HomeMy WebLinkAboutNCC241668_ESC Approval Submitted_20240604 4001,
Gail Geoffrey Mitchell <geoff@mitchcocustombuilders.com
teview Completed - Lot 617 Brookberry Farm - SFD Construction
message
:ity of Winston-Salem <noreply@geocivix.com> Tue, May 21, 2024 at 9:07 Al
reply-To: matthewo@cityofws.org
o: geoff@mitchcocustombuilders.com
Sol City 0,t.
1. WIT . - , LEM
NORTH M .1OI
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Lot 617 Brookberry Farm -SFD Construction
A/P#: EN2400142
Acreage to be Disturbed: 0.09
https://winston-salem.geocivix.com/secure/project/?projected=1351497
Hello Mitchco, Inc.,
Thank you for submitting your project to City of Winston-Salem. Review of the Erosion Control Plan for this project has
been completed. The design is adequate to meet the ordinance standards and the plan has been approved.
Be aware that this plan shall expire three (3)years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129. Also, acceptance and approval of this plan is conditioned upon
compliance with Federal and State water quality laws, regulations, and rules.
If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO)
form as applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has
already been provided, then please disregard this statement. Reminder that a completed FRO form is not required in the
instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion
Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction Stormwater
Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website
(https:/ledocs.deq.nc.gov/Forms/NCG01-N0l). Once coverage is obtained, please upload a copy of the Certificate of
Coverage (COC)to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will
not be issued until proof of coverage under NCG01 is provided. Please direct questions about the eNOI form to NCDEQ-
DEMLR Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC. ***This approval email serves as the "Approval Letter"that must
be uploaded when filing the a-NOI application to obtain the NCGO1 Certificate of Coverage. ***
As outlined in the Unified Development Ordinances (UDO)of Winston-Salem/Forsyth County, Village of Clemmons, Town
of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing
activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person
shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control
Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please contact Kent Wall at 336-462-7481 or kentw@cityofws.org.
Winston-Salem North Carolina and Forsyth County
City Link 311
311 or(336)727-8000
citylink@cityofws.org