Loading...
HomeMy WebLinkAboutNCG550095_Staff Report_19921203 4/(aA4U1)' 11)/Ce SOC PRIORITY PROJECT: Yes No X If Yes, SOC No. To: Permits and Engineering Unit Water Quality Section RECEIVED Attention: Mack Wi ins Date: December 2, 1992 DEC 0 j 1992 NPDES STAFF REPORT AND RECOMMENDATION ILCHNICAL SUPPORT BRANCH County: Stanly Permit No. NC0042366 I` `" PART I - GENERAL INFORMATION 1 . Facility and Address : J. Donald Brummitt Residence Rt . 3, Box 273 Randalls Ferry Road Norwood, North Carolina 28128 2 . Date of Investigation: 12-01-92 3 . Report Prepared By: G. T. Chen 4 . Persons Contracted and Telephone Number: Mrs . J. D. Brummitt; ( 704 ) 474-5476 5 . Directions to Site: From the junction of Highway 24/27/73 and SR 1740 ( Indian Mound Road) approximately 3 . 8 miles southeast of the City Limits of Albemarle, Stanly County, travel south on SR 1740 about 3 . 5 miles to the junction with SR 1743 (Randalls Church Road) . Turn left and travel on SR 1743 about 1 . 1 miles to the junction with SR 1802 (Randalls Ferry Road) . Turn left and proceed on SR 1802 about 0 . 2 mile, The Brummitt residence is the fifth house on the left (north) side of the road. 6 . Discharge Point(s ) . List for all discharge points : Latitude : 35° 15 ' 45" Longitude : 80° 06 ' 05" Attach a U. S .G. S . map extract and indicate treatment facility site and discharge point on map. USGS Quad No. : F 18 SE USGS Name: Morrow Mountain, NC 7 . Site size and expansion are consistent with application? Yes X No If No, explain: 8 . Topography (relationship to flood plain included) : The terrain is hilly with slopes generally 5 to 30 % . The existing site appears to be well above any potential flood plain. 9 . Location of nearest dwelling: A number of dwellings within 100 feet. 10 . Receiving stream or affected surface waters : Lake Tillery (Pee Dee River) a. Classification: Ws-III and B b. River Basin and Subbasin No. : Yadkin-Pee Dee & 03-07-08 c. Describe receiving stream features and pertinent downstream uses : The receiving stream is a hydro- electric impoundment that is used extensively for primary and secondary recreation. The treated wastewater is piped several hundred feet from the shore towards the main channel . PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1 . a. Volume of wastewater to be permitted: 0 . 00045 MGD (Ultimate Design Capacity) b. What is the current permitted capacity of the wastewater treatment facility? 0 . 00045 MGD c. Actual treatment capacity of the current facility (current design capacity) ? 0 . 00045 MGD d. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two years : N/A e. Please provide a description of existing or substantially constructed wastewater treatment facilities: The existing facility consists of a septic tank, nitrification field followed by a subsurface sand filter and effluent chlorination. f. Please provide a description of proposed wastewater treatment facilities : N/A g. Possible toxic impacts to surface waters : None h. Pretreatment Program (POTWs only) : in development: approved: should be required: not needed: NPDES Permit Staff Report Version 10/92 Page 2 2 . Residuals handling and utilization/disposal scheme: a. If residuals are being land applied, please specify DEM permit no. : Residuals Contractor: Telephone No. : b. Residuals stabilization: PSRP: RFRP: Other: c. Landfill : d. Other disposal/utilization scheme (specify) : Septage is periodically removed by a septage hauler (A. L. Lawder, Inc. ) and transported to a municipal wastewater treatment plant for final disposal. 3 . Treatment plant classification (attach completed rating sheet) : Single family dwelling, no rating 4 . SIC Code(s) : 9999 Wastewater Code(s) of actual wastewater, not particular facilities, i .e. , non-contact cooling water discharge from a metal plating company would be 14, not 56 . Primary: 04 Secondary: Main Treatment Unit Code: 44007 PART III - OTHER PERTINENT INFORMATION 1 . Is this facility being constructed with Construction Grant Funds or are any public monies involved (municipals only) ? N/A 2 . Special monitoring or limitations (including toxicity) requests : N/A 3 . Important SOC, JOC or Compliance Schedule dates : (please indicate) N/A Date Submission of Plans and Specifications Begin Construction Complete Construction 4 . Alternative Analysis Evaluation: Has the facility evaluated NPDES Permit Staff Report Version 10/92 Page 3 all of the non-discharge options available. Please provide regional perspective for each option evaluated. Spray Irrigation: Insufficient land area for a spray irrigation system Connection to Regional Sewer System: Area-wide system is not available Subsurface : Existing facility was converted from a subsurface disposal system. Other Disposal Options : N/A 5 . Other Special Items : N/A PART IV - EVALUATION AND RECOMMENDATIONS It is recommended that the NPDES discharge Permit be renewed. 44(7-711 Si natur4/ of Report Preparer g p Water Quality R tonal Supervisor f 2-/277� Date NPDES Permit Staff Report Version 10/92 Page 4 +am r a , . \--___Ij ' / "(..L..) -...... ./ (4, c: 7,,,,},:,/'• ))..\k\ --=--=-------• 1 �11 ' 40 Ad ' 14" „ ,Y, \4.v‘) ,, . „ ,, _ .• ' le C ___c ( •�� ' :„... :u \ ' 4 u- sir. + �a a I p\\1 (,------ , ., Lp'71': n` i 1 a \. �i j I 1�.'300 ; G a u * ill i ao\ `I` Crssk ar a.;; (\ �� Boat C( [p a * /1 ,1 ) 11 q (0 3, b /( / - 4' .' • / ) „,.1--z,----,1 \ y "05• - /A'i%v<,: %:, , `� AJU // /��/ ( "-- Le/ If I ,3 ..4 -,,•) Alt7.1:t / ''s 1.\ Fs3 q . , ,-.7 /Ai . ,,s,,s- 1 i j i ,; Tj ,. u ql 14 • \ ), ,. c z_f-)./ _ __ ( �I Q = i i 60 . \ (1/434 \I�� Lam- eeM n.II Opp Tii ,j----, AN30. �� � - At 061N . " $.04 _ ,/*/ ./f_ ii_ _ IL,firb ', . " rer 3o0 ik % ,' r- .401:1.1.115 in) ��Sii aa � 1 ,. /ut, sa Ip al a O I Ctl /t/ Jf � -` l' i) .\J \ A f ' (?) ,,3), .'7 \ • )...) ._,N . ..1kfr #CC. --- , C.tt .. .‘' i \. .......,,..)2:: 1 mar.'W.,, .._...p.,--\,31\ 0 z)t _i_c_. ,. / 0 N \. 2 47 k C' ' .— 1- • ! / , rt,: . Vii‘ ,I; /..0(' ) Ly a �` }J L 1 , , as\ h or. 1 a„ as O 7;.-.- , ,q, / r - _4.- ..L__;/\(-- • --"' :(• L� ;� 4y A •amp.4-... 1 1 --\:../y A, A, ,...... ,--7,. : q , is,„›,_,, (-5-- 1,),.64& I (")___,; * 1---•• -;- ( izt-- 1_ • c ,.4., i/irz .--'!-.„_", -- ,\1\r,- i=""."-,''t--Y.k • a0Y �r ;\,- ,, _ , _ U 8 I � \ %-� i •� �'��"' � I i�i�ilLk �� 550 000 8 1 ��j^.•�;}� /Di , ,//-/ /^ FEET-M• -\- v y,�/ - /� \,- ki: • I \ ' X,_;.."-/-—' /1-7_—__;___*,.._ a 0 . §, 5:,e: , ) ‘..// !BSc g U' .> 35°15 ,- .. r\ / ram.` f_ �� u \ - 8O0O73 '80 '81 I 1 670 000 FEET '82 '83 - 5' ,.` Mapped, edited, and published by the Geological Survey PO� Control by USGS, NOS/NOAAand North Clina Gdetic Survey MH \ + Caro eo E Topography by photogrammetric methods from aerial photographs c" taken 1977. Field checked 1978. Map edited 1981. I Projection and 10,000-foot grid ticks: North Carolina coordinate 89 MILS 1 033' system (Lambert conformal conic) 10 MILS 1000-meter Universal Transverse Mercator grid, zone 17 1927 North American Datum To place on the predicted North American Datum 1983