢ Pump Station Name ➢ Physical Location ➢ Alarm Type (i.e. audible, visual, telemetry, SCADA) ➢ Pump Reliability (Can convey peak hourly wastewater flow with largest single pump out of service) ➢ Reliability Source (permanent/portable generator, portable pumps) ➢ Capacity of Station (Pump Station Capacity in GPM) 4. Submit a list of all high priority lines according per 15A NCAC 02T .0402(2) known to exist in the collection system. Head the list with "Attachment A for Condition V(4)" and include the system name. ➢ Use the same line identification regularly used by the applicant ➢ Indicate type of high priority line (i.e. aerial), material and general location V. COLLECTION SYSTEM ADMINISTRATION: 1. Provide a brief description of the organizational structure that is responsible for management, operation and maintenance of the collection system. WCU Facilities Mana eg ment 2. Indicate the current designated collection system operators for the collection system per 15A NCAC 08G.0201 Main ORC Name: Bradford E. Moran Certification Number: 1013916 Back -Up ORC Name: Dustin H. Melton Certification Number: 1014311 See the "WQCS Contacts and ORC Report" for a current listing of the ORC(s) the Division has on file for WQCS permit 3. Approximate annual budget for collection system only: $ 0.00 (Funded as -needed: see cover letter.) 4. Submit a copy of your current annual budget. 5. Approximate capital improvement budget for the collection system only: $ (See Cover letter) 6. Submit a copy of your current capital improvement plan. 7. Is this collection system currently a satellite system ❑ Yes or ® No 8. Do any satellite systems discharge to this collection system ❑ Yes or ® No (If yes complete table below) Satellite System Contact Information(Name, Address, Phone Number Complete for Satellite Systems that have a flow or capacity greater than 200,000 GPD (Average daily flow) 9. List any agreements or ordinances currently in place to address flows from satellite systems: N/A APPLICATION CSA 04-16 Page 4 of 5 1� 63 ' VI. - COLLECTION SYSTEM COMPLIANCE: 1. Is a Response Action Plan currently in place ® Yes or ❑ No 2. If Yes, submit a copy of the Response Action Plan or see table 6 below. 3. Is a pump station contingency plan currently in place? ❑ Yes or ® No 4. If Yes, submit a copy of the pump station contingency plan or see table 6 below. 5. Is a comprehensive collection system map currently in place? ® Yes or ❑ No 6. Submit a submit a copy of the collection system map (CD or hardcopy) or indicate a schedule for completion 7. Thoroughly read and review the System -Wide Collection System Permit Conditions. Typically compliance schedules are only offered to NEW permit applicants and NOT permit renewals. Any compliance dates must be included within the permit prior to issuance or the permit holder will be found in violation upon inspection. Permit Condition Current Compliance? If no, Indicate a Compliance Date Typical Compliance Schedule I(4) - Grease ordinance with legal authority to inspect/enforce ® Yes ❑ No 12 - 18 mo. I(5) - Grease inspection and enforcement program ® Yes ❑ No 12 - 18 mo. 1(6) - Three to five year current Capital Improvement Plan. ❑ Yes ❑ No 12 - 18 mo. 1(8) - Pump station contingency plan ❑ Yes ® No N/A 3 mo. I(9) - Pump station identification signs. ❑ Yes ® No N/A 3 mo. I(11) - Functional and conspicuous audible and visual alarms. ❑ Yes ® No N/A 3 - 6 mo. II(5) - Spare pumps for any station where one pump cannot handle peak flows alone (in a duplex station, the 2°d pump is the spare if pump reliability is met). ❑ Yes ® No N/A 6 - 9 mo. II(7) - Accessible right-of-ways and easements. ® Yes ❑ No 6 - 12 mo. II(9) - Response action plan with Items 9 (a - h). ® Yes ❑ No 3 mo. III(3) - Comprehensive collection system map ® Yes ❑ No 10% per year For conditions not listed, compliance dates are not typically offered. List any permit conditions that may be difficult for the applicant to meet (attach clarification if needed): VII. APPLICANT'S CERTIFICATION per 15A NCAC 02T .0106(b): I, irecA t 0 s E a,A JtA w- attest that this application for Si o v (Si tore Authority's Name & Title from Item I.4) (Facility name from Item I.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 5- (� i- 2 0 2 (� 1 APPLICATION CSA 04-16 Page 5 of 5 1 2. Section IVA High Priority Lines List Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu Section IV.4 High Priority Lines List 1) Baseball Field, Through Culvert @ Forest Hills Road 3) Softball Field / Picnic Area 2) Cordelia Camp Annex (Camp Lab) a 3. Section V.4: Annual Budget for Collection System Note: The Wastewater Collection System for Western Carolina University (WCU) does not operate as a stand-alone entity. All revenues and expenditures are captured along with other WCU owned facilities for financial reporting requirements. For fiscal year 2024-25, the WCU total all funds budget totaled $177,573,000 (General Fund only) of which $26,415,325 was allocated to Facilities Management (Copies of each attached). Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu Western Carolina University FY 2024-25 All -Funds Budget Auxiliary & Other Trust General Fund Overhead/F&A Receipts Restricted Trust Funds Total Funds Revenues State Appropriations $ 157,613,000 $ - $ $ $ 157,613,000 Tuition & Fees $ 25,959,000 $ 25,885,000 $ $ $ 51,844,000 Less Discounts and Allowances $ (6,205,000) $ (4,275,000) $ $ (12,587,000) $ (23,067,000) Sales & Services $ $ 64,693,000 $ $ $ 64,693,000 Patient Services $ $ - $ $ $ - Contracts & Grants $ $ - $ $ 31,466,000 $ 31,466,000 Gifts & Investments $ $ 5,655,000 $ $ 2,946,000 $ 8,601,000 Other Revenues $ 206,000 $ 1,049,000 $ 748,000 $ 208,000 $ 2,211,000 Revenues Total $ 177,573,000 $ 93,007,000 $ 748,000 $ 22,033,000 $ 293,361,000 Expenses Salaries and Wages $ 103,238,000 $ 29,922,000 $ 32,000 $ 5,346,000 $ 128,538,000 Staff Benefits $ 34,769,000 $ 7,041,000 $ 11,000 $ 1,248,000 $ 43,069,000 Services, Supplies, Materials, & Equip. $ 34,208,000 $ 52,393,000 $ 351,000 $ 1,664,000 $ 88,616,000 Scholarships & Fellowships $ 6,205,000 $ 4,275,000 $ 4,000 $ 26,197,000 $ 36,682,000 Less Discounts and Allowances $ (6,205,000) $ (4,275,000) $ - $ (12,587,000) $ (23,067,000) Debt Service $ - $ 14,291,000 $ - $ - $ 14,291,000 Utilities $ 4,621,000 $ 1,712,000 $ - $ $ 6,333,000 Other Expenses $ 739,000 $ 574,000 $ 11,000 $ 1,618,000 $ 2,942,000 Expenses Total $ 177,575,000 $ 95,933,000 $ 409,000 $ 23,486,000 $ 297,403,000 Net Transfers $ - $ 4,667,000 $ (339,000) $ 1,453,000 $ 5,781,000 Change in Fund Balance $ 1,741,000 $ - $ - $ 1741000 Western Carolina University - Unit Breakout FY 2024-25 All -Funds Budget Auxiliary & Other Overhead/F&A Restricted Trust Facilities General Fund Total Trust Funds Receipts Funds Revenues State Appropriation, Tuition, & Fees $ 26,415,325 $ 26,415,325 Sales & Services $ Patient Services $ Contracts & Grants $ Gifts & Investments $ OtherRevenues $ Revenues Total $ 26,415,325 $ - $ - $ - $ 26,415,325 Expenses Salaries and Wages $ 9,502,404 $ 9,502,404 Staff Benefits $ 4,422,226 $ 4,422,226 Services, Supplies, Materials, & Equip. $ 8,095,378 $ 8,095,378 Scholarships & Fellowships $ - Debt Service $ - Utilities $ 4,355,508 $ 4,355,508 Other Expenses $ 39,809 $ 39,809 Expenses Total $ 26,415,325 $ - $ $ $ 26,415,325 Transfers Transfers In $ Transfers Out to Capital $ Transfers Out (Other) $ Net Transfers $ $ $ $ $ - Change in Fund Balance $ (0) $ - $ - $ - $ (0) 4. Section V.6: Capital Improvement Plan Note: Capital Improvement planning is performed as a part of the State of North Carolina biennial budget process that begins July 1 of each odd -numbered year and ends on June 30 of the next odd -numbered year (through State Budget Act, G.S. Chapter 143C). Six -year capital plans are developed for major appropriations, non - appropriated, and repair and renovation (R&R) projects. Capital planning for Wastewater Collection system major projects is covered within the R&R planning. Within each biennial planning, and as R&R funding is appropriated, decisions are made on campus as to the prioritization of projects. Further, improvements are made to the system on an as needed basis from the operating budget. (Copy of 2023-29 Six Year Plan attached). A Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu FY2023-29 SIX -YEAR CAPITAL PLAN WESTERN CAROLINA UNIVERSITY FY2021-23 BUDGET APPROPRIATIONS Remaining Project 2021-2022 2022.2023 Balance to be Previous Allocations Authorization Allocation Allocation Funded FY2023-29 PROPOSED BUDGET APPROPRIATIONS Proposed 2023-2024 Allocation Proposed 2024-2025 Allocation Proposed 2025-2026 Allocation Proposed 2026-2027 Allocation Proposed 2027-2028 Proposed 2028-2029 TOTAL I. SCIF MAJOR R&R PROJECTS Killian Building-HVAC Upgrades/Window Replacement Reid Building -Roof Replacement Moore Building -Abatement, Demo. & Struct. Improvements Moore Building -Infrastructure & Accessibility Moore Building Renovation PROPOSED PROJECTS (in priorityorder) $3,570,000 $2,520,000 $7,100,00a $4,2f10,000 $15,000,000 $3,570,000 $2,S20,000 $710,000 $420,DO0 $1,500,000 $1,490,000 $0 $3,570,000 $0 $2,520,000 $4,900,000 $7,100,000 $3,780,000 $4,200,000 500 n0_0M $15,000,000 Killian Building-HVAC Upgrades/Window Replacement (Phase II) Reid Building -Roof Replacement (Phase 11) Campus Wide -Centralized Fire Alarm Reporting Upgrade Breese Building -Partial Renovation Killian Annex - Partial Renovation Camp Building- Partial Renovation Coulter Building - Partial Renovation Reid Building -Infrastructure and Structural Repairs Steam and Condensate Replacement- Forsyth to McKee Belk Building - Roof Replacement Stillwell Building - Roof Replacement $3,570,000 $3,500,000 $2,520,006 $1,225,000 $3,000,000 $2,600,000 $1,200,000 $2,190,000 $3,190,000 $3,590,000 $7,070,000 $3,745,000 $3,000,000 $3,800,000 $2,180,000 $2,330,000 $4,400,000 $2,500,000 $1,400,000 $3,190,000 $3,590,000 $2,330,000 $4,400,000 $2,500,000 $1,400,000 Chemical Storage Building Replacement Ramsey Center - Minor Building Renovation $1,500,000 $1,500,000 I $2,270,ODOI I $2,270,000 TOTAL SCIF MAJOR R&R $32,390,000 $8,720,000 $1,490,000 $22,180,000 $17,885,000 $6,730,DODI $3,900,000 $1,S00,000I $2,270,0001 $0 $40,975,005 II. SCIF MINOR (MAINTENANCE) R&R PROJECTS Proj. Auth. 2021-2022 2022-23 Balance HFR Building -Roof Replacement $660,000 $660,000 $1,000,000-$1,000,000 Campus -Wide Fire Alarm System Upgrades _ $300,000 $150,D00 $150,000 $0 Reid Building -Gym Floor Replacement $275,000 $275,000 $0 Undersized Water Main Replacements/Non-Functioning Valves/Upgrade Unes $3,OOD,000 $1,000,000 $2,000,000 Facilities Management Building -Roof Replacement $193,000 $193,000 Highlands Biological Station -Structural Repairs $250,000 1 $250,000 $0 Ramsey Activities Center -Elevator Replacement $250,000 $250,000 $0 HFR Building -Chiller Replacement $200,000 $503,866 -$303,866 Old Student Union -Foundation & Exterior Repair $45D,000 $450,0D0 Hunter Library -Cooling Tower Replacement $175,000 $500,000 -$325,000 _ Campus -Wide Egress Lighting/Exit Light Replacement $100,000 $1D0,0D0 2021-22 Cost Escalation and Contingency Reserve $20,889 2022.23 Cost Escalation and Contingency Reserve Subtotall $5,853,000 $2,355,889 $2,403,8661 $1,114,134 $0 $0 $0 So Sol $0 0 PROPOSED PROJECTS (in priority order) R&R Category Water Plant- Sulfate Storage Tank and Platform Replacement Ramsey Center- Arena Lighting and Control Replacement Dam Repair and Improvements Central Plaza -Paver and Drainage Ramsey Center-ADA Drive Improvement Campus Wide -Sidewalk Repairs Stillwell Building - Elevator Replacement Sanitary Sewer System - Repair and Replacement Stillwell Building - Glass Block Exterior Replacement Stillwell Building - Corridor Flooring Replacement Water Valve Replacement for Feed to Reservoir cture $210,000 4- Electrical, plumbHVAC $630,000 11- Roads/utilities infrcture $210,000 11-Roads/utilities infncture $735,000 -ADA $300,000 11-Roads/utilties infrcture $250,000 -ADA 11- Roads/utilities infrcture 11-Roads/utilities infrIneeds 2 - ctural 9 - Improve exisspace 11- Roadslutilities infrcture 11-Roads/utilities infrcture - ADA 11- Roads/utilities infrcture 6 - Fire saeeds B -Asbestos, LBP, UG tank, etc 12-Drainage/landscape 2 - Structural 2 -Structural $210,000 $630,000 $21D,000 $735,000 $315,000 $1,210,000 $820,000 $300,000 $250,000 $315,000 $165,375 $110,260 $55,125 $250,000 $345,000 $466,563 $1,210,000 1 $820,000 $16S,375 $110,250 $55,125 Belk Building- Sanitary Sewer Repair and Replacement Continuation of Campus Wide ADA Program McKee Building - Paving Highlands Biological Station - Fire Safety Improvements (Phase 1) Continuation of Campus Wide Asbestos Abatement Program HHS Building- Green Roof Repair and Landscape Improvements Highlands Biological Station - Structural Repairs (Phase II) HFR Building - Exterior Repair and Drainage 1 $25D,OOD $345,000 $468,563 $250,0001 1 $250,000 $202,594 $289,406 $231,525 $202,584 $289,406 231, $525 'Projects shown in bold are fully funded as of September 2022. FY2023-29 SIX -YEAR CAPITAL PLAN Stillwell Building -Window Replacement Hunter Library - Elevator Replacement (original] Bardo Arts Center - Partial Roof Replacement Killian Annex -Controls Upgrade CAT Building - Roof Replacement Ramsey Activities Center - Concrete Floor Repair Restroom Partition Replacements - Belk, Coulter, Killian McKee Building -Flooring Replacement Steam and Condensate Replacement - Balsam to Belk Switchgear Replacementat Main Substation RamseyActivities Center - Pedestrian Bridge Replacement TOTAL SCIF MINOR R&R 7 - Energy efficiency 5 - ADA 1- R 4-Electrical, plumbing, HVA 1- R 9 - Improve existing space 9 - Improve existing space 9- Improve existing space 11-Roads/utilitiesinfrastructure 11-Roads/utilities Infrastructure 2-Structural 1 $11,706,0001 $4,711,7781 $4,907,7321 $2,228,Z681 $2,335,0001 $1,650,000 $364,650 $121,550 $1,650,000 $364,650 $121,550 $243,100 $243,100 $900,000 $900,000 5335,000 $335,000 $365,000 $365,000 $600,000 $60D,000 $1,100,000 $1,100,000 $2,34S,0001 $950,000 $950,000 5365,000 $385,000 $2,367,8291 $2,379,3001 $2,200,0001 $2,43S,0001 $24,062,129 III. NAMED AND NEW APPROPRIATED CAPITAL IMPROVEMENT PROJECTS Moore Building/Upper Campus Infrastructure PROPOSED PROJECTS In priority order) 1 $9,200,0001 $9,200,0001 $9,200,000 New Engineering Building New Landscape Services Building Belk Building Comprehensive Renovation Joyner Drive Reroute and Extension TOTAL NAMED AND NEW APPROPRIATED CAPITAL $95,300,000 1 $9,200,0001 $9,200,000 $0 $0 $95,300,000 $4,800,000 $4,800,000 $95,300,000 $4,800,000 $ 98,500,000 $98,500,000 $ 10,000,000 S10,000,000 $0 $0 $98,500,000 $10,0D0,000 $208,600,000 IV. NON -APPROPRIATED MAJOR R&R AND NEW CAPITAL IMPROVEMENT PROJECTS (INCL, SELF-LIQUIDATING) Acquisition of P3 Housing Project 1 $28,500,0001 1 1 $28,500,000 PROPOSED PROJECTS in priority ardor) Self-Uqt Football Operations Center - Phase 1 Whitmire Stadium -West Stand Renovation Norton Fieldhouse Football Operations Center - Phase 11 Whitmire Stadium - East Stand Renovation Ramsey Center - Partial Renovation Ramsey Center - Multipurpose Facility Hennon Stadium - Fieldhouse and Improvements Combined Services Building $16,800,000 $25,700,000 $6,000,000 $29,300,000 $5,150,000 $16,800,000 $25,700,000 $6,000,000 $8,200,000 $9,650,0001 $ 29,300,000 $5,150,000 $8,200,005 $9,650,000 $2,800,000 $14,600,000 _ _ _ _ $2,8D0,000 $14,600,000 Coulter Building - Comprehensive Renovation TOTAL NON -APPROPRIATED MAJOR R&RAND NEW CAPITALI 1 $28,500,000 $0 SO S28,500,000 $48,500,000 $51,850,000 $17,750,000 $0 $67,200,0001 $67,200,000 $0 $67,200,000 $165,300,000 V. NON -APPROPRIATED MINOR R&R PROJECTS PROPOSED PROJECTS in priority order R&R Category Auxiliary Type Continuation of Campus Wide ADA Program Hinds UC - Elevator Replacement 5 -ADA 5 - ADA Housing other $250,Do $300,000 $250,000 $300,000 Judaculla Hall- Cooling Tower Replacement Campus Residence Halls- Fire Alarm System Upgrades University Bookstore- Exterior Wall and Column Repair Village - Elevator Door Replacements Madison Hall - Window Replacement Judaculla Hall- Controls Upgrade 4- Electrical, plumbing, HVAC 6-Fire safety needs 2-Structural 5 -ADA 7 - Energy efficiency 4- Electrical, plumbing, HVAC Housing Housing Other Housing Housing Housing Dining Housing Housing Athletics $225,0001 $240,0001 1 1$240,000 _ $225,000 _ _$263,000 $100,000 $320,000 _ _ _ $263,000 $100,000 5775,000 $430,000 $345,000 $900,000 _ _ $220,000 $320,000 $775,000 $430,000 Courtyard Dining -Controls Upgrade Buchanan Hall -Window Replacement 4- Electrical, plumbing, HVAC 7-Energy efficiency $345,000 Albright -Benton- Steam to Natural Gas Water Heater Conversion 4- Electrical, plumbing, HVAC $900,000 $220,000 Carpet Replacement - Athletic Offices 9- Improve existing space Athletics Conference Room Renovation Whitmire Stadium - Structural Repairs 9- Improve existing space 2 -Structural _ _ Athletic Athletic Athletic 1 _ $1,015,000 $6113,0001 _ _ $775,0001 _ $900,000 _$1001000 $752,000 $1,500,000 $2,602,000 $100,000 _ $782,000 Whitmire Stadium -Lighting Replacement TOTAL NON -APPROPRIATED MINOR R&R 4-Electrical, plumbing, HVAC $77S,0001 $1,500,000 $6,750,000 *Projects shown in told am fully funded as of September 2022. 5. Section V1.2 and V1.4: Response Action Plan and Contingency Plans RECEIVED JUN 0 4 2024 NCDEQ/DWR/NPDES Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu WESTERN CAROLINA UNIVERSITY CU LLOWI HE E, NORTH C:AROLI NA COMMUNICATION, ASSESSMENT, mid SPILL RESPONSE PROCEDURE SANITARY WASTE COLLECTION SYSTEM RECEIVED JUN 0 4 2024 NCDEQ/DWR/NPDES i I11M'AIZED BY: COLLECTIONS ORC CULLOW111+AL NORTH (:AROLINA January 12024 Western Carolina Universit Procedures for responding to SSO • ORC, Backup ORC or designee dispatched with jet machine to location of spill • Determine cause of blockage • Assessment of other equipment needed • Get wastewater flowing • Clean area and remove debris- rake and lime area if not near branch, stream or river S Have steam plant call down call list to locate help if needed • Repair line failure if required other than blockage • If spill is of reportable volume contact DWQ Asheville regional Office@ (828) 296-4500 within 24 hours of first knowledge of occurance NC DEQ: Emergency Response `= NC DEQ Emergency Response Reporting Sanitary Sewer Collection System Overflows Wastewater treatment systems shall verbally report to a Division of Water Resources staff member at appropriate Regional Office (https: deq.nc.gov/contact/regional-offices), but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: o Any sewer system overflow and/or spill over 1,000 gallons; or o Any sewer system overflow and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information shall not be considered as the initial verbal report. SSOs (and other types of spills) occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Follow the instructions here (http l/deq.nc.gov/about/divisions/water-resources/water-resources- permits/wastewater-branch/collection-systems/sewer-system-overttow-documents). Reporting OIL Spills OIL SPILLS THAT REACH SURFACE WATER MUST BE REPORTED TO BOTH NORTH CAROLINA ARID THE NATIONAL RESPONSE CENTER FOR OIL SPILLS THAT DON'T REACH SURFACE WATER, CLICK ON NORTH CAROLINA REQUIREMENTS FOR REPORTING SPILLS (SEE LINK BELOW.' For North Carolina, report oil spills Monday -Friday 8 a.m.-5 p.m. to the appropriate Regional Office (/contact/regional-offices). See the map below for Regional Office locations. If no answer, call (919) 807-6308. To report oil spills to the National Response Center, call (800) 424-8802 (24 hours). To report oil spills after hours or on weekends in North Carolina, call (800) 858-0368. FART Fecal Accident Resoonse Team CONTACT/TITLE TELEPHONE # Brad Morgan Collection ORC Dustin Melton Back -Up ORC 828-226-9920 PURPOSE: This plan is to be implemented in (lie event of a SanitarySewer Overflow, (SSO) or spill within the Collection System, The plan was developed to insure the key personnel response to every spill event within sixty (60) minutes of a reported event. INITIAL RESPONSE: Spills reported to or detected by collection system personnel require immediate attention. The Collection System ORC or his appointed hack -up Operator will make the preliminary assessment of the spill within 15 minutes alter receiving report. That assessment includes visiting the Spill site. The ORC or Back-up will determine the appropriate response and request assisttuice from key personnel as necessary. '1'hc allached call hack list will be maintained current And be ranked according to essential response including, i.e. equipment operators. Local contractor may he employed as deemed necessary. Key personnel ~will, upon assessing the site, continue to document the event and determine the severity, magnitude, and potential environmental impact. Ever effort should be made to minimirc the Spill event consistent with tile: containment anti source control section of this plan. The safety of the respondent should in no way be compromised. Key personnel should implement recovery actions to eliminate the cause CA' obstruction and/or system failure as outlined in this plan. POST SPILL RESPONSE, (REPORTING): After containment is achieved, the Division of Water Quality, (DWQ) must be contacted its soon as possible but, in no case later than 24 hours alter initial detection if; 1)WQ A5liLV1I.LL t�l l l(:L 20�)(► IJ.S. IIWY 70 SWANNANO A N.C. 28778 828-296-4500 FAX 828-299-7043 1) The spill has reached surfiice waters, "Watei:s of the State" or 2) The spill excecds one thousand gallons, (1,000 gals.) Every small spill must be logged on site including time, date, approximate volume, name of respondent. Spills that Are fully contained and removed quickly and are less than one thousand gallons are not required to be reported to DWQ. However, it full spill report form will be filled out and kept on file. BACKUP RESOURCES TUCKASEIGHE WATER AND SEWER AUTHORITY UI1I� IC1; 586-5189 SEWED PLANT 1 586-9318 SOURCE CONTROL AND CONTAINMENT PROCEDURE Depending on the nature of the Spill or overtlow, the initial assessment should indicate the priority of source control and/or containment. t) When the; source can be isolated through valves, plugs or other methods, the flow should be discontinued immediately or reduced to the least possible voltunc. 2) If the pumps on the location are not operating file control panel should be checked for; a. Power ON? b. Check breaker. e. Breaker closed, check thermal overloads, (External button). d. Overload good, Check fuses, if you are trained to do so. e. Is pump straining? (Clogged with debris?) f. Do you smell a burnt motor?( contact vendor from list) g, Call for Electrician. (From attached list.) 3) Containment methods will typically include; a. Sand or dirt dikes and dams. (Small streams, creeks.) b. I Iolcs of pits. I o prevent run o11'to surface waters.) If Illo shill evClll resulic(l frcml ;-III area wide power oulf1ge You Should ciln(acl l c wet. Company an(1 i(lolllil'y your silt as critical. You nluSI have accollm number fill. location. If (he probleill i5 Illedl lllil•111 ill 1111turc, rclrim,c 1)11r(s frolll illvenlory 1111(l 111i1ke, wpairs• Re-1lrcicr parts as they arc uscdl f thu ]wohlem results from sewel blockagc cull I'or jat roddillr >11r? ►chine• Or the jetter depending on the situation and need as determined by responding ORC. KEY 10IMPLOYIT's WATER AND ,Slit' W1"jW 'I VA-,E'NION11, NUMBER'S PLUMBING' NORMAL HOURS Brad Morgan - 828-507-3614 Dustin Melton- 828-226-9920 Mark Barefoot- 252-469-6194 Chris Ammons-828-506-1689 Phillip Melton- 828-226-1117 Dustin Cabe- 828-507-2816 Kevin Step hens-828-507-1 736 Jeff Coggins - 828-226-7926 Mickey Dills- 828-226-9434 Benji Collins- 828-226-7597 AFTER HOURS Brad Morgan - 828-507-3614 Dustin Melton- 828-226-9920 Philip Morris- 828-507-9875 Matt Ledbetter- 828-342-3771 Brandon Franks-828-507-7380 Mark Barefoot-252-469-6194 Chris Ammons-828-506-1689 Phillip Melton-828-226-1117 Dustin Cabe- 828-507-2816 Kevin Stephen s-828-507-1736 Jeff Coggins-828-226-7926 Mickey Dills - 828-226-9434 Benji Collins- 828-226-7597 PARTS 6"DIP 40' 8" 1/8 BENDS 8" WYE 8x4 8" 1/4 BENDS 8" COUPLINGS 8" TEES 6" TEES 6" ELLS 6"COUPLINGS 6" DWV 100, 4" DWV 100, 4" DWV ASSORTED CONNECTORS AND MAKE UPS 3" DWV 60' AND ASSORTED CONNECTORS AND MAKE UPS 3 ASSORTED MANHOLE COVERS & RINGS 2-3 PALLETS BRICK 12 assortedl2,10,8,6,4 inch DIP coupling; quandmii clamps 4" DIP 20' Assorted 6' and 8" Green PVC sewer line 80 feet RESPONSE EQUIPMENT 17QUIPMENT BACKI lOE DUMP TRUCKS BOBCAT GASOLINE POWERED GENERATORS MANHOLE VENTILATORS DROP CORD LIGHTS SAFETY HARNESSES SEWER JETTER GASOLINE POWI-Rlil) PUMPS WNI`ER TRUCK WELDING TRUCK PLUMBING SERVICE VECHICLES MINI TRACKHOI; BO13CAT SPILL OCCURRING ON: MAJOR INTERCEPTOR RIGHT OF WAY 1. Put up warning lope "DO NOT ENTER "around SSO site to restrict access. 2. In open areas lime, remove debris and lime site rotor -till if needed. Re -seed and mulch with Straw. 3. In areas were there is under growth and small trees, flush area with potable water until no waste remahis. Wait twelve to twenty four hours then lime the area. Ile certain that lime does not flush to receiving stream. NOTIC: DO NOT LIME' IF RAIN 1S FORECASTED. IN CITIZEN'S YARD 1. 'fill entire area if possible. Apply lime and follow with seed and straw. 2. If waste/debris not visible applies lime. and 2 Inches of lop soil and mix thoroughly. Apply lime lightly, seed and mulch. ON ASPHALT OR C:ONC RFTE 1. Set up containment at or near the storm drainage system. Do not let the Spill enter the storm drain system. 2. Put up Black or Red "DO NUT KNTER "tape around the SSO area. 3. Spread lime on spillage and sand or other material to it depth of one inch. Let this material absorb, for one hour, then sweep up. Dispose of debris appropriately. If spill is still evident repeat application. a. After removing the contaminated material, wash down area with high pressure water and bleach. 5. Pump elcan up materials and wash water into sanitary sewer. IN A CREEK OR STREAM 1. 'fake conductivity readings of the creek upstream and downstream to determine were temporary dam should be placed. 2. The dam should be constructed near a manhole which is accessible to the jet rodder and vacuum truck. 3. [)am should be placed below the spill as indicated by tow conductivity reading. 4. Construct a dam sized to contain the flow of water plus any flush water added during; clean rip. 5. Station two pumps at clean up site, one to use one for back - III). 6. have a back hoe at the site for dam repairs as needed. 7. Wash down all rip rap in stream bed until no residue is evident. 8. Put up warning tap "DANGER DONOT ENTER" at spill site and 401) feet down stream. 9. full stream samples for fecal coliforni. Upstream and Downstream. 10. Repeat sampling until normal, background counts 500 c.ts/100 mg. 11. If settled sludge evident sweep bottom until clean. 12. if creek or stream is recreational water notify the affected community and local officials as soon as the problem is discovered. JACKSON CO. EMERGENCY WIT. 586-7592/7508 AFTER 5:00 PM 586-1911 JACKSON CO. HEALTH DEPT 586-8994 JACKSON CO. MGR. Darlene Fox OFFICE 828-631-2207 ELECTRICIANS Jeff Gunter 828-506-1134 John Freeman 828-400-5085 Jared Rathbone 828-371-1235 Michael Wheatley 828-508-2967 Jacob Dills (Night) 828-507-4208 Darryl Buchanan 828-226-3286 Ray Randall 407-335-9154 George Roper 828-421-0083 Nathan Rhinehart 734-6928 Toby Norman 828-508-8046 Western Carolina Power Randy Fox 828-226-9253 Andy Edwards 828-399-0786 Travis Taylor 828-507-2285 Brandon Green 828-508-6205 Carpenters Rod Colton 828-507-0217 Darryl Shuler 828-226-7613 Alan Fortner 828-227-3577 Kev Contractor and Vendors Wholesale supply 828-586-6355 Ferguson Supply 828-670-6901 Core and Main 828-767-1202 Sewer Pump Trucks, Septic Tank Hauler, Etc... Roto-Rooter 828-452-0160 Roto-Rooter 828-586-5273 Sids Septic 828-488-3255 Home 488-1686 Parts Vendors Fergusons plumbing parts 828-369-7124 Night 828-545-1487 Wholesale supply 828-586-6355 Wards Plumbing 828-586-4213 828-586-3151 Imsco 800-476-2212 Sexauer 800-431-1872 Ha joca 800-968-3291 Supply Items Located at Central Warehouse Equiptment Trash Pumps and Hoses PPE Supplies Tri-Pod - Warehouse Haz Mat Suits - Warehouse Rubber Gloves - Warehouse Rubber Boots - Warehouse Masks - Warehouse Harness for Tripod — at Plumbing Shop Response_ Supplies Location Lime Warehouse Vendor Phone # 227-7298 Straw Warehouse 227-7298 6. Section V1.6: Comprehensive Collection System Map Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu DRAIN � ZONE 9 TO DUN SEWER E LIT .Q L TION ALBRIGHT-BENTON RESIDENCE HALL 2 BUCHANAN RESIDENCE HALL 3 MAGISON RESIDENCE HALL 4 MOORE BUILDING 5 REYNOLDS RESIDENCE HALL 8 CO.—BER�SON RESIDENCE HALL CDINING HALL 8 HEADER/LFATHERWOOD REPLACEMENTS B HUNTER LIBRARY 10 SBURRI NG U"` 11 NURSERY TORIU. 12 HOEY IUM 13 RCNEE BUILDING ES, LDI 4 RERDcu SRE 15 BREESE cM 'IT BIRD BUILDING I> GROUNDS MAINTENANCE/PAINT SHOP 1B STEAM GBUILDING 20 RAHNI BUILDING 2I LI NS RESIDENCE y BROWNN NDINNING HALL 25 KIWAN BUILDING 26 CORDETIA CAMP LAB BUILDING CENTER 27 CORDEIIA GAMP AB BUILDING ANNEX 28 CDRDEIN CAMP LAB BUILDING GYMNASIUM 29 OLD STUDENT UNION 3D WATER TREATMENT PLANT 31 TELEDHONE E%CIMNGE M UN —GUEST HOUSE X TRIPLEX APRARTMEM 6. ] & e 40 YOUNG DRNE FACULTY APPARTMENIS E. 12. 13. @ 14 41 YOUNG DRIVE FACULTY APPANTMEMM 1D & 11 4g 0— NINE% 49 SCOTT RESIDENCE HALL 5D FACU- APPARTMENTS (S E.GS) 54 PRINT SHOP 55 FOR— BUILDING 56 BELK BUILDING 5] HARRILL RESIDENCE HALL SB WALRER RESIDENCE HALL LD NEW FACULTY AF—TMENS JORGAN-PHIWPS FIELD HOUSE 82 NATURAL SCIDIC6 BUILDING 83 COULTER BUILDING 64 BIRD ALUMNI HOUSE 88 BEIX AUXIUANI' 87 CHEMICAL STORAGE BUILDING 89 JENKINTS HOUSE - UNNERSRY CWB 70 UNNFRSItt BOOKSTORE 71 WATER RESERVOIR ]2 AUTO MNNTAINENCE 73 RAMSEY REGIONAL ACT— CENTER 74 BATRE HOUSE 75 CENTRAL STORES/YIAREHOUSE TS ALUMNI TOWER ] CAR NO GAROUNA CENTER FOR THE ADVANCEMENT OF TEACHING 75 NO CAROUNA CENTER MR THE AWANCENEW OF TEACHING - RESIDENIS HALL (A 79 NORM OUNA CENTER FOR THE AWANCEMENT OF TEACHING - RMIDE— HALL B W WHITMIRE STADIUM AND WATERS FOOTBALL FIELD 83 HENNON STADIUM AND LHILDRESS BASEBALL FIELD FI:1L`II1:{:�J1P1•�r 98 CENTER FOR APPLIED TECHNOLOGY 9B FINE AND PERFORMING AM 1D0 CENTRAL ME RESIDENCE HALL 1011118 THE NLLAGE RESIDENCE HALLS 1M NORTON RESIDENCE HALL 121 TRACK. SOCCER. & TENNIS FACILITY 122 WOMENS SOFTBALL FAM— +y ANOREWS HOUSE 12a MW "` HOUSE 125 PUMPING STATION 127 STUDENT REC CENTER S3adN/8M®/0303N tiZL� to ;,;r;r G3AI303IJ 20NE e Vq -�- r a t g R 0�1 b ' 20NE3 �SOUNTTY EWE Q �—E ID �uF WF'R PDDEND O WCU SEWAGE COLLECTION SYSTEM BY ZONE NCDEQ/DWR/NPDES __ n - DodSE VEM JUN O 4 LJL4 NCDEQIDwRINPDES w z 0 N 4 i tt i w METER W 0 0 M R WCI Lo7 73 TWSA - -- ZONE 10 WCU SE SYD r u � 1 1 0 0 METER WC3 - DENSE VEG. ZONE 10 STEAM DISTRIBL 125 PSI STEAM 30 PSI STEAM ABANDONED LINES SEWER LI Wcu 7. Section VII: Note: There are no compliance issues. RECE��ED .oa NcpEQI p\JVRINPpES Facilities Management 3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu