No preview available
HomeMy WebLinkAboutProcessing Nutrient Offset Credit Sales_KatieHow to process requests for Nutrient Offset Credits AFTER Permit is issued. (key documents shown in red font) Situation: A developer wants to build a car dealership in North Durham, which is located in the Neuse River Basin, 8-digit Hydrologic Unit Code (HUC) 03020201 and inside the Falls Lake Watershed (use the map resources on DWR's website to find the HUC information). The developer is told by their stormwater engineer, that the City of Durham (the Delegated Local Government who implements the storm water management rules for nutrients) won't approve the stormwater management plan for the car dealership until they have shown how they will treat their stormwater onsite. Based on the engineer's calculations and the SNAP Tool, it is determined that the developer will have to buy 350 pounds of Nitrogen nutrient offset credits to meet the stormwatermanagement requirements. The engin eerprepares the storm water management plan and submits it to the City of Durham for their review and approval. The City of Durham approves the stormwater management plan requiring 350 pounds of Nitrogen nutrient offset credits to be purchased from a Provider (Private Bank or DMS) located in the Neuse 03020201, inside of the Falls Lake Watershed (use the map resources on DWR's website to locate a nutrient offset bank). The developer now has their stormwater management plan, which does not authorize construction of the car dealership until they have purchased 350 pounds of Nitrogen nutrient offset credits. The developer FIRST reaches out to a private bank Sponsor (contact information is provided on the DWR website) about their availability of riparian buffer credits. If no private bank has nutrient offset credits, then the developer can contact the Division of Mitigation Services for credit availability. Next Steps for Provider: 1) Ask the developer to send you a copy of the approved stormwater management plan letter on City of Durham's letterhead that identifies HOW MANY Nitrogen offset credits they need, what UNITS those credits are defined in, and from WHERE (what service area) the credits have to come from. If the letter doesn't have this information, then there is likely a form referred to as "Nutrient Reporting Form" that should be attached to the approval letter. This form will have all the necessary information needed to process this request. The provider can proceed with Step 2. For the situation above, the developerneeds 350 pounds of Nitrogen nutrient offset credits from a Private Bank located in the Falls Lake Watershed. 2) Once the developer pays the Provider in Full for the 350 pounds of Nitrogen nutrient offset credits from a bank site in the Falls Lake Watershed, the Provider issues a Mitigation Credit Transfer Certificate (MCTC) to the developer, using the template provided by DWR, to document the sale. The MCTC should be sent to the City of Durham and the developer for their records. If the developer constructs Request the stormwater management plan approval letter issued by the Local Gov't (not DWR) (may need Nutrient Reporting Form too) Provider documents the sale on the Nitrogen or phosphorus credit ledge date must match the MCTC) Flow chart for processing nutrient offset credit sales Which nutrient is needed? Nitrogen and/or Phosphorus If selling Ibs, then Provider' provides a Mitigation Credit Transfer Certificate using th template not for permaneno :redits and sends to customer & Local Gov't to document Receipt of sale What are the units of the credits being required? Pounds (Ibs) or Pounds per Year (Ibs/yr) are aka "permanent credits" If selling Ibs/yr, then Provider provides a Mitigation CreditTransfer Certificate using the Permanent Credit template and sends to customer & Local Gov't to document llReceipt of sale Determine which.1 bank the nutrient offset credits need to come from based on servi area in MBI Receive payment for the credits