Loading...
HomeMy WebLinkAboutNCC241450_ESC Approval Submitted_20240604 ;c��p. t,,cW`STAo.U3 TE of ro 1 l'f ROY COOPER ' 9. Governor ELIZABETH S.BISER ` ,, ,z '*a_ �f QUANNo"_= Secretary __ WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality March 26,2024 LETTER OF APPROVAL Southbury Development, LLC Attn: Zachary Anderson, Manager 3434 Edwards Mill Road#112-1 Raleigh,NC 287612 RE: Project Name: Cedar Grove Acres Approved: 26.6 Project ID: HARNE-2022-117 County: Harnett, City: Lillington, Address: Hwy 421 River Basin: Cape Fear Stream Classification: Other Submitted By: Arnold Land Design,PLLC Date Received by LQS: March 22,20224 Plan Type: New Dear Mr. Anderson: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required(G.S. 113A-54.1)(b). As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNO1 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Paul Clark at Paul.clark@ncdenr.gov.After you submit a complete and correct NOI Form,a COC will be emailed to you within three business days. A $120 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. DE North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources --;) Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville,North Carolina 28301 NORTH CAROLINA Department of Environmental seam /`' 910.433.3300 Letter of Approval Southbury Development,LLC March 26,2024 Page 2 of 2 3. Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a)requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition,it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, r "QoL.C.I.. Jodi Pace,EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet cc: David Arnold,Arnold Land Design,PLLC(electronic copy) Jay Sikes,Building Inspector(electronic copy) DEMLR-Fayetteville Regional Office File