No preview available
HomeMy WebLinkAboutTrends & flowcharts_11-29-2023_BlakeHDivision of Water Resources November 29, 2023 NORTH CAROLINA Department of Environmental qualify Establishing a Nutrient Offset or Riparian Buffer Private Mitigation Bank in NC The first step to establishing a mitigation bank for buffer mitigation or nutrient offset is to request a site visit by DWR by contacting the 401 & Buffer Permitting Branch. Multiple site visits by different DWR staff will be necessary for most projects depending on the need of the site visit requested. It is most common to have 2 site visits: 1) stream call determination, and 2) site viability evaluation. NORTH OUNAD_E oewmiemaRmmmm�meiawi� /� updated 1112812023 Stream Determination Letter Site Viability Request Provider submits Provider Submit Site Stream Determination Viability Request Request via Package via Stream Determination Mitigation Project submission submission forme* form1* I On site Stream Determination On -site Site Viability completed evaluation is by DWR completed by DWR Stream Determination Site Viability Letter Letter Issued issued by DWR to By DWR to Applicant Provider Continue to Bank Instrument Review Process pg. 2 Pg. 1 *see Online Resource slide (pg4) for corresponding link Banking Instrument (BI) Review Process Bank Sponsor performs the following 2 functions : Submit completed DRAFT BI for DWR review via Mitigation Project submission formz 1 hard copy and 1 electronic copy If no public comments, BI is approved NORTH OUNAD_E Q ueremiemaummnmemeiawi� /� (1) Register w/ NC Sec. of State (2) Complete Banking Instrument Yes BI uses a standard language? NO DWR reviews BI and provides written Sponsor addresses comments And submits FINAL BI comments to Sponsor updated 1112812023 BI is Submitted to DWR Director for Review & Signature DWR notifies Sponsor Of BI Approval NOTE: A Banking Instrument and Project Plan must BOTH be approved before a Sponsor can implement a project as approved. See Pg3. for completing a Plan Pg. 2 DWR is not accepting BI with non-standard language DWR Posts BI to Public Comment (15 days) *see Online Resource slide (pg4) for corresponding link Buffer Mitigation &/or Nutrient Offset Plan Review Bank Sponsor performs the following function: Submit completed DRAFT Plan for DWR review via Mitigation Project submission formZ *1 hard coov and 1 electronic coov* If no public comments, Plan is approved DWR sends written Approval letter Complete Buffer Mitigation and/or Nutrient Offset Plan (Plan) DWR reviews Plan and provides written comments to Sponsor DWR Posts the Plan and Draft Banking Instrument (if applicable) to Public Comment (15 calendar days) Proceed to Banking Instrument Review Process(pg2) Sponsor has permission to implement project According to the approved Plan 4NORT GAROLIND_E Q updated 1112812023 Sponsor addresses comments And submits FINAL Plan Yes W Pg. 3 DWR Accepts the Final Draft as complete Yes Has the Sponsor submitted a banking instrument to DWR for the Plan? I re DWR sends back review And comments to Sponsor Sponsor addresses all DWR comments satisfactorily and submits FINAL Draft #2 Of the Plan NOTE: A Banking Instrument and Plan must BOTH be approved before a Sponsor can implement a project as approved. See Pg2. for completing a Banking Instrument *see Online Resource slide (pg4) for corresponding link Online Resources 1. Online Stream Determination Submission Form: httDS://edocs.dea.nc.Rov/Forms/Determination-Reauest-Form 2. Site Viability Form: https://www.deq.nc.gov/water-quality/surface-water- protection 401 mitigation via bi I ityassessmentrequestform-2023 3. Online Mitigation Submission Form: https://edocs.deg.nc.gov/Forms/Mitigation Information Upload 4. 401 & Buffer Branch Contacts: https://www.deg.nc.gov/about/divisions/water-resources/permittin permitting -contacts 401-buffer-perm itti ng/401-buffer- Pg. 4 Trends and Updates in Buffer Mitigation & Nutrient Offset rt — �9 :i a � ' r a; 1Al. 1 .I Division of Water Resources November 29, 2023 NORTH CAROLINA Department of Environmental qualify Trend of Buffer Mitigation and Nutrient Offset Private Banks since 2010 120 110 100 a� 90 a� v 80 70 U Y 60 ~ 50 }�—, 40 E 30 D U 01C Timeline Notes: • 2011- Nutrient Offset & 106 Buffer Mitigation Program Coordinator position created • 2012 — 1st credit sale audit • 2013 -1st MBI template, 1St round of templates for BPDP, MCTC, ledgers, CE • 2015 — Buffer Mitigation Rule (more options) 0 1 . I I I I 1 1 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 +Total Banks Fun Facts: • Currently 94 Available Banks • 61 still in Monitoring • 12 Providers "Available" Private Banks 2020-Present 20 W:3 16 N W Vf Q 14 W J W 12 H iLu 10 u Y 8 N H � 6 O 4 2 0 10 2020 14 7 rlL 2021 2022 YEAR M 2023 (to date) 49 new banks since 2020 DMS Projects submitted to DWR Review since 2020 12 10 0 0 M 2 0 0 041Y , 11 iONIIIIIIIIIIIII 0 Mitigation Plans Rec'd 0 ►, 2022 2023 (to date) 20 DMS Projects since 2020 Site Viability Assessments Issued 2020-present 30 25 Ln M > "15 N N 4- 0 10 5 0 27 0 2020 2021 21 2022 17 2023 2020 2021 2022 2023 0 2023 (in progress) 12 2023 (in progress) Overall 85 Total sites visited 76letters Issued "In progress" _ letter is pending Workload Outlook — Documents received 1/1/23-To Date a� U N V) v E Z) U 0 r) 4- 0 HE 35 30 5 0 31 Mit Plans (Bank) 0 Mit Plans (DMS) AsBuilt Reports (Bank) Document Type Cm Task 2 AsBuilt Site Mon. Report (DMS) Visits (Bank) Resource Links • Strea m,Wetla nd, Buffer, Nutrient Offset — shows service areas for Credit Types https://edocs.deg.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2206931&cr=1 • Interactive Bank map — shows where a buffer mitigation and/or nutrient offset bank is located by either 8-digit HUC, Watershed, or Sub -watershed where applicable. httpsWexperience.arcgis.com/experience/748f2c0ac1554161a740ccbcb31845f4 • Nutrient Offset & Buffer Mitigation https://www.deg.nc.gov/about/divisions/water-resources/permitting/401-buffer- perm itti ng/n utrient-offset-buffer-m itigation-progra m � �� Alt } ., � � � -�, _ �� �� /' �