Loading...
HomeMy WebLinkAboutNCG550094_Notice of Continuing Violation_20110602 .F AV4 7.41A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary June 2, 2011 CERTIFIED MAIL 7010 2780 0001 4221 5941 RETURN RECEIPT REQUESTED Mr. Jeffrey S. Everett 187 Marajo Court RECEIVED Winston-Salem,NC 27127 Subject: NOTICE OF CONTINUING VIOLATION JUN 3 General Wastewater Permit Inspection CENTRAL ALES NPDES General Permit t :1 '0-9 • DWQ/BOQ Single Family Residence Davidson County Dear Mr. Everett: On May 26, 2011, Ms. Jenifer Carter of this office performed a General Permit Inspection on the wastewater treatment system at the abovementioned address in Davidson County,North Carolina. During this inspection, it was noted that chlorination disinfection and dechlorination have still not been installed, as required in a Notice of Violation dated April 7, 2008. Authorization to Construct(A to C) was issued for the construction of a chlorinator, chlorine contact tank, dechlorinator and a pump tank on December 12, 2008. The A to C was issued based on plans received by our Construction Grants &Loans Section on May 21, 2008 from John Beeson, PE, on your behalf. This office requests that you respond to this letter, in writing, within 14 days of receipt of this Notice. Construction, as per the approved plans, must be completed within 90 days of receipt of this Notice. Your written response should include the following: • Acknowledgment of and reasons for not constructing the required improvements as per the A to C. • The name of a duly registered Professional Engineer in the State of North Carolina being used to observe the construction of the chlorination/dechlorination system as per the approved plans and specifications. • If more than 90 days is needed to complete the construction, include reasons why, along with any supporting documentation A copy of the A to C, from the letter dated December 12, 2008, is enclosed. Please refer to it for requirements related to construction of the required elements, as well as notification requirements. continued on reverse... North Carolina Division of Water Quality,Winston-Salem Regional Office One Location:585 Waughtown St Winston-Salem,North Carolina 27107 NorthCarolina Phone:336-771-5000\FAX:336-771-4630\Customer Service:1-877-623-6748 Internet www.ncwaterquality.org Naturally An Equal Opportunity`.Atfhma"we Action Employer �/ Thank you for your attention to this matter. These violations and any future violations are subject to a d' civil penalty assessment of up to $25,000.00 per day for each violation. Failure to construct required chlorination & dechlorination will result in recommendation for enforcement being sent to the Director of the Division of Water Quality. Your response to this correspondence will be considered in this process. Should you have any questions,please contact Jenifer Carter or myself at(336) 771-5000. Sincerely, -.46041.164.444--er W. Corey Basinger Surface Water Regional Supervisor Winston-Salem Regional Office Division of Water Quality cc: WSRO Files SVU=P—=Central-Files, 2 Authorization to Construct Permit. In accordance with your application for discharge, the Division is also authorizing the construction of a chlorinator and chlorine contact tank, dechlorinator, and a pump tank into an unnamed tributary to Miller Creek, classified C NSW waters in the Yadkin Pee-Dee River Basin. All elbow piping must be of the long sweeping type. All cleanouts are to be housed in meter boxes below the surface. This system must be at least 50 feet from the dwelling and property lines and at least 100 feet from water supply wells on and off the site. The system must also be constructed and located above a 100-year flood. This Authorization to Construct permit is issued in accordance with Part III, Paragraph 2 of NPDES Permit No. NCG550000, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NCG550000. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction-of additional or replacement wastewater treatment or disposal facilities. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General.Statute 143-21.5:6A to 143-215.6C. The Winston-Salem Regional Office, telephone number 336-771-5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in- place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, an Engineer's Certification must be received certifying that the permitted facility has been installed in accordance with the NPDES Permit, the Certificate of Coverage,this Authorization to Construct and the approved plans and specifications. A leakage test shall be performed on the septic tank and dosing tank to insure that any exfiltration occurs at a rate that does not exceed twenty (20) gallons per twenty-four (24). hour per 1,000 gallons of tank capacity. The Engineer's Certification will serve as proof of compliance with this.condition. Mail the completed Engineer's Certification to the NPDES Unit, 1617 Mail Service Center, Raleigh, NC 27699- 1617. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. r • NCG550094 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time)the construction of the following chlorination/dechlorination system project: Project Name Location For the permittee hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date