Subject: COMPLIANCE EVALUATION INSPECTION
NPDES Stormwater Permit SW3081003
Kluttz Substation
Cabarrus County
Dear Mr. Gaddy:
On May 15, 2024, a site inspection was conducted for the Kluttz Substation facility located at Barrier Road,
Cabarrus County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review.
The site visit and file review revealed that the subject facility is covered by NPDES Stormwater Permit
SW3081003. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters
designated as Dutch Buffalo Creek, class WS-II waters in the Yadkin Pee-Dee River Basin.
As a result of the inspection,the facility was found to be noncompliant with the conditions of the SW3081003
permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations
made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions,
comments, or need assistance with understanding any aspect of your permit, please contact Kathryn Peterson
at(704) 235-2100 or via e-mail at kathryn.peterson@deq.nc.gov.
Sincerely,
DocuSigned by:
4A35DOB02BO2438...
Jerry W. Eplin, PE
Regional Engineer
DEMLR
Enclosure: Compliance Inspection Report
c: DEMLR NPDES Stormwater Permit Laserfiche File
North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115
�*� + 704-235-2100
Compliance Inspection Report
Permit: SW3081003 Effective: 11/30/08 Expiration:
Project: Kluttz Substation
Owner: Duke Energy Carolinas LLC
County: Cabarrus Adress: Barrier Rd
Region: Mooresville
City/State/Zip: Concord NC 28025
Contact Person:Randy N Veltri Title: Phone:704-382-2741
Directions to Project:
Type of Project: State Stormwater-Low Density
Drain Areas:
On-Site Representative(s):
Related Permits:
Inspection Date: 05/15/2024 Entry Time 03:20PM Exit Time:03:40PM
Primary Inspector: Matthew J Gigante Phone:704-663-1699
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant 0 Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
page 1
Permit: SW3081003 Owner-Project: Duke Energy Carolinas LLC
Inspection Date: 05/15/2024 Inspection Type Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
An inspection was conducted at the substation which, since previous reports, has finished construction. Based
on the inspection conducted the site was not compliant.
The signed copies of the operation and maintenance agreement, engineer's certification, and a copy of the
deed restrictions are not present in the file for the site.
Portions of the inner slopes of the stormwater basin are bare and need denser permanent vegetative ground
cover to ensure the risk of erosion is properly mitigated. Additionally, the riser inlet was almost fully covered
over by about 1 inch of sediment. The riser inlets need to be unobstructed to function properly.
The facility must:
-Within 30 days, send copies of the signed operation and maintenance agreement, engineer's certification, and
deed restrictions to the DEQ Mooresville Regional Office.
- Ensure proper stabilization of the stormwater basin slope and remove any excess sediment in the basin
obstructing the inlets.
page 2
Permit: SW3081003 Owner-Project: Duke Energy Carolinas LLC
Inspection Date: 05/15/2024 Inspection Type Compliance Evaluation Reason for Visit: Routine
File Review Yes No NA NE
Is the permit active? 0 ❑ ❑ ❑
Signed copy of the Engineer's certification is in the file? ❑ 0 ❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the file? ❑ ■ ❑ ❑
Copy of the recorded deed restrictions is in the file? ❑ 0 ❑ ❑
Comment: Signed copies of the engineer's certification and operation and maintenance agreement are not
on file. The recorded deed restrictions are not on file.
Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? 0 ❑ ❑ ❑
Is the drainage area as per the permit and approved plans? 0 ❑ ❑ ❑
Is the BUA(as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑
Comment: The built upon area was constructed per the permit. Stormwater run off drains to the stormwater
basin.
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑
Are the inlets located per the approved plans? ■ ❑ ❑ ❑
Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑
Comment: All stormwater measures are installed per plan. Outlets and inlets are located per the approved
plan.
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ❑ ■ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or ❑ ❑ ❑ ■
provided to DWQ upon request?
Comment: The stormwater basin riser inlet was mostly covered by sediment measuring approximately 1 inch
deep. Portions of the stormwater basin inner slopes were bare or thinly stabilized.
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? ❑ ❑ ❑
Comment: No other conditions noted.
Other WQ Issues Yes No NA NE
Is the site compliant with other water quality issues as noted during the inspection? ❑ ❑ ❑
Comment: No other water quality issues noted.
page 3
Permit: SW3081003 Owner-Project: Duke Energy Carolinas LLC
Inspection Date: 05/15/2024 Inspection Type Compliance Evaluation Reason for Visit: Routine
page 4