HomeMy WebLinkAboutSW3240201_Supplement-EZ Form_20240603 SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name Crosswind-Phase 5 2 Project Area() _ 37 3 Coastal Wetland Area(ac)_ 0 4 Surface Water Area(act 1 5 Is this project High or Low Density? _ High 6 Does this project use an off-site SCM7 1_ No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feel) 30 i 8 Will the vegetated setback remain vegetated? Yes rI9 If BUA Is proposed In the setback.does It meet NCAC 02FI.1003(4)( __ NIA 10 1Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF:SCMs: 11 jInfiltration System 0 12 Bioretention Cell 0 — - — 13 Wet Pond 1 _ 14 Slormwater Wetland 0 15 Permeable Pavement 0 _ _ 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter MORALS-FS) 0 20 Dlsco.mected Impervious Surface DIS) 0 21 Treatment Swale 0 22.4Dry-Pond 0 -— — - 23 StormFiller 0 _24 Silva Cell 1 0 -_, 25 Bayfilter 0 26 1Friterra 0 foIMSWWADED DESIGNER CERTIFICATION 27 Name and Tit Matthew S Kilter 28 Organization Thomas&Hutton 29 Street address 1020 Euclid Avenue 30 City.Slate.Zip Charlotte,NC 28203 l 31 Phone numberlsl 980.201-5507 32 Email kiker m£ytandh.com D edlhnatiorl Sytalement. I certify,under penalty of law that this Supplement-EZ form and all supporting nformation were prepared under my direction or supervision that the information provided in the form is to the best of my knowledge and betel true accurate,and complete and that the engineering plans specifications.operation and maintenance agreements and other supporting Information are consistent with the Information provided here D•sion•r c%I ***• 0.• FES a' p - nature of Designer •* 3 p.4-0.2y yeah'• ,\V Date fit illttl\ DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION _ Entire Site 1 4 Type of SCM N/A WET POND 6 5 Total drainage area(sq ft) 1347311 1347311 6 Onsite drainage area(sq ft) 1347311 1347311 7 Offsite drainage area(sq ft) 0 0 8 Total BUA in project(sq ft) 791862 sf 791862 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 520000 sf _ 520000 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 271862 sf 271862 sf 11 Offsite BUA(sq ft) sf sf 12 Breakdown of new BUA not on subdivided lots: 0 0 -Parking(sq ft) sf sf -Sidewalk(sq ft) 47306 sf 47306 sf -Roof(sq ft) sf sf -Roadway(sq ft) 116029 sf 116029 sf -Future(sq ft) sf sf -Other,please specify in the comment box below(sq ft) 108527 sf 108527 sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) sf sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) sf sf 16 Existing BUA that is already permitted(sq ft) sf sf 17 Existing BUA that will be removed(sq ft) sf sf 18 Percent BUA 49% 59% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 88148 cf 88148 cf 21 Calculation method for design volume Simple Simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 ,drainage area(s): For New BUA on subdivided lots,we are assuming a maximum of 5,000 SF of BUA that includes the driveway portion within the subdivided lots.Cell 12(Other)=Curb& Gutter AND driveway portion outside the subdivided lot.We are assuming a maximum of 877 SF of BUA per lot for the driveway portion outside the subdivided lots. WET POND 1 Drainage area number Pond 06 2 Minimum required treatment volume(cu ft) 65008 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed b an NC licensed professional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used _ SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 577.50 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 578.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 582.00 23 Elevation of the permanent pool(fmsl) 582.50 24 Elevation of the top of the vegetated shelf(fmsl) 583.00 25 Elevation of the temporary pool(fmsl) 584.00 26 Surface area of the main permanent pool(square feet) 43743 27 Volume of the main permanent pool(cubic feet) _ 172326 cf 28 Average depth of the main pool(feet) 3.33 ft 29 Average depth equation used Equation 3 30 If using equation 3,main pool perimeter(feet) 1124.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) _ 3.0 ft 32 Volume of the forebay(cubic feet) 33750 cf 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 54 in 35 Design volume of SCM(cu ft) 88148 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 4 in 38 If weir,weir height(inches) - 39 If weir,weir length(inches) - 40 Drawdown time for the temporary pool(days) 2.48 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance(inches) 60 in 44 Depth of forebay at exit(inches) 54 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) _ 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? _ 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 wet pond(s): 2