HomeMy WebLinkAboutNCC200218_NOT Closeout Documents_20240531 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699
County: Mecklenburg Project: New West Charlotte High School River basin: Catawba
Person financially responsible:Charlotte Mecklenburg Board of Education-Gary Project#: MECKL-2020-031
S Adams,Director of Architecture
Address: 3301 Stafford Drive,PO Box 30035,Charlotte,NC 28208
1. Project Location: Senior Drive,Charlotte
Pictures: No
2. Weather and soil conditions: Sunny,workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): None Title:
Inspection report: Sent Report Date given/sent: May 23,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
All projects that have been approved prior to April 01,2019,under the old permit system,are
not required to take any additional actions.The stormwater permit is terminated at the same
time as the termination of this erosion control permit.
Reported by: Owen Swavely Others present:
Date of inspection: May 15,2024 Time arriving on site: 10:00 AM Time leaving site: 10:15 AM
cc: