HomeMy WebLinkAboutNCC241679_NOI Application_20240604 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 5/31/2024 8:53:24 AM (NCG01 NOI Submission)
Approve by Brooklyn.Broussard 5/31/2024 9:12:24 AM (Review-NOI 200460 Robinson Plant-Rockingham 230kV
Line Rebuild)
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:June 5,2024 5:00 PM
5/31/2024 8:53:34 AM
• The task was assigned to Brooklyn.Broussard by round robin distribution 5/31/2024 8:53:34 AM
Submit by Austin Sanderford 6/4/2024 1:11:03 PM(Payment Verification for NCC241679)
0 Nuwan Wijesuriya
• The task was assigned to DEMLR NCG01 Payment Team.The due date is:July 12,2024 5:00 PM
5/31/2024 9:12:40 AM
• Austin Sanderford assigned the task to Austin Sanderford 6/4/2024 1:10:43 PM
applicationConstruction Stormwater: Notice of Intent (NOI)
National Pollutant Discharge Elimination System(NPDES)
General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities
N O RTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
...................................................................................................................................................................................................................................................................................................................................................................................................
Are you submitting an NOI that was rejected before?
No
Yes
1a.Project Name*
Robinson Plant-Rockingham 230kV Line Rebuild
1b.Specific Lot Numbers
This field may be used to list specifc lot numbers.
1c.Parcel ID Number(s)(PIN)
List all PINs associated with this project.
735800562038
735800475703
735800750581
735800766867
736900232873
736800085735
735800899538
735900808249
735900902661
735900423183
735900531242
735900555001
735900742176
735900564085
735900466315
735900573236
735900770184
735900689227
735900689938
735900486461
745000504869
745000305353
745000307665
745000401909
745000710297
745000723560
745000542531
745000554201
745000646810
745000551565
745000665245
745000564722
/4000UJ/3/Uo
745000575851
745000578801
745000670920
745000675635
745000587331
745000681089
745000674928
745000676963
745000686386
745000685711
745000682905
745000794229
745000792553
745000699691
745000695532
745100608204
745100802906
745100818812
745100829551
745100922925
745100920186
745100923217
745100923369
745100924658
746100240383
746101069289
746101155822
746101166028
746101168633
746101178773
746101285319
746101287804
746101293319
746203418699
746101395484
2.County*
Richmond
3. Highway or Street Address*
N/A(Transmission R/W)
Street name only is acceptable if no address number assigned yet
4.City or Township*
Rockingham
5.State* NC
6.Zip Code* 28379
7. Latitude* Enter the latitude in decimal degrees
34.8994
8. Longitude* Enter the longitude in decimal degrees(MUST be negative)
-79.7899
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 08/01/2024
Estimated Construction Project Start Date
10. Date to End* 12/31/2025
Estimated Construction Project End Date
11.SIC(Primary)*
Other(9999)
Standard Industrial Classification for Development
12.Acres to be 122.00
disturbed* (including off-site borrow and waste areas)
13.Total site area 122.00
(acres)*
14. Post-construction 0.00
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-RICHM-2024-Robinson Plant-Rockingham 230kV Line
Rebuild
Assigned automatically(not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a.Receiving Waterbody*
Marks Creek
Name of waterbody into which stormwater runoff will discharge
15b.Waterbody Index No.
13-45-(2)
NC Waterbody Index Number
Stormwater discharges will flow to additional waters*
No
Yes
15c.Additional Receiving Waterbody
Speeds Creek
Waterbody name
15d.Waterbody Index No.
13-40-3
NC Waterbody Index Number
15e.Additional Receiving Waterbody
Watery Branch
Waterbody name
15f.Waterbody Index No.
13-40-3-1
NC Waterbody Index Number
16a.Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNOl on 1/26/2023 and will not be answered in applications submitted prior to that date.
B. Permittee Information
Part B.
Permittee Information-Legally Responsible Entity and Individual
......................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as
a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
1. Permittee*
Legally Responsible Entity
Duke Energy Progress, LLC.
If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name.
Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the
registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership(FRO)Form.
2. First Name* Nuwan
If Corporation,enter Registered Agent First Name
3. Last Name* Wijesuriya
If Corporation,enter Registered Agent Last Name
3b.Title Lead Transmission Permitting Manager
4. Permitee E-mail Address*
nuwan.wijesuriya@duke-energy.com
5. Permittee Telephone No.*
919-931-6655
6. Permittee Mailing Address*
Street Address
410 South Wilmington Street
Address Line 2
NCO2
City State/Province/Region
Raleigh INC
Postal/Zip Code Country
27601-1849 us
Check box if the street address the same as mailing address
Yes
7.Permittee Street Address
Street Address
410 South Wilmington Street
Address Line 2
NCO2
City State/Province/Region
Raleigh NC
Postal/Zip Code Country
27601-1849 US
8.Type of Ownership*
Ownership is only individual if an individual is named in B.1.above.
Non-Government
C. Site Contact Information
Part C.
Project Site Contact Information
................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Contact-First Name*
Laura
2. Primary Site Contact-Last Name*
Kirby
3.Title
Senior Transmission Permitting Manager
4.Site Contact E-mail Address*
laura.kirby@duke-energy.com
5.Site Contact Telephone No.*
276-613-3776
6.Organization Name
Duke Energy Progress, LLC.
7.Site Contact Mailing Address*
Street Address
411 Fayetteville Street
Address Line 2
City State/Province/Region
Raleigh NC
Postal/Zip Code Country
27601 us
8.Consultant Name
(Optional)
Trae Livick
First and Last name
9.Consultant E-mail
trae.livick@wsp.com
This person will be copied on all correspondence.
10.Consultant Telephone No.
910-398-3428
11. Billing E-mail
(For Annual Fee correspondence)
nuwan.wijesuriya@duke-energy.com
Default is legally responsible person e-mail
12. Billing Telephone
(For Annual Fee correspondence)
919-931-6655
Default is legally responsible person telephone
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 05/03/2024
Approved*
2. E&SC Plan Project RICHM-2024-0107
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4.State DEQ Office* Fayetteville(FRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can
include the beginning point and end point coordinates in the"Notes"box below).
5. E&SC Plan Letter of Approval-Friday May 3 2024 1235 PM.pdf 302.96KB
Approval letter or Must be PDF format
Grading Permit
6.Signed FRO Financial Responsibility/Ownership Form
Application Report-Friday, May 3,2024 1235
95.29KB
PM.pdf
Must be PDF format
7.Site Location Map Must be PDF format(limit 20 MB)
Figure1.pdf 295.58KB
Please do not upload entire set of E&SC plans.
8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application.Include additional waterbodies if necessary.
FRO is via online portal now-do not have signed hard copies
anymore
9. NOI Certification Robinson plant.pdf 1.28MB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project,for satisfying
the requirements of this permit,and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is,to the best of my knowledge and belief,true,
accurate,and complete based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person'(signing on behalf of Legally Responsible Person
named in Part B)
Important:The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
Signature
Type Name* Nuwan Wijesuriya
Title Lead Transmission Permitting Manager
Organization Legally Responsible Entity
Duke Energy Progress, LLC
Date* 05/31/2024
F. Tracking and COC Info
NOI Tracking No. 200460
NC Reference No. NCG01-2024-1679
Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SIP(passed
from workflow if eNOI approved)
Certificate of NCC241679
Coverage(COC) No.* Uses NOI number until approved,then uses NUMBER incremented by SIP(formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC241679-2024
Invoice Due Date 6/30/2024
Initial Fee $ 120.00
Fee increased to$120,effective October 3,2023
Invoice Status OPEN