HomeMy WebLinkAboutSW3220305_Annual Certificate of Completion (2024)_20240529 CERTIFICATE OF COMPLETION
Post-Construction Stormwater Annual Permit Certification
This certifies that Chad VonCannon has completed the Annual Permit Certification for Post-Construction Stormwater Permit SW3220305, Rocky River
Regional Wastewater Treatment Plant Phase 3 Expansion Design, located in Concord,Cabarrus County,on May 29,2024 in accordance with G.S. 143-
214.7(b4). Please keep a copy of this certificate for your records.The electronic record will be stored in the Department of Environmental Quality's digital
repository permit file.
The Annual Permit Certification must be completed each year on or before the day of permit issuance,June 21. Failure to do so is a violation of your
permitting conditions and is subject to enforcement action per G.S. 143-215.6.
Jim Farkas
State Stormwater Engineer
Division of Energy, Mineral,and Land Resources