No preview available
HomeMy WebLinkAboutNutrient Offset Conversion - Requirements and Guidance for LGs and Developers 11-29-2023_TrishDz� T _4 4 Y • l i ' lip,' ,L.P.�,,, t t NORTH CAROLINA Department of Environmental Qualm Past Requirements and Processes • Developers calculated using Neuse Methods, SNAP 4.1 nutrient export overshoot in lbs/yr Tar -Pam Tools, JFLSNLAT, or • Previous Offset rules required calculation of pounds needed fora 30 year period 4 Iblyr over 30 years =1bs • Developers acquire offsets prior to development approval • LGs submit Authorization Letters for developers Department of Environmental Quality NORTH CAROLINA�.E Department of Environmental Quality 2 Department of Environmental Quality Effects of Rule Changes • New Neuse and Tar -Pamlico NMS Stormwater Rules require following new Offset Rule (.0703) and specify permanent offset credits • 43 LGs affected (not including Falls LGs) - 16 new • Rule sets up staggered review and approval by EMC • Not all LGs implement starting at the same time • New SNAP 4.2 tool calculates results for offsets in lb/yr • Falls LGs seek new offset units when using SNAP 4.2 e:-iopp D,.E NORTH CAROLINA Department of Environmental Quality 3 Local Implementation — How / When • Change to new units starts with switch to new SNAP 4.2 • All Falls Lake LGs have already started • As EMC approves new & revised Neuse or Tar -Pamlico Local Programs (6 month lag after approval) • Some Neuse & Tar -Pamlico LGs already started • Most Neuse & Tar -Pamlico LGs will start in July 2024 • A few straggler LGs through end of 2024 • No implementation in Jordan for now NORTH CAROLINA Department of Environmental Quality Department of Environmental Quality N Falls Local Governments Already Implementing • Butner • Durham • Creedmoor • Durham County • Franklin County • Granville County • Hillsborough Department of Environmental Quality • Orange County • Person County • Raleigh • Roxboro • Stem • Wake County • Wake Forest WRIIIIIIIIIIIIIII Q-7 e:wx50wf D E NORTH CAROLINA Department of Environmental Quality 5 Revised Neuse/Tar-Pam LGs Already Implementing • Cary • Durham • Durham County • Edgecombe County • Garner • Havelock • Kinston • Orange County Department of Environmental Quality • Raleigh • Rocky Mount • Smithfield • Washington • Wayne County • Wilson of D E NORTH CAROLINA Department of Environmental Quality I New & Revised NeuselTar-Pam LGs Due to Implement Starting July 2024 Previously participating: • Beaufort County • Franklin County • Goldsboro • Greenville • Henderson • Nash County • New Bern • Oxford Department of Environmental Quality • Pitt County • Tarboro • Wilson Newly participating: • Apex • Craven County • Fuquay-Varina • Holly Springs • Knightdale • Wake Forest • Wendell • Wilson County e:ae D E NORTH CAROLINA,am Department of Enuirenmentaf Quality 7 New & Revised NeuselTar-Pam LGs Due to Implement Late 2024 • Johnston County • Winterville • Morrisville • Wake County • Rolesville • Clayton Department of Environmental Quality D E NORTH CAROLINA am Department of Enuirenmentaf Quality W Process Flow Chart Nutrient Offset Payment Process for Non -governmental Applicants (March 2023) No Start Process r. Does Developer drafts developer Developer completes Are offsets stormwater plan for the Developer meets any meet the Nutrient Reporting Forms needed to project and calculates onsite treatment offsite Yes � to characterize their meet nutrient Yes nutrient loading from requirements nutrient load ro ect and submits it to p 1 loadin rate g the sites. hresholds� the local gov't for review. targets? No Revise the stormwater No Local gov't reviews the project and Apply the delivered \ plan. verifies that the applicant can seek Is the offset credits. If approved, local gov't load to Lake Project in provides a verification letter to the percentages to the Yes the Jordan developer authorizing them to seek reductions needed Lake offset credits. at the project sites. Watershed Does DM 5 Are offset Applicant checks Submit nutrient credits availability of credits approve NO P he offset credit request No available from private ? request. to DMS from private mitigation banks in banks? the Service Areal. Yes Yes Definitions Service Area — Area within which the offset provider — NCDMS or a private bank - is allowed to accept offset payments. Typically an 8- digit Cataloguing Unit (CU) identified by the USGS. In Jordan and Falls watersheds, however, it is a sub -area of the CU. Non -governmental —As defined by NCGS 143-214.11, applicants other than State or Federal entities Applicant pays the offset credit provider and receives a receipt for nutrient credit purchased. Applicant provides local goat a copy of payment receipt demonstrating fulfillment of nutrient reduction requirements from the project. Applicant must purchase credits from a private bank. Nutrient treatment requirements for the project are satisfied. Local Government approves applicant's nutrient controls on stormwater. D, E NORTH CAROLINA ity Department of Environmental Qual ❑MS sends a denial letter to the applicant. Applicant must find other alternatives to satisfy nutrient requirements. I End Process Old Offset Credit Units Will Continue — Why lHow Long., • Not all requests to buy offsets will be in (new) permanent credit units — Why? • Ongoing development may need to "top up" as they exceed original permit • Permit Choice allows developers of vested projects to choose old or new ruleset (ALL of them, not mix'n'match) • Only applies in I -Gs previously implementing Rules Department of Environmental Quality ow f D E NORTH CAROLINA Department of Environmental Quality 10 New Offset Acquisition Process and Considerations • As before, most purchases happen before development is permitted • LGs/Developers will submit an Authorization Letter and maybe a Reporting Form —all LGs are different • Auth Letter must include: • Specific offset type needed (permanent vs "old") and amount • Units must match offset type (permanent = Ib/yr, "old" = Ibs) • Some LGs will require Letter to include both permanent offset amount (in Ibs/yr) and "old" units (lbs) • Some Auth Letters for "old" units will trickle in Department ofEnvironmental Quality D, � E NORTH CAROLINA Department of Environmental Duality 11 Local Government and Developer Resources • Online materials: • Process Flow Chart • SNAP 4.2 tool • Sample LG Authorization Letter • Sample Offset Reporting Form • Guidance for Local Governments • Process is reviewed during SNAP 4.2 training for I -Gs Department ofEnvironmental Quality e:ae D E NORTH CAROLINA Department of Environmental Duality 12 : 7 LM F m a.. L _ '{�° r Ye.. ''�'- ,?RAF' �y -. -'r.• `¢�• •t _ p••` ,�j'}"�5 IS 114c, _ a ram' Y l 7tL