Loading...
HomeMy WebLinkAboutNCC241679_NOI Application_20240604 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 5/31/2024 8:53:24 AM (NCG01 NOI Submission) Approve by Brooklyn.Broussard 5/31/2024 9:12:24 AM (Review-NOI 200460 Robinson Plant-Rockingham 230kV Line Rebuild) • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:June 5,2024 5:00 PM 5/31/2024 8:53:34 AM • The task was assigned to Brooklyn.Broussard by round robin distribution 5/31/2024 8:53:34 AM Submit by Austin Sanderford 6/4/2024 1:11:03 PM(Payment Verification for NCC241679) 0 Nuwan Wijesuriya • The task was assigned to DEMLR NCG01 Payment Team.The due date is:July 12,2024 5:00 PM 5/31/2024 9:12:40 AM • Austin Sanderford assigned the task to Austin Sanderford 6/4/2024 1:10:43 PM applicationConstruction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System(NPDES) General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities N O RTH CAROUNA Environmental Quality A. Project Information Part A. Project Location and Waterbody Information ................................................................................................................................................................................................................................................................................................................................................................................................... Are you submitting an NOI that was rejected before? No Yes 1a.Project Name* Robinson Plant-Rockingham 230kV Line Rebuild 1b.Specific Lot Numbers This field may be used to list specifc lot numbers. 1c.Parcel ID Number(s)(PIN) List all PINs associated with this project. 735800562038 735800475703 735800750581 735800766867 736900232873 736800085735 735800899538 735900808249 735900902661 735900423183 735900531242 735900555001 735900742176 735900564085 735900466315 735900573236 735900770184 735900689227 735900689938 735900486461 745000504869 745000305353 745000307665 745000401909 745000710297 745000723560 745000542531 745000554201 745000646810 745000551565 745000665245 745000564722 /4000UJ/3/Uo 745000575851 745000578801 745000670920 745000675635 745000587331 745000681089 745000674928 745000676963 745000686386 745000685711 745000682905 745000794229 745000792553 745000699691 745000695532 745100608204 745100802906 745100818812 745100829551 745100922925 745100920186 745100923217 745100923369 745100924658 746100240383 746101069289 746101155822 746101166028 746101168633 746101178773 746101285319 746101287804 746101293319 746203418699 746101395484 2.County* Richmond 3. Highway or Street Address* N/A(Transmission R/W) Street name only is acceptable if no address number assigned yet 4.City or Township* Rockingham 5.State* NC 6.Zip Code* 28379 7. Latitude* Enter the latitude in decimal degrees 34.8994 8. Longitude* Enter the longitude in decimal degrees(MUST be negative) -79.7899 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/01/2024 Estimated Construction Project Start Date 10. Date to End* 12/31/2025 Estimated Construction Project End Date 11.SIC(Primary)* Other(9999) Standard Industrial Classification for Development 12.Acres to be 122.00 disturbed* (including off-site borrow and waste areas) 13.Total site area 122.00 (acres)* 14. Post-construction 0.00 impervious area (Estimated) (acres)* Project Tracking ID NCC-RICHM-2024-Robinson Plant-Rockingham 230kV Line Rebuild Assigned automatically(not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a.Receiving Waterbody* Marks Creek Name of waterbody into which stormwater runoff will discharge 15b.Waterbody Index No. 13-45-(2) NC Waterbody Index Number Stormwater discharges will flow to additional waters* No Yes 15c.Additional Receiving Waterbody Speeds Creek Waterbody name 15d.Waterbody Index No. 13-40-3 NC Waterbody Index Number 15e.Additional Receiving Waterbody Watery Branch Waterbody name 15f.Waterbody Index No. 13-40-3-1 NC Waterbody Index Number 16a.Is this project subject to the NC Sediment Pollution Control Act?* Yes No, not subject to NC SPCA 17. Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOl on 1/26/2023 and will not be answered in applications submitted prior to that date. B. Permittee Information Part B. Permittee Information-Legally Responsible Entity and Individual ...................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1. Permittee* Legally Responsible Entity Duke Energy Progress, LLC. If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name. Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership(FRO)Form. 2. First Name* Nuwan If Corporation,enter Registered Agent First Name 3. Last Name* Wijesuriya If Corporation,enter Registered Agent Last Name 3b.Title Lead Transmission Permitting Manager 4. Permitee E-mail Address* nuwan.wijesuriya@duke-energy.com 5. Permittee Telephone No.* 919-931-6655 6. Permittee Mailing Address* Street Address 410 South Wilmington Street Address Line 2 NCO2 City State/Province/Region Raleigh INC Postal/Zip Code Country 27601-1849 us Check box if the street address the same as mailing address Yes 7.Permittee Street Address Street Address 410 South Wilmington Street Address Line 2 NCO2 City State/Province/Region Raleigh NC Postal/Zip Code Country 27601-1849 US 8.Type of Ownership* Ownership is only individual if an individual is named in B.1.above. Non-Government C. Site Contact Information Part C. Project Site Contact Information ................................................................................................................................................................................................................................................................................................................................................................................................ 1. Primary Site Contact-First Name* Laura 2. Primary Site Contact-Last Name* Kirby 3.Title Senior Transmission Permitting Manager 4.Site Contact E-mail Address* laura.kirby@duke-energy.com 5.Site Contact Telephone No.* 276-613-3776 6.Organization Name Duke Energy Progress, LLC. 7.Site Contact Mailing Address* Street Address 411 Fayetteville Street Address Line 2 City State/Province/Region Raleigh NC Postal/Zip Code Country 27601 us 8.Consultant Name (Optional) Trae Livick First and Last name 9.Consultant E-mail trae.livick@wsp.com This person will be copied on all correspondence. 10.Consultant Telephone No. 910-398-3428 11. Billing E-mail (For Annual Fee correspondence) nuwan.wijesuriya@duke-energy.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 919-931-6655 Default is legally responsible person telephone D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Plan Approval Information ...................................................................................................................................................................... 1. Date E&SC Plan 05/03/2024 Approved* 2. E&SC Plan Project RICHM-2024-0107 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4.State DEQ Office* Fayetteville(FRO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can include the beginning point and end point coordinates in the"Notes"box below). 5. E&SC Plan Letter of Approval-Friday May 3 2024 1235 PM.pdf 302.96KB Approval letter or Must be PDF format Grading Permit 6.Signed FRO Financial Responsibility/Ownership Form Application Report-Friday, May 3,2024 1235 95.29KB PM.pdf Must be PDF format 7.Site Location Map Must be PDF format(limit 20 MB) Figure1.pdf 295.58KB Please do not upload entire set of E&SC plans. 8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application.Include additional waterbodies if necessary. FRO is via online portal now-do not have signed hard copies anymore 9. NOI Certification Robinson plant.pdf 1.28MB Form Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is,to the best of my knowledge and belief,true, accurate,and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person'(signing on behalf of Legally Responsible Person named in Part B) Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. 'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature Type Name* Nuwan Wijesuriya Title Lead Transmission Permitting Manager Organization Legally Responsible Entity Duke Energy Progress, LLC Date* 05/31/2024 F. Tracking and COC Info NOI Tracking No. 200460 NC Reference No. NCG01-2024-1679 Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SIP(passed from workflow if eNOI approved) Certificate of NCC241679 Coverage(COC) No.* Uses NOI number until approved,then uses NUMBER incremented by SIP(formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC241679-2024 Invoice Due Date 6/30/2024 Initial Fee $ 120.00 Fee increased to$120,effective October 3,2023 Invoice Status OPEN