Loading...
HomeMy WebLinkAboutSW3160904_Wet Detention Basin Supplement_20160908 fl WET POND #1 Permit No. - go be pmvlrlew by DWO) 2pG WATE9O NCDENR aCDENR o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part I/1)must be printed filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Cambridge village Contact person Brian Rosenfeld Phone number 980-272-3400 Date 9/8/2016 Drainage area number -FA-1 11. DESIGN INFORMATION Site Characteristics Drainage area 467,834 ft' Impervious area,past-development 407,016 ft' %impervious 87.00% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 32,476 ft Volume provided 32,476 ft' OK,volume provided is equal to or in excess of volume required. Storage Volume: SAWaters 1.5'runoH volume ft' Pre-development 1-yr,24-hr runoff to Post-development 1-yr,24-hr runoff ft Minimum volume required ft' Volume provided it, Peak Flow Calculations Is the prelpost control of the 1 yr 24hr storm peak flow required? N (Y or N) 1-yr,24-hr rainfall depth 2.8 in Rational C,pre-development 0.35(unidess) Rational C,post-development 0.89(untless) Rainfall intensity:l-yr,24-hr storm 0.12 in/hr OK Pre-development 1-yr,24-hr peak flow 6.25 ft/sec: Post-dmelopment 1-yr,24-hr peak flow 36.29 ft/sec PreJPost 1-yr,24-hr peak flow control 30.04 ft"/sec Elevations Temporary pool elevation 755.88 hnsl Permanent pool elevation 753.50 first SHWT elevation(approx.at the perm.pool elevation) N/A first Top of 10ft vegetated shelf elevation 754.00 first Bottom of 10ft vegetated shelf elevation 753.00 first Sediment deanout,top elevation(bottom of pond) 744.00 first Sediment deanout,bottom elevation 743.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-mquired temp.pool? WA (Y or N) Elevation of the top of the additional volume ftnsl Form SvvQ1-Wet Detention Basin-Rsv."/18112 Parts I.a It.Desgn Summary.Page 1 of 2 Permit No. (to be pmw,HM by DWQ) 11. DESIGN INFORMATION Surface Areas Area,temporary pod 16,228 ft' Area REQUIRED,permanent pool 10,058 ft SAIDA ratio 2.15(unitless) Area PROVIDED,permanent pod,Ap,,,,,. 10,100 fe Of Area,bottom of I Oft vegetated shelf,Ap ma 5,897 0' Area,sediment deanout,top elevation(bottom of pond),Amy„a 2,303 fl' Volumes Volume,temporary pod 32,47511' OK Volume,permanent pod,Vp,,,, 28,344 ft Volume,foebay(sum of forebays if more than one forebay) 3,967 ft' Forebay%of permanent pool volume 14.0%% Insufficient forebay volume. SAIDA Table Data Design TSS removal 85% Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.15(unilless) Average depth(used in SAIDA table): Calculation option 1 used?(See Figure 10.2b) N (Y or N) Volume,permanent pod,Vp„, m 28,344 8' Area provided,permanent pod,Aps,,,, 10,100 ft2 Average depth calculated ft Need 3 If min. Average depth used in SAIDA,d,,,(Round to nearest 0.5ft) If Calculafion option 2 used?(Sea Figure 10.2b) Y (Y or N) Area provided,permanent pod,A,_,, 10,100ft Area,bottom of 10ft vegetated shelf,Ap mg 5,897 ft Area,sediment deanoul,top elevation(bottom of pond),App,-pp„a 2,303 12 'Depth'(distance law bottom of I Oft shelf and top of sediment) 9.00 It Average depth calculated 6.45 ft OK Average depth used in SAIDA,d„,(Round to down to nearest 0.510 6.5 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice(if circular) 2.00 in Area of odfice(if-non-circular) in2 Coefficient of discharge(Co) 0.60(unitless) Driving head(H,) 2.14 ft Drawdown through weir? N (Y Or N) Weir type (unitless) Coefficient of discharge(C,) (unitless) Length of weir(L) ft Driving head(H) ft Pre-development 1-yr,24-hr peak flow 6.25 ft'Isec Post-development 1-yr,24-hr peak flow 36.29 ft'Isec Storage volume discharge rate(through discharge orifice or weir) 0.15 ft Isec Storage volume drawdovm time 2A5 days OK,draws down in 2-5 days. Additional Information Vegetated side slopes 3:1 OK Vegetated shelf slope 10:1 OK Vegetated shelf width 10.0 If OK Length of flowpath to width ratio 3:1 OK Length to width ratio 3.2:1 OK Trash rack for overflow 8 orifice? Y (Y or N) OK Freeboard provided 1.8 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? N (Y or N) Insufficient. Recorded drainage easement required. Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump to drain Farm SW401-Wet Detention Basin-Rev.& 18112 Parts I.a II.Design Summary,Page 2 of 2