Loading...
HomeMy WebLinkAboutSW3240305_Design Calculations_20240604 ON aco s Blackwelder Retail 100-kilovolt (W) Substation Project Duke Energy Stormwater Report D3717400-CERE-102 I A February 26, 2024 D3717400 111 Corning Rd, Suite 200 Cary, NC 27518 USA Phone: 919.859.5000 / Fax: 919.859.5151 NC Engineering Firm License No. F-0287 ON Stormwater Report Saco S Waste Treatment Master Plan Project No: D3717400 Document Title: Stormwater Report Document No.: D3717400-CERE-102 Revision: A Date: February 26, 2024 Client Name: Duke Energy Client No: D3717400 Project Manager: Taylor Aho, PE Author: Hannah Banks File Name: D3717400-CERE-102.docx 111 Corning Road, Suite 200 Cary, North Carolina 27518 United States T +1.919.859.5000 F +1.919.859.5151 www.jacobs.com NC Engineering Firm License No F-0287 www.jacobs.com ©Copyright 2018 The concepts and information contained in this document are the property of Jacobs.Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of,and for the exclusive use of Jacobs'client,and is subject to,and issued in accordance with,the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for,or in respect of,any use of,or reliance upon,this document by any third party. Document history and status Revision Description I By ---rReview I Approved A February Issued for Review HLB JEG JEG 26,2024 63FGFG2A-CERE-103 ON Stormwater Report oaco S Contents 1. Stormwater Narrative................................................................................................................................ 3 1.1 Project Overview......................................................................................................................................... 3 1.2 Adjacent Property ....................................................................................................................................... 3 1.3 Offsite Area................................................................................................................................................. 3 1.4 Soils ............................................................................................................................................................ 3 1.5 Drainage Pattern......................................................................................... Error! Bookmark not defined. 1.6 Drainage Pattern......................................................................................... Error! Bookmark not defined. Appendix A. Additional Information & Calculations 63FGFG2A-CERE-103 ii 7 Stormwater Report jaco S 1 . Stormwater Narrative 1.1 Project Overview The Blackwelder Substation Project(Project) described in this Stormwater Report is being conducted by Duke Energy.The Project is in the eastern Harrisburg area outside of Charlotte in central Cabarrus County, North Carolina. Duke Energy is proposing to construct a new three-transformer bank, 100 kV substation with the capacity to serve up to eight distribution feeders.The fenced substation area would be approximately 308 feet by 215 feet.The overall project footprint requires approximately five acres of upland to include buffer areas surrounding the substation fence, driveway access,and ingress/egress of transmission and distribution lines. Based on the purpose and need of the project,the area where the greatest demand for energy is expected (referred to as the load center) is in the vicinity of the intersection of State Route 49 (NC-49)and Blackwelder Road. Based on current plans,the proposed substation will connect to Duke Energy's Harrisburg to Concord 100 kV Transmission Line, located 2.5 miles northwest of the load center,via a new 100 kV transmission tap line. The Project Site is on a 9.6-acre undeveloped parcel east of Blackwelder Road and north of NC 49 in Cabarrus County.The parcel is zoned limited industrial and currently used for agriculture(soybean crop).The site is predominantly flat and based on aerial imagery and public data, no wetlands or waterbodies are within or in the vicinity of the site.A drainage ditch runs along the western edge of the parcel along Blackwelder Road.A forested area is east of the site and provides partial visual screening from the east. 1.2 Adjacent Property A forested area is east of the site and provides partial visual screening from the east.Two residences and associated farm buildings are west of the site, including a historic structure. 1.3 Offsite Area No material will be exported from this project. NCDEQ Mooresville Regional office shall be notified of the name and location if any material is needed or will be taken to a permitted site. 1.4 Soils The project area is entirely HSG `C' soil type. Below is a brief description of soils. Refer to Appendix for more detail. • IcIA: Iredell loam, (0-2 percent slopes), HSG C/D • MeB: Mecklenburg loam, (2-8 percent slopes), HSG C 1.5 Stormwater Quality This property can be divided into three main drainage points. Drainage point#1 is located at the northwestern most corner and is the largest drainage area. This drainage point will receive the entirety of the proposed built upon area. Drainage point#2 is located at the northern most corner and drainage point#3 is located at the southernmost property corner. 63FGFG2A-CERE-103 7 Stormwater Report jaco S This site is classified as a phase II MS or UA and is subject to phase II post construction stormwater requirements. Low-density for this stormwater program is 24% or less of built-upon-area and meets the intent of disperse flow. The total built upon area for the entire site is 18% and this site utilizes sheet flow instead of curb and gutter to convey stormwater runoff. This site meets the intent of a low density site and is therefore, exempt from stormwater treatment. 63FGFG2A-CERE-103 ON Stormwater Report jaco 5 Appendix A. Additional Information & Calculations • Soils Map and Soil Information • USGS Map • Drainage/Land Use Map 63FGFG2A-CERE-103 ` U.S. DEPARTMENT OF THE INTERIOR The CONCORD SE QUADRANGLE U S G S U.S. GEOLOGICAL SURVEY I '(� �O�O NORTH CAROLINA - CABARRUS COUNTY science for a changing world �JJ 7.5-MINUTE SERIES -80.6250' -80.5000' 35.3750' 535000M E 36 37 38 39 40 41 42 43 44 45 35.3750' f e,R sw ackson Park 5� ° 6so �, esD �'' SAppLEWpOD ROBERT RD GREE,ySTSW PQ-0���0 �S� � � n0 � �° 6So �° z 1°° y�G�q'QPO 63O h 1� ^ p0 �y v � C-HAMPION L SW o y gyCgSy�?FWq E O A ° A W NE- _ 5� � ��"� ° � 5� ��'I'c� a 49 w DR �� 6s � ollL.ns Pond � �-�� r R� � o � 1 , 391400OMN i t'�. . 14 P�0 Q•0 J �� w 6pp � c bp0 5y0 tt,0� FPS Q �� lF�,p�S =d PRRO/y � AB/L /yFRO EARM LAKE OR sW � JFO j � P `0 OIt,Q' o H PP� Q o v Z �P o 1153 n' byo o h OyG c � STATE RD 1153 � � ��q''�cy y° 0 13 Po � SG EORS� uo 1 $ e yyTRyNOME R �$ 13 � � ° � 600 / 600 RPM GROUSE DR LPN b „O'a O 0 1E(10 0 5P moo ^ �W OAS coo 0 CAP � v0 FALLS LAKE DR SW CENT e Z 12 �P°��P� �oG ` � MAR•SHP r RqL N£/GyTSOR T (:�� Q� 12 (I K �� � FST pR BR4XTON p y50 �� 0 °' 600 �Q� x � � OR �06yC0 � 50 gRMQO 6S0 yh° C►odd1le Creek boo sso j o 1°° moo sso j o0o Jo so ,g° o e b° o. B� LIPPARD LN EXN y �� ti e hh 11 '9�,�F! / N4PEL FFkR 0PV�0 M �y ` 3 o cG"�c Po i 6R 0 0 UN-• � G `` v O 49 h 6So o $ MULBE � RRY RD � Q 10 OX DR 3 10 ,s 'oy SSo ^+ e "o P� S B/GGERS RD °o 6p0 Po R D F0X LN 600 z i So 0 -50 0 550 o el, s 200 550 o � SHAMROCK RD Pha S Mlllll $ oNRO W o a o 0 y 22 O C� O � O �o � .� �`G e O � A 09 v o `� �lb ° ` Z 09 z z Aa PJ, W •SSo 600 � O y T � $ Rock SSD RpCKy� � r o M SS CREEK DR yg0 gpoWS�N a, o RRISBURG 60o b`'° 600 0 5� H MILL BRIDGE RD sFpG �p �o �o o Q`V�OR h°° yyo o9y�! 0 pRAKE MILL L/VS c,'�°�� moo S4GFB.pGs 08 <r � h' o 'y�iR 08 v M/op�FTOSSo, ��, gLFS�oUG� �a�0 Po Z h rn m o 0�os 1161Q. ST T�Fgy pR �'�� Q 650 JOYNER RD O gTERD 1/6j /y000 S50 eed1� Creek 550 0 ��'� 'i 65p 07 3 SON �F Roclry '�per R -` 'So o� 07 i 1206 o WILLIS DR O � S ° o S1P1ERp 1139 1139 °=O��y�° Q o �° y° l qp�Pp o n FIOWfSSTp,PERpE c0 b p 1p0 0 REDM4PLELV c o�Agti o O o o Flows Store z � NESBILT DR SNgppR'4C. ?Q 550 vL co o yOFySW 06 pR `o qr 06 Q A � 600 Sp 550 ]Z e(ly GENE AD a Pp = a r MARK D OAP y'Po 650 m x /yF�Fq�C/R os�Cr m r O (i0 JIM KISER RD = 601 B//RLWOOD A 650 OLDE CREEK TRL a 05 °° 550 20 o v 6p0 NGS Rp o S SR O5 RO 70 o B � 650 RUNNING `� C h o qL BGST O . c bh° 600 RD v n Cr Go,P . � A nderso S.ro 04 04 to g 0 - - CEDAR COVE DR �PpSq � � � c+ oy c W cS b r~n A 2 O y W 03 °� a e �� 0 03 �R• �O O O� O vo° d r S n'e 600 o 601 Mci,,i and gt IRON HORSE LN v PIPER o 650 0� o n v � 6So ° ALLEY ACRES 02 h CC m yF 02 700 0 u, .so JC,�ER MORRISON RD O �o V O 0 550 Z O p So W 01 s5o 3901000mN o ,,•� 27 � 700 0 35 36 37 38 39 40 41 42 43 44 545000-E 35.2500° 35.2500° -80.6250° -80.5000° Produced by the United States Geological Survey ' SCALE 1:24 000 ROAD CLASSIFICATION N North American Datum of 1983(NAD83) MN., Do Expressway Local Connector o World Geodetic System of 1984(WGS84). Projection and 1 0.5 0 KILOMETERS 1 2 NORTH � 1 000-meter grid:Universal Transverse Mercator,Zone 17S N �AROLINA Secondary Hwy Local Road CO Y 7"57• 1000 500 0 METERS 1000 2000 This map is not a legal document.Boundaries may be 141 MILS 1 0.5 0 1 Ramp 4WD generalized for this map scale.Private lands within government t')N reservations may not be shown.Obtain permission before MIL y p 4 MILS MILES •Interstate Route 0 US Route O State Route co X entering private lands. 1 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION U) Imagery.....................................................NAIP, July 2020 - July 2020 FEET o 0 Roads......................................... U.S. Census Bureau, 2016 UTM GRID AND 2019 MAGNETIC NORTH co U) Names............................................................................GNIS, 1980-2022 1 Kannapolis DECLINATION AT CENTER OF SHEET Hydrography...............................National Hydrography Dataset, 2006 - 2018 1 2 3 2 Concord • Contours............................................National Elevation Dataset, 2008 3 Mount Pleasant O co U.S.National Grid NORTH CONTOUR INTERVAL 10 FEET AMERICAN VERTICAL DATUM OF 1988 Z Boundaries..............Multiple sources; see metadata file 2019 2021 00,000-m Square lD 4 5 4Harrisburg LL Wetlands.................FWS National Wetlands Inventory Not Available This map was produced to conform with the 5 Locust IX NV National Geospatial Program US Topo Product Standard. 6 Mint Hill 6 7 8 7 Midland �08 Stanfield CONCORD SE, NC Z Z Grid Zone Designation ADJOINING QUADRANGLES 17S 2022 a r all' ► + 0�.l : A. or +� � + 4688 ' 0168 , 97 f iL ED n� J I J L -n i'l11: CABARRUS COUNTY FILED 01/11/2003 12:21 PK LINDA F- KCABEE Register; �f Deeds Est. ,�h4 Deputyl BY' -� $0.00 EXCISE TAX Prepared by and Return to: Spurgeon Melds, III , Assistant Attorney General. N.C. DOT, Attorney General's Office, 1505 Mail Service Center, Raleigh,N. C. 27699 NORTH CAROLINA IN THE GENERAL COURT OF JUSTICE SUPERIOR COURT DIVISION CABARRUS COUNTY 02 CVS 223 DEPARTMENT OF TRANSPORTATION, ) Plaintiff, ) V. ) CONSENT JUDGMENT } (CNDM) NELSON HARDISTER and wife, JOYCE B. ) HARDISTER, ) Defendants. ) THIS CAUSE coming on to be heard and being heard before the undersigned Judge of the Superior Court and it appearing to the Court and the Court finding as fact: That this action was duly instituted on the 28th day of January, 2002, by the issuance of Summons, filing of a Complaint and Declaration of Taking and Notice of Deposit and by the deposit of SIXTY THOUSAND DOLLARS ($60,000.00) as estimated just compensation; that Summons was duly served on the defendants together with a copy of the Complaint and Declaration of Tah ng and Notice of Deposit, that the defendants, NELSON HARDISTER and wife, JOYCF B. HARDISTER, are the only parties who have or claim to have an interest in the property described in the Complaint and Declaration of Taking and the title to the property is not in dispute; that the property described in the Complaint and Declaration of Taking is subject only to such liens and encumbrances as are set forth in Exhibit "A" of the Complaint and Declaration of Taking; that the defendants filed an Answer to the Complaint within the time permitted by law: that all parties who are necessary to the determination of this action are properly before the Court: and that the defendants are Linder no le-al disability: 4688 0169 Boor 4688 pe.Gt i69 2 That now, the defendants and the plaintiff have reached an agreement whereby the plaintiff has agreed to pay and the said defendants have agreed to accept the additional sum of THIRTY THOUSAND DOLLARS ($30,000.00), which includes any claim for interest and all costs as full and just compensation for the appropriation of the interests and areas as set forth in the Complaint and Declaration of Taking and as hereinafter more particularly described; for any and all damages caused by the construction of Department of Transportation Project S.1661005(WBS# 34448.2 2), I.D.# R-2533A, Cabarrus County; and for the past and future use thereof by the Department of Transportation, its successors and assigns, for all purposes for which the Department is authorized by law to subject the same. NOW, THEREFORE, IT IS ORDERED, ADJUDGED AND DECREED: 1. That the Department of Transportation, plaintiff herein, was entitled to acquire and did acquire on the 28th day of January,2002,by the filing of a Complaint and Declaration of Taking and Notice of Deposit,together with the deposit of SIXTY THOUSAND DOLLARS($60,000.00),that certain interests or estates and areas, hereinafter more particularly described, in, over, upon and across the property of defendants; and that said property of defendants is described as follows: Being all of that tract of land more particularly described in that certain MEMORANDUM OF ACTION captioned "DEPARTMENT OF TRANSPORTATION, Plaintiff, V. NELSON HARDISTER and wife, JOYCE B. HARDISTER, Defendants", recorded in the Office of the Register of Deeds for Cabarrus County in Book 3642,Page 307,reference to which MEMORANDUM OF ACTION is made for a more particular description of said property of the defendants. 2. That the interests or estates acquired in, over, upon and across the hereinabove described property of defendants is described as follows: Fee simple title to right of way, and a slope easement for providing lateral support to the highway,or land adjacent thereto, which area will revert to the owners at such time as said owners lower or raise the elevation of the land adjacent to said highway to the extent that such lateral support is no longer needed and, in addition, a temporary construction easement to continue until the completion of the project, at which time said temporary construction easement area will revert to the owners. 3. That the areas acquired in, over, upon and across the hereinabove described property to include survey lines and station numbers are delineated on that set of plans for Department of Transportation Project # 8.1661005 as Parcel # 054 on file in the Right of Way Branch of the Department of Transportation, Transportation Building, in Raleigh, North Carolina, and also on a copy of said project plans which are or will be recorded, as required by law, in the office of the Register of Deeds of Cabarrus County,to which plans reference is hereby made for greater certainty of the areas and interests herein conveyed, and said areas and interests are described as follows: 4688 0170 a=4688 :sra VO AREA TAKEN: NEW RIGHT OF WAY: Beginning at the point Survey Station 4+455.609, L Rev. being equal to Survey Station 1+349.448, Survey Line Y-5; thence in a northwesterly direction along Survey Line Y-5 to the intersection with Survey Station 1+130.000; thence in a northeasterly direction in a straight line to a point 16.5 m.(54.13 ft.) lying northeast of and normal to Survey Station 14-130.000. Survey Line Y-5, thence in a southeasterly direction in a straight to a point 16.5 m. (54.13 ft.)lying northeast f and normal to Survey Station 1+183.780, Survey Line Y-5; thence in a southeasterly direction 16.5 m. (54.13 ft.) northeast of and parallel to survey Line Y-5 to a point 16.5 m. (54.13 ft.)lying northeast of and equal to Survey Station 1+285.671, Survey Line Y-5; thence in a southeasterly direction in a straight line to a point 16.5 m. (54.13 ft.) northeast of and normal to Survey Station 1+310.000, Survey Line Y-5; thence in a southeasterly direction in a straight line to a point 30 m. (98.42 ft.) lying northwest of and normal to Survey Station 4+485.000,Survey Line L Rev;thence in a northeasterly direction in a straight line toward a point 30 m. (98.42 ft.) lying northwest of and normal to survey Station 4+788.116, Survey Line L Rev. to the point of intersection with the northeastern property line of the undersigned,common with Mineral Research and Development Corp., et al, now or formerly; thence in a southeasterly direction along the northeastern property line of the undersigned, common with Mineral Research and Development Corp.,et al,now or formerly and the northeastern property line, if extended, to the point of intersection with Survey Line L Rev;thence in a southwesterly direction along Survey Line L Rev.to the point of beginning. TEMPORARY CONSTRUCTION EASEMENT 41: An area outside of and between the northeastern right of way boundary of Survey Line Y-5, said area having a maximum distance of 2.5 m. (8.21 ft.) lying northeast of and between Survey Station 1+183,780 and Survey Station 1+311.747, survey Line Y-5. TEMPORARY CONSTRUCTION EASEMENT #2: An area outside of and between the northeastern right of way boundary of Survey Line L Rev, said area having a maximum distance of 6.4 m. (21 ft.) lying northwest of and between Survey Station 4+476.349 and Survey Station 4.530.000,Survey Line L Rev. SLOPE EASEMENT: It is understood and agreed that the Department shall have the right to construct and maintain the cut and/or fill slope in the above-described areas until such time that the 4688 ei�i m 4688 171 4 property owners alter the adjacent lands in such a manner that the lateral support of the cut and/or fill slope is on longer needed. Any additional construction areas lying beyond the cut and/or fill slopes and extending beyond that right of way limits will terminate upon completion of the project. The areas and interests acquired by this consent judgment includes any and all property owned by the defendants, lying southeast of the existing centerline of NC 49 HWY., and northwest of the existing centerline of Norfolk Southern Railroad. 4. That the Department of Transportation,plaintiff herein,pay into Court the additional sum of THIRTY THOUSAND DOLLARS ($30,000.00), and that said sum, together with the original deposit made by the plaintiff in this action unless heretofore disbursed by order of the Court, be disbursed to the defendants as their interests may appear. 5. That the sum ofNINETY THOUSAND DOLLARS($90,000.00),said sum being the total amount of the original deposit plus said additional amount,and including any claim for interest and all costs, is the full, fair and adequate value of and represents just compensation for the taking of the hereinabove described interests and areas by the Department of Transportation; for any and all damages caused by the construction of Department of Transportation Project 8.1661005, I.D.# R- 25 33,Cabarrus County;and for the past and future use thereof by the Department of Transportation, its successors and assigns for all purposes for which the said Department is authorized by law to subject the same. 6. That a copy of this Judgment be certified by the Clerk of Superior Court of Cabarrus County to the Register of Deeds, who shall record the same among the land records of said County. 7. That the plaintiff, Department of Transportation, pay the costs of this action. This the q day of � 2003. JUDGE OF SUPERIOR COUFa RUE COPY TO: APPROVED AND CONSENTEDCLL ERK OF SUPERIOR COURT ARRUS COUNTY BYbad -ZM4� Owt ROY COOPER Attorney General 4688 0172 eQox4688 *g 172 W. Richar Moore Special eputy Attorney General Sp geon Field , II Assistant Attorney General Nelson Hardister oyce B. Hardister :4109691 Job No. D3717400 JACOBSJob Name Blackwelder Retail 100-kW Substation Project Date: 7/14/2023 Revisions No Date Description Skimmer Basin No.: TSSB-1 Site Conditions Initial Final Disturbed Area: 4.45 4.66 ac Additional Drainage Area: 0.19 0.20 ac Total Drainage Area: 4.64 4.86 ac Runoff Coeff[Cc]: 0.40 0.56 10-yr Rainfall Intensity[1]: 7.30 7.30 in/hr 10-yr Discharge [Q10]: 13.55 19.87 cfs Max Required Sed. Storage Vol: Dist.A.x 1800 = 8010 8388 8388 cf Required Surface Area: 435 sf/cfs = 4403 6457 6457 sf Basin Volume: Bottom Elevation of Basin: 581.0 ft Elevation Interval of Basin: 1.00 ft Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 581.0 6050 0 0 0 582.0 6726 1.0 6388 6388 583.0 7434 2.0 7080 13468 584.0 1 8174 1 3.0 7804 1 21272 585.0 1 8946 1 4.0 8560 29832 Top of Req. Sediment Pool (per Surface Area): 581.60 ft Top of Req. Sediment Pool (per Volume): 582.28 ft Principle Spillway Design: Target Dewatering Time: 3-5 days Draw-down Volume: 8388 cf Skimmer Size: 2.0 in diameter Skimmer Orifice Size: 1.750 in diameter Skimmer Orifice Capacity: 2790 cf/day Calculated Days to Drain: 3.01 days Emergency Spillway Weir Elevation: 583.00 ft Weir Width: 10.00 ft Weir Capacity: 23.33 cfs 10-yr Water Surface Elevation: 583.85 ft Freeboard: 1.00 ft Min. Embankment Elevation: 584.85 ft Set Embankment Elevation: 585.0 ft Surface Area Required: 6457 sf Surface Area Provided: 7434 sf OK Sediment Storage Volume Required: 8388 cf Sediment Storage Provided: 13468 cf OK SED-SKIM-BASIN.xls LATEST PRINTING:7/14/20239:58 AM Page 1 of 2 Job No. D3717400 JACOBSJob Name Blackwelder Retail 100-kW Substation Project Date: 7/14/2023 Revisions No Date Description Skimmer Basin No.: TSSB-2 Site Conditions Initial Final Disturbed Area: 3.50 3.30 ac Additional Drainage Area: 0.22 0.21 ac Total Drainage Area: 3.72 3.51 ac Runoff Coeff[Cc]: 0.35 0.35 10-yr Rainfall Intensity[1]: 7.30 7.30 in/hr 10-yr Discharge [Q10]: 9.50 8.97 cfs Max Required Sed. Storage Vol: Dist.A.x 1800 = 6300 5940 6300 cf Required Surface Area: 325 sf/cfs = 3089 2915 3089 sf Basin Volume: Bottom Elevation of Basin: 582.0 ft Elevation Interval of Basin: 1.00 ft Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 582.0 4050 0 0 0 583.0 4606 1.0 4328 4328 584.0 5194 2.0 4900 9228 585.0 1 5814 1 3.0 5504 1 14732 586.0 1 6466 1 4.0 6140 20872 Top of Req. Sediment Pool (per Surface Area): #N/A ft Top of Req. Sediment Pool (per Volume): 583.40 ft Principle Spillway Design: Target Dewatering Time: 3-5 days Draw-down Volume: 6300 cf Skimmer Size: 2.0 in diameter Skimmer Orifice Size: 1.500 in diameter Skimmer Orifice Capacity: 2049 cf/day Calculated Days to Drain: 3.07 days Emergency Spillway Weir Elevation: 584.00 ft #N/A Weir Width: 10.00 ft Weir Capacity: 11.17 cfs 10-yr Water Surface Elevation: 584.52 ft Freeboard: 1.00 ft Min. Embankment Elevation: 585.52 ft Set Embankment Elevation: 586.0 ft Surface Area Required: 3089 sf Surface Area Provided: 5194 sf OK Sediment Storage Volume Required: 6300 cf Sediment Storage Provided: 9228 cf OK SED-SKIM-BASIN.xls LATEST PRINTING:7/14/20239:58 AM Page 2 of 2 Job No. D3717400 JACOBS' Job Name Blackwelder Retail 100-kW Substation Project Date: 7/14/2023 Revisions No Date Description PERMANENT LINING - Permissible Velocity and Capacity Channel No: TDD-1 Drainage Area: 1.13 ac Sta from: Design Fequency: 10 yrs Sta to: Time of Conc: 5 min Section Length: 240 ft Intensity: 7.30 in/hr Section Slope: 1.00 % Runoff Coeff: 0.35 Ret Class: D Discharge: 2.89 cfs Permissible Velocity: 5.50 fps Allowable Depth: 1.00 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 2.89 cfs flow by Rational Method n = 0.08 Grass Manning's Coefficient(dimensionless) S = 0.01 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 1.55 quantity to equate to Zav M = 3 :1 side slope of channel (ft of run : 1 ft of rise) NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 0 1.00 3.00 6.32 0.47 1.82 deep 0 0.95 2.71 6.01 0.45 1.59 deep 0 0.90 2.43 5.69 0.43 1.38 shallow 0 0.94 2.65 5.95 0.45 1.55 OK B = bottom width of trapezoidal channel D = normal depth of flow Zav = 7xeq A= cross-sectional area of flow 23 _ Qn P = wetted perimeter of the channel A - 1.49 R = hydraulic radius of the channel Normal Depth, D = 0.94 ft Depth O.K. Velocity= 1.09 fps Vel. O.K. SHEAR STRESS T = yds = shear stress in Ib/sq-ft Y= unit weight of water, 62.4 Ib/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T= 0.59 Ib/sq-ft FINAL CHANNEL LINING DIMENSIONS B = 0 ft side slopes, M = 3 :1 D = 1.0 ft top width, W= 6.0 ft Permanent Channel Lining: Grass (REF: Malcom, 1991) Page 1 TEMPORARY LINING - Permissible Shear Channel No: TDD-1 Drainage Area: 1.13 ac Sta from: Design Fequency: 2 yrs Sta to: Time of Conc: 5 min Section Length: 240 ft Intensity: 5.70 in/hr Section Slope: 1.00 % Runoff Coeff: 0.35 Lining Type: Straw w/ Net Discharge: 2.25 cfs Permissible Shear: 1.45 Ib/sf Channel Depth: 1.00 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 2.25 cfs flow by Rational Method n = 0.033 Manning's Coefficient(dimensionless) S = 0.01 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 0.499 quantity to equate to Zav M = 3 :1 side slope of channel (ft of run : 1 ft of rise) NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 0 0.80 1.92 5.06 0.38 1.006 deep 0 0.70 1.47 4.43 0.33 0.705 deep 0 0.60 1.08 3.79 0.28 0.467 shallow 0 0.62 1.15 3.92 0.29 0.510 OK B = bottom width of trapezoidal channel D = normal depth of flow Zav = Z'eq A= cross-sectional area of flow 23 _ Qn P = wetted perimeter of the channel A R 1.49 Vs R = hydraulic radius of the channel Normal Depth, D = 0.62 ft Velocity= 1.95 fps SHEAR STRESS T = yds = shear stress in Ib/sq-ft Y= unit weight of water, 62.4 Ib/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T= 0.39 Ib/sq-ft Temp Liner O.K. FINAL CHANNEL LINING DIMENSIONS B = 0 ft side slopes, M = 3 :1 D = 1 ft top width, W= 6.0 ft Line Channel with: Straw w/ Net (REF: Malcom, 1991) Page 2 Job No. D3717400 JACOBS' Job Name Blackwelder Retail 100-kW Substation Project Date: 7/14/2023 Revisions No Date Description PERMANENT LINING - Permissible Velocity and Capacity Channel No: TDD-2 Drainage Area: 3.50 ac Sta from: Design Fequency: 10 yrs Sta to: Time of Conc: 5 min Section Length: 590 ft Intensity: 7.30 in/hr Section Slope: 0.60 % Runoff Coeff: 0.64 Ret Class: D Discharge: 16.35 cfs Permissible Velocity: 5.50 fps Allowable Depth: 1.50 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 16.35 cfs flow by Rational Method n = 0.04 Grass Manning's Coefficient(dimensionless) S = 0.006 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 5.67 quantity to equate to Zav M = 3 :1 side slope of channel (ft of run : 1 ft of rise) NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 2 1.50 9.75 11.49 0.85 8.74 deep 2 1.00 5.00 8.32 0.60 3.56 shallow 2 1.20 6.72 9.59 0.70 5.30 shallow 2 1.25 7.19 9.91 0.73 5.80 OK B = bottom width of trapezoidal channel D = normal depth of flow Zav = 7xeq A= cross-sectional area of flow 23 _ Qn P = wetted perimeter of the channel - 1.49 Vs- R= hydraulic radius of the channel Normal Depth, D = 1.25 ft Depth O.K. Velocity= 2.28 fps Vel. O.K. SHEAR STRESS T= yds = shear stress in Ib/sq-ft Y= unit weight of water, 62.4 Ib/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T= 0.47 Ib/sq-ft FINAL CHANNEL LINING DIMENSIONS B= 2 ft side slopes, M = 3 :1 D= 1.5 ft top width, W= 11.0 ft Permanent Channel Lining: Grass (REF: Malcom, 1991) Page 3 TEMPORARY LINING - Permissible Shear Channel No: TDD-2 Drainage Area: 3.50 ac Sta from: Design Fequency: 2 yrs Sta to: Time of Conc: 5 min Section Length: 590 ft Intensity: 5.70 in/hr Section Slope: 0.60 % Runoff Coeff: 0.64 Lining Type: Straw w/Net Discharge: 12.77 cfs Permissible Shear: 1.45 Ib/sf Channel Depth: 1.50 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 12.77 cfs flow by Rational Method n = 0.033 Manning's Coefficient(dimensionless) S = 0.006 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 3.651 quantity to equate to Zav M = 3 :1 side slope of channel (ft of run : 1 ft of rise) NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 2 1.50 9.75 11.49 0.85 8.741 deep 2 1.00 5.00 8.32 0.60 3.559 shallow 2 1.01 5.08 8.39 0.61 3.637 shallow 2 1.02 5.16 8.45 0.61 3.715 OK B = bottom width of trapezoidal channel D = normal depth of flow Zav = Zreq A= cross-sectional area of flow 23 _ Qn P = wetted perimeter of the channel A R 1.49 R= hydraulic radius of the channel Normal Depth, D = 1.02 ft Velocity= 2.47 fps SHEAR STRESS T= yds = shear stress in Ib/sq-ft Y= unit weight of water, 62.4 Ib/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T= 0.38 Ib/sq-ft Temp Liner O.K. FINAL CHANNEL LINING DIMENSIONS B= 2 ft side slopes, M = 3 :1 D= 2 ft top width, W= 14.0 ft Line Channel with: Straw w/ Net (REF: Malcom, 1991) Page 4 JACOBS' Job No. D3717400 Job Name Blackwelder Retail 100-kW Substation Project Date: 7/14/2023 Revisions No Date Description PERMANENT LINING - Permissible Velocity and Capacity Channel No: TDD-3 Drainage Area: 2.89 ac Sta from: Design Fequency: 10 yrs Sta to: Time of Conc: 5 min Section Length: 516 ft Intensity: 7.30 in/hr Section Slope: 0.70 % Runoff Coeff: 0.35 Ret Class: D Discharge: 7.38 cfs Permissible Velocity: 5.50 fps Allowable Depth: 1.00 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 7.38 cfs flow by Rational Method n = 0.07 Grass Manning's Coefficient(dimensionless) S = 0.007 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 4.15 quantity to equate to Zav M = 3 :1 side slope of channel (ft of run : 1 ft of rise) NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 2 1.50 9.75 11.49 0.85 8.74 deep 2 1.00 5.00 8.32 0.60 3.56 shallow 2 1.10 5.83 8.96 0.65 4.38 deep 2 1.08 5.66 8.83 0.64 4.21 OK B = bottom width of trapezoidal channel D = normal depth of flow Zav = 7xeq A= cross-sectional area of flow 23 _ Qn P = wetted perimeter of the channel A - 1.49 R = hydraulic radius of the channel Normal Depth, D = 1.08 ft Depth too deep Velocity= 1.30 fps Vel. O.K. SHEAR STRESS T = yds = shear stress in Ib/sq-ft Y= unit weight of water, 62.4 Ib/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T= 0.47 Ib/sq-ft FINAL CHANNEL LINING DIMENSIONS B = 2 ft side slopes, M = 3 :1 D = 1.0 ft top width, W= 8.0 ft Permanent Channel Lining: Grass (REF: Malcom, 1991) Page 5 TEMPORARY LINING - Permissible Shear Channel No: TDD-3 Drainage Area: 2.89 ac Sta from: Design Fequency: 2 yrs Sta to: Time of Conc: 5 min Section Length: 516 ft Intensity: 5.70 in/hr Section Slope: 0.70 % Runoff Coeff: 0.35 Lining Type: Straw w/ Net Discharge: 5.77 cfs Permissible Shear: 1.45 Ib/sf Channel Depth: 1.00 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 5.77 cfs flow by Rational Method n = 0.033 Manning's Coefficient(dimensionless) S = 0.007 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 1.526 quantity to equate to Zav M = 3 :1 side slope of channel (ft of run : 1 ft of rise) NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 2 1.50 9.75 11.49 0.85 8.741 deep 2 0.70 2.87 6.43 0.45 1.677 deep 2 0.60 2.28 5.79 0.39 1.224 shallow 2 0.67 2.69 6.24 0.43 1.532 OK B = bottom width of trapezoidal channel D = normal depth of flow Zav = Z'eq A= cross-sectional area of flow 23 _ Qn P = wetted perimeter of the channel A R 1.49 Vs R = hydraulic radius of the channel Normal Depth, D = 0.67 ft Velocity= 2.15 fps SHEAR STRESS T = yds = shear stress in Ib/sq-ft Y= unit weight of water, 62.4 Ib/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T= 0.29 Ib/sq-ft Temp Liner O.K. FINAL CHANNEL LINING DIMENSIONS B = 2 ft side slopes, M = 3 :1 D = 1 ft top width, W= 8.0 ft Line Channel with: Straw w/ Net (REF: Malcom, 1991) Page 6 Job No. D3717400 JACOBS Job Name Blackwelder Retail 100-kW Substation Project Date: 7/14/2023 Outlet: Driveway Culvert Revisions No Date Description NEW YORK DEPARTMENT OF TRANSPORTATION METHODOLOGY Input Values Diameter(in) 18 3D, s v Flow Rate(cfs) 2.62 Slope(%) 0.500 Outlet4 W ' Do + 0.4La Outlet W= Do + La Manning Coef. 0.013 pips ( to�� nips 2 Mt^ diameter Q]) niameter, 4o Conversions i w r 5[la j Diameter(ft) 1.500 ilwater v.50a Radius(ft) 0.750 Flow Rate(cfs) 2.616 NOT USED USED Slope(ft/ft) 0.005 Area(sf) 1.767 Calculated Data Normal Depth(ft) 1.28 Diagram of Outlet Apron Outlet Velocity(fps) 3.85 North Carolina Erosion&Sediment Control Planning and Design Manual Section 8.0-Appendix NYDOT Dissipator Methodology 25 - LENGTH OF APRON . APRON MATERIAL TO PROTECT TO PREVENTSCOUR 6 CULVERT HOLE USE L2 ALWAYS 20 N L2 rr Lt 1 STONE FILLING(FINE) CL.A 3 X Dv 4 x D. y t5 2 STONE FILLING(LIGHT) CL.B 3 XDv Bx D, a : 7' v 3 STONE FILLING(MEDIUM)CL.1 4XDv SXEo 4 STONE FILLING(HEAVY) CL.1 4 X Dv 8x D. LUUtq 5 STONE FILLING(HEAVY) CL 2 5 X Dv 10 x Da 6 STONE FILLING(HEAVY) CL_2 6XDv 10xDa 5 2 3 4 ' 7 SPECIAL STUDY REQUIRED(ENERGY DISSIPATORS,STILLING BASIN OR LARGER SIZE STONE). o Average Minimum e ar ac.d'er I Classification Diameter in Stone Class Thickness in 0. a' to' 15' 21' 25 Fine 3 A 12 DIAMETER(Ft.) Light 6 B 18 Zone= 2 (Zone 2 used as minimum) Medium 13 1 24 jHeavy 1 23 1 2 1 36 Summary of Rip Rap Apron Length of Apron= 9 ft Width of Apron= 11 ft Classification= LIGHT NCDOT Stone Class= B Min.Thickness= 18 in Dimensions used may be irregular due to configuration but exceed the above. hops://jacobsengineering.sharepoint.com/sites/CPBPAOOlJ9/DukeEnergy/Siting Engagement and SWPF DW Culvert (SES)/Projects/D3717400_Blackwelder_SUP/800_Working_Documents/Permit_Application/ESCP/Calculations/Rip-Rap OutletProtection.xls Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Friday,Aug 11 2023 DW Pipe Invert Elev Dn (ft) = 583.00 Calculations Pipe Length (ft) = 57.00 Qmin (cfs) = 2.50 Slope (%) = 2.19 Qmax (cfs) = 3.00 Invert Elev Up (ft) = 584.25 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 2.50 No. Barrels = 1 Qpipe (cfs) = 2.50 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.89 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.80 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 584.05 HGL Up (ft) = 584.85 Embankment Hw Elev (ft) = 585.08 Top Elevation (ft) = 587.00 Hw/D (ft) = 0.55 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 5.00 Eiev Inl Ow Pipe Hr•Geom(f) 58fi CU t]5 5840v 25 582..E -2.25 5 10 15 20 25 30 35 40 95 50 60 65 70 75 2� LirculerLulert HGL £mbenk 1 2 3 4 5 6 TSSB-2: Z 7 o / w AREA=3.72 AC goo s LOD i on > w SFO/ SFO S$G/ w SF o j SF sFp o co oi N m A /�sF ` w > a U L0�SF J 580 `moo TSSB- 1 : VOID D SFp \ AREA=4.86 AC LL o oo� / � O LLJ LL / ° O° w 0 0_ TDD-2: / s` \S com �o AREA=3.50 AC s wZo ° o �z O� �w w LL F TDD-3: a= °�� AREA=2.89 AC �� w OH SKIMMER BASIN/SEDIMENT TRAP DRAINAGE AREA w w o °5 G'�o ` 5 ` � DIVERSION DITCH DRAINAGE AREA 0 m F B `r ` • ` 2 z� v1 a 0 U <° a — aw no m H W wO Q oz\ A wa p OLL O Z Q z U = OVA zz zo `�- Ln LD 00 w-i �O ,n o 0 00 1 ` O N a— \ rs O I o O �J<< \ Z O \ / p0 U) N 0w \ z O O° \ � } �U� Q � � a0 TDD-1 . > ys S$ $$� Q �J� _j ZW \ O ��� Lu— \ _ ` \ rnof O = = go AREA 1 . 13 AC �\ < o �J O� / o o QX nNaa UOm Z)00 w W U L1J / S CO— z � w� W 2 �S oocw� w N o pQNdQoW arnaa W HJ2 Z z w C � JJ o0o�0O L zaQQ C)n < Z C) ai Z:a: w0 Lu / SF / SFi SFO . o, o =70 z0-Ozoz w T P.STOCKPILE AREA ` `r,n \ \ \ < o> / � 590� s� Z Q CULVERT AREA=0.50 A _ I — � — —jF= � \ o z J ��� ` ao�� (101 � Q0, ��jS � 1 � 0 Q S / GO ao \ o \ D v, 5950�� i ,n \ �I w 0 Q \ / \ TDD-4: \\ \ -j U z — z Q AREA-0.24 AC Y o �\ o w / r _ < \ DIdle \\� TDD 5: AREA-0.16 AC p „ _ , `\ SF 1 - 40 VERIFY SCALE --� \ \ S� BAR IS ONE INCH ON � TST-1 . p� + ORIGINAL DRAWING. � I I = \AREA 0.69 AC DATE JULY 2023 PROJ D3567800 DWG DRAINAGE MAP SHEET of FILENAME: Drainage Maps.dwg PLOT DATE: 7/14/2023 PLOT TIME: 11:01:34 AM