Loading...
HomeMy WebLinkAboutNCC241670_Site Plan or Location Map_20240604 • / CONSTRUCTION SCHEDULE r l `1 1 I ' I I / \l \ \\ I.Obtain all necessary permits and plan approvals.Erasion and Sediment Control(PNSC)permit and a Certificate of Coverage T s26 of I. I Iw I / N \ \\ I (COC)must be obtained before any land disturbing activities occur.A copy of Me E&SC permit,the COC and a hard copy / - M \ \ 9 of Me plan must be kept on site,preferably in a permits box,and accessible during inspection /� J� 7 I •7 / / p 2.Install grovel construction entrances first,then silt fences,reinforced silt fence / �- / \mil - outlets.d wattles. / /7�� - _��/ / / ry/ \\\ �\ 3.Finish clearing and grubbing any necessary areas on the lots as they are started / / .:/ •4 4,Begin lot grading and excavation activities / / I / ��-- // / / \ \ 5.Begin or<ominue with house cons...activities. / / / _ A� -// I \ \ Se e. all rowan grading and house<oastra<tidn.All areas not aiatmbea for v dare needs m have temporary or pemmnem i/i/ /i----/ / \\ \ K^\ owner instal 7 tall driveways,walks e.patina. / //r�� AA� / 1 \ B.Begin fine grading of lot saes4.3 \\ ( \ / p 9.Final gassing,mulching and stabilizing of lot.In most cases this will involve the installation of sad on the lot.The silt // / / / ' N''''" ) / - �,psY fence will remain in plaza until the lot iswdded or grassingisxtabiliud and taken hold. r /� ' / \ \ �8-� \\� \\ �� pyt4'S"' 10.The contractor shall conduct self-inspections of the erosion and sedimentation control messures end complete Me following / / / ( // ,16. �__ \\ r \ \ 1 ( I O.. combined self-inspection form found on the DEMLR websim aastmction-pro l p 18 \ I I \ \ WL� http.Avww.denn<.govrabnnndivisinn=,energy-mineral-and-land-reaomceaismmrwater/stommwater-progmmMedea-< tit / 1�� e�� a Twelve mon.of complete inspection forms shall be kept i nsite.davailableforinspectionatalltimes,Itia / I T / ��• rxommuarnd.acopy be keptmapermits box.Ref G.S.IJA-54.1lbrough G.S.IIJA-ST Seceons lSA NCAC 04A.0101 / \ \ \\ \ r(p i1� tmnugnlsArvcAco4aoso4GenealPemmarvcGmoogorveoesfarcnmo-uctinnwaivnlea / / 1 / \ -J \ '� / • num II.Self-inspections for erosion and mdimemation control measures are to be perform.at least once every seven calendar days / \ \ / \ and 'w 24 hours Or m - of greater m inch,Any neededrepairshub a immediately maintain I 1 \ \\ \11 \ \� ) / AU YVILLE m designed A SC shall be maintained specified M / I v / g shall be installed h j for \ \ 90 -'4i II Inspectiondfinal as I WhentheP I theP i 'hall DEMLR theI 1 I ---- \ 'C N / SITE4N>R. ENSCPIa After DEMUR informs me perm of me project l via inspect awn the pemmhtce shall visit / 19 / L'� Nyyy "deq.ncgov/NCOOM to submit.electronic Notice of termination(e-NOT).A$120 annual general Permit fee.11 be I \\\ \ „\ / ;til No, charged until the a-NOT has been filled out. 1 I _ \\ \\ \\ N. N\ ( GROUND STABILIZATION j \ ,t -15-��` \\ \ \� \\ \ VICINITY MAP SITE AREA STABILIZATION I `� ,,\ \ l '•"r'I'Gem r . \ I / DESCRIPTION TIME FRAME EXCEPTIONS I `� ; _ _ - :17-17/ --- ---_-_- \ \ / / N.T.S. - r.:aa.ae -_PERIMETER DIKES, 7 DAYS NONE --, - - - __�- I / /� �\ \ \ SWALES, DITCHES / / /&=LOPEI i 20 / / Nr--' / vvHIGH QUALITY 7 DAYS NONE /, /` / / /WATER ZONES \_ -- / \ \ (HQW) ,/ ��/�� / // a I �/ l\ \ \ \ SLOPES STEEPER 7 DAYS IF SLOPES ARE -/ , l / i / / / - .S/ \ \� \\ A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED ET THAN 3:1 10 OR LESS IN -- / / .j "/�•"•i / / // l I / \ 111 \ NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE / / - / / -`1 ,� �r 22 / ) r `40 --_ \\ COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER __ - i' / // / / ' / / I U l \ v/ 23 / / N AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 -'' / ^7A / 13' / \ / / 21 4'/ \"'y• N, EROSION AND DAYS ARE _ -- J // / / r - \ `:tom / SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED _ / // / / / 7 ( i AU J 0\ I N\ //_---- // y / NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY SLOPES 3:1 OR 14 DAYS 7 DAYS FOR 73 / / / / \ 17 p �/. -- / _ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE / / I 1 o}n�T \ -_ / _-- - •A3• / APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER _ / / / \\ 1 \ N Lail I --_ 4. `24"-_ V / DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50'IN \` " / / / / 1\ ",-- \ / _ /PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION LENGTH --�� / / / / ( ` 1 I, /I\ / -- - // Lot Plan / / I - CONTROL PLAN." \ / - / / ALL OTHER AREAS 14 DAYS NONE(EXCEPT \ 8 4/ / / \ t3' / 1 1 7 - •� / / t WITH SLOPES FOR PERIMETERS 128 1 ' C-L\( \ 40 , ) Ara,°// \ -- , FLATTER THAN 4:1 AND HOW ZONES) \ \ / ��4 �� /� // / / J53/� 25 / / w S / ___ / )DATE: PAGE: -�� I\�\ pe lIBC fq_� /7 //� /12 \\\ \ I sat sock/woetle sat Sock/wore NOTE: / // / -- 'PG43 T /_ /• / / 11 .� • \ / L\\ \ / / %/ MI 3.NI Area to be ...kited Mr ' / FLOW,_ ? L°_ITS�o5rn_I• /' / / 0 � 7 / 1 / \ \ 26 / II / I S II_: compost _ n'�I ,timm Mai " mdaMmm i �/ �\ \ a i \ / \\ \ / I J SECTION Stakes SECTION Stakes end e Maned slope. m...tad..duel of -_- /.7 -- / ^a, /�/•\1 r \\ \ / / -- \\/" \ \ 27 R/ ` 1X sucknwanblaian6 ..agadlW mm ewe........ / l / / / �\ \\ \ i ^--r r 28 ^ •• O0 l 1 \\\ % A,... <D N•M, runoff Bern g undtheendofthelightly unstop° / / / �� 7� N tr / 29\ }3o cvs oo \ I III IIIII/� 4- Oak or other durable hardwood stakes with a 2 silt e peross LL aB --� �eP /�� �� -�� Lot planA V Aw4 A\ ':/ .-- �' \ ) A W Wvertically through the center of the Silt soce. ,9� 13p II / I^ 4.-� �\ / �\\ El \\ \\ \ \ �./ /� 1 0 f4B/ \ maximum i.wat Ma or Corn g tree Mn of 2 feet aaman<u re`m°etp maximum interval \ \ \ \ \ l 7 N ,�`��\ cf�� �� \ N �� / 1 ` I 7zi \ UNTRENcroi/i Mulch m log at s. nPm:mlera nm. \\ \ \ \ 7 '- / /° J'^ 6 \ >\ / N I W HED INSTALLATION antLot Plan Me s n he silt moMmnc w.m...�.,.co..on .. ,: aa<ki.,mtbtohaconcrete Mocks nnplacede used grunorcevents. X ) ) 1 ) \ I �7' 7 /SO'r. "F" \ / -� I \ J G\ Ise I. IdAINIE"ahA<heat<e<kr„aaleatleastwaaklrandafter 1 I / / l I ) I / 1 ^yo1- 'B\ogpOVR, ' , ------ N_ oaz" 4,9 COMPOST SOCK IMRAL PLOW RATER as I J / / / / I C /' N // ,, gU / \ cn fecNnnenmeas a B. o<.w�a'w�.�, ; (.;an'.°m1(It')(;�n",m1 �; 2. amemnarbe,e edwsado, I / / / / / , /' -/ I ,az_ Lo51an ggY Top Lane / `\ Mulch D accumulated sediment reWatne �) (nos allow.adegn reams need. J__ sheetam.� f ew.aulleeau m5",sore.t �a �'inl x.on1 a. m^s toberer silt a.a,as I / / / / / // / / .,B„&„H„ _ --:_-- ----- N \\ sat Sock/"k�atn"'1<2/ i°aa col a col NOS m ( rater oreedMebnrewasurcon e. 1 / / / / 1/ 7 ' ( I _ / / v' wwk Am . larger 4. Reinstall if mdamiaged or d.wagesal` ► / l l I \ \\ / / // \ Lo tan4 / I \ mroa "(tit gTsil" ' i 2 t 7 measure he war�an;Fe 3..... / / / / / aHa _ °J 3m a Ito d 6. m nectar ^-- �sD L SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION / I / / I 1 _ / I \ I / / / / / \ Lot Plan \ / / / / I 1 2 :-:--- ___ \ DATE: PAGE: \ / / / / \ I r^ J'r� Lot Plan ( \ 1 / / / i \ ' Lott tan \• \ 1 1 / / / • / / tin i $ro 1 I / / / / / / I \ Spca • :1111---\--\.. \ 1 1 / / / / I /\ I - \\Ge _ /'G eyT • tat d HW ✓< @HOUSE �V ; CV Ti� 1 �HOuS 1 ( ( 1 11 I ‘V �/ // �� ial wLE cE or cuRB 111 v�tFs -oAnwnV red L;P�Ran'nT o 7�tFi \ 1 1 I 1 1 1 / __.-- 150 / Notes: I 1 I / / ' ,.If needed,Tree Protection fencing should be installed along the buffer zone,wetland I / boundary and/or around protected trees,providing a radius of at least 1,25 feet for each \ \ / / 1 1 / / / 54 \ LEGEND inch I / / / / / / / / / 31 I 2.Insmll Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on \ ' / / / / / / / / DIRECTIONFLOW @ schematic/diagram and field adjusted.i(necessary,for placement at low points.If lots are \ I / / / / contiguous and have different land owners or builders,each lot should have individual Silt 1 I I / / / / / / / ` // / / , / I / SILT FENCE OUTLET ® 3.Insttall required sat Fence within 10 feet of property line to ensure there is no con0lvl with J ) / / / / / / I \` / // / ` \ ( / J I ENTRANCECONSTRUCTION ENEseptic system.It is the responsibility of the builder to ensure the installation Of sediment / / / / / / 1 \ / CURB INLET = control measures does not impact the septic system and repair area(=). / / / / 4.Al least one Construction Entrance/Exit is to be installed per lot. / / / / / r / / / ( / ) \ -/ I54 \ 5.Waste bins and other areas dedicated for managing building material waste shall be at -- least 50 feet away from storm dram inlets or damage ditches unless It can be shown that ( / / / I I 1 ( / l\ 1 K ---\ \ no other alternative exists.If this separation cannot be achieved,these areas must be I - \ \ contained befrom nd it Fence. van I� 11 I I iI (I III I ������ / B Inlets downstream of disturbances should be protected;streets should be swept when / I I I I - ) sediment from me construction activity is present. s I I f I I I \ \ .\NC-Envronmenlaldpeg T Details for Silt Fence Silt Fence Outlets Construction Entrances and other measures are \ / I provided on additional sheets.Erosion end sediment control details ere not drawn to scale /I I I / \ ------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER THIS PROJECT IS IN A PUBLIC SUPPLY DATE. PAGE. WATERSHED(WS-IV)AND ALL REQUIREMENTS PAGE 1 of 2 REGARDING SENSITIVE AREA TOTAL DISTURBED ACREAGE: 5.46 ACRES toe WATERSHEDS SHOULD BE FOLLOWED LOT EROSION CONTROL PLAN a / LOTS 1-7 & 24 °e°a� , 3_ �. w MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION HORSESHOE RIDGE Q,n f�,n, s General-All measures will be inspected and corrections made after runoff producingrainfalls or at least onceper week minimum.The builder will insure that the construction activities on anyparticular lot do not adverse/ affect anyof the installed erosion control measures.If lot construction dictates,measures will be v vFOR 4r! c ��tr3.��� relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested i the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. S BENJAM I N STOUT I_ygy¢_i.S.'a WAN 1 1'�-`�� 44.*_� Gravel Construction Entrance-The gravel pad should remain n a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all y" "a=44 '�j - objectionable materials spilled,washed,or tracked onto public roadways. 4-' aMn - ,.. ..... - REAL ESTATE SERVICES LLC ysy..41, .4, Silt Fence-Sediment fences should be Inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure / ='i� S"'d%.,-,,.' that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. • + i ;��p LITTLE COHARIE TOWNSHIP SAMPSON COUNTY Sodding-The sod should be property maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth SCALE:1"=100' APRIL 2024 Construction: Maintenance: and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. GRAPHIC SCALE 1,Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 inspect at least once a week and aver each 1 inch or material and properly grade it. greater rainfall:make any required repairs immediately. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be 2.Place the gavel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pea in a condition to prevent mud or sediment repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. loo - 5�D o 0 smooth it. from leaving the construction site.This may require periodic 3.Provide drainage to carry water to a sediment tap or other suitable outlet. topdressing with 2 inch stone. 4.Use geoteAile fabrics in order to improve stability of the foundation in locations 3.Immetliately remove all objectionable materials spilled,washed or Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed LI subject to seepage or high water table. tracked onto public roadways. sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind Or water. ( IN FEET ) CONSTRUCTION ENTRANCE/EXIT Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the nett rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all h = 100 fled fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAVETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106 LAST SAVED:4/23/2024 5:02 PM LAST PLOTTED:4/23/2024 5:03 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\24-2510-04 HORSESHOERIDGE-EC\PLPNS\HORSESHOEEC-LOTS1-,uuu,cW0