Attached for your review are the following items in regards to your email dated March 27, 2024:
1. Updated and Revised Application (CSA 04-16) per your request
2. Section IV.4: High Priority Lines List
3. Section V.4: Annual Budget for Collection System
Note: The Wastewater Collection System for Western Carolina University (WCU) does
not operate as a stand-alone entity. All revenues and expenditures are captured
along with other WCU owned facilities for financial reporting requirements. For fiscal
year 2024-25, the WCU total all funds budget totaled $177,573,000 (General Fund
only) of which $26,415,325 was allocated to Facilities Management (Copies of each
attached).
4. Section V.6: Capital Improvement Plan
Note: Capital Improvement planning is performed as a part of the State of North
Carolina biennial budget process that begins July 1 of each odd -numbered year and
ends on June 30 of the next odd -numbered year (through State Budget Act, G.S.
Chapter 143C). Six -year capital plans are developed for major appropriations, non -
appropriated, and repair and renovation (R&R) projects. Capital planning for
Wastewater Collection system major projects is covered within the R&R planning.
Within each biennial planning, and as R&R funding is appropriated, decisions are
made on campus as to the prioritization of projects. Further, improvements are made
to the system on an as needed basis from the operating budget. (Copy of 2023-29 Six
Year Plan attached).
5. Section VI.2 and V1.4: Response Action Plan and Contingency Plans
6. Section VI.6: Comprehensive Collection System Map
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu
7. Section VII:
Note: There are no compliance issues.
If you should have any further questions, please contact this office.
Sincerely,
j--w ) wl*\�
Jason Turner
Director, Operations and Maintenance
RECEIVED
0 4 ',' ""4
NCDEQ/DWR/NPDES
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu
'#
I. APPLICANT INFORMATION:
1. Applicant's name (Municipality, Public Utility, etc): Western Carolina University, State of North Carolina
2. Facility Information: Name: WCU Collection System Permit No.: WQCS00200
3. Applicant type: ❑ Municipal ® State ❑ Privately -Owned Public Utility
❑ County ❑ Other:
4. Signature authority's name: Jason Turner per 15A NCAC 02T .0106(b)
Title: Director, Op's and Maintenance
5. Applicant's mailing address: 3476 Old Cullowhee Road
City: Cullowhee State: NC Zip: 28723-
6. Applicant's contact information:
Phone number: (�28) 227-3563 Fax number: 828 227-7198 Email address: jstumer@,wcu.edu
H. CONTACT/CONSULTANT INFORMATION:
1. Contact Name: Jason S. Turner
2. Title/Affiliation: Director, Op's and Maintenance
3. Contact's mailing address: 3476 Old Cullowhee Road
4. City: Cullowhee State: NC Zip: 28723-
5. Contact's information:
Phone number: (B28) 227-3563 Fax number: (828) 227-7198 Email address: istumer()wcu.edu
III. GENERAL REQUIREMENTS:
1. New Permit or Premit Renewal? ❑ New ® Renewal
2. County System is located in: Jackson County
3. Owner & Name of Wastewater Treatment Facility(ies) receiving wastewater from this collection system:
Owner(s) & Name(s): TWSA
4. WWTF Permit Number(s): W00005763
5. What is the wastewater type? 100 % Domestic Ior Commercial % Industrial (See 15A NCAC 02T .0103(20))
Lj Is there a Pretreatment Program in effect? ❑ Yes or ® No
6. Wastewater flow: 0.5 MGD (Current average flow of wastewater generated by collection system)
7. Combined permitted flow of all treatment plants: 0 MGD
8. Explain how the wastewater flow was determined: ❑ 15A NCAC 02T .0114 or ® Representative Data
9. Population served by the collection system: 12,500
IV. COLLECTION SYSTEM INFORMATION:
1. Line Lengths for Collection System:
Sewer Line Description
Length
Gravity Sewer
4 miles
Force Main
0 miles
Vacuum Sewer
0 miles
Pressure Sewer
0 miles
APPLICATION CSA 04-16 Page 3 of 5
93
Pump Stations for Collection System:
RECEIVED
Pump Station Type
Numbe
Simplex Pump Stations(Serving Single Building)
0
Simplex Pump Stations(Serving Multiple Buildings)
Du lex Pump Stations
0
4 2024
WR/NPDES
3. Submit a list of all major (i.e. not simplex pump station serving a single family home) pump stations. Include the following
information:
➢ Pump Station Name
➢ Physical Location
➢ Alarm Type (i.e. audible, visual, telemetry, SCADA)
➢ Pump Reliability (Can convey peak hourly wastewater flow with largest single pump out of service)
➢ Reliability Source (permanent/portable generator, portable pumps)
➢ Capacity of Station (Pump Station Capacity in GPM)
4. Submit a list of all high priority lines according per 15A NCAC 02T .0402(2) known to exist in the collection system. Head
the list with "Attachment A for Condition V(4)" and include the system name.
➢ Use the same line identification regularly used by the applicant
➢ Indicate type of high priority line (i.e. aerial), material and general location
V. COLLECTION SYSTEM ADMINISTRATION:
1. Provide a brief description of the organizational structure that is responsible for management, operation and maintenance of
the collection system.
WCU Facilities Mana eg ment
2. Indicate the current designated collection system operators for the collection system per 15A NCAC 08G.0201
Main ORC Name: Bradford E. Moran
Certification Number: 1013916
Back -Up ORC Name: Dustin H. Melton
Certification Number: 1014311
See the "WQCS Contacts and ORC Report" for a current listing of the ORC(s) the Division has on file for WQCS permit
3. Approximate annual budget for collection system only: $ 0.00 (Funded as -needed: see cover letter.)
4. Submit a copy of your current annual budget.
5. Approximate capital improvement budget for the collection system only: $ (See Cover letter)
6. Submit a copy of your current capital improvement plan.
7. Is this collection system currently a satellite system ❑ Yes or ® No
8. Do any satellite systems discharge to this collection system ❑ Yes or ® No (If yes complete table below)
Satellite System Contact Information(Name, Address, Phone Number
Complete for Satellite Systems that have a flow or capacity greater than 200,000 GPD (Average daily flow)
9. List any agreements or ordinances currently in place to address flows from satellite systems:
N/A
APPLICATION CSA 04-16 Page 4 of 5
1� 63
' VI. - COLLECTION SYSTEM COMPLIANCE:
1. Is a Response Action Plan currently in place ® Yes or ❑ No
2. If Yes, submit a copy of the Response Action Plan or see table 6 below.
3. Is a pump station contingency plan currently in place? ❑ Yes or ® No
4. If Yes, submit a copy of the pump station contingency plan or see table 6 below.
5. Is a comprehensive collection system map currently in place? ® Yes or ❑ No
6. Submit a submit a copy of the collection system map (CD or hardcopy) or indicate a schedule for completion
7. Thoroughly read and review the System -Wide Collection System Permit Conditions. Typically compliance schedules
are only offered to NEW permit applicants and NOT permit renewals. Any compliance dates must be included within
the permit prior to issuance or the permit holder will be found in violation upon inspection.
Permit Condition
Current
Compliance?
If no, Indicate a
Compliance
Date
Typical
Compliance
Schedule
I(4) - Grease ordinance with legal authority to inspect/enforce
® Yes ❑ No
12 - 18 mo.
I(5) - Grease inspection and enforcement program
® Yes ❑ No
12 - 18 mo.
1(6) - Three to five year current Capital Improvement Plan.
❑ Yes ❑ No
12 - 18 mo.
1(8) - Pump station contingency plan
❑ Yes ® No
N/A
3 mo.
I(9) - Pump station identification signs.
❑ Yes ® No
N/A
3 mo.
I(11) - Functional and conspicuous audible and visual alarms.
❑ Yes ® No
N/A
3 - 6 mo.
II(5) - Spare pumps for any station where one pump cannot
handle peak flows alone (in a duplex station, the 2°d pump is
the spare if pump reliability is met).
❑ Yes ® No
N/A
6 - 9 mo.
II(7) - Accessible right-of-ways and easements.
® Yes ❑ No
6 - 12 mo.
II(9) - Response action plan with Items 9 (a - h).
® Yes ❑ No
3 mo.
III(3) - Comprehensive collection system map
® Yes ❑ No
10% per year
For conditions not listed, compliance dates are not typically offered. List any permit conditions that may be difficult for the
applicant to meet (attach clarification if needed):
VII. APPLICANT'S CERTIFICATION per 15A NCAC 02T .0106(b):
I, irecA t 0 s E a,A JtA w- attest that this application for Si
o v
(Si tore Authority's Name & Title from Item I.4) (Facility name from Item I.1)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this
application are not completed and that if all required supporting information and attachments are not included, this application package
will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement,
representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed
$10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 5- (� i- 2 0 2 (� 1
APPLICATION CSA 04-16 Page 5 of 5
1
2. Section IVA High Priority Lines List
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu
Section IV.4 High Priority Lines List
1) Baseball Field, Through Culvert @ Forest Hills Road
3) Softball Field / Picnic Area
2) Cordelia Camp Annex (Camp Lab)
a
3. Section V.4: Annual Budget for Collection System
Note: The Wastewater Collection System for Western Carolina University (WCU) does
not operate as a stand-alone entity. All revenues and expenditures are captured
along with other WCU owned facilities for financial reporting requirements. For fiscal
year 2024-25, the WCU total all funds budget totaled $177,573,000 (General Fund
only) of which $26,415,325 was allocated to Facilities Management (Copies of each
attached).
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu
Western Carolina University
FY 2024-25 All -Funds Budget
Auxiliary & Other Trust
General Fund Overhead/F&A Receipts Restricted Trust Funds Total
Funds
Revenues State Appropriations
$
157,613,000
$ -
$ $
$
157,613,000
Tuition & Fees
$
25,959,000
$ 25,885,000
$ $
$
51,844,000
Less Discounts and Allowances
$
(6,205,000)
$ (4,275,000)
$ $
(12,587,000)
$
(23,067,000)
Sales & Services
$
$ 64,693,000
$ $
$
64,693,000
Patient Services
$
$ -
$ $
$
-
Contracts & Grants
$
$ -
$ $
31,466,000
$
31,466,000
Gifts & Investments
$
$ 5,655,000
$ $
2,946,000
$
8,601,000
Other Revenues
$
206,000
$ 1,049,000
$ 748,000 $
208,000
$
2,211,000
Revenues Total
$
177,573,000
$ 93,007,000
$ 748,000 $
22,033,000
$
293,361,000
Expenses Salaries and Wages
$
103,238,000
$ 29,922,000
$ 32,000
$ 5,346,000
$ 128,538,000
Staff Benefits
$
34,769,000
$ 7,041,000
$ 11,000
$ 1,248,000
$ 43,069,000
Services, Supplies, Materials, & Equip.
$
34,208,000
$ 52,393,000
$ 351,000
$ 1,664,000
$ 88,616,000
Scholarships & Fellowships
$
6,205,000
$ 4,275,000
$ 4,000
$ 26,197,000
$ 36,682,000
Less Discounts and Allowances
$
(6,205,000)
$ (4,275,000)
$ -
$ (12,587,000)
$ (23,067,000)
Debt Service
$
-
$ 14,291,000
$ -
$ -
$ 14,291,000
Utilities
$
4,621,000
$ 1,712,000
$ -
$
$ 6,333,000
Other Expenses
$
739,000
$ 574,000
$ 11,000
$ 1,618,000
$ 2,942,000
Expenses Total
$
177,575,000
$ 95,933,000
$ 409,000
$ 23,486,000
$ 297,403,000
Net Transfers
$
-
$ 4,667,000
$ (339,000)
$ 1,453,000
$ 5,781,000
Change in Fund Balance
$ 1,741,000
$ -
$ -
$ 1741000
Western Carolina University - Unit Breakout
FY 2024-25 All -Funds Budget
Auxiliary & Other Overhead/F&A Restricted Trust
Facilities General Fund Total
Trust Funds Receipts Funds
Revenues State Appropriation, Tuition, & Fees $ 26,415,325 $ 26,415,325
Sales & Services $
Patient Services $
Contracts & Grants $
Gifts & Investments $
OtherRevenues $
Revenues Total $ 26,415,325 $ - $ - $ - $ 26,415,325
Expenses Salaries and Wages
$
9,502,404
$
9,502,404
Staff Benefits
$
4,422,226
$
4,422,226
Services, Supplies, Materials, & Equip.
$
8,095,378
$
8,095,378
Scholarships & Fellowships
$
-
Debt Service
$
-
Utilities
$
4,355,508
$
4,355,508
Other Expenses
$
39,809
$
39,809
Expenses Total
$
26,415,325 $ - $
$ $
26,415,325
Transfers Transfers In $
Transfers Out to Capital $
Transfers Out (Other) $
Net Transfers $ $ $ $ $ -
Change in Fund Balance $ (0) $ - $ - $ - $ (0)
4. Section V.6: Capital Improvement Plan
Note: Capital Improvement planning is performed as a part of the State of North
Carolina biennial budget process that begins July 1 of each odd -numbered year and
ends on June 30 of the next odd -numbered year (through State Budget Act, G.S.
Chapter 143C). Six -year capital plans are developed for major appropriations, non -
appropriated, and repair and renovation (R&R) projects. Capital planning for
Wastewater Collection system major projects is covered within the R&R planning.
Within each biennial planning, and as R&R funding is appropriated, decisions are
made on campus as to the prioritization of projects. Further, improvements are made
to the system on an as needed basis from the operating budget. (Copy of 2023-29 Six
Year Plan attached).
A
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu
FY2023-29 SIX -YEAR CAPITAL PLAN
WESTERN CAROLINA UNIVERSITY
FY2021-23 BUDGET APPROPRIATIONS
Remaining
Project 2021-2022 2022.2023 Balance to be
Previous Allocations Authorization Allocation Allocation Funded
FY2023-29 PROPOSED BUDGET APPROPRIATIONS
Proposed
2023-2024
Allocation
Proposed
2024-2025
Allocation
Proposed
2025-2026
Allocation
Proposed
2026-2027
Allocation
Proposed
2027-2028
Proposed
2028-2029
TOTAL
I. SCIF MAJOR R&R PROJECTS
Killian Building-HVAC Upgrades/Window Replacement
Reid Building -Roof Replacement
Moore Building -Abatement, Demo. & Struct. Improvements
Moore Building -Infrastructure & Accessibility
Moore Building Renovation
PROPOSED PROJECTS (in priorityorder)
$3,570,000
$2,520,000
$7,100,00a
$4,2f10,000
$15,000,000
$3,570,000
$2,S20,000
$710,000
$420,DO0
$1,500,000
$1,490,000
$0 $3,570,000
$0 $2,520,000
$4,900,000 $7,100,000
$3,780,000 $4,200,000
500 n0_0M $15,000,000
Killian Building-HVAC Upgrades/Window Replacement (Phase II)
Reid Building -Roof Replacement (Phase 11)
Campus Wide -Centralized Fire Alarm Reporting Upgrade
Breese Building -Partial Renovation
Killian Annex - Partial Renovation
Camp Building- Partial Renovation
Coulter Building - Partial Renovation
Reid Building -Infrastructure and Structural Repairs
Steam and Condensate Replacement- Forsyth to McKee
Belk Building - Roof Replacement
Stillwell Building - Roof Replacement
$3,570,000 $3,500,000
$2,520,006 $1,225,000
$3,000,000
$2,600,000 $1,200,000
$2,190,000
$3,190,000
$3,590,000
$7,070,000
$3,745,000
$3,000,000
$3,800,000
$2,180,000
$2,330,000
$4,400,000
$2,500,000
$1,400,000
$3,190,000
$3,590,000
$2,330,000
$4,400,000
$2,500,000
$1,400,000
Chemical Storage Building Replacement
Ramsey Center - Minor Building Renovation
$1,500,000
$1,500,000
I $2,270,ODOI
I $2,270,000
TOTAL SCIF MAJOR R&R
$32,390,000 $8,720,000 $1,490,000 $22,180,000 $17,885,000
$6,730,DODI
$3,900,000
$1,S00,000I
$2,270,0001
$0
$40,975,005
II. SCIF MINOR (MAINTENANCE) R&R PROJECTS Proj. Auth. 2021-2022 2022-23 Balance
HFR Building -Roof Replacement
$660,000 $660,000
$1,000,000-$1,000,000
Campus -Wide Fire Alarm System Upgrades
_ $300,000
$150,D00
$150,000
$0
Reid Building -Gym Floor Replacement
$275,000
$275,000
$0
Undersized Water Main Replacements/Non-Functioning Valves/Upgrade
Unes $3,OOD,000
$1,000,000
$2,000,000
Facilities Management Building -Roof Replacement
$193,000
$193,000
Highlands Biological Station -Structural Repairs
$250,000
1 $250,000
$0
Ramsey Activities Center -Elevator Replacement
$250,000
$250,000
$0
HFR Building -Chiller Replacement
$200,000
$503,866
-$303,866
Old Student Union -Foundation & Exterior Repair
$45D,000
$450,0D0
Hunter Library -Cooling Tower Replacement
$175,000
$500,000
-$325,000
_
Campus -Wide Egress Lighting/Exit Light Replacement
$100,000
$1D0,0D0
2021-22 Cost Escalation and Contingency Reserve
$20,889
2022.23 Cost Escalation and Contingency Reserve
Subtotall $5,853,000
$2,355,889
$2,403,8661
$1,114,134 $0
$0
$0
So
Sol
$0
0
PROPOSED PROJECTS (in priority order)
R&R Category
Water Plant- Sulfate Storage Tank and Platform Replacement
Ramsey Center- Arena Lighting and Control Replacement
Dam Repair and Improvements
Central Plaza -Paver and Drainage
Ramsey Center-ADA Drive Improvement
Campus Wide -Sidewalk Repairs
Stillwell Building - Elevator Replacement
Sanitary Sewer System - Repair and Replacement
Stillwell Building - Glass Block Exterior Replacement
Stillwell Building - Corridor Flooring Replacement
Water Valve Replacement for Feed to Reservoir
cture $210,000
4- Electrical, plumbHVAC $630,000
11- Roads/utilities infrcture $210,000
11-Roads/utilities infncture $735,000
-ADA $300,000
11-Roads/utilties infrcture $250,000
-ADA
11- Roads/utilities infrcture
11-Roads/utilities infrIneeds
2 - ctural
9 - Improve exisspace
11- Roadslutilities infrcture
11-Roads/utilities infrcture
- ADA
11- Roads/utilities infrcture
6 - Fire saeeds
B -Asbestos, LBP, UG tank, etc
12-Drainage/landscape
2 - Structural
2 -Structural
$210,000
$630,000
$21D,000
$735,000
$315,000
$1,210,000
$820,000
$300,000
$250,000
$315,000
$165,375
$110,260
$55,125
$250,000
$345,000
$466,563
$1,210,000
1
$820,000
$16S,375
$110,250
$55,125
Belk Building- Sanitary Sewer Repair and Replacement
Continuation of Campus Wide ADA Program
McKee Building - Paving
Highlands Biological Station - Fire Safety Improvements (Phase 1)
Continuation of Campus Wide Asbestos Abatement Program
HHS Building- Green Roof Repair and Landscape Improvements
Highlands Biological Station - Structural Repairs (Phase II)
HFR Building - Exterior Repair and Drainage
1
$25D,OOD
$345,000
$468,563
$250,0001
1 $250,000
$202,594
$289,406
$231,525
$202,584
$289,406
231, $525
'Projects shown in bold are fully funded as of September 2022.
FY2023-29 SIX -YEAR CAPITAL PLAN
Stillwell Building -Window Replacement
Hunter Library - Elevator Replacement (original]
Bardo Arts Center - Partial Roof Replacement
Killian Annex -Controls Upgrade
CAT Building - Roof Replacement
Ramsey Activities Center - Concrete Floor Repair
Restroom Partition Replacements - Belk, Coulter, Killian
McKee Building -Flooring Replacement
Steam and Condensate Replacement - Balsam to Belk
Switchgear Replacementat Main Substation
RamseyActivities Center - Pedestrian Bridge Replacement
TOTAL SCIF MINOR R&R
7 - Energy efficiency
5 - ADA
1- R
4-Electrical, plumbing, HVA
1- R
9 - Improve existing space
9 - Improve existing space
9- Improve existing space
11-Roads/utilitiesinfrastructure
11-Roads/utilities Infrastructure
2-Structural
1 $11,706,0001 $4,711,7781 $4,907,7321 $2,228,Z681 $2,335,0001
$1,650,000
$364,650
$121,550
$1,650,000
$364,650
$121,550
$243,100
$243,100
$900,000
$900,000
5335,000
$335,000
$365,000
$365,000
$600,000
$60D,000
$1,100,000
$1,100,000
$2,34S,0001
$950,000
$950,000
5365,000
$385,000
$2,367,8291
$2,379,3001
$2,200,0001
$2,43S,0001
$24,062,129
III. NAMED AND NEW APPROPRIATED CAPITAL IMPROVEMENT PROJECTS
Moore Building/Upper Campus Infrastructure
PROPOSED PROJECTS In priority order)
1 $9,200,0001 $9,200,0001 $9,200,000
New Engineering Building
New Landscape Services Building
Belk Building Comprehensive Renovation
Joyner Drive Reroute and Extension
TOTAL NAMED AND NEW APPROPRIATED CAPITAL
$95,300,000
1 $9,200,0001 $9,200,000 $0 $0 $95,300,000
$4,800,000
$4,800,000
$95,300,000
$4,800,000
$ 98,500,000
$98,500,000
$ 10,000,000
S10,000,000
$0
$0
$98,500,000
$10,0D0,000
$208,600,000
IV. NON -APPROPRIATED MAJOR R&R AND NEW CAPITAL IMPROVEMENT PROJECTS (INCL, SELF-LIQUIDATING)
Acquisition of P3 Housing Project
1 $28,500,0001 1 1 $28,500,000
PROPOSED PROJECTS in priority ardor)
Self-Uqt
Football Operations Center - Phase 1
Whitmire Stadium -West Stand Renovation
Norton Fieldhouse
Football Operations Center - Phase 11
Whitmire Stadium - East Stand Renovation
Ramsey Center - Partial Renovation
Ramsey Center - Multipurpose Facility
Hennon Stadium - Fieldhouse and Improvements
Combined Services Building
$16,800,000
$25,700,000
$6,000,000
$29,300,000
$5,150,000
$16,800,000
$25,700,000
$6,000,000
$8,200,000
$9,650,0001
$ 29,300,000
$5,150,000
$8,200,005
$9,650,000
$2,800,000
$14,600,000
_ _ _ _
$2,8D0,000
$14,600,000
Coulter Building - Comprehensive Renovation
TOTAL NON -APPROPRIATED MAJOR R&RAND NEW CAPITALI
1 $28,500,000 $0 SO S28,500,000 $48,500,000
$51,850,000
$17,750,000
$0
$67,200,0001
$67,200,000
$0
$67,200,000
$165,300,000
V. NON -APPROPRIATED MINOR R&R PROJECTS
PROPOSED PROJECTS in priority order
R&R Category
Auxiliary Type
Continuation of Campus Wide ADA Program
Hinds UC - Elevator Replacement
5 -ADA
5 - ADA
Housing
other
$250,Do
$300,000
$250,000
$300,000
Judaculla Hall- Cooling Tower Replacement
Campus Residence Halls- Fire Alarm System Upgrades
University Bookstore- Exterior Wall and Column Repair
Village - Elevator Door Replacements
Madison Hall - Window Replacement
Judaculla Hall- Controls Upgrade
4- Electrical, plumbing, HVAC
6-Fire safety needs
2-Structural
5 -ADA
7 - Energy efficiency
4- Electrical, plumbing, HVAC
Housing
Housing
Other
Housing
Housing
Housing
Dining
Housing
Housing
Athletics
$225,0001
$240,0001
1
1$240,000
_
$225,000
_ _$263,000
$100,000
$320,000
_
_ _
$263,000
$100,000
5775,000
$430,000
$345,000
$900,000
_
_
$220,000
$320,000
$775,000
$430,000
Courtyard Dining -Controls Upgrade
Buchanan Hall -Window Replacement
4- Electrical, plumbing, HVAC
7-Energy efficiency
$345,000
Albright -Benton- Steam to Natural Gas Water Heater Conversion
4- Electrical, plumbing, HVAC
$900,000
$220,000
Carpet Replacement - Athletic Offices
9- Improve existing space
Athletics Conference Room Renovation
Whitmire Stadium - Structural Repairs
9- Improve existing space
2 -Structural
_
_ Athletic
Athletic
Athletic
1
_
$1,015,000
$6113,0001
_ _
$775,0001
_
$900,000
_$1001000
$752,000
$1,500,000
$2,602,000
$100,000
_
$782,000
Whitmire Stadium -Lighting Replacement
TOTAL NON -APPROPRIATED MINOR R&R
4-Electrical, plumbing, HVAC
$77S,0001
$1,500,000
$6,750,000
*Projects shown in told am fully funded as of September 2022.
5. Section V1.2 and V1.4: Response Action Plan and Contingency Plans
RECEIVED
JUN 0 4 2024
NCDEQ/DWR/NPDES
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu
WESTERN CAROLINA UNIVERSITY
CU LLOWI HE E, NORTH C:AROLI NA
COMMUNICATION, ASSESSMENT,
mid
SPILL RESPONSE PROCEDURE
SANITARY WASTE COLLECTION
SYSTEM
RECEIVED
JUN 0 4 2024
NCDEQ/DWR/NPDES
i
I11M'AIZED BY: COLLECTIONS ORC
CULLOW111+AL NORTH (:AROLINA
January 12024
Western Carolina Universit
Procedures for responding to SSO
• ORC, Backup ORC or designee dispatched with jet
machine to location of spill
• Determine cause of blockage
• Assessment of other equipment needed
• Get wastewater flowing
• Clean area and remove debris- rake and lime area if
not near branch, stream or river
S Have steam plant call down call list to locate help if
needed
• Repair line failure if required other than blockage
• If spill is of reportable volume contact DWQ
Asheville regional Office@ (828) 296-4500 within 24
hours of first knowledge of occurance
NC DEQ: Emergency Response
`= NC DEQ
Emergency Response
Reporting Sanitary Sewer Collection System Overflows
Wastewater treatment systems shall verbally report to a Division of Water Resources staff member
at appropriate Regional Office (https: deq.nc.gov/contact/regional-offices), but in no case more than
24 hours following the occurrence or first knowledge of the occurrence of either of the following:
o Any sewer system overflow and/or spill over 1,000 gallons; or
o Any sewer system overflow and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information shall not be considered as the initial verbal report. SSOs
(and other types of spills) occurring outside normal business hours may also be reported to the
Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Follow the instructions here (http l/deq.nc.gov/about/divisions/water-resources/water-resources-
permits/wastewater-branch/collection-systems/sewer-system-overttow-documents).
Reporting OIL Spills
OIL SPILLS THAT REACH SURFACE WATER MUST BE REPORTED TO BOTH NORTH CAROLINA ARID
THE NATIONAL RESPONSE CENTER
FOR OIL SPILLS THAT DON'T REACH SURFACE WATER, CLICK ON NORTH CAROLINA
REQUIREMENTS FOR REPORTING SPILLS (SEE LINK BELOW.'
For North Carolina, report oil spills Monday -Friday 8 a.m.-5 p.m. to the appropriate Regional Office
(/contact/regional-offices). See the map below for Regional Office locations. If no answer, call (919)
807-6308.
To report oil spills to the National Response Center, call (800) 424-8802 (24 hours).
To report oil spills after hours or on weekends in North Carolina, call (800) 858-0368.
FART
Fecal Accident Resoonse Team
CONTACT/TITLE TELEPHONE #
Brad Morgan
Collection ORC
Dustin Melton
Back -Up ORC
828-226-9920
PURPOSE:
This plan is to be implemented in (lie event of a SanitarySewer Overflow, (SSO)
or spill within the Collection System, The plan was developed to insure the key personnel
response to every spill event within sixty (60) minutes of a reported event.
INITIAL RESPONSE:
Spills reported to or detected by collection system personnel require immediate
attention. The Collection System ORC or his appointed hack -up Operator will make the
preliminary assessment of the spill within 15 minutes alter receiving report. That
assessment includes visiting the Spill site. The ORC or Back-up will determine the
appropriate response and request assisttuice from key personnel as necessary. '1'hc
allached call hack list will be maintained current And be ranked according to essential
response including, i.e. equipment operators. Local contractor may he employed as
deemed necessary.
Key personnel ~will, upon assessing the site, continue to document the event and
determine the severity, magnitude, and potential environmental impact. Ever effort
should be made to minimirc the Spill event consistent with tile: containment anti source
control section of this plan. The safety of the respondent should in no way be
compromised.
Key personnel should implement recovery actions to eliminate the cause CA'
obstruction and/or system failure as outlined in this plan.
POST SPILL RESPONSE, (REPORTING):
After containment is achieved, the Division of Water Quality, (DWQ) must be
contacted its soon as possible but, in no case later than 24 hours alter initial detection if;
1)WQ A5liLV1I.LL t�l l l(:L 20�)(► IJ.S. IIWY 70 SWANNANO A N.C. 28778
828-296-4500 FAX 828-299-7043
1) The spill has reached surfiice waters, "Watei:s of the State" or
2) The spill excecds one thousand gallons, (1,000 gals.)
Every small spill must be logged on site including time, date, approximate
volume, name of respondent.
Spills that Are fully contained and removed quickly and are less than one thousand
gallons are not required to be reported to DWQ. However, it full spill report form will be
filled out and kept on file.
BACKUP RESOURCES
TUCKASEIGHE WATER AND SEWER AUTHORITY
UI1I� IC1; 586-5189
SEWED PLANT 1 586-9318
SOURCE CONTROL AND CONTAINMENT
PROCEDURE
Depending on the nature of the Spill or overtlow, the initial assessment
should indicate the priority of source control and/or containment.
t) When the; source can be isolated through valves, plugs or other
methods, the flow should be discontinued immediately or reduced
to the least possible voltunc.
2) If the pumps on the location are not operating file control panel
should be checked for;
a. Power ON?
b. Check breaker.
e. Breaker closed, check thermal overloads, (External button).
d. Overload good, Check fuses, if you are trained to do so.
e. Is pump straining? (Clogged with debris?)
f. Do you smell a burnt motor?( contact vendor from list)
g, Call for Electrician. (From attached list.)
3) Containment methods will typically include;
a. Sand or dirt dikes and dams. (Small streams, creeks.)
b. I Iolcs of pits. I o prevent run o11'to surface waters.)
If Illo shill evClll resulic(l frcml ;-III area wide power oulf1ge You Should ciln(acl
l c wet. Company an(1 i(lolllil'y your silt as critical. You nluSI have accollm number
fill. location.
If (he probleill i5 Illedl lllil•111 ill 1111turc, rclrim,c 1)11r(s frolll illvenlory 1111(l 111i1ke,
wpairs• Re-1lrcicr parts as they arc uscdl
f thu ]wohlem results from sewel blockagc cull I'or jat roddillr >11r? ►chine•
Or the jetter depending on the situation and need as determined by responding ORC.
KEY 10IMPLOYIT's
WATER AND ,Slit' W1"jW 'I VA-,E'NION11, NUMBER'S
PLUMBING'
NORMAL HOURS
Brad Morgan - 828-507-3614
Dustin Melton- 828-226-9920
Mark Barefoot- 252-469-6194
Chris Ammons-828-506-1689
Phillip Melton- 828-226-1117
Dustin Cabe- 828-507-2816
Kevin Step hens-828-507-1 736
Jeff Coggins - 828-226-7926
Mickey Dills- 828-226-9434
Benji Collins- 828-226-7597
AFTER HOURS
Brad Morgan - 828-507-3614
Dustin Melton- 828-226-9920
Philip Morris- 828-507-9875
Matt Ledbetter- 828-342-3771
Brandon Franks-828-507-7380
Mark Barefoot-252-469-6194
Chris Ammons-828-506-1689
Phillip Melton-828-226-1117
Dustin Cabe- 828-507-2816
Kevin Stephen s-828-507-1736
Jeff Coggins-828-226-7926
Mickey Dills - 828-226-9434
Benji Collins- 828-226-7597
PARTS
6"DIP 40'
8" 1/8 BENDS
8" WYE 8x4
8" 1/4 BENDS
8" COUPLINGS
8" TEES
6" TEES
6" ELLS
6"COUPLINGS
6" DWV 100,
4" DWV 100,
4" DWV ASSORTED CONNECTORS AND MAKE UPS
3" DWV 60' AND ASSORTED CONNECTORS AND MAKE UPS
3 ASSORTED MANHOLE COVERS & RINGS
2-3 PALLETS BRICK
12 assortedl2,10,8,6,4 inch DIP coupling; quandmii clamps
4" DIP 20'
Assorted 6' and 8" Green PVC sewer line 80 feet
RESPONSE EQUIPMENT
17QUIPMENT
BACKI lOE
DUMP TRUCKS
BOBCAT
GASOLINE POWERED GENERATORS
MANHOLE VENTILATORS
DROP CORD LIGHTS
SAFETY HARNESSES
SEWER JETTER
GASOLINE POWI-Rlil) PUMPS
WNI`ER TRUCK
WELDING TRUCK
PLUMBING SERVICE VECHICLES
MINI TRACKHOI; BO13CAT
SPILL OCCURRING ON:
MAJOR INTERCEPTOR RIGHT OF WAY
1. Put up warning lope "DO NOT ENTER "around
SSO site to restrict access.
2. In open areas lime, remove debris and lime site
rotor -till if needed. Re -seed and mulch with
Straw.
3. In areas were there is under growth and small
trees, flush area with potable water until no
waste remahis. Wait twelve to twenty four hours
then lime the area. Ile certain that lime does not
flush to receiving stream.
NOTIC: DO NOT LIME' IF RAIN 1S FORECASTED.
IN CITIZEN'S YARD
1. 'fill entire area if possible. Apply lime and follow
with seed and straw.
2. If waste/debris not visible applies lime. and 2
Inches of lop soil and mix thoroughly. Apply lime
lightly, seed and mulch.
ON ASPHALT OR C:ONC RFTE
1. Set up containment at or near the storm drainage
system. Do not let the Spill enter the storm drain
system.
2. Put up Black or Red "DO NUT KNTER "tape
around the SSO area.
3. Spread lime on spillage and sand or other material
to it depth of one inch. Let this material absorb, for
one hour, then sweep up. Dispose of debris
appropriately. If spill is still evident repeat
application.
a. After removing the contaminated material, wash
down area with high pressure water and bleach.
5. Pump elcan up materials and wash water into
sanitary sewer.
IN A CREEK OR STREAM
1. 'fake conductivity readings of the creek upstream and
downstream to determine were temporary dam should be
placed.
2. The dam should be constructed near a manhole which is
accessible to the jet rodder and vacuum truck.
3. [)am should be placed below the spill as indicated by tow
conductivity reading.
4. Construct a dam sized to contain the flow of water plus any
flush water added during; clean rip.
5. Station two pumps at clean up site, one to use one for back -
III).
6. have a back hoe at the site for dam repairs as needed.
7. Wash down all rip rap in stream bed until no residue is
evident.
8. Put up warning tap "DANGER DONOT ENTER"
at spill site and 401) feet down stream.
9. full stream samples for fecal coliforni. Upstream and
Downstream.
10. Repeat sampling until normal, background counts 500
c.ts/100 mg.
11. If settled sludge evident sweep bottom until clean.
12. if creek or stream is recreational water notify the affected
community and local officials as soon as the problem is
discovered.
JACKSON CO. EMERGENCY WIT.
586-7592/7508 AFTER 5:00 PM 586-1911
JACKSON CO. HEALTH DEPT
586-8994
JACKSON CO. MGR.
Darlene Fox
OFFICE
828-631-2207
ELECTRICIANS
Jeff Gunter 828-506-1134
John Freeman 828-400-5085
Jared Rathbone 828-371-1235
Michael Wheatley 828-508-2967
Jacob Dills (Night) 828-507-4208
Darryl Buchanan 828-226-3286
Ray Randall 407-335-9154
George Roper 828-421-0083
Nathan Rhinehart 734-6928
Toby Norman 828-508-8046
Western Carolina Power
Randy Fox 828-226-9253
Andy Edwards 828-399-0786
Travis Taylor 828-507-2285
Brandon Green 828-508-6205
Carpenters
Rod Colton 828-507-0217
Darryl Shuler 828-226-7613
Alan Fortner 828-227-3577
Kev Contractor and Vendors
Wholesale supply 828-586-6355
Ferguson Supply 828-670-6901
Core and Main 828-767-1202
Sewer Pump Trucks, Septic Tank Hauler, Etc...
Roto-Rooter 828-452-0160
Roto-Rooter 828-586-5273
Sids Septic 828-488-3255
Home 488-1686
Parts Vendors
Fergusons plumbing parts 828-369-7124
Night 828-545-1487
Wholesale supply 828-586-6355
Wards Plumbing 828-586-4213
828-586-3151
Imsco 800-476-2212
Sexauer 800-431-1872
Ha joca 800-968-3291
Supply
Items Located at Central Warehouse
Equiptment
Trash Pumps and Hoses
PPE Supplies
Tri-Pod - Warehouse
Haz Mat Suits - Warehouse
Rubber Gloves - Warehouse
Rubber Boots - Warehouse
Masks - Warehouse
Harness for Tripod — at Plumbing Shop
Response_ Supplies
Location
Lime Warehouse
Vendor Phone #
227-7298
Straw Warehouse 227-7298
6. Section V1.6: Comprehensive Collection System Map
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu
DRAIN �
ZONE 9
TO DUN SEWER
E LIT
.Q
L TION
ALBRIGHT-BENTON RESIDENCE HALL
2 BUCHANAN RESIDENCE HALL
3 MAGISON RESIDENCE HALL
4 MOORE BUILDING
5 REYNOLDS RESIDENCE HALL
8 CO.—BER�SON RESIDENCE HALL
CDINING HALL
8 HEADER/LFATHERWOOD REPLACEMENTS
B HUNTER LIBRARY
10 SBURRI NG
U"`
11 NURSERY TORIU.
12 HOEY IUM
13 RCNEE BUILDING
ES, LDI
4 RERDcu
SRE
15 BREESE cM
'IT BIRD BUILDING
I> GROUNDS MAINTENANCE/PAINT SHOP
1B STEAM
GBUILDING
20 RAHNI BUILDING
2I LI NS RESIDENCE
y BROWNN NDINNING HALL
25 KIWAN BUILDING
26 CORDETIA CAMP LAB BUILDING CENTER
27 CORDEIIA GAMP AB BUILDING ANNEX
28 CDRDEIN CAMP LAB BUILDING GYMNASIUM
29 OLD STUDENT UNION
3D WATER TREATMENT PLANT
31 TELEDHONE E%CIMNGE
M UN —GUEST HOUSE
X TRIPLEX APRARTMEM 6. ] & e
40 YOUNG DRNE FACULTY APPARTMENIS E.
12. 13. @ 14
41 YOUNG DRIVE FACULTY APPANTMEMM 1D & 11
4g 0— NINE%
49 SCOTT RESIDENCE HALL
5D FACU- APPARTMENTS (S E.GS)
54 PRINT SHOP
55 FOR— BUILDING
56 BELK BUILDING
5] HARRILL RESIDENCE HALL
SB WALRER RESIDENCE HALL
LD NEW FACULTY AF—TMENS
JORGAN-PHIWPS FIELD HOUSE
82 NATURAL SCIDIC6 BUILDING
83 COULTER BUILDING
64 BIRD ALUMNI HOUSE
88 BEIX AUXIUANI'
87 CHEMICAL STORAGE BUILDING
89 JENKINTS HOUSE - UNNERSRY CWB
70 UNNFRSItt BOOKSTORE
71 WATER RESERVOIR
]2 AUTO MNNTAINENCE
73 RAMSEY REGIONAL ACT— CENTER
74 BATRE HOUSE
75 CENTRAL STORES/YIAREHOUSE
TS ALUMNI TOWER
] CAR
NO GAROUNA CENTER FOR THE ADVANCEMENT OF TEACHING
75 NO
CAROUNA CENTER MR THE AWANCENEW OF TEACHING - RESIDENIS HALL (A
79 NORM OUNA CENTER FOR THE AWANCEMENT OF TEACHING - RMIDE— HALL B
W WHITMIRE STADIUM AND WATERS FOOTBALL FIELD
83 HENNON STADIUM AND LHILDRESS BASEBALL FIELD
FI:1L`II1:{:�J1P1•�r
98 CENTER FOR APPLIED TECHNOLOGY
9B FINE AND PERFORMING AM
1D0 CENTRAL ME RESIDENCE HALL
1011118 THE NLLAGE RESIDENCE HALLS
1M NORTON RESIDENCE HALL
121 TRACK. SOCCER. & TENNIS FACILITY
122 WOMENS SOFTBALL FAM—
+y ANOREWS HOUSE
12a MW "` HOUSE
125 PUMPING STATION
127 STUDENT REC CENTER
S3adN/8M®/0303N
tiZL� to ;,;r;r
G3AI303IJ
20NE e
Vq
-�-
r a t
g R
0�1
b
' 20NE3
�SOUNTTY
EWE
Q
�—E ID
�uF WF'R PDDEND
O
WCU SEWAGE COLLECTION
SYSTEM BY ZONE
NCDEQ/DWR/NPDES
__ n -
DodSE VEM
JUN O 4 LJL4
NCDEQIDwRINPDES
w
z
0
N
4 i
tt
i
w
METER W
0
0 M R WCI
Lo7
73
TWSA - --
ZONE 10 WCU SE
SYD
r
u
� 1
1
0
0
METER WC3 -
DENSE VEG.
ZONE 10
STEAM DISTRIBL
125 PSI STEAM
30 PSI STEAM
ABANDONED LINES
SEWER LI
Wcu
7. Section VII:
Note: There are no compliance issues.
RECE��ED
.oa
NcpEQI
p\JVRINPpES
Facilities Management
3476 Old Cullowhee Rd I Cullowhee, NC 28723 1 828.227.7441 tel 1 828.227.7198 fax I facilities.wcu.edu