CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Catherine Roland, Water & Land Solutions, catherine@waterlandsolutions.com,
571-643-3165
Through: Water & Land Solutions, LLC
We formally request a credit release for the Salem Nutrient Offset Site for completion of Task #3 per
the approved credit release schedule, which is included in the Attachments with this request. The
following documents have been submitted to DWR for Task # 3: Monitoring Financial Assurances
Posted and Approval of As-Built. The as-built site visit was conducted by DWR (Blake Hartshorn)
on March 13, 2024. The minor erosion rill that was observed on the site visit has been addressed, and
photos are included in the As-Built Report. The credit request reflects the updated credit numbers
from the as-built survey.
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration
Buffer Preservation and
Coastal Headwater
Buffer Enhancement
Generated Nitrogen Nutrient
Offset
10 2,591.390 lbs Credit request for task 3:
2,556.661 + 15.435 (remaining
task 1) +15.435 (remaining task
2) + 3.859 (remaining task 7)
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
Generated Nitrogen Nutrient
Offset
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments: 1) Approved Project Credit Table (include the most recent Asset Table approved by
DWR, whether it is the BPDP table or the As-Built table), 2) Approved Credit Release Schedule
Include the approved credit release schedule, whether it is the credit release schedule from the
MBI/UMBI or from the BPDP,
Table 1. Salem, 2022-0139 V3, Project Credits
Project Area
N Credit Conversion Ratio (ft2/pound)
P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject? (enter
NO if
ephemeral or
ditch 1)
Feature Type Mitigation Activity Min-Max Buffer
Width (ft)Feature Name Total Area (ft2)
Total (Creditable)
Area of Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible to
Nutrient Offset?
Delivered
Nutrient Offset:
N (lbs)
Delivered
Nutrient
Offset: P (lbs)
Nutrient Offset Rural No Ditch Restoration 0-100 D1 235,562 1 100%No —Yes 12,291.940 —
Nutrient Offset Rural No Ditch Restoration 101-200 D1 200,527 1 33%No —Yes 10,463.767 —
Nutrient Offset Rural No Ditch Restoration 0-100 D3 32,513 1 100%No —Yes 1,696.572 —
Nutrient Offset Rural No Ditch Restoration 101-200 D3 20,940 1 33%No —Yes 1,092.677 —
Nutrient Offset Rural Yes I / P Restoration 0-100 Stream A 415 1 100%No —Yes 21.655 —
Nutrient Offset Rural No Ditch Restoration diffused flow deductions 13,068 0 1 ———
Totals (ft2):503,025 0 0.000 25,566.611 0.000
Total Buffer (ft2):0 0
Total Nutrient Offset (ft2):503,025 N/A
Total Ephemeral Area (ft2) for Credit:0 0
Total Eligible Ephemeral Area (ft2):0 0.0%Ephemeral Reaches as % TABM
Enter Preservation Credits Below Total Eligible for Preservation (ft2):0 0.0%Preservation as % TABM
Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer
Width (ft)Feature Name Total Area (sf)
Total (Creditable)
Area for Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Riparian Buffer
Credits
Buffer —
Buffer —
Buffer —
—
—
Preservation Area Subtotals (ft2):0 0
Square Feet Credits
0 0.000
0 0.000
0 0.000
0 0.000
Square Feet Credits
Nitrogen:25,566.611
Phosphorus:0.000
Neuse 03020201 - Outside Falls Lake
19.16394
N/A
Restoration:
Enhancement:
Mitigation Totals
503,025
TOTAL AREA OF BUFFER MITIGATION (TABM)
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Nutrient Offset:
Preservation:
Total Riparian Buffer:
1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).
last updated 08/03/2020
I 1 1 . CREDIT RELEASE SCHEDULE
A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by
DWR, it is agreed that Nutrient Offset Credits associated with the Bank Parcel will become
available to sell to a third party in accordance with the Credit Release Schedule in Table 3.0.
Table 3.0 - Credit Release Schedule for Nutrient Offset Credits
Credit
Task Project Milestone Available for
Sale
1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded*,
Financial Assurance Posted 20
All Riparian Earthwork, Planting and Installation of Monitoring Devices
2 Completed, Easement Boundaries adequately marked, and all applicable permits
obtained. A site visit by DWR is required for this task.
20
3 Monitoring Financial Assurance Posted and Approval of As -Built Report 10
Monitoring Report #1: Approved by the DWR** & financial assurance renewed
4 10
Monitoring Report #2: Approved by the DWR** & financial assurance renewed
5 10
Monitoring Report #3: Approved by the DWR** & financial assurance renewed
6 10
Item B (1) of Section X in this Instrument has been completed and approved by DWR. 7 5
No remaining credits will be released until the conservation easement has
been assigned to an approved land trust or stewardship
Monitoring Report #4: Approved by the DWR** & financial assurance renewed
8 5
Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been9
conducted 10
Total 100%
For specification, please see Section V in this Instrument
DWR Approval provided upon a determination that the site is meeting success criteria
contained within the approved BPDP
B. DWR may modify the credit release schedule based on the information submitted or the order in
which required information is received. DWR will notify the Sponsor of any modification to the
credit release schedule.
C. Any major deviations to the Bank Parcel that were not authorized in writing by DWR prior to
implementation may affect the amount of nutrient offset credits that will be generated by the Bank
Parcel.
10