HomeMy WebLinkAboutSW3240202_Stormwater Report_20240530 Stormwater Management & Erosion and Sediment Control Calculations Rowan 85 Trade Center Unincorporated Rowan County, North Carolina Prepared for: RP Salisbury Partners, LLC 445 Bishop Street NW Atlanta, GA 30318 Date: May, 2024 KHA Reference#: 013335005 6•gaZieptaV. ., N.CAR ,•♦♦ 4 • •Q- 9<'� • SEAL : 030861 05/30/24 KimIey >) Horn ©Kimley-Horn and Associates,Inc.2024 200 South Tryon,Suite 200,Charlotte,NC 28202 Phone:704-333-5131 NC FIRM#F-0102 ROWAN 85 TRADE CENTER SALISBURY,NC STORMWATER MANAGEMENT & EROSION AND SEDIMENT CONTROL CALCULATIONS Prepared for: RP Salisbury Partners,LLC 445 Bishop Street NW Atlanta,GA 30318 Prepared by: KIMLEY-HORN AND ASSOCIATES,INC. 200 SOUTH TRYON ST,SUITE 200 CHARLOTTE,NORTH CAROLINA 28202 MAY, 2024 KHA PROJECT NO. 013335005 This document,together with the concepts and designs presented herein,as an instrument of service,is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Hom and Associates,Inc.shall be without liability to Kimley-Horn and Associates,Inc. STORMWATER MANAGEMENT & EROSION AND SEDIMENT CONTROL CALCULATIONS TABLE OF CONTENTS 1.0 BACKGROUND 2 2.0 EXISTING CONDITIONS 2 3.0 SOILS 2 4.0 FLOODPLAIN/FLOODWAY/FIRM FLOOD INSURANCE RATE MAP 2 5.0 PROPOSED DEVELOPMENT 2 6.0 WATER QUALITY/ STORMWATER CONTROL MEASURES 3 7.0 STORMWATER ROUTING AND RESULTS 3 8.0 PIPE CONVEYANCE NETWORK 5 9.0 EROSION CONTROL 5 10.0 EROSION AND SEDIMENT CONTROL PLANS 5 11.0 CONCLUSION 8 APPENDIX A: SITE MAPS SITE VICINITY MAP FIGURE 1 USDA SOIL CLASSIFICATION MAP FIGURE 2 FEMA FIRMETTE FIGURE 3 USGS TOPOGRAPHIC MAP FIGURE 4 APPENDIX B: WATERSHED MAPS PRE-DEVELOPMENT DRAINAGE AREA MAP EXHIBIT 1 POST-DEVELOPMENT DRAINAGE AREA MAP EXHIBIT 2 APPENDIX C: WATER QUALITY PRE-AND POST-DEVELOPMENT CN AND TC CALCULATIONS EXHIBIT 3 NCDEQ SANDFILTER CALCULATIONS EXHIBIT 4 APPENDIX D: WATER QUANTITY PRE-AND POST-DEVELOPMENT HYDROCAD REPORT EXHIBIT 5 CONSTRUCTION PLANS STORMWATER NETWORK ANALYSIS EXHIBIT 6 APPENDIX E: EROSION CONTROL CALCULATIONS RIP RAP APRON CALCULATIONS EXHIBIT 7 NCDEQ SEDIMENT BASIN PHASE 1 CALCULATIONS EXHIBIT 8 NCDEQ SEDIMENT BASIN PHASE 2 CALCULATIONS EXHIBIT 9 TEMPORARY DIVERSION DITCH CALCULATIONS EXHIBIT 10 APPENDIX F: SUPPLEMENTAL INFORMATION SEASONAL HIGHWATER TABLE REPORT EXHIBIT 11 NOAA RAINFALL DATA EXHIBIT 12 1 1.0 BACKGROUND This report contains the approach and results of the stormwater analysis conducted for the proposed logistics center facility (Rowan 85 Trade Center) in Salisbury, North Carolina. The approximately 91.56- acre project site is located east of 1-85 and northwest of 1212 Webb Road. The development is planned to consist of approximately 2 industrial buildings totaling approximately +/- 1,240,000 SF, surrounding trailer parking and associate parking. This project consists of the following components: ■ Clearing and grubbing of the existing site. ■ Construction of the building and associated site appurtenances for operation (i.e. parking, driveways and sidewalks); ■ Construction of the stormwater conveyance network and proposed stormwater control measures. 2.0 EXISTING CONDITIONS The site is located east of 1-85, between Webb Road and Lane Parkway and is currently undeveloped. The existing topography drains towards three points of analysis (POA): approximately 4.58-acres towards the North of the site (POA 1) 67.14-acres towards the Northwest corner of the site (POA 2). The remaining 19.83-acres drains to a creek at the southern point of the site (POA 3). See Appendix B for a Pre-Development drainage map. 3.0 SOILS According to the USGS Soils Map, downloaded on August 31, 2023, the existing soils onsite are as follows: Cecil sandy clay loam with a hydrologic soil group B, Enon fine sandy loam and Mecklenburg loam with a hydrologic soil group C, and Sedgefield fine sandy loam, Iredell loam and Chewacla loam with hydrologic soil group D. In a separate report prepared specifically for this project, Terracon investigated four boring locations to understand the infiltration rates throughout the site. The infiltration rates were: 0.004, 0.007, 0.014 and 0.027 in/hr. Based on the reported findings from Terracon's testing and the results from the USGS Soils Maps, the calculations were done using hydrologic soil groups B,C and D. Refer to Appendix A for the USDA Soil Classification Map. 4.0 FLOODPLAIN/FLOODWAY/FIRM FLOOD INSURANCE RATE MAP Based on the effective FEMA Flood Insurance Rate Map Number 3710564700J, dated June 16, 2009, the site is determined to be outside the 0.2% annual chance floodplain. Refer to Appendix A for the FEMA FIRMETTE. 5.0 PROPOSED DEVELOPMENT The development is planned to consist of 2 industrial buildings totaling approximately 1,240,000 +/- SF, surrounding trailer parking and associate parking, utility infrastructure and stormwater improvements including three sand filters. The site will be composed of approximately 63.01 acres of impervious area. The site is divided into three drainage areas, one to the North of the site (DA-1), one in the center of the site (DA-2) and one in the South of the site (DA-3). Drainage areas 2 and 3 contain proposed sand filters to treat for water quality and decrease peak flows leaving the site in the post-development condition. DA-1 will discharge to the 2 North of the site, DA-2 discharges to a stream that runs through the center of the site and DA-3 discharges to a stream at the South of the site. This report contains the locations of the final stormwater quality measures. Drainage areas for the development have been delineated in the existing and proposed conditions. The proposed impervious areas have been calculated based on the proposed development footprint. A separate design package has been submitted to NCDOT for the construction of the extension of Lane Parkway to Webb Road, the majority drainage from the proposed road will bypass the stormwater BMPs. 6.0 WATER QUALITY/STORMWATER CONTROL MEASURES In accordance with the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual, a stormwater quality control system designed to treat runoff of the first inch of rain for 85% average annual removal of total suspended solids will be required. This requirement will be met by the construction of on-site above-ground sand filters. The above-ground sand filters 1, 2 and 3, have been designed in accordance with Part C-6 of the NCDEQ BMP Design Manual, to treat the first inch of runoff from the development for water quality. The sand filters have been designed with a media depth of 1.5 feet and minimum drawdown of 2 inches per hour to achieve 85% TSS removal. The media depth of includes a 3" layer of washed stone, 1.0' of cleaned washed "concrete" sand, 9" gravel layer for underdrain system, and 6" perforated PVC inside the gravel layer. The water quality volume (WQV), in accordance with the design manual, was multiplied by 0.75 due to the water draining through the sand media at quicker rate during storm events. The sand filters have been designed with a maximum ponding depth of 6 feet. Detailed calculations are included in Appendix C of this report. Proposed and existing, pervious and impervious area were used to calculate the CN values for the sand filter drainage areas. Hydrologic soil groups of were assigned in the pre and post conditions based on the downloaded Web Soil Survey from the Natural Resources Conservation Service (NRCS). The table below displays the drainage area summary for all proposed development areas. SCM SAND FILTER RESULTS FINAL FINAL FINAL Drainage WQV WQV Q10 Area Required Provided Discharge SCM NAME (ac) (CF) (CF) (cfs) 1 20.77 45,584 49,665 20.78 2 18.79 44,016 47,714 93.75 3 36.80 80,673 244,809 13.54 7.0 STORMWATER ROUTING AND RESULTS Peak attenuation was analyzed by routing the required rain events through the proposed stormwater control measures. Refer to the construction plans for detailed design of the stormwater control measures. Per NCDEQ requirements, peak attenuation for the 1-year, 2-year, and 10-year 24-hour storm will be treated with the proposed SCMs. The pre- and post-development peak discharge from the site was modeled in HydroCAD. The hydrologic analysis was conducted using NRCS TR-55 (SCS Method) of calculating runoff, curve numbers, and time 3 of concentration. Sheet flow lengths for use in the time of concentration calculations were limited to 100 feet or less. The SCS Type-II, 24-hour storm with a peaking factor of 484 was used in the analysis. As reported by the NOAA Precipitation Frequency Data Server, the 24-hour rainfall depths used for this analysis were (1-yr= 2.73 inches, 2-yr = 3.30 inches, 10-yr=4.80 inches; refer to Appendix F). Results of the HydroCAD analysis are provided in a detailed report in Appendix D. Results of the stormwater analysis are provided in the tables below. PRE-VS POST-DEVELOPMENT PEAK DISCHARGE RESULTS POA-1 POA-2 POA-3 Pre- Post- Percent Pre- Post- Percent Pre- Post- Percent Event Development Development Reduction Development Development Reduction Development Development Reduction Frequency* (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 1-year,24- 4.47 2.30 -49% 56.46 55.80 -1.2% 74.97 73.06 -2.6% hour 2-year,24- 6.55 3.39 -48% 88.27 87.92 -0.4% 110.80 106.57 -3.9% hour 10-year, 12.59 6.55 -48% 184.94 189.61 +2.5% 215.63 212.82 -1.3% 24-hour The site's post-development discharge was compared to the peak flow rates for the pre-development discharge at the points of analysis. Refer to Appendix A and the pre- and post-development drainage area maps in Appendix B for the exact locations of the Points of Analysis. As shown in tables above, the results of the analysis indicate attenuation of post-development discharge to the pre-development peak flow rate for all POAs which impact the residential neighboring community. As shown in the table above, the results of the routing indicate peak attenuation is achieved for the 1-year, 2-year, and 10-year 24- hour storm events at POA-1, POA-2 and POA-3. In addition to the peak attenuation, sand filters 2 and 3 have been provided with an outlet control structure designed to provide 1 foot of freeboard between the 10-year, 24-hour peak elevation and the top of pond. A summary of the peak water surface elevation for each pond has been provided in the summary table below. Sand filter 1 is surrounded by proposed roadways and parking areas, therefore an emergency spillway was not provided but the principal riser was sized to pass the 100-year event without overtopping the pond. Sand Filters 2 and 3 have been sized to pass the 100-year through the principal spillway. PEAK WATER SURFACE ELEVATION SUMMARY Top of Pond Emergency Spillway 10 year Water Freeboard Pond Name (ft) Elevation(ft) Surface Elevation(ft) (ft) SAND FILTER 1 792 N/A 790.02 1.98 SAND FILTER 2 793 792.5 791.96 1.04 SAND FILTER 3 786 785.5 784.67 1.33 4 8.0 PIPE CONVEYANCE NETWORK The onsite development includes paved parking areas and an associated storm drainage system. The onsite stormwater drainage system was analyzed using Autodesk Civil 3D 2022 by Autodesk, Inc. for pipe analysis. This program performs pipe analysis and computes hydraulic grade lines according to HEC-22, 3rd edition standards. A minimum time of concentration of 5 minutes was assumed for the entire site for the analysis. The stormwater network was designed using the 10-year rational storm event.The inlets' drainage areas for the site were delineated using the finished ground surface at the proposed build out conditions. The stormwater network was analyzed using a tail water condition equal to the calculated 10-year stage at their respective discharge locations. Refer to the Construction Plans Stormwater Network Analysis in Appendix D for the results of drainage network analysis. Additionally, refer to the Rowan 85 Trade Center Civil Plans for Stormwater Profile Sheets C405 to C414 for hydraulic grade lines of the proposed stormwater conveyance networks. 9.0 EROSION CONTROL The project will require disturbance of approximately 89 acres. Proposed temporary erosion control measures include a stone construction entrance, silt fence, sediment basins, sediment trap, stone filter outlet ring, and catch basin inlet protection. All measures have been designed in accordance with North Carolina Department of Environmental Quality Erosion Control standards. 10.0 EROSION AND SEDIMENT CONTROL PLANS A variety of storm water pollutant controls are proposed for this project. Please see below for a detailed description of each measure and refer to the attached Erosion and Sedimentation Control Plan/Site Maps, Phase 1, Phase 2, and Phase 3 prepared by Kimley-Horn and Associates, Inc. (Construction Drawings)for further information. The following measures will be used to control erosion and sedimentation for this project. Please see the calculations for more information on the design of each item. 5 10.1 Soil Stabilization The purpose of soil stabilization is to prevent soil from eroding and leaving the site. In the natural condition, soil is stabilized by native vegetation. The primary technique to be used at this project for stabilizing site soils will be to provide a protective cover of grass, pavement, or building structure. 6.1.1.Temporary Seeding or Stabilization— All denuded areas that will be inactive for 7 days or more must be stabilized temporarily with the use of fast-germinating annual grass/grain varieties appropriate for site soil and climate conditions, straw/hay mulch, wood cellulose fibers, tackifiers, netting and/or blankets. Stockpiles and diversion ditches/berms must be stabilized to prevent erosion and dust issues. 6.1.2.Permanent Seeding, Sodding or Mulching— All areas at final grade must be seeded or sodded within 7 days after completion of work in that area. Seed immediately after final grade is achieved and soils are prepared to take advantage of soil moisture and seed germination. At the completion of ground-disturbing activities the entire site must have permanent vegetative cover, meeting vegetative density requirements, or mulch per landscape plan, in all areas not covered by hardscape (pavement, buildings, etc.). Seeded areas shall be protected with mulch or a rolled erosion control product. Mulch must be anchored to the soil surface by spray-on tackifiers or crimped by disc or other machinery and/or rolled erosion control products must be installed per manufacturer recommendations. Consideration is given to climate conditions, soil type and native vegetation when designing the final landscaping plan. Final site stabilization is achieved when perennial vegetative cover provides an established permanent ground cover sufficient to restrain erosion. This shall be no less than a coverage density of at least 80 percent over the entire area to be stabilized by vegetative cover. Furthermore, "establishment of stabilization" is loosely defined by the State and could include vegetation growing through at least on growing season, based on site and drought conditions at the time vegetation is first established. This area is exclusive of areas that are covered with rock (crushed granite, gravel, etc.) or landscape mulch, paved or have a building or other permanent structure on them. 6.1.3.Rip Rap— Riprap is a cover of rock used to create a stabilized outlet by dissipating concentrated flow paths and catching larger sediment or debris. Riprap stone and apron size are calculated based on the drainage areas concentrated flow. See plan details for specific rip rap stone size, type, and apron dimensions. 6 10.2 Structural Controls 6.1.4.Silt Fence— Silt fence is a synthetic permeable woven or non-woven geotextile fabric incorporating metal support stakes at intervals sufficient to support the fence (5-feet maximum distance between posts), water, and sediment retained by the fence. The fence is designed to retain sediment- laden stormwater and allow settlement of suspended soils before the stormwater flows through the fabric and discharges off-site. Silt fence shall be located on the contour to capture overland, low-velocity sheet flows and is typically installed with a wire fence backing for additional support. Wire fence backing is required unless the silt fence is installed using the slicing method as the slicing method ensures the silt fence fabric is anchored securely in the ground. 6.1.5.Inlet Protection— All existing and proposed storm network structures shall have inlet protection during construction. Inlet protection is put in place to trap sediment as it approaches the storm drainage system before final stabilization is complete. Inspect, clean and properly maintain all inlets twice a week, and after each storm event until entire project area has been properly stabilized. See detail sheets for specific inlet protection types and installation requirements. 6.1.6.Construction Exit— All access points from the public street into the construction site shall include a construction exit composed of course stone to the dimensions shown on the Construction Drawings detail sheet. The rough texture of the stone helps to remove clumps of soil adhering to the construction vehicle tires through the action of vibration and jarring over the rough surface and the friction of the stone matrix against soils attached to vehicle tires. In addition to the stone at the construction exit, it may be necessary to install devices such as pipes (cattle guard) to increase the vibration and jarring. It may also be necessary to install a wheel wash system. If this is done, a sediment trap control must be installed to treat the wash water before it discharges from the site. All site access must be confined to the construction exit(s). Barricade to prevent use, any locations other than the construction exit(s) where vehicles or equipment may access the site. Use jersey barriers, construction fencing/drums, etc. near construction exit(s) to prevent traffic by-pass or short circuiting. 6.1.7. Temporary Sediment Trap— A temporary sediment trap is a small, temporary ponding basin formed by an embankment or excavation to detain sediment-laden runoff and trap the sediment to protect receiving streams, lakes, drainage systems, and protect adjacent property. Select locations for sediment traps during site evaluation. Note natural drainage divides and select trap sites so that runoff from potential sediment producing areas can easily be diverted into the traps. Ensure the drainage areas for each trap does not exceed 5 acres. Install temporary sediment traps before land disturbing takes place within the drainage area. 7 6.1.8.Sediment Basin— A sediment basin is an earthen embankment suitably located to capture sediment with a primary spillway system consisting of a riser and barrel pipe. The purpose of a sediment basin is to retain sediment on the construction site, and prevent sedimentation in off-site streams, lakes, and drainageways. Select key locations for sediment basins during initial site evaluation. Install basins before any land-disturbance takes place within the drainage area. Select basin sites to capture sediment from all areas that are not treated adequately by other sediment controls. Always consider access for cleanout and disposal of the trapped sediment. Locations where a pond can be formed by constructing a low dam across a natural swale are generally preferred to sites that require excavation. Where practical, divert sediment-free runoff away from the basin. 11.0 CONCLUSION The proposed Rowan 85 Trade Center will occupy a 91.56-acre site that will treat both water quality and quantity using three sand filters. The first 1.0" rainfall event will be treated for water quality and peak attenuation will be provided for the 1-, 2-, and 10-year storms. The stormwater control measures that have been put in place will allow the removal of 85% TSS and reduce the post-development peak flow for the 1-, 2-, and 10-year storms to within 10% of the pre-development flow conditions. 8 APPENDIX A: SITE MAPS / 1 NORTH / , Z. .,�/ 41 / m f 4ha W YOUTFIF RN }3' d IT4 T 9 //J � M IN65 :f "a�+` H .'4 A', "'S14 o� NCti CV r„- >trnwlY>IHO( O N CD a m U 5 d X W_ C7 N. C1 3 I.+v.1 AL WS 3 SITE LOCATION Lo O GRAPHIC SCALE IN FEET In 0 1000 2000 4000 M M de/ _ /f 0 J 0 ' TITLE: PROJECT: 1 (CLIENT: JOB NUMBER: 013335005 TRACT WEST SCALE: 1"= 1000' E KingleY* Horn SALISBURY PARTNERS, LLC DATE o VICINITY MAP 10/19/2023 200 SOUTH TRYON ST.,SUITE 200 LOGISTICS CENTER 1962 HOWELL MILL RD., SUITE 210 SHEET: E CHARLOTTE,NC 28202 ATLANTA, GA 30318 EXHIBIT A PHONE:(704)3 3 3-51 311 www.kimley-horn.corn l a Hydrologic Soil Group—Rowan County, North Carolina P, P § § 541100 541503 541900 542300 542700 543100 543500 543900 544300 544700 545100 35°36 42"N 1 11# 35°36'42"N _ _ 1. . MbC / - 1_ .- /u130- lATF Pap gIU 14.. ..1 *I StnEeB Aiii3* .A . 1400411- • , ‘44, . ' • iLdB2 SITE •Vir GeB2 III LOCATION 7 , ir ar_l EnC EuB MbB IAA:3 i_ i_o3,1:3 En_.-, 2,538 ,-. . o.,,,...., . . . - . ..: , . s• . .!:•0 t " "-• '''. • • • EnC 01 M -' • ,, ii,... . 4. ; • ,, -. .f,C-h •-- . p4 SeB VaB -. • 4,,,? .<// MbB el* Aig, GM Well3 ,,' e A Mill3 GeB, . • .- III - - • 1 A'473 c i , ' *•-• i _:•":' • 1 IRfl 1 P 1 c EnB Vn B2 4 ...113 CC3 SeB o E , 1 i‘ SeB VaB ._ 0) ill iviri ,-• - ' . ' i., 1 / pxD \wcf)et k • GeB2 ee)32 ,t f•- ' - - - i • _I_ . 1 GeB2 0 VnIE4d • 0 eeB2 4 @@@s ecB lc? En B PiseG2 PeS-2"Irv, ,,, @OD, Z--Cipb:j1W t Weili3 111, 1 COCO SeB 2 En BillithiNVnB2 SeB -/ 0 , EnB GeGvrig2 r GeB2 -\ , ' - ' Ce-B2M •-•.. ... . 1 4 r , 35°35'14"N 11111111111111WIIIIIIMIll i&r.‘ 35°35'14"N 541100 341500 541900 543100 544700 545100 Map Scale:1:19,200 if prit ket1 on A landscape(11"x 8.5)sheet. P P, Meters § N 0 250 500 1000 1500 Feet A 0 5(5) 1000 2000 3000 Map projection:Web Mercator Corner coordinates:WG584 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 8/31/2023 Iliad Conservation Service National Cooperative Soil Survey Page 1 of 5 Hydrologic Soil Group—Rowan County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. O C/D Soils Please rely on the bar scale on each map sheet for map Soil Rating Polygons • D measurements. 0 A p Not rated or not available Source of Map: Natural Resources Conservation Service n A/D Water Features Web Soil Survey URL: Streams and Canals Coordinate System: Web Mercator(EPSG:3857) B Maps from the Web Soil Survey are based on the Web Mercator Transportation 0 B/D projection,which preserves direction and shape but distorts Rails distance and area.A projection that preserves area,such as the n C •.i Interstate Highways Albers equal-area conic projection,should be used if more accurate calculations of distance or area are required.C/D US Routes This product is generated from the USDA-NRCS certified data as 0 D Major Roads of the version date(s)listed below. n Not rated or not available Local Roads Soil Survey Area: Rowan County,North Carolina Soil Rating Lines Background Survey Area Data: Version 20,Sep 12,2022 A 1111 Aerial Photography Soil map units are labeled(as space allows)for map scales • A/D 1:50,000 or larger. .v B Date(s)aerial images were photographed: Mar 13,2022—May 9,2022 •y B/D The orthophoto or other base map on which the soil lines were • • C compiled and digitized probably differs from the background • • C/D imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. • • D • • Not rated or not available Soil Rating Points O A O ND ▪ B • B/D USDA Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group-Rowan County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ArA Armenia loam,0 to 2 C/D 8.1 0.6% percent slopes, frequently flooded CcB Cecil sandy loam,2 to 8 B 103.7 7.4% percent slopes CcC Cecil sandy loam,8 to A 3.0 0.2% 15 percent slopes CeB2 Cecil sandy clay loam,2 B 290.5 20.6% to 8 percent slopes, moderately eroded CeC2 Cecil sandy clay loam,8 B 43.3 3.1% to 15 percent slopes, moderately eroded ChA Chewacla loam,0 to 2 B/D 73.9 5.3% percent slopes, frequently flooded EnB Enon fine sandy loam,2 C 192.3 13.7% to 8 percent slopes EnC Enon fine sandy loam,8 C 43.1 3.1% to 15 percent slopes EuB Enon-Urban land C 14.7 1.0% complex,2 to 10 percent slopes IrB Iredell loam, 1 to 8 C/D 10.4 0.7% percent slopes LdB2 Lloyd clay loam,2 to 8 B 25.3 1.8% percent slopes, moderately eroded MbB Mecklenburg loam,2 to C 37.6 2.7% 8 percent slopes MbC Mecklenburg loam,8 to C 0.4 0.0% 15 percent slopes MeB2 Mecklenburg clay loam, C 12.1 0.9% 2 to 8 percent slopes, moderately eroded PaD Pacolet sandy loam, 15 B 0.0 0.0% to 25 percent slopes PcC2 Pacolet sandy clay B 23.7 1.7% loam,8 to 15 percent slopes,moderately eroded PxD Poindexter-Rowan C 12.9 0.9% complex, 15 to 25 percent slopes tism Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 3 of 5 Hydrologic Soil Group—Rowan County,North Carolina Map unit symbol Map unit name gm Rating Acres in AOI Percent of AOI SeB Sedgefield fine sandy C/D 154.6 11.0% loam, 1 to 6 percent slopes Ud Udorthents,loamy C 197.7 14.0% Uf Urban land 7.9 0.6% VaB Vance sandy loam,2 to C 55.1 3.9% 8 percent slopes VnB2 Vance sandy clay loam, C 73.2 5.2% 2 to 8 percent slopes, moderately eroded W Water 8.0 0.6% WaA Warne loam,0 to 2 C/D 15.6 1.1% percent slopes, occasionally flooded Totals for Area of Interest 1,406.9 100.0% t si)\ Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 4 of 5 Hydrologic Soil Group—Rowan County,North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 5 of 5 80°32'46.79"W 35°36'44.98"N r r 7�FEff /r /.\ v\ �� ti - �ti - .. FFF / 17 • 1 Za,;eAE ' / f it -j ^t _ + FEE / / �. _ ; . '' • • `_' ," N 6,54.4? „. • 1 • •R ; SITE LOCATION ec,`AO/ • . if .'-k.,_ ,..e.,�� F�.ZonerAE vo /- I . ;� r d e- :11) 760 FEET • i _ • 1. .,~ r FEEii r767 FEET , ..• • •. • :,1 • 71� r i. • b,..A,g 43-27 / <J110 I (&K( c( „•, _ KS �/ 116. ROW iUNTY ;eve 4 (7......--4 AREA OF MINIMAiLOODHAZARD - One..s/wy � � 4T 5 ,=l1 --- y _I • )7 (ir 1111/11 . /w0 4:47/- ,,,$',s6:9 /.../. ' 0 ,s 4 ie- . •• •• L-...116 w-. /40.‘,./....... .. . ,/ , e -1,<, le.. o_ tor SW # -. a +�:10:::: Iy iplit:TP. �17 ./ • . ,.*,_,i• -li :4., f % * v ..-"Cv.-. __Lv•.-- , 7 •7.- e-Q.cig. i ...,y „„., ~ , . •Vylki• it . -11F" ' " iiiiff-)' .. . . . ,, •I ... . . , . � , •7,76 • .3 FEET • _ + FFr 8s,407% o f' - ' �'� ' 1 tB5 • it . '-, t ► • ..-_4.. -11401; ,.! • ... -oar . 15,.. \ a • • ...../. s }fit•,• �+. - f u • 4 4 ,F``"' 0% i•. • • • 4'41 _ +� q FEE T J .* z ++)♦. '"I 800 FEET ♦ r803T �' — 00 -.imoa. .4. b - , - iir , 806 FEET •..�� ; , - 1• f • All` •.'1 ' _�__�,. ..: �. 899 FEET r.1 80°30'53.44"W 35°34'39.31"N FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP NATIONAL FLOOD INSURANCE PROGRAM FOR DRAFT FIRM PANEL LAYOUT For Information and questions about this Flood Insurance Rate Map(FIRM),available products associated with Map Projection: this FIRM,including historic versions,the current map date for each FIRM panel,how to order products, GCS,Geodetic Reference System 1980; E LOOD INSURANCE RATE MAP or the National Flood Insurance Program(NFIP)in general,please call the FEMA Map Information eXchange at Vertical Datum:NAVD88 CO — 1.877.FEMA-MAP(1-877.336-2627)or visit the FEMA Flood Map Service Centerwebsile at https://msc.fema.gov. For information about the specific vertical datum for elevation features,datum Without Base Flood Elevation(BFE) Available products may include previously issued Letters of Map Change,a Flood Insurance Study Report, conversions,or vertical monuments used t0 create this map,please see the Flood Zone A,V,A99 and/or digital versions of this map.Many of these products can be ordered or obtained directly from the website. Insurance Study(FIS)Report for your community at hops://msc.fema.gov With BFE or Depth zone AE,A0,AH,VE,AR 0 PANEL 5647 OF 6702 SPECIAL FLOOD Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well L as the current FIRM Index.These may be ordered directly from the Flood Map Service Center at the number A 1 inch=500 feet 1.6,000 ..Lil1 HAZARD AREAS Regulatory Floodway listed above. For community and countywide map dates,refer to the Flood Insurance Study Report for this jurisdiction. 0 250 500 1,000 1,500 2,000 Q) 0.2%Annual Chance Flood Hazard,Areas Feet V of 1%annual chance flood with average To determine if flood insurance is available in this community,contact your Insurance agent or call the National A 1 Meters = depth less than one foot or with drainage Flood Insurance Program at 1-800-638.6620. I\' �.`, areas of less than one square mile zone xY 0 50 100 200 300 400 4 Basemap information shown on this FIRM was provided in digital format by the United States Geological Survey(USGS). C ) L 1 Future Conditions 1%Annual The basemap shown is the USGS National Map:Orthoimagery.Last refreshed October,2020. ` = Panel Contains: N111111Chance Flood Hazard Zone X This mapwas exported from FEMA's National Flood Hazartl Layer(NFHL)on 10/19/2023]:00 AM antl tloes N COMMUNITY NUMBER PANEL �/// Area with Reduced Flood Risk due to Levee chtng eor beco es upense dments new data ovt rp me.dote d The NFi n,ple esesee he Floodon may = changn or become superseded by hee data overtime.For additional information,please see the Flood Hazard ROWAN COUNTY 370351 5647 See Notes Zone X Mapping Updates Overview Fact Sheet at https:/Iwww.fema.govlmedia-library/asselsldocumenls/118418 OTHER AREAS OF '/ Area with Flood Risk due to Levee Zone D This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. Q FLOOD HAZARD The basemap shown complies with FEMA's basemap accuracy standards.This map image is void if the one 0 or more of the following map elements do not appear:basemap imagery,flood zone labels,legend,scale bar, NO SCREEN Area of Minimal Flood Hazard Zone X map creation date,community identifiers,FIRM panel number,and FIRM effective date. I Effective LOMRs MS OTHER AREAS Area of Undetermined Flood Hazard Zone D = 0 GENERAL ---------- Channel,Culvert,or Storm Sewer 47, STRUCTURES r r r r r r r r r r Levee,Dike,or Floodwall CO © 20.2 Cross Sections with 1%Annual Chance 17.5 Water Surface Elevation ®--- Coastal Transect ——------Coastal Transect Baseline —--—Profile Baseline Hydrographlc Feature •^^'••6f7'•••••Base Flood Elevation Line(BFE) OTHER - Limit of Study FEATURES -Jurisdiction Boundary MAP NUMBER 3710564700J x EFFECTIVE DATE w June 16,2009 r,, USGS U.S.DEPARTMENT OF THE INTERIOR The NationalMap CHINA GROVE QUADRANGLE Ju U.S.GEOLOGICAL SURVEY US TOpO 7.5-MINUTE NORTH CARLINA science for a changing world SERIES -80.6250° -80.5000° 35.6250° 534°0°7E 35 36 37 38 39 40 41 42 43 44 45 35.6250° 1 _ .. B , 42 a'42°0°mN - ., JSALISBURY f t Q' .. ter • rHIR e ° . , ii e d 0_' °® i .4 SITE LOCATION e; boa �3ecmm I 1 E / - f. t 01 AL o !s 40 �e 1 v s 40 I 1' e 4 N% " m 6 9 ® a 9 "006300 39 \ ACP 4 - 39 ® e %� °® 6psn�ae° m � 0 �� aom m H e m 38 i I m E - &A; • 13`ZILN 38 �0E7980•tl � �.. g a Q6 9 o 2) % e� to e �s� sit / e 6 \ - N ti �d e m a1m • ea 9 - \� � ec � \ � 35/ �rP�2.�35 � �A�4 M3 ® elagfr� Q a El - i d Qe e\ � � RC l m ° a °. a p T r.,, 34 ��r4 %k.p 0 r © N ��am 'giarGm 4 4 � �y qa 9 \F,g'"gnp� r Py9O`ti, RI'@YDd'W caoDKCOd� ©N'iff r © `EaQ OR®� d 1 - 6 �m &C @ ? p 68m 33 B �. l EiyaCO B .....,,,ytwuu i 33 © - EaImo.6p i 000000OD58L7 g N I I I .e N) CO]S&1 - 'P 1a8 as 4 €,i m .= a d' m 32 .9J GA cClS�a _ 32 Caomarecra Wa320 V, 0 ;% UCEIDeJ LP t i g FID 5 aI • I @0 0 ti re N3 %A gg 9 0maw MOW &MEW 0 N sp 31 0 Q. C 9 6 e t 7 31 1 zot. �I co.f� _ N 4q fI, E""" 9 crrmm1 ' pie cte co sMW [�,yp6 46 30 li IT' ■ 8 gg - p 30 az,meap 6 St 4' Imam Mau a 02x a ©k'47m Co QBRLity /r.� CL'•7f9GDQJ _..__.-- ©IIp® aLtm£O 62 • 0 ° mom a dam 1 0 i =R.,. �m gym© w°D wx�fFxwneD� ye k �a �m 29 d .,rnFm8? . CE7LaJ D°em7� r�"° g Q* q� � .--- -.-_.._,� _ IRISH✓.4TO RP EakM f69D 4? 3929°0°'nN IL... 0 Jim, EA4 1 - 4435.5000' 35 36 37 38 39 40 41 42 43 44 '4500P1 35.5000° -80.6250' -80.5000' Produced by the United States Geological Survey ,` SCALE 1:24 000 ROAD CLASSIFICATION __ Nor 83(NAD83) Expressway Local Connector World Geodetic oy tam o!1984(wG5841.Projection and Lo 1 0.5 0 KILOMETERS 1 3 /,,1—''",,''''' \] er gnd:Universal Transverse Merta[or,Zane 1]S �— -�^VL'�,^ Secondary Hwy Local Road TM1IDs map iz not a legal document.Boundaries may be 142 MILS 1000 500 0 5 0 METERS 1000 2000 f" Ramp 4WD generalized for IM1is map xale.Private lands wilM1in government 1 1 of be shown.Obtain permission before ts 4.0LS MILES •Interstate Route 0 US Route 0 State Route en eNng priv teykndz. moo__0 1000 2000 3000 4000 5000 6900 7000 8000 9000 10000 Cv^o^^ao�s.°c^mon Imagery NAIP, July 202s - July 202D E` Roads US. Cemus Bureau, 2016 FEET Names GNI5,1980-2022 ATOENIEROFSHEE DECLINATION T 1Cleveland m Hydrogra0W National HydrograEhy Dataset,2002-2018 1 2 3 2Rawan Mills onal Ievallon Oataset, 2008 CONTOUR INTERVAL 10 FEET ;Salisbury —,o i 6ounda�r es Mul[ipk sources, see metadata file 3019 2021 ,moon q Io NORTH AMERICAN VERTICAL DATUM OF 1988 4 5 4 Enocbvale Wetlands FW8 National Wetlands Inventory Not Available This map was praducetl to conform toot Ott SRockwell = K NV National Geospatlal Program US Topo Product Standard. 6 Kannapolis =i Q 6 ] a Mount CHINA GROVE, NC a M Mount Pleasant CHINA i `rid Zone naDealgruilloo ADJOINING QUUMRANGIES 2022 APPENDIX B: WATERSHED MAPS i 1/-..* PRE-DEVELOPMENT DRAINAGE `6"''+.. - �. AR !'- ,>•. F fGY CURVE NUMB)ER:8576 / - L •r !J '� 1 ,, t r - PRE-DEVELOPMENT LEGEND / t • ` ^ �1 „ .„ PROPERTY LINE - - tip` ooFTOFSMEETFLow@369,a ` '.wt > ��•' e: f., � DRAINAGE AREA BOUNDARY — — — /:I. - . • . . e3., TIME OF CONCENTRATION 6 . 503 FT OF CHANNEL FLOW @ 0 99% -• ` - h Y'�'"1 ;. FLOW PATH TV .J,.. / � /N/ PRE-DEVELOPMENT DRAINAGE AREA 1-ONSITE---'� 44 ' • • / POA-, AREA(AC):4.58 -. ..x. ,,M�.-- �, .:� �. I PROPOSED LIMITS OF •� - T 201 FT OF SHALLOW G I CUR TO(MINI:20.E :7789 '6 -- . DISTURBANCE LOD CONCENTRATED FLOW @ -' C/ _ - -y - '1 : a 1 } _ e. -- .? f � F��lI( �v` I i�;l�A��� '�' ( ! POINT OF ANALYSIS —*— — 100FTOFSHEET II---.- .1',)1(I 7W/ I(I /-` - EXISTING MAJOR CONTOUR 1 / �.. FLOW@3.09% -� 3�I�'�I I I/, / i�,-/, EXISTING MINOR CONTOUR ---- TM° ---- 571 FT OF SHALLOW —\ _- ,1'1-��/�1//Il//�=�j j//// .t r /\ DRAINAGE PRE DEVELOPMENT ITF ..r... -- i�//�I//// I J i r��``• 1y P f .\ P. ' l AREA AACA 67.14ONS . ..... r✓. r .! Y� ' 4 ^ - `, f ' .,: CURVE NUMBER:75.78 :\�. L. �� % I ' TC(MIN).3641 — - e i , .sf ,,. i. 'a uj y�,� :� 2214 FTOFSHALLOW �� �' Q ,_ � �.1,. CONCENTRATED FLOW @ 1.74% .r 5 A..4.,.:/4::/li -,:': , L ____. --/ , % ' '' \ PRE-DEVELOPMENT DRAINAGE AAREA(A):36.8 B w AREA(AC):36.88 CURVE NUMBER:70.77 T' f ( TC(MIN):1900 '% a m i �-, , PRE-DEVELOPMENT ,✓ �VDRAINAGEAREA3 ONSITE _ ' a - '('- .,. 1521 FT OF SHALLOW - ai RVEAUMB R:73 L 24Y w -�' + CURVE NUMBER:74.64 f. .. .-. ` W @ 2. ( ) i - FLOW @2.81% 9• FLOW J CONCENTRATED L S :x TC MIN:20.]5 ..,_ , 4 .. .L„\ ......,.. 7 FT OF SHALLOW 1111� 1120 ,00 FT OF SHEET 3 • _ f CONCENTRATED FLOW @ 1 79% Il FLOW @ 2.82% I I _ lye„,f PRE-DEVELOPMENT - „ OFFSITEB o c ` DRAINAGERVE AREA3 Y _; /' '� ' ` IL_ .. ,` ,.N (NUMBER 825 ,. CU 56 TC MIN 5732 a _ r 11 oo FT OF SHEET FLOW @3.01 1 4 S 701 FT OF CHANNEL OF SHALLOW ` �� 3 FLOW @ 1 80%. ` 369 FT CONCENTRATED FLOW @ 4.31'/, ....../ ` 2300 FT OF SHALLOW u ..' l CONCENTRATED FLOW @ 1.31% M �, ram . ,` ems.. w ,,, ?;. a A ' ' PRE-DEVELOPMENT DRAINAGE a - AREA OFFSITEA 10 FFTOF SHEET / 1981 FT OF SHALLOW FLOW @ 1.00% N \ AREA(AC):83.2 CONCENTRATED FLOW @ 2.98% CURVE NUMBER:]54] ) n O \' - - TC(MIN).43.17 J • xi 1 i-I ' T a ti- 5 .p •N 100 FT OF SHEET FLOW@100% o M , ti • t w a \0 0 'I. I C:.. tt 11 x ... ._ - - ..?!.•.�. r - Z N GRAPHIC SCALE IN FEET /\ 0 150 300 600 I 11 NORTH ° N SALISBURY LOGISTICS CENTER PRE-DEVELOPMENT DRAINAGE AREA MAP Ki m I e >> Horn CHARLOTTE,30RTH CAROLINA 28202 Q2023- iii yPHONE DATE: 05-24-2024 d• THIS DOCUMENT,TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN,AS AN INSTRUMENT OF SERVICE,IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED.REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES,INC.SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES,INC. I... , 1 4 s _, ,• POST-DEVELOPMENT 1 • w d - d•" ,' 7 . /DRAINAGE AREA2-OFFSITEB /J 'A A I C C i A I - i., f,' 4 1" CURVE NUMBER: 5.76 =1 - - _�1 -•' '_ M' • :�.. _ /',. TC(MIN):11.99 J. POST-DEVELOPMENT - 4.• �� * `�` ' • - �_- .. DRAINAGE AREA, ONSITE _ •, , - MENT LEGEND PRE DEVELOP "` '100 FT OF SHEET FLOW @309% AREA(AC:14 I , 1 J=`.'` ,f• ' �' ,, T.-it '' �' -,-, • 503 FT OF CHANNEL FLOW CURTC(MIN).VE NUMBER:6.2fi _ ,, V.f,; PROPERTY LINE 201 FT OF SHALLOW ' ' h 1 DRAINAGE AREA BOUNDARY — GONCENTRATEDFLOW@4.88% \/ ;(�1 ,. ' TIME OF CONCENTRATION // /V POA 1 1 - .- �A.. f r 'E y FLOW PATH c Tv POST-DEVELOPMENT �_ \ x rr PROPOSED LIMITS OF DRAINAGE AREA 2-ONSITEC x ,'y * LOD AREA(AC):4.39 � . L _-' � ! A i,'s p DISTURBANCE P CURVE NUMBER'.78.03 / .Ina_p .. _ _ �` ' \V )( / ) I l I i \\ TC(MIN)17 sz .p.. r. • :V�A 1 �1 �� ��J l I A / POST-DEVELOPMENT c j I 1\1\�— I , "J ,,\\\` \ l I * 4 POINT OF ANALYSIS * '''' POA-2 \ DRAINAGE AREA 2-ONSITE A(SCM-1) I / 1 \/�—,�\1 1 / , N.7 ` '- y „„, ` �! AREA(Aq:zD.n �� .1 < /�/11—� VAAA�1{I /1/ 1(1 / �"' �` CURVE NUMBER:94.7fi • �� '1I A I1 l / l�1// EXISTING MAJOR CONTOUR ',IAMBI TC MIN 5.00 ` / / J 1 v w A I�/c //2/i/ EXISTING MINOR CONTOUR .� �,, F - POST-DEVELOPMENT \ - %`�\\'� /I� J ��� / - ;I. 10 LOW OF24fihNN� .� DRAINAGEAREA2 ONSITEB \- \ - \111 `�/ //// ��,/ / . - . - ]6 FT OF CHANNEL -FLOW @ 2.46'/ / CUR RENUMBER z78.10 >•�. /-\ \\ /////'// // / a33 Fr of SHALLOW I .-_- - , _ _---'All IIIIIII ��\ /� �� ) \ ° lei \ j 7 - _ TC MIN'1330 19' -- �1i ,( _\ POST DEVELOPMENT I CONCENTRATED FLOW @704/ �, — - -_ !� DRAINAGE AREA ONSITED ``. AREA(AC):0]8 I J \\ I CURVE NUMBER 77.62 `].,' ! - p 100 FT OF SHEET — --- - TC(MIN).5.00 . a, FLOW@aze% !�® �. a.'mrrS ..a�ec' 1) 1251 FT OF SHALLOW _ r�1 v \' -' •. I POST-DEVELOPMENT H. CONCENTRATED FLOW@126% L Ol {{ DRAINAGE AREA 3-OFFSITE C SCM-3 ; , t i ••••TE *(EE'` � 1 ( ) 'H " . POST-DEVELOPMENT '�Ji:fir e6 1111 ` (ASSUMED TO BE IMPERVIOUS FOR POSSIBLE f. / ri DRAINAGE AREA 2-ONSITE E(SCM-2) '-\ �■ i i FUTURE DEVELOPMENT) ' n �i AREA(AC):18.79 - AREA(AC):7 88 er! :7 /4.',VI ,11 - ,�y -`+7 CURVE NUMBER:95.81 �T r -r- ( ` CURVE NUMBER:98 t , ' , i,s p 4i =Vi� I:=I TC(MIN)5.00 'I' TC(MIN).5 K .4P ,f' E� _ _ Mr ■■ I *'.,- .. POST DEVELOPMENT - c v y.... GEAR AREA AEO SM2 T V .. £ .. r '4 - OFFSITE �' EA ' a + T r y `'M1� -' -- - � _ DRAINAGE AREA2-OF w a L_ a = _ rt' - . I■■ DRAINAGE C 349EA L l n DRA (SOI�F3 CURVE NUMBER:70.8 .f.. ;J. -!a.-»`. Y T.h�. 'V I �.. . CURVE NUMBER.92.89 ■ • �� 2 TC(MIN):2 11Rl1R F' S ��?�� TC(MIN):5.00 1: d7 I 4��Ti \i —\���\ 1� 1521 FTALL I ' i / : •-7 ® ` l—�.,,-- �/\/ \�� "'L=ti' ''.. CONCENTRATED FLOW @ 2.26/0 I a Q. L _ `k 1 ` 1120 FT OF SHALLOW ' 3Q ( / CONCENTRATED FLOW @ 1 79% ',_ BM / �'F 7 POST-DEVELOPMENT 1 u S/j "DRAINAGE AREA 3-OFFSITE R I ^ t AREA(AC)42 35 " III° \ • CURVE NUMBER:82.56 \k,, 1} ! +, ( TC(MIN):57.32 too FT OF SHFFT f. o J \ N 1 __ /- - \ '' V. 2300 FT OF.IALLON.r Y. 701 FT OF CHANNEL I /-CONCENTRATED FI O7 @ 1.31% fN o FLOW @ 1 80% I� ', r =Mj i5 POST DEVELOPMENT T ��1Y _ \ - DRAINAGE AREA 3 ONSITE B � ram-4-rice-•male: k \ AREA(AC)5.84 \ , A, CURVE NUMBER:78.29 .. POST-DEVELOPMENT A ft -A A A _t TC(MIN)14.96 ' • - DRAINAGE AREA3-OFFSITEA I A ) _ , i 100 FT OF SHEET AREA(AC):83.2 _ ,„ FLOW@810% It„,„ CURVE NUMBER:75.47 / `/. I'� 2TE35 FT OF SHALLOW `I / / ' „p: CONCENTRATED FLOW @753/0 TC(MIN)'.43.17 l\ _�,� 10 FTOFSHEET '.� 1981 FT OF SHALLOW,-�. ILO,+,i%1.oU% N 11 =, - - _ CONCENTRATED FLOW@298Nr,.m ` L` Lr • " / "1' - ., *' / 100 FT OF SHEET H T, FLOW @ 1.00% L, f a 0 1 f'. A ,r- -. - a: - N GRAPHIC SCALE IN FEET IN 0 150 300 600 I 11 NORTH s° N SALISBURY LOGISTICS CENTER POST-DEVELOPMENT DRAINAGE AREA MAP S. Ki m l e >> Hon !PHON CHARLOTTE,200 30RTH CAROLINA 28202 Q2023- y DATE: 05-24-2024 d• THIS DOCUMENT,TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN,AS AN INSTRUMENT OF SERVICE,IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED.REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES,INC.SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES,INC. APPENDIX C: WATER QUALITY Kimley»>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Lopisbcs center KHA Project N: 3 Designed by: EM Date 6 10/19/2023 Revised by: Date: Checked by: Date: Minimum Time of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Pre-Development Drainage Area:DA-I-ONSITE r w lNnnrt,.l sceeaNn N emata a 1 TNMyeamHr rainfall, p d rl neS't Arl Wetted eererim e ur,tx Ixvqrinnrqux .•„tIWeual"itvv '1,n'e.Tt SHALLOW CONCENTRATED nsxaumvmxctxmn.to riow sn.00 0.0342 a Pre-Development Time of Concentration,DA-1-ONSITE 20.96 Pre-Development Drainage Area:DA-2-ONSITE I I rlceuem,t I sope,alNn1 I N eaaeudae.n s Two-v pzc-o„erall.I a pave, I'"'::::An;'";e'''. na,nlcla'at I wavat'unas,ew Ixv rgh.q.e, vereaeevau,o.v I rra Iminla,n CHANNEL narra oaow 4274400 0.0245 0.05 a PreDevelopment Time of Concentration,DA-2-ONSITE 35.41 Pm-Development Drainage Area:DA-2-OFFSITE A flow Length,I. two- pnstall, o Area. Wetted ee Perimeter, Hydraulic aolipiaes, Average Velocity, Travel nnnl slope,sNM Coefficient, nn Unpaved Plow, h Ms nni SHEET tro-¢r NOW 100.00 0.0200 0.15 3.30 9.95 nsxnuaw mxttmmswanax 503.00 o0 3.60 0.93 CHANNEL RCINanat SLOW .ao9s o.03 U SHALLOW CONCEN19AlE0 13.so 13.50 1.00 5.93 zo804.00 Pre-Development Time of Concentration,Da-2-OFFSITE A 11.e9 Pre-Development Drainage Area:DA-2-OFFSITE B Flaw LAW,I. oe.alNn emaema a 1 TWOtee,.W l4Ar rainfal, p , rlan eKl Area at reePemrim e rer, ar qrinnlrga wrat1Nev,ePty,v rr'ann'e,n SHALLOW CONCENTRATED nsxaumvmxctxm ROW s 1672.00 o.ozz, a Pre-Development Time of Concentration,DA-2-OFFSITE B 19.00 Pm-Development Drainage Area:DA-3-ONSITE flowLength,I. toughness Two- rainfall, Crossof Wetted Perimeter. Hydraulic s. Average .v r t tEl slope,sln/m coemaem,a rPellnn Unpaved Flow.aln'Il ap 151 ev aoilto/ eraeevseiatity Travel e. CHANNEL to c..aaerrww 29 o.01xa 0.os a Pm-Development Time of Concentration,DA-3-ONSITE to, Pre-Development Drainage Area:DA-3-OFFSITE I I`wlmed,.t 19 ,a ln/nl I A 5aemaem a e Irwo- noel rear tI p d I° rla alwlee r I wex'151 .Pw Ixv,'151 aa.I .rein,:l'7nr,v I ra I4"nrn 11 SHALLOW CONCENTRATED 13 SHALLOW CONCENTRATED{LOW 1120.00 o.oin "2 6.86 11 SHALLOW CONCENTRATEDnsxauowmxctxmn.toriow ccToo 0.0075 a 1.00 pre-Development Time of Concentration,DA-3-OFFSITE coon, Pm-Development Drainage Area:DA-3-0FFSITE B flowLength,I. two- rainfall, Crossor wetted r.pw Hydraulic s. Average .v r t lln slope,sln/nt Coefficient, rP2 nni r. Unpaved FlowoA Ilt) dp(IN e< al�00 era103,1'oaty a1 d EEr 0„,,,uaow 100.00 0.0100 0.40 3.30 27.90 H nsxnuawmdcmmsteotww 20.76 SHALLOW CONCENTRATED nsxaumvmxetxmnworuw 11x0.00 o.o1T9 a Pre-Development Time of Concentration,DA-3-OFFSITE B 57.32 Kimley>>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Checked by: Date: Minimum Time of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Post-Developmet Drainage Area:DA-1-ONSITE Flow Length,L Manning's Roughness Two-year,24-hr rainfall, paved or Cross Sectional Area of Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt (ft) Slope,s ift/ft) Coefficient,n P2(in) Unpaved Flow,A(ft') (ft) r(ft) (ft/sr (min) TL MINIMUM if I 155.00 1 0.0000 I I I 5.00 Post-Developmet Time of Concentration,DA-1-ONSITE s.00 Drainage Area:DA-2-ONSITE A(SCM-1) Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Cross Sectional Area of Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt (ft) Slope,s MAN Coefficient,n P2(in) Unpaved Flow,A ift')) Ift) rift) Misr. (min) n MINIMUM rC 1400.00 0.0000 5.00 Time of Concentration,DA-2-ONSITE A(SCM-1) 5.00 Post-Developmet I Drainage Area:DA-2-ONSITE B Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or cross sectionalof Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt (ft) Slope,s(ft/ft) Coefficient,n P2(in) Unpaved Flow,A ltt'')) (ft) r(ft) (ft/s)" (min) SHALLOW CONCENTRATED n,,wvuW CONCENnIATED FLOW 1409.00 00126 U 1.81 12.97 CHANNEL TS CHANNEL FLOW 234.00 0.0246 0.05 U 46.00 12.39 3.71 11.68 0.33 Post-Developmet Time of Concentration,DA-2-ONSITE B 13.30 Post-Developmet Drainage Area:DA-2-ONSITE C Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Cross semonai Area of Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,It ON Slope,s(ft/ft) Coefficient,n P2(in) Unpaved Flow,A ift') Ift) rift) (ft/s)" (min) SHEET n,HEETFLow 100.00 0.0926 0.40 3.30 15.63 SHALLOW CONCENTRATED Tx SHALLOW CONCENTRATED FLOW 483.00 0.0704 U 4.28 1.88 • CHANNEL 13 CHANNEL FLOW 76.00 0.0246 0.05 U 46.00 12.39 3.71 11.68 0.11 Post-Developmet Time of Concentration,DA-2-ONSITE C 17.62 Post-Developmet Drainage Area:DA-2-ONSITE D Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Cross Paved or Cro I of Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt ift) Slope,s(ft/ft) Coefficient,n P2(in) Unpaved Flow,A ltt')) (ft) r(ft) (tt/s)'a (min) rc MINIMUM if 324.00 0.0000 5.00 Post-Developmet Time of Concentration,DA-2-ONSITE D 5.00 Post-Developmet Drainage Area:DA-2-ONSITE E(SCM-2) Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Cross I nal Area 01 Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt (ft) Slope,s(ft/tt) Coettident,n P2(in) Unpaved Flow,A(ft') Ift) rift) ltt/s)" (min) TL MINIMUM TC 1715.00 0.0000 5.00 Post-Developmet Time of Concentration,DA-2-ONSITE E(SCM-2) 5.00 Kimley>>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Checked by: Date: Minimum Time of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Post-Developmet Drainage Area:DA-2-OFFSITE A Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Cross Sectional urea of Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt ini Slope,s(ft/ft) Coefficient,n P2(in) Unpaved FIow,A(ft') (ft) r(ft) Pt/sl" (min) SHEET TISNEETrLOW 10000 00282 0.40 3.30 18.43 SHALLOW CONCENTRATED r4vvw ew CONCENTRATED FLOW 1521.00 0.0224 U 2.41 ip r50 Post-Developmet Time of Concentration,DA-2-OFFSITE A 28.93 Post-Developmet Drainage Area:DA-2-OFFSITE B Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Crossof Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Tine,Tt (ft) Slope,slit/ftl Coefficient,n P2(in) Unpaved Flow,A lftzlrea (ft) r/ftl (ft/sl** (min) SHEET ncvErr FLOW 10000 0.0200 0.15 3.30 9.65 CHANNEL Tx CHANNEL FLOW 503.00 0.0099 0.03 P 13.50 13.50 1.00 5.93 141 SHALLOW CONCENTRATED 7351.10W CONCEmaATED FLOW 201.00 0.0498 U 3.60 0.93 Post-Developmet Time of Concentration,DA-2-OFFSITE B 1199 Post-Developmet Drainage Area:DA-3-ONSITE A(SCM-3) Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Crossof Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Ti (ft) Slope,s(ft/ft) Coefficient,n P2)in) Unpaved Flow,A lftzlrea (ft) r(ft) (ft/a)" (min) TS MINIMUM rC 2243.00 00000 5.00 Post-Developmet Time of Concentration,DA-3-ONSITE A(SCM-3) 3.00 Post-Developmet Drainage Area:DA-3-ONSITE B Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved Sr CM.5e.ional Area of Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt (ft) Slope,s(ft/ft) Coefficient,n Pa(in) Unpaved Flow,A(ft'l (ft) r(nl In/sl" (min) SHEET TL SHEET FLOW 100.00 0.0810 0.40 3.30 12.08 SHALLOW CONCENTRATED n SHALLOW CONCENTRATED FLOW 235.00 0.0753 U 4.43 0.88 CHANNEL Ta CHANNEL FLOW 499.00 0.0180 0.07 U 11.00 6.20 1.77 4.19 1.99 Post-Developmet Time of Concentration,DA-3-ONSITE B 14.96 Kimley>>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Checked by: Date: Minimum Time of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Post-Developmet Drainage Area:DA-3-OFFSITE A Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Cross i rea Ot Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,TO tel Slope,s(ft/ft) Coefficient,n P2(in) Unpaved Flow,A(ft) (ft) rlftl (ft/sl** (min) SHEET Ts SHEET FLOW 100.00 0.0010 0.13 3.30 28.52 SHALLOW CONCENTRATED TX 0NAuowcONCENTRATED FLOW 1981.00 0.0298 U 2.78 11.86 CHANNEL Ta CHANNEL FLOW 701.00 0.0180 0.07 U 11.00 6.20 1.77 4.19 279 Post-Developmet Time of Concentration,DA-3-OFFSITE A 43.17 Post-Developmet Drainage Area:DA-3-OFFSITE B Flow Length,L Manning's Roughness Two-year,24-1r rainfall, Paved or Crossof Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,Tt (ft) Slope,s(ft/ft) Coefficient,n P2(in) Unpaved Flow,A lftLlrea (ft) rlftl (ft/sl** (min) SHEET Ta SHEET FLOW 100.00 0.0100 0.40 3.30 27.90 SHALLOW CONCENTRATED nvwuowCONCENTRATED FLOW 2300.00 0.0131 U 1.85 20.76 SHALLOW CONCENTRATED 75 SHALLOW CONCENTRATED FLOW 1120.00 0.0176 U 2.16 8.65 Post-Developmet Time of Concentration,DA-3-OFFSITE B 57.32 Post-Developmet Drainage Area:DA-3-OFFSITE C(SCM-3) Flow Length,L Manning's Roughness Two-year,24-hr rainfall, Paved or Crossof Wetted Perimeter,pw Hydraulic radius, Average Velocity,V Travel Time,TO (ft) Slope,s(ft/ft) Coefficient,n P2(in) Unpaved Flow,A lftLlrea (ft) rlftl (ft/sl** a(min) SHEET TL SHEET FLOW 100.00 0.0293 0.40 3.30 18.15 SHALLOW CONCENTRATED TS SHALLOW CONCENTRATED FLOW 370.00 0.0211 U 2.34 2.63 Post-Developmet Time of Concentration,DA-3-OFFSITE C(SCM-3) 20.78 Kimley>>> Horn Pre vs. Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Revised by: Date: Checked by: Date: Pre-Development Drainage Area: DA-1 - ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 1.76 OPEN_SPACE Good condition(grass cover>75%) 0.60 80.00 1.56 WOODS WOODS,Fair condition(grass cover 50 to 75%) 0.58 79.00 0.99 RESIDENTIAL 1/4 acre(38%imp.) 0.74 87.00 0.27 COMPOSITE C-VALUE- DA-1 - ONSITE 0.56 4.58 COMPOSITE SCS CURVE NUMBER-DA-1 - ONSITE 77.89 Pre-Development Drainage Area: DA-2- ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 39.38 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 6.26 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 3.90 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 15.80 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 1.80 COMPOSITE C-VALUE- DA-2-ONSITE 0.52 _ 67.14 COMPOSITE SCS CURVE NUMBER- DA-2- ONSITE 75.78 Pre-Development Drainage Area: DA-2- OFFSITE A HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grasscover>75%) C 0.48 74.00 2.19 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 0.47 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 0.39 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 2.81 _ COMPOSITE C-VALUE-DA-2- OFFSITEA 0.72 5.86 COMPOSITE SCS CURVE NUMBER-DA-2- OFFSITE A 85.76 Pre-Development Drainage Area: DA-2- OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 0.67 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 6.68 RESIDENTIAL 1/4 acre(38%imp.) C 0.66 83.00 0.18 URBAN DISTRICTS Industrial(72%imp.) C 0.82 91.00 0.13 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 1.38 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 13.18 WOODS WOODS,Fair condition(grass cover 50 to 75%) A 0.15 36.00 3.00 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 5.88 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 5.78 COMPOSITE C-VALUE-DA-2-OFFSITE B 0.45 36.88 COMPOSITE SCS CURVE NUMBER-DA-2- OFFSITE B 70.77 Kimley>>> Horn Pre vs. Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Revised by: Date: Checked by: Date: Pre-Development Drainage Area: DA-3- ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRpT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 8.05 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 2.00 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 8.05 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 1.66 Paved parking lots,roots,driveways,etc.(excluding IMPERVIOUS right of wavl D 0.96 98.00 0.07 COMPOSITE C-VALUE- DA-3-ONSITE 0.50 19.83 COMPOSITE SCS CURVE NUMBER-DA-3- ONSITE 74.84 Pre-Development Drainage Area: DA-3- OFFSITE A HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRpT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 6.12 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 3.69 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 5.17 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 1.38 URBAN_DISTRICTS Industrial(72%imp.) D 0.86 93.00 16.61 OPEN_SPACE Good condition(grass cover>75%) B 0.22 61.00 14.43 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 11.70 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 20.13 URBAN_DISTRICTS Industrial(72%imp.) B 0.76 88.00 _ 2.32 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) A 0.96 98.00 1.65 COMPOSITE C-VALUE-DA-3- OFFSITEA 0.51 83.20 COMPOSITE SCS CURVE NUMBER-DA-3- OFFSITE A 75.47 Pre-Development Drainage Area: DA-3- OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (GRAY) (CN) (ac.) RESIDENTIAL 1/4 acre(38%imp.) 1. 0.66 83.00 0.29 URBAN_DISTRICTS Industrial(72%imp.) C 0.82 91.00 1.80 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 5.48 URBAN_DISTRICTS Industrial(72%imp.) D 0.86 93.00 9.76 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 10.62 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 _ 2.39 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 12.01 COMPOSITE C-VALUE-DA-3-OFFSITE B 0.65 I 42.35 COMPOSITE SCS CURVE NUMBER-DA-3- OFFSITE B 82.56 Kimley>>> Horn Pre vs. Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Revised by: Date: Checked by: Date: Post-Development Drainage Area: DA-1 - ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 1.35 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) 0.96 98.00 0.14 COMPOSITE C-VALUE- DA-1 - ONSITE 0.53 1.49 COMPOSITE SCS CURVE NUMBER-DA-1 - ONSITE 76.26 Post-Development Drainage Area: DA-2- ONSITE A (SCM-1) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 1.27 OPEN_SPACE Good condition(grass cover>75%) 0.60 80.00 2.05 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) 0.96 98.00 17.45 COMPOSITE C-VALUE-DA-2- ONSITE A (SCM-1) 0.90 20.77 COMPOSITE SCS CURVE NUMBER-DA-2- ONSITE A (SCM-1) 94.76 Post-Development Drainage Area: DA-2- ONSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 1.67 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 0.00 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 1.46 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 _ 0.97 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 0.16 COMPOSITE C-VALUE- DA-2- ONSITE B 0.56 4.26 COMPOSITE SCS CURVE NUMBER-DA-2- ONSITE B 78.10 Post-Development Drainage Area: DA-2- ONSITE C HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 0.68 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 2.36 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 0.21 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 0.45 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 0.69 COMPOSITE C-VALUE- DA-2-ONSITE C 0.56 4.39 COMPOSITE SCS CURVE NUMBER-DA-2- ONSITE C 78.03 - Post-Development Drainage Area: DA-2- ONSITE D HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 0.31 OPEN_SPACE Good condition(grasscover>75%) 0.60 80.00 0.47 COMPOSITE C-VALUE-DA-2- ONSITE D 0.55 0.78 COMPOSITE SCS CURVE NUMBER-DA-2- ONSITE D 77.62 Post-Development Drainage Area: DA-2- ONSITE E(SCM-2) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 1.87 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) 0.96 98.00 16.92 COMPOSITE C-VALUE- DA-2-ONSITE E(SCM-2) 0.91 18.79 COMPOSITE SCS CURVE NUMBER-DA-2- ONSITE E(SCM-2) 95.61 Kimley>>> Horn Pre vs. Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Revised by: Date: Checked by: Date: Post-Development Drainage Area: DA-2- OFFSITE A HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grasscover>75%) 0.48 74.00 0.67 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 6.06 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 1.38 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 13.06 WOODS WOODS,Fair condition(grass cover 50 to 75%) A 0.15 36.00 3.00 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 _ 5.06 RESIDENTIAL 1/4 acre(38%imp.) Q 0.50 75.00 5.59 RESIDENTIAL WOODS,Fair condition(grass cover 50 to 75%) 0.46 73.00 0.18 URBAN DISTRICTS Industrial(72%imp.) 0.82 91.00 0.00 COMPOSITE C-VALUE-DA-2- OFFSITE A 0.45 35.00 COMPOSITE SCS CURVE NUMBER-DA-2- OFFSITE A 70.80 Post-Development Drainage Area: DA-2- OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 2.19 WOODS WOODS,Fair condition(grass cover 50 to 75%) 0.46 73.00 0.47 WOODS WOODS,Fair condition(grass cover 50 to 75%) 0.58 79.00 0.39 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) 0.96 98.00 2.81 COMPOSITE C-VALUE-DA-2-OFFSITE B 0.72 5.86 COMPOSITE SCS CURVE NUMBER-DA-2- OFFSITE B 85.76 Post-Development Drainage Area: DA-3- ONSITE A (SCM-3) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) 0.48 74.00 6.40 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 1.76 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 26.76 COMPOSITE C-VALUE-DA-3- ONSITE A (SCM-3) 0.85 34.92 COMPOSITE SCS CURVE NUMBER- DA-3- ONSITE A (SCM-3) 92.69 Post-Development Drainage Area: DA-3- ONSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) L 0.60 80.00 1.39 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 _ 79.00 _ 1.87 OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 0.05 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 0.05 OPEN_SPACE Good condition(grass cover>75%) B 0.22 61.00 0.26 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 1.12 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) A 0.96 98.00 1.10 COMPOSITE C-VALUE-DA-3- ONSITE B 0.57 5.84 COMPOSITE SCS CURVE NUMBER-DA-3- ONSITE B 78.29 Kimley>>> Horn Pre vs. Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project#: 13335005 Designed by: EM Date: 10/19/2023 Revised by: SMC Date: 5/27/2024 Revised by: Date: Checked by: Date: Post-Development Drainage Area: DA-3- OFFSITE A HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 6.12 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 3.69 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 5.17 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 1.38 URBAN_DISTRICTS Industrial(72%imp.) D 0.86 93.00 16.61 OPEN_SPACE Good condition(grass cover>75%) B 0.22 61.00 14.43 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 11.70 RESIDENTIAL 1/4 acre(38%imp.) B _ 0.50 75.00 _ 20.13 URBAN_DISTRICTS Industrial(72%imp.) B 0.76 88.00 2.32 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) A 0.96 98.00 1.65 COMPOSITE C-VALUE-DA-3- OFFSITE A 0.51 83.20 COMPOSITE SCS CURVE NUMBER-DA-3- OFFSITE A 75.47 Post-Development Drainage Area: DA-3- OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) RESIDENTIAL 1/4 acre(38%imp.) 0.66 83.00 0.29 URBAN_DISTRICTS Industrial(72%imp.) L. 0.82 91.00 1.80 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 5.48 URBAN_DISTRICTS Industrial(72%imp.) D _ 0.86 93.00 9.76 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 10.62 WOODS WOODS,Fair condition(grass cover 50 to 75%) 0.20 60.00 2.39 RESIDENTIAL 1/4 acre(38%imp.) i. 0.50 75.00 12.01 COMPOSITE C-VALUE-DA-3- OFFSITE B 0.65 42.35 COMPOSITE SCS CURVE NUMBER-DA-3- OFFSITE B 82.56 Post-Development Drainage Area: DA-3- OFFSITE C(SCM-3) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CRAT) (CN) (ac.) Paved parking lots,roofs,driveways,etc.(excluding right of way) 0.96 98.00 COMPOSITE C-VALUE-DA-3- OFFSITE C(SCM-3) 0.96 1.88 COMPOSITE SCS CURVE NUMBER-DA-3- OFFSITE C(SCM-3) 98.00 Kimley>>>Horn SAND FILTER CALCULATIONS SAND FILTER 1A Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 5/20/2024 Checked by: Date: Design Resource: NCDEQ-Stormwater BMP Manual(2017) Site Information Sub Area Identification: DA-2 Onsite A and Offsite A Drainage Area(DA)= 20.77 Acres Impervious Area(IA)= 17.45 Acres Percent Impervious(I)= 84.0 % SHWT Separation Type of Sand Filter: Open Bottom SHWT Elevation= 779.0 ft Top of Sand Filter Media Elevation= 785.0 ft Sand Chamber Media Depth= 18.0 in SHWT Separation Required= 2.0 ft SHWT Separation Provided= 4.5 ft OK Sand Filter Design Required Storm Depth RD= 1 inch Percent Sizing= 100% Design Storm Depth RD= 1 inch Determine Rv Value= 0.05+.9(I)= 0.81 in/in WQV= 60,779 cf WQVad 45,584 cf 75%of WQv per SCM Manual Top of Sand Filter Media Elevation= 785.0 ft Top of Ponding Elevation= 790.0 ft Ponding Depth Provided= 5.0 ft OK Total Volume Required= 45,584.2 cf Minimum Required Sand Chamber Volume= 22,792.1 cf 50%of Water Quality Volume Minimum Required Sediment Chamber Volume= 22,792.1 cf 50%of Water Quality Volume Stormwater Stage-Area-Storage Table-Sandfilter 1 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft') Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 785.0 10,630 0 0.24 0.00 786.0 12,300 11,465 0.28 0.26 Lowest Orifice 787.0 14,000 24,620 0.32 0.57 788.0 15,860 39,550 0.36 0.91 789.0 17,730 56,345 0.41 1.29 790.0 19,650 75,035 0.45 1.72 791.0 21,650 95,685 0.50 2.20 Top of Sand Chamber 792.0 23,700 118,360 0.54 2.72 Provided Surface Area of Sand Chamber= 10,630.0 Approximate Sand Chamber Volume Provided at First Orifice= 24,620.0 OK Stormwater Stage-Area-Storage Table-Sandfilter 1 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ftz) Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 785.0 10,990 0 0.25 0.00 786.0 12,500 11,745 0.29 0.27 Lowest Orifice 787.0 14,100 25,045 0.32 0.57 788.0 15,765 39,978 0.36 0.92 789.0 17,500 56,610 0.40 1.30 790.0 19,300 75,010 0.44 1.72 791.0 21,175 95,248 0.49 2.19 Top of Sediment Chamber 792.0 23,100 117,385 0.53 2.69 Provided Surface Area of Sediment Chamber= 10,990.0 Approximate Sediment Chamber Volume Provided at First Orifice= 25,045 OK Required Sand Filter Volume= 45,584 cf Total Provided Sand Filter Volume= 49,665 cf OK Kimley>>> Horn UNDERDRAIN CALCULATIONS SAND FILTER B100 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 5/20/2024 Checked by: Date: Compute Sand Filter Drawdown Discharge Surface Area of Sand Chamber(Af) = 10630 sf Coefficient of Permeability(ft/day)= 4.0 ft/day Filter Bed Depth (df)= 1.5 ft Maximum Ponding Depth (hf)= 2.5 ft Half of Max Ponding Depth of Sand Filter Sand Filter Media Drawdown = 1.31 cfs Computer Diameter of Single Pipe D=16(Q*n/S^0.5)^(3/8) Diameter of single pipe (D)= 20.91 in Roughness factor(n) = 0.011 Internal Slope (S)= 0.005 for a slope of 0.5% Factor of safety= 10 Underdrain Design Flow(Q)= 13.12 cfs multiply by factor of safety 2- 10 Orifice Flow Number of Pipes= 6 Size of Pipe= 6 in Sand Filter Media Drawdown = 1.31 cfs Orifice flow design based off of Factor of safety= 10.00 Required Design Flow Per Pipe(Qtotal) w/sf= 13.12 Required Design Flow Per Pipe(Qreq) per pipe= 2.19 cfs maximum drawdown. Head (H) = 6.25 Orifice Coefficient= 0.6 Orifice Flow(Q)= 2.4 is Qreq<=Qorifice? YES SUFFICIENT UNDERDRAINS Compute Perforation Capacity Pipe Diameter= 4 in Number of Pipes= 6 Used to calculate orifice flow above Total Length of Pipes= 300 LF Total Length of Perf Pipe Rows of Perforations= 4 Perforations per Row= 1,200 assume 3"o.c. Number of 3/8" Perforations= 4,800 50%of Perforations= 2,400 Capacity of each 3/8" Perforation = 0.009 Total Underdrain Capacity= 22.15 cfs OK Kimley>>>Horn SAND FILTER CALCULATIONS SAND FILTER 2 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 5/20/2024 Checked by: Date: Design Resource: NCDEQ-Stormwater BMP Manual(2017) Site Information Sub Area Identification: DA-2 ONSITE E Drainage Area(DA)= 18.79 Acres Impervious Area(IA)= 16.92 Acres Percent Impervious(I)= 90.0 % SHWT Separation Type of Sand Filter: Open Bottom SHWT Elevation= 775.0 ft Top of Sand Filter Media Elevation= 786.0 ft Sand Chamber Media Depth= 18.0 in SHWT Separation Required= 2.0 ft SHWT Separation Provided= 9.5 ft OK Sand Filter Design Required Storm Depth Rp= 1 inch Percent Sizing= 100% Design Storm Depth Rp= 1 inch Determine Rv Value= 0.05+.9(I)= 0.86 in/in WQV= 58,688 cf WQVadj= 44,016 cf 75%of WQv per SCM Manual Top of Sand Filter Media Elevation= 786.0 ft Top of Ponding Elevation= 792.0 ft Ponding Depth Provided= 6.0 ft OK Total Volume Required= 44,016.0 cf Minimum Required Sand Chamber Volume= 22,008.0 cf 50%of Water Quality Volume Minimum Required Sediment Chamber Volume= 22,008.0 cf 50%of Water Quality Volume Stormwater Stage-Area-Storage Table-Sandfilter 2 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft2) Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 786.0 5,370 0 0.12 0.00 787.0 6,360 5,865 0.15 0.13 788.0 7,420 12,767 0.17 0.29 789.0 8,560 20,757 0.20 0.48 Lowest Orifice 789.5 9,150 25,184 0.21 0.58 790.0 9,760 29,912 0.22 0.69 791.0 11,020 40,149 0.25 0.92 792.0 12,350 51,834 0.28 1.19 Top of Sand Chamber 793.0 13,736 64,877 0.32 1.49 Provided Surface Area of Sand Chamber= 5,370.0 Approximate Sand Chamber Volume Provided at First Orifice= 25,184.2 OK Stormwater Stage-Area-Storage Table-Sandfilter 2 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft2) Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 786.0 4,400 0 0.10 0.00 787.0 5,500 4,950 0.13 0.11 788.0 6,690 11,045 0.15 0.25 789.0 7,970 18,375 0.18 0.42 Lowest Orifice 789.5 8,650 22,530 0.20 0.52 790.0 9,350 27,030 0.21 0.62 791.0 10,840 37,125 0.25 0.85 792.0 12,440 48,765 0.29 1.12 Top of Sediment Chamber 793.0 14,170 62,070 0.33 1.42 Provided Surface Area of Sediment Chamber= 4,400.0 Approximate Sediment Chamber Volume Provided at First Orifice= 22,530 OK Required Sand Filter Volume= 44,016 cf Total Provided Sand Filter Volume= 47,714 cf OK Kimley>>> Horn UNDERDRAIN CALCULATIONS SAND FILTER 2 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 5/20/2024 Checked by: Date: Compute Sand Filter Drawdown Discharge Surface Area of Sand Chamber(Af) = 5370 sf Coefficient of Permeability(ft/day)= 4.0 ft/day Filter Bed Depth (df)= 1.5 ft Maximum Ponding Depth (hf)= 3.0 ft Half of Max Ponding Depth of Sand Filter Sand Filter Media Drawdown = 0.75 cfs Computer Diameter of Single Pipe D=16(Q*n/S^0.5)^(3/8) Diameter of single pipe (D)= 16.92 in Roughness factor(n) = 0.011 Internal Slope (S)= 0.005 for a slope of 0.5% Factor of safety= 10 Underdrain Design Flow(Q)= 7.46 cfs multiply by factor of safety 2- 10 Number of Pipes= 4 Size of Pipe= 6 in Sand Filter Media Drawdown = 0.75 cfs Orifice flow design based off of Factor of safety= 10.00 Required Design Flow Per Pipe (Qtotal) w/sf= 7.46 Required Design Flow Per Pipe(Qreq) per pipe= 1.86 cfs maximum drawdown. Head (H) = 6.25 Orifice Coefficient= 0.6 Orifice Flow(Q)= 2.4 is Qreq<=Qorifice? YES SUFFICIENT UNDERDRAINS Compute Perforation Capacity Pipe Diameter= 6 in Number of Pipes= 4 Used to calculate orifice flow above Total Length of Pipes= 120 LF Total Length of Perf Pipe Rows of Perforations= 4 Perforations per Row= 480 assume 3"o.c. Number of 3/8" Perforations= 1,920 50%of Perforations= 960 Capacity of each 3/8" Perforation = 0.009 Total Underdrain Capacity= 8.86 cfs OK Kimley>>>Horn SAND FILTER CALCULATIONS SAND FILTER SCM 3 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 5/20/2024 Checked by: Date: Design Resource: NCDEQ-Stormwater BMP Manual(2017) Site Information Sub Area Identification: DA-3 ONSITE A AND OFFSITE C Drainage Area(DA)= 36.80 Acres Impervious Area(IA)= 30.88 Acres Percent Impervious(I)= 83.9 SHWT Separation Type of Sand Filter: Open Bottom SHWT Elevation= 776.7 ft Top of Sand Filter Media Elevation= 782.0 ft Sand Chamber Media Depth= 18.0 in SHWT Separation Required= 2.0 ft SHWT Separation Provided= 3.8 ft OK Sand Filter Design Required Storm Depth Rp= 1 inch Percent Sizing= 100% Design Storm Depth Rp= 1 inch Determine Rv Value= 0.05+.9(I)= 0.81 in/in WQV= 107,564 cf WQVad 80,673 cf 75%of WQv per SCM Manual Top of Sand Filter Media Elevation= 782.0 ft Top of Ponding Elevation= 786.0 ft Ponding Depth Provided= 4.0 ft OK Approximate Surface Area Required= 20,168 Total Volume Required= 80,673.1 cf Minimum Required Sand Chamber Volume= 40,336.6 cf 50%of Water Quality Volume Minimum Required Sediment Chamber Volume= 40,336.6 cf 50%of Water Quality Volume Stormwater Stage-Area-Storage Table-Sandfilter 3 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft') Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 782.0 27,895 0 0.64 0.00 783.0 30,131 29,013 0.69 0.67 Lowest Orifice 784.0 32,400 60,279 0.74 1.38 785.0 34,800 93,879 0.80 2.16 Top of Sand Chamber 786.0 37,230 129,894 0.85 2.98 Provided Surface Area of Sand Chamber= 27,895.0 Approximate Sand Chamber Volume Provided at First Orifice= 60,278.5 OK Stormwater Stage-Area-Storage Table-Sandfilter 3 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft2) Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 782.0 87,960 0 2.02 0.00 783.0 92,250 90,105 2.12 2.07 Lowest Orifice 784.0 96,600 184,530 2.22 4.24 785.0 101,000 283,330 2.32 6.50 Top of Sediment Chamber 786.0 105,494 386,577 2.42 8.87 Provided Surface Area of Sediment Chamber= 87,960.0 Approximate Sediment Chamber Volume Provided at First Orifice= 184,530 OK Required Sand Filter Volume= 80,673 cf Total Provided Sand Filter Volume= 244,809 cf OK Kimley>>> Horn UNDERDRAIN CALCULATIONS SAND FILTER 3 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 5/20/2024 Checked by: Date: Compute Sand Filter Drawdown Discharge Surface Area of Sand Chamber(Af) = 27895 sf Coefficient of Permeability(ft/day)= 4.0 ft/day Filter Bed Depth (df)= 1.5 ft Maximum Ponding Depth (hf)= 2.0 ft Half of Max Ponding Depth of Sand Filter Sand Filter Media Drawdown = 3.01 cfs Computer Diameter of Single Pipe D=16(Q*n/S^0.5)^(3/8) Diameter of single pipe (D)= 28.56 in Roughness factor(n) = 0.011 Internal Slope (S)= 0.005 for a slope of 0.5% Factor of safety= 10 Underdrain Design Flow(Q)= 30.13 cfs multiply by factor of safety 2- 10 Orifice Flow Number of Pipes= 13 Size of Pipe= 6 in Sand Filter Media Drawdown = 3.01 cfs Orifice flow design based off of Factor of safety= 10.00 Required Design Flow Per Pipe(Qtotal) w/sf= 30.13 Required Design Flow Per Pipe(Qreq) per pipe= 2.3 cfs maximum drawdown. Head (H) = 6.25 Orifice Coefficient= 0.6 Orifice Flow(Q)= 2.4 is Qreq<=Qorifice? YES SUFFICIENT UNDERDRAINS Compute Perforation Capacity Pipe Diameter= 6 in Number of Pipes= 13 Used to calculate orifice flow above Total Length of Pipes= 650 LF Total Length of Perf Pipe Rows of Perforations= 4 Perforations per Row= 2,600 assume 3"o.c. Number of 3/8" Perforations= 10,400 50%of Perforations= 5,200 Capacity of each 3/8" Perforation = 0.009 4125 Total Underdrain Capacity= 47.99 cfs OK APPENDIX D: WATER QUANTITY 1S \3S 5S 6S I (10S)PRE-DEVA-2 PRE-D VIDA-2PR -DEV DA-27$ (8S) PRE-D V DA-1 ONSITEOFFITEAFFSITE B ON ITE PRE-D V DA-3 PRE-DEV 3 OFF ITE A PR -DEV DA-3 ONSITE FFSITE B 2L �� 4L 9L POA 1 /� POA3 POA2 (Subca) Reach Ond MN Routing Diagram for PRE-DEVELOPMENT Prepared by Kimley-Horn&Associates, Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC PRE-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 2.73 2 2 2-Year Type II 24-hr Default 24.00 1 3.30 2 3 10-Year Type II 24-hr Default 24.00 1 4.80 2 4 100-Year Type II 24-hr Default 24.00 1 7.21 2 PRE-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 4.580 78 (1S) 150.340 76 (3S, 8S) 5.860 86 (5S) 36.880 71 (6S) 19.830 75 (7S) 42.350 83 (10S) 259.840 77 TOTAL AREA PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 4 Time span=0.00-120.00 hrs, dt=0.01 hrs, 12001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: PRE-DEV DA-1 ONSITE Runoff Area=4.580 ac 0.00% Impervious Runoff Depth=0.94" Tc=21.0 min CN=78 Runoff=4.47 cfs 0.359 of Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff Area=67.140 ac 0.00% Impervious Runoff Depth=0.84" Tc=36.4 min CN=76 Runoff=39.16 cfs 4.687 of Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=1.43" Tc=12.0 min CN=86 Runoff=12.07 cfs 0.700 of Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff Area=36.880 ac 0.00% Impervious Runoff Depth=0.61" Tc=19.0 min CN=71 Runoff=22.15 cfs 1.875 of Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff Area=19.830 ac 0.00% Impervious Runoff Depth=0.79" Tc=20.7 min CN=75 Runoff=15.73 cfs 1.304 of Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff Area=83.200 ac 0.00% Impervious Runoff Depth=0.84" Tc=43.2 min CN=76 Runoff=42.93 cfs 5.808 of Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=1.23" Tc=57.3 min CN=83 Runoff=28.19 cfs 4.350 of Link 2L: POA 1 Inflow=4.47 cfs 0.359 af Primary=4.47 cfs 0.359 af Link 4L: POA 2 Inflow=56.46 cfs 7.263 af Primary=56.46 cfs 7.263 af Link 9L: POA 3 Inflow=74.97 cfs 11.461 af Primary=74.97 cfs 11.461 af Total Runoff Area= 259.840 ac Runoff Volume= 19.083 af Average Runoff Depth = 0.88" 100.00%Pervious=259.840 ac 0.00%Impervious= 0.000 ac PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 4.47 cfs @ 12.15 hrs, Volume= 0.359 af, Depth= 0.94" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 5 - i 4.47 cfs i —Runoff Type II 24-hr 4- 1-Year Rainfall=2.73" Runoff Area=4.580 ac 3 Runoff Volume=0.359 af Runoff Depth=0.94" 2— Tc=21.8 min CN=78 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 39.16 cfs @ 12.34 hrs, Volume= 4.687 af, Depth= 0.84" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 42 z 39.16 cfs —Runoff 40= 38= , 36; Type II 2-4-I r 32= 32= 1-Year; Rainfall2,73" , , Runoff Area=6T :4a 1 ac 28; 26= Runoff=volume=4.88- af 24= LL 201 Runoff Depth=Q.84" 18= TC=36.4 MI6 16= 14; h CN=76 12= , 10; 8z 6= 4= 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 12.07 cfs @ 12.04 hrs, Volume= 0.700 af, Depth= 1.43" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 13- i 12.07 cfs i —Runoff 12- 11 Type--1124-hr 10 1-Year RaFnfaII=2.73" 9= Runoff Area=$.$60 ac w 8- Runoff Volume=,O.TQO of G = r Runoff ,Depth=1.43" LT 5- ,Ic=12.0_miln 4- CN w'=86 3- 2- 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 22.15 cfs @ 12.14 hrs, Volume= 1.875 af, Depth= 0.61" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 36.880 71 36.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 24; 23- I 22.15 cfs I —Runoff 22=_ 21= ' , Typ f}} 2 4-fir 20= , 18; 1-Year.--Rain all=2--73" 16 Runoff Area - 6,880 ac 15 r w 14 Runoff-i o Itjrnol.875 a f 13- = 12- RunoffDepth=0.S1 LT 11= 10= j Tc=19.0 min 9; r I I r r /s 8= CAFICI=7 r�l 7= 6; 5= 4= 3; 2= I I I I 1] 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 15.73 cfs @ 12.15 hrs, Volume= 1.304 af, Depth= 0.79" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 17= , 15.73 cfs —Runoff 16: 15: Type II 24-hr 14= 13= 1-Year, RaFnfaII-2.73" 12= Runoff Area= 9.830 ac 11— rn 10 R-undff VoILrn=1.304 of = LL $ Runoff Depth=0.79" T6=20.7 Mill 6= CN=75 5= 4= 3= 2= 1= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 42.93 cfs @ 12.43 hrs, Volume= 5.808 af, Depth= 0.84" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 48- 46 44= 42.93 cfs i —Runoff 42= 40= r r i "Type 1I''24-h,r 38; 36= 1-Year Ra fnfa 11=2.73'" 34= I , 32; J Runoff Area -83.200 ac 30: Runoff-Volume 5.808 -af • 28= 6 26- LL 22- Runoff bepth=0.84" 20= 18= Tp=4.3.2-m-lp 16: 1 1 1 1 r fir_ L7 14 CN 7 12= 10= 8= 6= 4- 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 28.19 cfs @ 12.61 hrs, Volume= 4.350 af, Depth= 1.23" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 30= 128.19 cfs l —Runoff 28: 26= Type II 24-hr 24= 1-Year Rainfar172.7-3" 22= =4 Runoff Area- 2. 20 50, ac w 18- Rundff IfOh r e=4.350 of 0 16= Runoff Depth=1.23" LT 14= TCi 7. 10= C N=83 8 6= 4- 2- 0 ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,,�,,,,�,,,,�,,,,�,,,,�,,,,�,,,,, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 12 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 0.94" for 1-Year event Inflow = 4.47 cfs @ 12.15 hrs, Volume= 0.359 af Primary = 4.47 cfs @ 12.15 hrs, Volume= 0.359 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 5 _ 14.47 cfs I —Inflow —Primary 4 Inflow Area=4.580 ac 3— w - - 0 2— 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 13 Summary for Link 4L: POA 2 Inflow Area = 109.880 ac, 0.00% Impervious, Inflow Depth = 0.79" for 1-Year event Inflow = 56.46 cfs @ 12.22 hrs, Volume= 7.263 af Primary = 56.46 cfs @ 12.22 hrs, Volume= 7.263 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 60= 156.46 cfs I -Inflow - -Primary ::i, Inflow Area=109.880 ac 45 40 w 35- C - 0 ::ij20- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 14 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 0.95" for 1-Year event Inflow = 74.97 cfs @ 12.48 hrs, Volume= 11.461 af Primary = 74.97 cfs @ 12.48 hrs, Volume= 11.461 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 80= 174.97 cfs I Inflow 75: —Primary 70= I of ow-Area=1-45.380 --ac 65: 60: 55= 50= u 45-- c 40; u. 35= 30= 25= 20= 15= 10= 5= 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 15 Time span=0.00-120.00 hrs, dt=0.01 hrs, 12001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: PRE-DEV DA-1 ONSITE Runoff Area=4.580 ac 0.00% Impervious Runoff Depth=1.35" Tc=21.0 min CN=78 Runoff=6.55 cfs 0.514 of Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff Area=67.140 ac 0.00% Impervious Runoff Depth=1.22" Tc=36.4 min CN=76 Runoff=59.72 cfs 6.838 of Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=1.92" Tc=12.0 min CN=86 Runoff=16.11 cfs 0.939 of Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff Area=36.880 ac 0.00% Impervious Runoff Depth=0.94" Tc=19.0 min CN=71 Runoff=36.69 cfs 2.885 of Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff Area=19.830 ac 0.00% Impervious Runoff Depth=1.16" Tc=20.7 min CN=75 Runoff=24.13 cfs 1.921 of Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff Area=83.200 ac 0.00% Impervious Runoff Depth=1.22" Tc=43.2 min CN=76 Runoff=65.53 cfs 8.473 af Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=1.69" Tc=57.3 min CN=83 Runoff=39.24 cfs 5.970 of Link 2L: POA 1 Inflow=6.55 cfs 0.514 af Primary=6.55 cfs 0.514 af Link 4L: POA 2 Inflow=88.27 cfs 10.662 af Primary=88.27 cfs 10.662 af Link 9L: POA 3 Inflow=110.80 cfs 16.364 af Primary=110.80 cfs 16.364 af Total Runoff Area= 259.840 ac Runoff Volume=27.540 af Average Runoff Depth = 1.27" 100.00%Pervious=259.840 ac 0.00%Impervious= 0.000 ac PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 6.55 cfs @ 12.15 hrs, Volume= 0.514 af, Depth= 1.35" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 6.55 cfs —Runoff 6- Type II 24-hr = 2-Year Rainfall=3.30`' Runoff Area=4.580 ac - Runoff Volume=0.514 af - 4— o Runoff Depth=1.35"' LL - 3— Tc=21.O midi 2- CN=78 17 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 59.72 cfs @ 12.34 hrs, Volume= 6.838 af, Depth= 1.22" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 65 - = 159.72 cfs i —Runoff 60- 55 Type II 24**��-1r 50- 2-Year Rainfall=3.3O" - -45= Runoff area--6�.140 ac Runoff Vofu,me 40— -0.$3$ of 35- 3 = Runoff Depth=1.22" LL 30- T A 25- ,Tor=36.4--m-in 20- G-+'N=76 15iL10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 16.11 cfs @ 12.04 hrs, Volume= 0.939 af, Depth= 1.92" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 18- 17- 116.11 cfs f -Runoff 16:15: Type II 24-hr 13_ 2-Year; Rainfall3.'0" 12- Ranaff Area=$.860 ac 11= 10= Runoff V--olume=0,939 af 9- Runoff Depth=1.92" Li 8- T--c=12. 6_ C =86 4.- 3= 2= 1= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 36.69 cfs @ 12.14 hrs, Volume= 2.885 af, Depth= 0.94" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 36.880 71 36.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 40= 38- l 36.69 cfs i —Runoff 36= 34= Type II->2-4—Ir 3 - 30= , , 2-dear Rainfall 3,w7'' Q'n 28= Runoff Area=36.88O ac 26; 24= Runoff VoIume=2.885 of o 22= 20- Runoff Depth=O.44'' 18= T6=19.0 min 14= C N=7 1 10= 8- 6= 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 24.13 cfs @ 12.15 hrs, Volume= 1.921 af, Depth= 1.16" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 26- 124.13 cfs I —Runoff ::i Type 1124-hr 20= 2-Year, RainfaN=3.30" 18= Runoff Area=19 883a ac 16 Runoff Vorume=1.921 of 14- G = Runoff ,Depth=1.�16" LL 12— 10 176=2 .7_m_il 8 CN=7$ 6- 4- 2- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 65.53 cfs @ 12.43 hrs, Volume= 8.473 af, Depth= 1.22" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 70 1 65.53 cfs —Runoff ::: Type II 24-1hr 2 =- 55- , , 'Year Ram#all-3.�0', 50- RRunoffArea=83.20a ac 45 • 40= Runoff Volume=8.47 3 of 35= Runoff-Depth=1.22" • - 30- TC=43. m 1n 25- 20 CN=76 15- 10- 5 , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 39.24 cfs @ 12.60 hrs, Volume= 5.970 af, Depth= 1.69" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 42, 139.24 cfs -Runoff 40: r r > 38; 36; I Type II 24-hcr 3 32; I2-Year--Rainfall=-3.3-Q" = 30= r Runoff_Area430 28= - ac 26= Runoff=volume=5.97_'' af - 24- f __ Li 20- I Runoff Depth=1.69" 16= "TC=57.3 min 14= r N=8$ 12; 10= L ) L\ 8= 6= 4= 2; 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 23 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 1.35" for 2-Year event Inflow = 6.55 cfs @ 12.15 hrs, Volume= 0.514 af Primary = 6.55 cfs @ 12.15 hrs, Volume= 0.514 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 7 I6.55 cfs I —Inflow —Primary 6- Inflow Area=4.580 ac 5— w o 4— 3 - o - 3- 2— 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 24 Summary for Link 4L: POA 2 Inflow Area = 109.880 ac, 0.00% Impervious, Inflow Depth = 1.16" for 2-Year event Inflow = 88.27 cfs @ 12.21 hrs, Volume= 10.662 af Primary = 88.27 cfs @ 12.21 hrs, Volume= 10.662 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 95= —Inflow 88.27 cfs I I 90= P P P —Primary 85= 85 P InflowAraa=109.880 ac_ 75 70= 65-- 60= 55= o - 3 50= LL 45= 40= 35= : 30- 25= 20- 15= 10= 5= 0'.....I..... „i....I.... ...................I.........I..............I.........I.........I..............I.........1...., 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 25 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 1.35" for 2-Year event Inflow = 110.80 cfs @ 12.43 hrs, Volume= 16.364 of Primary = 110.80 cfs @ 12.43 hrs, Volume= 16.364 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 120: 115! 1110.80 cfs I 4 4 4 ; 4 : i —Inflow I 110= } : —Primary 105= Inflow Area=145.380 ac 100= 95: 85: i 44 80= 75: , , i 70= 65: r 4 . 33 60: M 55: ? t 50: 45: , 4 4 4 4 40= i r , 35= 30: ; 25= I i 4 4 4 ? 20: 15: 10: 5: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 26 Time span=0.00-120.00 hrs, dt=0.01 hrs, 12001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: PRE-DEV DA-1 ONSITE Runoff Area=4.580 ac 0.00% Impervious Runoff Depth=2.54" Tc=21.0 min CN=78 Runoff=12.59 cfs 0.970 of Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff Area=67.140 ac 0.00% Impervious Runoff Depth=2.37" Tc=36.4 min CN=76 Runoff=120.57 cfs 13.270 af Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=3.28" Tc=12.0 min CN=86 Runoff=27.02 cfs 1.602 of Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff Area=36.880 ac 0.00% Impervious Runoff Depth=1.97" Tc=19.0 min CN=71 Runoff=81.74 cfs 6.044 of Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff Area=19.830 ac 0.00% Impervious Runoff Depth=2.29" Tc=20.7 min CN=75 Runoff=49.21 cfs 3.781 af Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff Area=83.200 ac 0.00% Impervious Runoff Depth=2.37" Tc=43.2 min CN=76 Runoff=132.47 cfs 16.444 of Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=2.99" Tc=57.3 min CN=83 Runoff=70.19 cfs 10.565 of Link 2L: POA 1 Inflow=12.59 cfs 0.970 af Primary=12.59 cfs 0.970 af Link 4L: POA 2 Inflow=184.94 cfs 20.915 af Primary=184.94 cfs 20.915 af Link 9L: POA 3 Inflow=215.63 cfs 30.790 of Primary=215.63 cfs 30.790 af Total Runoff Area= 259.840 ac Runoff Volume= 52.676 af Average Runoff Depth = 2.43" 100.00%Pervious=259.840 ac 0.00%Impervious= 0.000 ac PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 12.59 cfs @ 12.14 hrs, Volume= 0.970 af, Depth= 2.54" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 14- 13- I 12.59 cfs i —Runoff 12- Type II 24-hr 11= 10-Year Rainfall=4.80" 10- 9 Runoff,Area=4.580_--ac =8 Runoff VoII� rn =b.970 af 0 7- D Runoff- pth-=2.5-4" LL 6 Tc=21 .0 m i n 5- 4 LII�l=--- --8 7$ 3- 2- 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 120.57 cfs @ 12.33 hrs, Volume= 13.270 af, Depth= 2.37" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 130- 120.57 cfs I —Runoff 120: 110- Type II24-hr 100 10-Year- Raipfall=-4-80" 90- Runoff Arca=67.140 ac 80- Runoff Volume=13.270 of - 3 70= Runoff Depth2.137" LL 60= Tc=364 m i n ON=76 40- 30- 20- 10- 0 ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,,�,,,,�,,,,�,,,,�,,,,�,,,,�,,,,, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 27.02 cfs @ 12.04 hrs, Volume= 1.602 af, Depth= 3.28" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 30- 28- 27.02 cfs —Runoff 26= I . TYpe li'2 r 24- 22 10-Year.-Ra_i-nfaU=4.8_0" 20 Ru noff Area=5.866 ac 18= Runoff Vorum - `f V16- � 1.602a 3.28" 0 14 RRunoff_De-p h= 12 Tc=12.0 min I I C N=86 8- 6- 4- 2- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 81.74 cfs @ 12.12 hrs, Volume= 6.044 af, Depth= 1.97" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 36.880 71 36.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 90.- 85-- 181.74 cfs —Runoff 80= 75= Type II 24-1hr 70= 10-Year', Rainfall4.80," 65= 60= Runoff Area=36.880 arc 55= Runoff 50= Volume=;8.444 a 45: Runoff Depth--1.97" Li 40: (� 35: Tc=1 3.O rm in 30= dN=71 25= 20: 15= 10: 5= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 49.21 cfs @ 12.14 hrs, Volume= 3.781 af, Depth= 2.29" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 55— i 49.21 cfs i -Runoff 50- 45- Type- 11 24-hr 40- I , 10_-Year_Ra-i-nfa-il=4.$_0�' 35- Runoff-Area=19.830--a-c 30- Runoff Volume=,3.781 af 3 - Runoff Depth=2.29" ° 25- 20- ,Tc=20.7 m i In 15- CN=75 10- 5- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 132.47 cfs @ 12.43 hrs, Volume= 16.444 af, Depth= 2.37" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 140- 1 132.47 cfs I —Runoff 130- 120 .Type II 24-hr 110= 10 Ypar Rai0f0+4 80" Runoff Area83.200 ae 90- Runoff Voluil e=16.444 of so= Runoff p 0 =70 De th=2.''37 LL 60= To=43;2--IY1i +► 50- t IV j7t 40- 30- 20- 10- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 70.19 cfs @ 12.55 hrs, Volume= 10.565 af, Depth= 2.99" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 75_ 170.19 cfs —Runoff 70- I 1 A 65: Type 124-hr 60= 10-blear Rainfa11=4.80" 55= Runoff Area=42.350 ac 50= • 45— Runoff / luM0=1 0.5fi f 3 40_ Runoff Depth*2.997 LL 35= Tc=57s3 min 30: 25 CN=83 20- 15- 10- 5= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 34 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 2.54" for 10-Year event Inflow = 12.59 cfs @ 12.14 hrs, Volume= 0.970 of Primary = 12.59 cfs @ 12.14 hrs, Volume= 0.970 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 14- 13- 12.59 cfs —Inflow —Primary 12 Inflow Area=4.580 ac 11- 10- 9- w 8- 3 7= o = LL 6 5- 4- 3- 2- 1- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 35 Summary for Link 4L: POA 2 Inflow Area = 109.880 ac, 0.00% Impervious, Inflow Depth = 2.28" for 10-Year event Inflow = 184.94 cfs @ 12.18 hrs, Volume= 20.915 af Primary = 184.94 cfs @ 12.18 hrs, Volume= 20.915 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 200= ; ; 190- 1184.94 cfs I I —Inflow in — Primary 180_ 170- Io-w Area=109.880 ac 160 150= 140= 130: 120= i 110 c 100: , Li 90: 80= 70 60= 50: ; 40= 30 20= 10.- 0 ....I... I I I j l l l l l 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 36 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 2.54" for 10-Year event Inflow = 215.63 cfs @ 12.43 hrs, Volume= 30.790 af Primary = 215.63 cfs @ 12.43 hrs, Volume= 30.790 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 240� 230= 1215.63 cfs —Inflow 220! I , Primary 210= 200= h Inflow Area=i 45.380 ac 190: 180: 170: 160= 150: i h h h ; w 140= 4 4 I ' I u 130= 120= 1 h I h h h h h h I .° 110g 1 100.. l 90! 4 4 4 4 + 80= 70= h h h 1 1 60: 50: i i h ; 40: 30= I h h h ; 20: , 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 37 Time span=0.00-120.00 hrs, dt=0.01 hrs, 12001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: PRE-DEV DA-1 ONSITE Runoff Area=4.580 ac 0.00% Impervious Runoff Depth=4.67" Tc=21.0 min CN=78 Runoff=23.01 cfs 1.781 af Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff Area=67.140 ac 0.00% Impervious Runoff Depth=4.44" Tc=36.4 min CN=76 Runoff=227.86 cfs 24.868 af Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=5.57" Tc=12.0 min CN=86 Runoff=44.63 cfs 2.719 of Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff Area=36.880 ac 0.00% Impervious Runoff Depth=3.90" Tc=19.0 min CN=71 Runoff=164.77 cfs 11.989 of Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff Area=19.830 ac 0.00% Impervious Runoff Depth=4.33" Tc=20.7 min CN=75 Runoff=93.65 cfs 7.164 of Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff Area=83.200 ac 0.00% Impervious Runoff Depth=4.44" Tc=43.2 min CN=76 Runoff=250.36 cfs 30.817 af Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=5.23" Tc=57.3 min CN=83 Runoff=121.96 cfs 18.444 of Link 2L: POA 1 Inflow=23.01 cfs 1.781 af Primary=23.01 cfs 1.781 af Link 4L: POA 2 Inflow=359.19 cfs 39.576 af Primary=359.19 cfs 39.576 af Link 9L: POA 3 Inflow=397.65 cfs 56.425 af Primary=397.65 cfs 56.425 af Total Runoff Area= 259.840 ac Runoff Volume=97.782 af Average Runoff Depth =4.52" 100.00%Pervious=259.840 ac 0.00%Impervious= 0.000 ac PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 23.01 cfs @ 12.13 hrs, Volume= 1.781 af, Depth= 4.67" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 24— 23.01 cfs —Runoff 22— Type II 24-hr 20= 100-Year Rainfaill7. 1" 18: Runoff Area=4.580 ac 16- 14= Runoff Volume=,1 .781 of o 0 12— Runoff Depth=4.6-7" Tc - 1 8= E N=78 6- 4- 2— 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 227.86 cfs @ 12.33 hrs, Volume= 24.868 af, Depth= 4.44" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 240— '1227.86 cfs l —Runoff 220- , Type 11'24-hr 200- 100-Year Rainfall=7.421" 180— RuRunoff Area67.140 ac Runoff Volume=24.868 of w 140- 3 = Runoff D ;pth=4.447 G 120— Tc=36,4 min 100- So CN=76 60- 40— 20- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 44.63 cfs @ 12.03 hrs, Volume= 2.719 af, Depth= 5.57" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 48= —Runoff 46! 44.63 cfs 44= 42; rType- II 24-hr 40= 38; r 100-Year'Rainfall=7.21" 36: 3 ; 32= Runoff Are-fi=5.860---fi-c p /� 30= FEUi�L.(9 1 _ 28= iOff V-diuM Of -- 26; i 1 r r r r r r 24; i Runoff Depth-5.57" u 22= 20= 17=12.0min 18; 16: 1 C N=86 14: 12; 10; 8: 6= 4; 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 164.77 cfs @ 12.12 hrs, Volume= 11.989 af, Depth= 3.90" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 36.880 71 36.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 180= 170: 1164.77 cfs I I —Runoff 160= 150- Type II'24-h r 140: 1 QO Y-ear- Raii fil=7.,' 1 ' 120120- Runoff_Area=36._880_a_ 110= I unoff Volurne=l l,989 of 100= Runoff _!Q 90= �p h= ..90' o Li 80- Tc=19,0 miry 70= ►A' 60= 0N 071 50= 40: 30= 20- 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 93.65 cfs @ 12.13 hrs, Volume= 7.164 af, Depth= 4.33" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 100= 93.65 cfs -Runoff 95= F 90= 'Type-1124-h.r 85= 80= 100-Year Rainfall=7.21`' 70 Runoff are=19.830 ac 65= Runoff Volume-=7.�64af 55= _0 50= Runoff Depth#4.33"' U. 45= 40= Tc=2'0�'*� rn i n 35= 30= CN=75 25= 20= 15= 10- 5= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 250.36 cfs @ 12.42 hrs, Volume= 30.817 af, Depth= 4.44" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 280- 260- 1250.36 cfs —Runoff 240= Type 1124-hr 220- 100-Year Rainfall=7.'21`' 200- 180= Ru hofF Area83.200 ac kunoff_Volu 3 81 ' f 3 140= Runoff.-DOpth=4.44" O u_ 120- Tc=43 2 mi -- 100_ cN=76 80- 60- 40- 20 J 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 121.96 cfs @ 12.55 hrs, Volume= 18.444 af, Depth= 5.23" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 130- 1121.96 cfs I —Runoff 120= 110_ Type II 24-h r 100 1 Q0 Year Rai if II 7.21 90- Runoff Area42. ►50 a 80 R1 no f Volume=1,[8.444 a1f - 70= Runoff Depth-5.23'' Li 60- Tn=573 D'1n ON=83 40- 30- 20- 10- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 45 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 4.67" for 100-Year event Inflow = 23.01 cfs @ 12.13 hrs, Volume= 1.781 af Primary = 23.01 cfs @ 12.13 hrs, Volume= 1.781 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 24- 23.01 cfs —Inflow —Primary ::i. Inflow Area=4:580 ac 18- 16- o 14_ o 12- 10- 8- 6- 4- 2- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 46 Summary for Link 4L: POA 2 Inflow Area = 109.880 ac, 0.00% Impervious, Inflow Depth = 4.32" for 100-Year event Inflow = 359.19 cfs @ 12.17 hrs, Volume= 39.576 af Primary = 359.19 cfs @ 12.17 hrs, Volume= 39.576 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 400- 380 1 1359.19 cfs I —Inflow 360= —Primary 340= Inflow Area-109.880 ac 320 300 280= 260= 240 -) 220 3 200= LL 180= 160I 140= 120= 100: 80 60 40= 20= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 47 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 4.66" for 100-Year event Inflow = 397.65 cfs @ 12.42 hrs, Volume= 56.425 af Primary = 397.65 cfs @ 12.42 hrs, Volume= 56.425 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 440= 420- 1397.65 cfs l —Inflow 400= —Primary 380= Inflow ► rea=14 .380 ac 360 340= 320= . 3001 280= 260= = 2401 . . . 3 220- LL 200= 180-E 160= 140= 120 100- 80 60= 40=20= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 1-Year Event 4 Node Listing 5 Subcat 1 S: PRE-DEV DA-1 ONSITE 6 Subcat 3S: PRE-DEV DA-2 ONSITE 7 Subcat 5S: PRE-DEV DA-2 OFFSITE A 8 Subcat 6S: PRE-DEV DA-2 OFFSITE B 9 Subcat 7S: PRE-DEV DA-3 ONSITE 10 Subcat 8S: PRE-DEV DA-3 OFFSITE A 11 Subcat 10S: PRE-DEV DA-3 OFFSITE B 12 Link 2L: POA 1 13 Link 4L: POA 2 14 Link 9L: POA 3 2-Year Event 15 Node Listing 16 Subcat 1 S: PRE-DEV DA-1 ONSITE 17 Subcat 3S: PRE-DEV DA-2 ONSITE 18 Subcat 5S: PRE-DEV DA-2 OFFSITE A 19 Subcat 6S: PRE-DEV DA-2 OFFSITE B 20 Subcat 7S: PRE-DEV DA-3 ONSITE 21 Subcat 8S: PRE-DEV DA-3 OFFSITE A 22 Subcat 10S: PRE-DEV DA-3 OFFSITE B 23 Link 2L: POA 1 24 Link 4L: POA 2 25 Link 9L: POA 3 10-Year Event 26 Node Listing 27 Subcat 1 S: PRE-DEV DA-1 ONSITE 28 Subcat 3S: PRE-DEV DA-2 ONSITE 29 Subcat 5S: PRE-DEV DA-2 OFFSITE A 30 Subcat 6S: PRE-DEV DA-2 OFFSITE B 31 Subcat 7S: PRE-DEV DA-3 ONSITE 32 Subcat 8S: PRE-DEV DA-3 OFFSITE A 33 Subcat 10S: PRE-DEV DA-3 OFFSITE B 34 Link 2L: POA 1 35 Link 4L: POA 2 36 Link 9L: POA 3 100-Year Event 37 Node Listing PRE-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 5/28/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC 38 Subcat 1 S: PRE-DEV DA-1 ONSITE 39 Subcat 3S: PRE-DEV DA-2 ONSITE 40 Subcat 5S: PRE-DEV DA-2 OFFSITE A 41 Subcat 6S: PRE-DEV DA-2 OFFSITE B 42 Subcat 7S: PRE-DEV DA-3 ONSITE 43 Subcat 8S: PRE-DEV DA-3 OFFSITE A 44 Subcat 10S: PRE-DEV DA-3 OFFSITE B 45 Link 2L: POA 1 46 Link 4L: POA 2 47 Link 9L: POA 3 • ® POSST-ES DA-2CM ® O E( 2) POST-DES -2 POST-D V DA-1 ONSITEA(D D ) • O'.ITE 10 OST-DEV DA-2 OFFSITE A A. S M2 POST-DEV -3 P -DEV 12 OFFSITE C(S 3) O ITE A(SCM-DA-33) SCM1 POST-DES DA-3 POST-DES DA-2 24 OFFSITE B ONSITE D 13R Q-- Sc 30R r, NORTH TREAM A-3 BYPASS PIPE DEPRESSION POST-DES DA-2 b ONSITE B 28R 14R 1-® SOUTH TREAM • ES NORTH AM TO PO O NSITEC DA-2 POST-DES DA-3 P ^` NSI OFFSITE A LS 2L 9L 4L I POA 3 POST-DEV DA-3 POA 1 POST-DEV DA-2 POA 2 OFFSITE B ONSITE B (Subca) Reach OndIN Routing Diagram for POST-DEVELOPMENT Prepared by Kimley-Horn&Associates, Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC POST-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1"WQ EVENT Type II 24-hr Default 24.00 1 1.00 2 2 1-Year Type II 24-hr Default 24.00 1 2.73 2 3 2-Year Type II 24-hr Default 24.00 1 3.30 2 4 10-Year Type II 24-hr Default 24.00 1 4.80 2 5 100-Year Type II 24-hr Default 24.00 1 7.21 2 POST-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 1.880 98 (10S) 84.690 76 (11S, 32S) 18.790 96 (12S) 5.860 86 (15S) 20.770 95 (16S) 15.270 78 (18S, 19S, 23S, 29S) 35.000 71 (22S) 34.680 93 (25S) 42.350 83 (31S) 259.290 82 TOTAL AREA POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 4 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE Runoff Area=1.880 ac 100.00% Impervious Runoff Depth=0.79" Tc=5.0 min CN=98 Runoff=2.54 cfs 0.124 of Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=0.04" Tc=5.0 min CN=76 Runoff=0.01 cfs 0.005 af Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=18.790 ac 0.00% Impervious Runoff Depth=0.63" Tc=5.0 min CN=96 Runoff=21.42 cfs 0.987 of Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=0.20" Tc=12.0 min CN=86 Runoff=1.43 cfs 0.096 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=0.56" Tc=5.0 min CN=95 Runoff=21.48 cfs 0.975 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=4.260 ac 0.00% Impervious Runoff Depth=0.06" Tc=13.3 min CN=78 Runoff=0.08 cfs 0.021 af Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=0.06" Tc=17.6 min CN=78 Runoff=0.07 cfs 0.021 of Subcatchment 22S: POST-DEV DA-2 OFFSITE ARunoff Area=35.000 ac 0.00% Impervious Runoff Depth=0.01" Tc=28.9 min CN=71 Runoff=0.03 cfs 0.023 af Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=0.06" Tc=5.0 min CN=78 Runoff=0.03 cfs 0.004 of Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=0.45" Tc=5.0 min CN=93 Runoff=29.07 cfs 1.302 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=0.06" Tc=15.0 min CN=78 Runoff=0.11 cfs 0.028 of Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=0.13" Tc=57.3 min CN=83 Runoff=1.92 cfs 0.466 af Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=0.04" Tc=43.2 min CN=76 Runoff=0.45 cfs 0.267 af Reach 13R: NORTH STREAM DEPRESSION Inflow=1.26 cfs 2.009 af Outflow=1.26 cfs 2.009 af Reach 14R: NORTH STREAM TO POA 2 Inflow=1.29 cfs 2.031 af Outflow=1.29 cfs 2.031 af Reach 28R: SOUTH STREAM Inflow=3.14 cfs 2.187 af Outflow=3.14 cfs 2.187 af POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 5 Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=0.26' Max Vet=5.26 fps Inflow=1.92 cfs 0.466 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=1.92 cfs 0.466 af Pond 10P: SCM 2 Peak Elev=787.82' Storage=27,286 cf Inflow=21.42 cfs 0.987 af Primary=0.55 cfs 0.987 af Secondary=0.00 cfs 0.000 af Outflow=0.55 cfs 0.987 af Pond 12P: SCM 1 Peak Elev=785.82' Storage=25,658 cf Inflow=21.48 cfs 0.975 af Outflow=0.67 cfs 0.975 af Pond 24P: SCM 3 Peak Elev=782.32' Storage=37,936 cf Inflow=31.60 cfs 1.426 af Primary=0.83 cfs 1.426 af Secondary=0.00 cfs 0.000 af Outflow=0.83 cfs 1.426 af Link 2L: POA 1 Inflow=0.01 cfs 0.005 af Primary=0.01 cfs 0.005 af Link 4L: POA 2 Inflow=2.55 cfs 2.127 of Primary=2.55 cfs 2.127 af Link 9L: POA 3 Inflow=3.14 cfs 2.187 of Primary=3.14 cfs 2.187 af Total Runoff Area= 259.290 ac Runoff Volume=4.319 af Average Runoff Depth = 0.20" 99.27%Pervious=257.410 ac 0.73%Impervious= 1.880 ac POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 2.54 cfs @ 11.96 hrs, Volume= 0.124 af, Depth= 0.79" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 1.880 98 1.880 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 12.54 cfs i —Runoff Type II 24-hr 1 ' WQ EVENT Rainfall-1.00" 2— Runoff Area=1.880 ac Runoff Volume=0.124 af - Runoff Depth=0.79" - Tc=5.0 min 0 u_ CN=98 1- 0 „ 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 0.01 cfs @ 12.36 hrs, Volume= 0.005 af, Depth= 0.04" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 0.011- 0.01= 10.01 cfs Runoff 0.01. 0.009 0.009= ' ' Type I1'244,hr 0.008 1 WQ-EVEN17--Rainfa117t0O" 0.0081 fF Area 0.0071 . '. Run- =1-.490--1e 0.007= fRunof--Votume=II.b05` -af- 0.0061 0.0061 - Rur off,,Deptha.04" 0.005; . n -LL 0.005- m T- -5�0--m 0.004 CN= 6 0.004' 0.003= 0.003- 0.002= 0.002= 0.001 0.001 H L-- L 0.000 h- 0 m 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 21.42 cfs @ 11.96 hrs, Volume= 0.987 af, Depth= 0.63" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 18.790 96 18.790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 23 121.42 cfs l 22- —Runoff 21- 20= Type 1124-hr 19; 1" WQ--EVENT--Rainfall1.00" 181 171 Runoff Area=18.79-0 ac 16= 151 Runoff Voi u me=O.987 of 14; 13; R naff Depth-0.63" 3 121 LL 11= Tc=50 min 10= 81 7- 5= 4- 3- 2= 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff = 1.43 cfs @ 12.06 hrs, Volume= 0.096 af, Depth= 0.20" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE B Hydrograph 11.43 cfs i —Runoff Type II 24-hr 1 ' WQ EVENT Rainfall-1.00" Runoff Area=5.860 ac 1- Runoff Volume=0.096 af Runoff Depth=0.20" Tc=12.0 min u_ CN=86 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 21.48 cfs @ 11.96 hrs, Volume= 0.975 af, Depth= 0.56" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 24- 23; 121.48 cfs —Runoff 22= 21_ 201 Type It 24-hr 19; 1"yyQ EVENT_=Rainfalt0.00"---- 18= 171 Rum*Area=20.170 ac 161 151 Runoff Voiurne=0.975 of 14= Runoff 11,E 1, f1 C 13; Depth O 56-" 3 12_ LL 11= T_n=5t0_min 10. ON=JS 9- 8- 7- 6= 5= 4= 3 2 1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 0.08 cfs @ 12.15 hrs, Volume= 0.021 af, Depth= 0.06" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 4.260 78 4.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 0.09. I 0.085I 0.08 cfs —Runoff 0.08_ 0.075- Type 11 24-hr 0.07= 1' WQ EVENT Rainfa1174.0O" 0.065_ Runoff Area=4 260 ac 0.55= Off_Volume 0. 0.055= , 1�-un- = b21_.af 0.05- ! ! I Rurloff1Depth a.06" c 0.045= Tc=13,3 min Li 0.047 +► 0.035= CN=78 0.03= 0.025= 0.02 0.015 0.01 0.005 0 m 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 0.07 cfs @ 12.23 hrs, Volume= 0.021 af, Depth= 0.06" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 0.08= 0.075= -I 0.07 cfs —Runoff 0.07_ .Type 11`24�,;hr 0.065 WQ EVENT Rainfall=1.08" 0.06= 0.055= Rhnoff_Area=4.890_ac 0.05= Runoff Volume=0.021 of 0.045_ ku off'Depth=0.0 " 0.047 Tc=17:6 min u 0.035 CN=78 0.03- 0.025- 0.027 0.015 0.01 0.005 0 m 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE A Runoff = 0.03 cfs @ 23.99 hrs, Volume= 0.023 af, Depth= 0.01" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 35.000 71 35.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE A Hydrograph 0.036- 0.034= 1 0.03 cfs f —Runoff (:: 0.032= 0.037 r r Type-_Il._24-h r 0.0287 1' WQ E /Eid-T- Rainfal171.00" 0.026= Lr Runoff Area=35.000 ac 0.024 0.022= Runoff Volume=13.023 of 74 0.02_ Runoff'Depth a.01" 0.018_ Tc=2819 min 0.016- 0.014= CN=71 0.012- 0.01 0.008 0.006= 0.004 0.002 0 m 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 0.03 cfs @ 12.02 hrs, Volume= 0.004 af, Depth= 0.06" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph 0.028- 0.03 cfs —Runoff 0.026- 0.024= Type II 24-h r 0.022= 1' WQ EVENT Rainfalp1.0O" 0.02= Runoff-Area=0.78O ae 0.018 fRunAff Votume 0.b04 of 0.0167 Runoff-Depth=0-.06" 0.0147 Tc=5,O min 0.012- = dN=78 0.01- 0.008- 0.006- 0.004- 0.002- 0 r 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 29.07 cfs @ 11.96 hrs, Volume= 1.302 af, Depth= 0.45" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 327 30=---I 29.07 cfs l —Runoff 28= Type 11244,hr 26 1" WQ EVENT Rainfall1.00" 24= 22= Runoff_Are-a=,34.68-0_ac 20= Runoff Volume=1.302'af • 187 Runof-Depth0.4,5" 16 Tc=50 On u. 14= 12 CN=93 10- 8= 6 42 ^0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 0.11 cfs @ 12.18 hrs, Volume= 0.028 af, Depth= 0.06" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 0.115 0.11= 1 0.11 cfs r —Runoff 0.105= , 0.1= Type tl 244hr 0.095= 0.09 1" WQ EVENT Rainfall=1.0'0" 0.085 0 08= R' ff_Area 5.8 40--1And — � 0.075= Runoff Volume=0.d2S of _ 0.07= 40.065 n = 'Ruoff Depth=0.0,6" 0.06 - .1 0 0.055= Tc=i-510--min---- u 0.05; 0.045= Ow —18 0.04= + + 0.035 0.03 0.025 0.02 0.015= ; ; ; 0.01 t , 0.005 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 1.92 cfs @ 12.74 hrs, Volume= 0.466 af, Depth= 0.13" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 2 1.92 cfs —Runoff Type II 24-hr 1 ' WQ EVENT Rainfall-1.00" Runoff Area=42.350 ac Runoff Volume=0.466 af - Runoff Depth=0.13" 0 1 Tc=57.3 man CN=83 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 0.45 cfs @ 13.20 hrs, Volume= 0.267 af, Depth= 0.04" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1" WQ EVENT Rainfall=1.00" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 0.48= , 0.46= i 0.45 cfs l —Runoff 0.44 0.42= I Type-lI-244 r�--- o38= i 1 1" WQ-EVENT RairnfalI= :0''C" 0.33= + Runoff-Area=83.200 ac 0.32= unoff=1/ol_ume---067_ 0.3= ' ; > � � af F 0.28= y t IRunoff Depthr0:04"---- = 0.26 i i c 0.24_ Tc=43.2 nun ii 0.22 0.2_ I vN=76 0.18 0.16 4 4 r 0.14= 0.12=_ 0.1 ; + ; 0.08 i 0.06 0.04 0.02 l 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 19 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 79.600 ac, 0.00% Impervious, Inflow Depth = 0.30" for 1" WQ EVENT event Inflow = 1.26 cfs @ 14.94 hrs, Volume= 2.009 af Outflow = 1.26 cfs @ 14.94 hrs, Volume= 2.009 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph I 1.26 cfs I —Inflow —Outflow Inflow Area=79.600 ac 1- n 0 0 t �fi r r 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 20 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 83.990 ac, 0.00% Impervious, Inflow Depth = 0.29" for 1" WQ EVENT event Inflow = 1.29 cfs @ 13.52 hrs, Volume= 2.031 af Outflow = 1.29 cfs @ 13.52 hrs, Volume= 2.031 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph I 1.29 cfs I —Inflow —Outflow Inflow Area=83.990 ac 1- n 0 0 m i r 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 21 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 0.16" for 1" WQ EVENT event Inflow = 3.14 cfs @ 12.85 hrs, Volume= 2.187 of Outflow = 3.14 cfs @ 12.85 hrs, Volume= 2.187 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 3.14 cfs [:111Tfrowl 3— inflow Area=167.950 ac w 2— o _ LL 1— 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 22 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 0.13" for 1" WQ EVENT event Inflow = 1.92 cfs @ 12.74 hrs, Volume= 0.466 of Outflow = 1.92 cfs @ 12.81 hrs, Volume= 0.466 af, Atten= 0%, Lag= 4.1 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Max. Velocity= 5.26 fps, Min. Travel Time= 1.9 min Avg. Velocity = 2.95 fps, Avg. Travel Time= 3.3 min Peak Storage= 213 cf @ 12.78 hrs Average Depth at Peak Storage= 0.26' , Surface Width= 2.09' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight&clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' Reach 30R: DA-3 BYPASS PIPE Hydrograph 2- 11.92 cfs _Inflow Outflow Inflow Area=42.350 ac Avg. Flow Depth=0.26' Max Vel=5.26 fps 54.0" Round Pipe 0 1- LL n=0.011 L=585.0' S=0.0163 '/' Capacity=296.47 cfs 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 23 Summary for Pond 10P: SCM 2 Inflow Area = 18.790 ac, 0.00% Impervious, Inflow Depth = 0.63" for 1" WQ EVENT event Inflow = 21.42 cfs @ 11.96 hrs, Volume= 0.987 af Outflow = 0.55 cfs @ 14.61 hrs, Volume= 0.987 af, Atten= 97%, Lag= 159.3 min Primary = 0.55 cfs @ 14.61 hrs, Volume= 0.987 af Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 787.82' @ 14.61 hrs Surf.Area= 16,774 sf Storage= 27,286 cf Plug-Flow detention time= 683.1 min calculated for 0.987 af(100% of inflow) Center-of-Mass det. time= 683.0 min ( 1,493.1 - 810.1 ) Volume Invert Avail.Storage Storage Description #1 786.00' 142,346 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 13,241 0 0 787.00 15,150 14,196 14,196 788.00 17,130 16,140 30,336 789.00 19,170 18,150 48,486 790.00 21,270 20,220 68,706 791.00 23,420 22,345 91,051 792.00 25,635 24,528 115,578 793.00 27,900 26,768 142,346 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.414 0.580 0.746 0.912 1.077 1.243 #3 Device 1 789.50' 45.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 790.50' 45.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b sin 02344 ©2023 HydroCAD Software Solutions LLC Page 24 Primary OutFlow Max=0.55 cfs @ 14.61 hrs HW=787.82' (Free Discharge) 4-1=Culvert (Passes 0.55 cfs of 71.44 cfs potential flow) 2=Special & User-Defined (Custom Controls 0.55 cfs) 44 3=Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=786.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 10P: SCM 2 Hydrograph 23 121.42 cfs 22- —Inflow i —Outflow 21; � �` —Primary 20 I _- - - -Secondary pW'�Area '�8 ��© a� _ 19= 184 F Peak Efev,787.82' 174 16 Sto 1rage A �'} �8V+ = =2 cf 15= 7L 14= - 13- 3 124 , o 115 u 105 9- 8' 7- 65 5= 4- 3- 0 00 cfs 1 00..55�cfs II 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 25 Summary for Pond 12P: SCM 1 Inflow Area = 20.770 ac, 0.00% Impervious, Inflow Depth = 0.56" for 1" WQ EVENT event Inflow = 21.48 cfs @ 11.96 hrs, Volume= 0.975 af Outflow = 0.67 cfs @ 13.96 hrs, Volume= 0.975 af, Atten= 97%, Lag= 120.0 min Primary = 0.67 cfs @ 13.96 hrs, Volume= 0.975 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 785.82' @ 13.96 hrs Surf.Area= 32,094 sf Storage= 25,658 cf Plug-Flow detention time= 627.8 min calculated for 0.975 af(100% of inflow) Center-of-Mass det. time= 627.7 min ( 1,447.7- 820.0 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.820 1.148 1.476 1.804 2.133 2.461 #3 Device 1 787.00' 4.0"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.50' 60.0"W x 18.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.67 cfs @ 13.96 hrs HW=785.82' (Free Discharge) L=Culvert (Passes 0.67 cfs of 57.43 cfs potential flow) -2=Special &User-Defined (Custom Controls 0.67 cfs) -3=Orifice/Grate ( Controls 0.00 cfs) -4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 26 Pond 12P: SCM 1 Hydrograph 24- - 23: -1 21.48 cfs ' ' Inflow 224 p F i -Primary 21= 204 inflow Area=2O.770 ae 19= 18= Peak ;Elev=785.82' 174 164 154 Storage=2L5;6518 Of 14- - 13- 3 12 2 11- LL 10- 9- 8' 7= 6=_ 5 4 3 2 10.67 cfs l I I I I I I I 1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 27 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 5.14% Impervious, Inflow Depth = 0.47" for 1" WQ EVENT event Inflow = 31.60 cfs @ 11.96 hrs, Volume= 1.426 af Outflow = 0.83 cfs @ 15.02 hrs, Volume= 1.426 af, Atten= 97%, Lag= 183.7 min Primary = 0.83 cfs @ 15.02 hrs, Volume= 1.426 of Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 782.32' @ 15.02 hrs Surf.Area= 118,370 sf Storage= 37,936 cf Plug-Flow detention time= 757.9 min calculated for 1.426 af(100% of inflow) Center-of-Mass det. time= 757.8 min ( 1,589.9- 832.1 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 2.583 3.874 5.166 6.457 7.749 #3 Device 1 784.00' 30.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 785.50' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.83 cfs @ 15.02 hrs HW=782.32' (Free Discharge) L=Culvert (Passes 0.83 cfs of 36.27 cfs potential flow) -2=Special &User-Defined (Custom Controls 0.83 cfs) -3=Orifice/Grate ( Controls 0.00 cfs) -4=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) L5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 28 Pond 24P: SCM 3 Hydrograph 34- 31.60 cfs I —Inflow 32- F —Outflow /� _ —Primary 30_ Inflow Area=36.560 ac -Secondary 28= 26= Peak Elev=782.32' 24- Storage=37,936 cf 22= 20 u 18- 2 16= 14 12- 10= 8- 6- t 1 0.83 cfs 0.00cfsIJ r r 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 29 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 0.04" for 1" WQ EVENT event Inflow = 0.01 cfs @ 12.36 hrs, Volume= 0.005 af Primary = 0.01 cfs @ 12.36 hrs, Volume= 0.005 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 0.011= 0.01 = 0.01 cfs —Inflow 0.01 —Primary 0.009= Fi i F�� 'Area=1■49O ac 0.008; 0.008 0.007 0.007 0.006: 0.006= 3 0.005: ° 0.005- 0.004= 0.004= 0.003; 0.003; 0.002; 0.002; 0.001= 0.001= 0.0001 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 30 Summary for Link 4L: POA 2 Inflow Area = 89.850 ac, 0.00% Impervious, Inflow Depth = 0.28" for 1" WQ EVENT event Inflow = 2.55 cfs @ 12.07 hrs, Volume= 2.127 of Primary = 2.55 cfs @ 12.07 hrs, Volume= 2.127 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 2.55 cfs —Inflow i —Primary Inflow Area=89 850 ac 2— N _ - 0 LL 1— 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1" WQ EVENT Rainfall=1.00" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 31 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 0.16" for 1" WQ EVENT event Inflow = 3.14 cfs @ 12.85 hrs, Volume= 2.187 of Primary = 3.14 cfs @ 12.85 hrs, Volume= 2.187 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph I 3.14 cfs I -Inflow -Primary 3- Inflow Area=167.950 ac 2- o _ LL 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 32 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE Runoff Area=1.880 ac 100.00% Impervious Runoff Depth=2.50" Tc=5.0 min CN=98 Runoff=7.46 cfs 0.392 af Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=0.84" Tc=5.0 min CN=76 Runoff=2.30 cfs 0.104 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=18.790 ac 0.00% Impervious Runoff Depth=2.29" Tc=5.0 min CN=96 Runoff=71.68 cfs 3.581 of Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=1.43" Tc=12.0 min CN=86 Runoff=12.07 cfs 0.700 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=2.19" Tc=5.0 min CN=95 Runoff=77.21 cfs 3.784 af Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=4.260 ac 0.00% Impervious Runoff Depth=0.94" Tc=13.3 min CN=78 Runoff=5.36 cfs 0.334 af Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=0.94" Tc=17.6 min CN=78 Runoff=4.76 cfs 0.344 af Subcatchment 22S: POST-DEV DA-2 OFFSITE ARunoff Area=35.000 ac 0.00% Impervious Runoff Depth=0.61" Tc=28.9 min CN=71 Runoff=15.69 cfs 1.780 of Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=0.94" Tc=5.0 min CN=78 Runoff=1.36 cfs 0.061 af Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=2.00" Tc=5.0 min CN=93 Runoff=121.32 cfs 5.771 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=0.94" Tc=15.0 min CN=78 Runoff=6.92 cfs 0.458 af Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=1.23" Tc=57.3 min CN=83 Runoff=28.19 cfs 4.350 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=0.84" Tc=43.2 min CN=76 Runoff=42.93 cfs 5.808 of Reach 13R: NORTH STREAM DEPRESSION Inflow=40.10 cfs 9.540 af Out low=40.10 cfs 9.540 af Reach 14R: NORTH STREAM TO POA 2 Inflow=44.83 cfs 9.884 af Out low=44.83 cfs 9.884 af Reach 28R: SOUTH STREAM Inflow=73.06 cfs 16.778 af Out low=73.06 cfs 16.778 af POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 33 Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=0.94' Max Vet=11.75 fps Inflow=28.19 cfs 4.350 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=28.17 cfs 4.350 af Pond 10P: SCM 2 Peak EIev=790.49' Storage=79,340 cf Inflow=71.68 cfs 3.581 af Primary=24.63 cfs 3.581 af Secondary=0.00 cfs 0.000 af Outflow=24.63 cfs 3.581 af Pond 12P: SCM 1 Peak EIev=788.22' Storage=109,114 cf Inflow=77.21 cfs 3.784 af Outflow=1.98 cfs 3.784 af Pond 24P: SCM 3 Peak EIev=783.48' Storage=177,312 cf Inflow=128.78 cfs 6.162 af Primary=3.20 cfs 6.162 af Secondary=0.00 cfs 0.000 af Outflow=3.20 cfs 6.162 af Link 2L: POA 1 Inflow=2.30 cfs 0.104 af Primary=2.30 cfs 0.104 af Link 4L: POA 2 Inflow=55.80 cfs 10.584 af Primary=55.80 cfs 10.584 af Link 9L: POA 3 Inflow=73.06 cfs 16.778 af Primary=73.06 cfs 16.778 af Total Runoff Area= 259.290 ac Runoff Volume=27.466 af Average Runoff Depth = 1.27" 99.27%Pervious=257.410 ac 0.73%Impervious= 1.880 ac POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 7.46 cfs @ 11.96 hrs, Volume= 0.392 af, Depth= 2.50" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 1.880 98 1.880 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 8- 7.46 cfs i —Runoff 7: Type II 24-hr 1-Year Rainfall=2.73" Runoff Area=1 .880 ac 5= Runoff Volume=0.392 af _ 4-_ Runoff- Depth=2.50" LL - Tc=5.O min 3- CN=98 2- - 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 2.30 cfs @ 11.97 hrs, Volume= 0.104 af, Depth= 0.84" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph - i 2.30 cfs i —Runoff i Type II 24-hr 2- 1-Year Rainfall=2.73" Runoff Area=1 .490 ac Runoff Volume=0.104 of Runoff Depth=0.84" 1 Tc=5.Q min CM=76 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 71.68 cfs @ 11.96 hrs, Volume= 3.581 af, Depth= 2.29" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 18.790 96 18.790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 80 75= 171.68 cfs l -Runoff 70 65 Type 1124-b r 60 1 Year Rainfa11=2.73" ::i!E RunoffArea='18.700 I 45- Runoff VoIurne=3.5$1 Of o - 3 40- Runoff Depth=2.29" LL 35 30- Tc=5.Q_mn 25= C N=96 20 15 10 0 , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff = 12.07 cfs @ 12.04 hrs, Volume= 0.700 af, Depth= 1.43" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE B Hydrograph 13- , i 12.07 cfs I —Runoff 12- -J T_ype_ll24-1tr 10= 1-Year Ra'nfail - - -- " Runoff Area=$.860 ac $- Runoff Volume=0.7O0 of N ' 7- 3 = Runoff Depth=I.43" Li 57 Tci=12.Ow--m-inn 47 C1>N' 86 3- 2- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 77.21 cfs @ 11.96 hrs, Volume= 3.784 af, Depth= 2.19" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 857 80=---I 77.21 cfs l —Runoff 75= 70= Type 11--*4-hr 1 Year Rainfaf1=2.7-3" 60 55 noff Area Runoff _2 0,770 ac N 50= Runoff Volume0.784 Of • 45= • 40= RuffD_no e-pth=2A 0" 357 1 c= .Q m jn 30= ^ww'' 25L . CN_9 5 20 15 10 5 , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 5.36 cfs @ 12.06 hrs, Volume= 0.334 af, Depth= 0.94" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 4.260 78 4.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 6 5.36 cfs i —Runoff 5- Type II 24-hr 1 -Year Rainfall=2.73" 4- Runoff Area=4.260 ac w = Runoff Volume=0.334 of 3 Runoff Depth=0.94`F u_ Tc=13.3 min 2- CN=18 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 4.76 cfs @ 12.11 hrs, Volume= 0.344 af, Depth= 0.94" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 14.76 cfs —Runoff = Type II 24-h r 4- 1 -Year Rainfall=2.73" Runoff Area=4.390 ac w 3 Runoff-Volume=0.344 of _ Runoff Depth=0.94" u_ 2= Tc=1-7-.6 min CM=78 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE A Runoff = 15.69 cfs @ 12.27 hrs, Volume= 1.780 af, Depth= 0.61" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 35.000 71 35.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE A Hydrograph 17 i 1569 cfs i —Runoff 16 r 15= Type II 24-11 r 14= 13= 1-Year- Ra lnfa II=2.73" 12 Runoff Area=35.00 0 ac w 107 Runoff Volurne=1.780 Of LL $- Runoff Depth=0.61" T--c=28.9 m in 6- A' 5- CA =71 4 3 2 1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 1.36 cfs @ 11.97 hrs, Volume= 0.061 af, Depth= 0.94" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph _ i 1.36 cfs i —Runoff i Type II 24-h r 1 -Year Rainfall=2.73" 1- Runoff Area=0.780 ac Runoff Volume=0.061 of Runoff Depth=0.94" Tc=5.0 min CM=78 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 121.32 cfs @ 11.96 hrs, Volume= 5.771 af, Depth= 2.00" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 130 121.32 cfs I —Runoff 120 110 Type 1l__24-hr 100 1-Year RairifalI=2.73" 90 =34.6 Runoff Area 0 ac 80 Runoff Volume=5.771 of 3 70 LL 60 Runoff Depth=2.00" 50 Tc=5.0 m i n 40 C =93 30 20 - 10 h� h 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 6.92 cfs @ 12.08 hrs, Volume= 0.458 af, Depth= 0.94" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph - 16.92 cfs i —Runoff 7- 1 Type II 24-hr 1-Year Rainfall=2.73" 5- Runoff Are- a=5.840 ac = Runoff Volume=0.458 of 4- _ Runoff Dep th=0.94" o - LL - 3 Tc=15.O min CM=78 2- 1- 0- T 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 28.19 cfs © 12.61 hrs, Volume= 4.350 af, Depth= 1.23" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 30= 128.19 cfs C —Runoff 28- 26= Type II 24-hr 24 1-Year Rainfall=2.73" 22 = Runoff Area4 20= 2.350 Oc w 187 Runoff-V-oEurne=4.3 50 Of 16 I - Runoff Depth=1.23" 14= 12- Tc=a-7.3 4xn-iq 10= Ci =83 8 6 - 4 2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 42.93 cfs @ 12.43 hrs, Volume= 5.808 af, Depth= 0.84" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 48 46 Runoff 44- i 42.93 cfs 42 401 Type II 24-fir 381 361 1-Year Ra'rnfa41=2.73" 34. 321 Runoff Area=83.200 ac 30= Runoff-Votume=5.808 -af 28= 26- LL 22= Runoff Depth=O.84" L04 181 Tc=43.2-rm inn 16- 14' CAI=76 , 12= 10= 8= 6 4 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 47 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 79.600 ac, 0.00% Impervious, Inflow Depth = 1.44" for 1-Year event Inflow = 40.10 cfs @ 12.09 hrs, Volume= 9.540 af Outflow = 40.10 cfs @ 12.09 hrs, Volume= 9.540 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 445 424 I 40.10 cfs l —Inflow 40 Outflow 38- Inflow Area=79.600 sic 364 34= 324 30- 284 26= t) 244 - 3 22- LL 20- - 18= 164 14- 12 10 8 4 2 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 48 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 83.990 ac, 0.00% Impervious, Inflow Depth = 1.41" for 1-Year event Inflow = 44.83 cfs @ 12.10 hrs, Volume= 9.884 af Outflow = 44.83 cfs @ 12.10 hrs, Volume= 9.884 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 50- 463 i 44.83 cfs I , Inflow 44= I �—Outflow 42= InflowArea=83'.990 ac 40= 38- 36 i r 3LH 32= _ 30 w = 28- 26= 0 24- LI 22- 20 , 18= 16= 14= 12= 10= 8- 4= 2=_ 0 Sri-h*� 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 49 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 1.20" for 1-Year event Inflow = 73.06 cfs @ 12.50 hrs, Volume= 16.778 af Outflow = 73.06 cfs @ 12.50 hrs, Volume= 16.778 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 80 75 -1 73.06 cfs Inflow —Outflow 70 Inflow Area=I67.95-0 ac 65= 60= 55. 50_ 45. 3 40= 0 a 357 30- 25- 20= 15 10 5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 50 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 1.23" for 1-Year event Inflow = 28.19 cfs @ 12.61 hrs, Volume= 4.350 af Outflow = 28.17 cfs @ 12.63 hrs, Volume= 4.350 af, Atten= 0%, Lag= 1.3 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Max. Velocity= 11.75 fps, Min. Travel Time= 0.8 min Avg. Velocity = 4.86 fps, Avg. Travel Time= 2.0 min Peak Storage= 1,403 cf @ 12.61 hrs Average Depth at Peak Storage= 0.94' , Surface Width= 3.65' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' Reach 30R: DA-3 BYPASS PIPE Hydrograph 307 -i 28.17 cfs C —Inflow 287 Outflow 267 Inflow Area=42.350 ac 247 Avg. Flow Depth=0.a4' 227 Max Vel=11.75 fps 20- 18- 54'0" 3 167 Round-Pipe LL 14= 'n=0.011 127 10 L=5850 87 S=0.0163 11' 67 Capacity=296.47 cfs 27 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 51 Summary for Pond 10P: SCM 2 Inflow Area = 18.790 ac, 0.00°/o Impervious, Inflow Depth = 2.29" for 1-Year event Inflow = 71.68 cfs @ 11.96 hrs, Volume= 3.581 af Outflow = 24.63 cfs @ 12.06 hrs, Volume= 3.581 af, Atten= 66%, Lag= 6.4 min Primary = 24.63 cfs @ 12.06 hrs, Volume= 3.581 af Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 790.49' @ 12.06 hrs Surf.Area= 22,319 sf Storage= 79,340 cf Plug-Flow detention time= 591.1 min calculated for 3.580 of(100% of inflow) Center-of-Mass det. time= 591.4 min ( 1,365.7- 774.4 ) Volume Invert Avail.Storage Storage Description #1 786.00' 142,346 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 13,241 0 0 787.00 15,150 14,196 14,196 788.00 17,130 16,140 30,336 789.00 19,170 18,150 48,486 790.00 21,270 20,220 68,706 791.00 23,420 22,345 91,051 792.00 25,635 24,528 115,578 793.00 27,900 26,768 142,346 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.414 0.580 0.746 0.912 1.077 1.243 #3 Device 1 789.50' 45.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 790.50' 45.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b sin 02344 ©2023 HydroCAD Software Solutions LLC Page 52 Primary OutFlow Max=24.60 cfs @ 12.06 hrs HW=790.49' (Free Discharge) 4-1=Culvert (Passes 24.60 cfs of 99.66 cfs potential flow) 2=Special & User-Defined (Custom Controls 0.99 cfs) 44 3=Orifice/Grate (Orifice Controls 23.61 cfs @ 3.19 fps) =Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=786.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 10P: SCM 2 Hydrograph 80- 75 171.68 cfs [ —Inflow I —Outflow 70 —Primary 65= Inflow.Ar-ea=1 8,790 ac —Secondary 60= Peak E-lev=790.49' ::i!E Sto rage=79,340 cf w 45= u - 3 40- o - - u 35 30- 24.63 cfs 25= 20= 15- 10- 10.00 cfs I 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 53 Summary for Pond 12P: SCM 1 Inflow Area = 20.770 ac, 0.00°/o Impervious, Inflow Depth = 2.19" for 1-Year event Inflow = 77.21 cfs @ 11.96 hrs, Volume= 3.784 af Outflow = 1.98 cfs @ 14.22 hrs, Volume= 3.784 af, Atten= 97%, Lag= 135.5 min Primary = 1.98 cfs @ 14.22 hrs, Volume= 3.784 of Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 788.22' @ 14.22 hrs Surf.Area= 37,542 sf Storage= 109,114 cf Plug-Flow detention time= 823.7 min calculated for 3.784 af(100% of inflow) Center-of-Mass det. time= 824.0 min ( 1,605.8- 781.8 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.820 1.148 1.476 1.804 2.133 2.461 #3 Device 1 787.00' 4.0"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.50' 60.0"W x 18.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=1.98 cfs @ 14.22 hrs HW=788.22' (Free Discharge) t-1=Culvert (Passes 1.98 cfs of 87.41 cfs potential flow) - 2- =Special &User-Defined (Custom Controls 1.55 cfs) -3=Orifice/Grate (Orifice Controls 0.43 cfs @ 4.95 fps) -4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 54 Pond 12P: SCM 1 Hydrograph 85- 80= 177 21 cfs I Inflow i —Primary 75= 70 I of low_Area=2O.770_ac 65= Peak Elev=788.22' 60= 55= Storage=109,114 cf 507 - 45- 0 40= LL 35= 30= 25- 20= 15= 10= 11.98 cfs I 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 55 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 5.14% Impervious, Inflow Depth = 2.02" for 1-Year event Inflow = 128.78 cfs @ 11.96 hrs, Volume= 6.162 of Outflow = 3.20 cfs @ 14.51 hrs, Volume= 6.162 af, Atten= 98%, Lag= 153.0 min Primary = 3.20 cfs @ 14.51 hrs, Volume= 6.162 af Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 783.48' @ 14.51 hrs Surf.Area= 123,358 sf Storage= 177,312 cf Plug-Flow detention time= 822.7 min calculated for 6.162 af(100% of inflow) Center-of-Mass det. time= 823.1 min ( 1,614.8- 791.7 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 2.583 3.874 5.166 6.457 7.749 #3 Device 1 784.00' 30.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 785.50' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=3.20 cfs @ 14.51 hrs HW=783.48' (Free Discharge) L=Culvert (Passes 3.20 cfs of 43.10 cfs potential flow) -2=Special &User-Defined (Custom Controls 3.20 cfs) -3=Orifice/Grate ( Controls 0.00 cfs) -4=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) L5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 56 Pond 24P: SCM 3 Hydrograph 140- = 1128 78 cfs I —Inflow 130' C�+/� —Outflow —Primary 120= Inflow Area=36.560 aC -Secondary 110_ Peak Eiev=78-3.48' 100- Storage=177,312 cf w 80- V 3 70- o - LL 60_ 50- 40- 30: 20_ lfl i 0.00 cfs I i 3.20 cfs r 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 57 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 0.84" for 1-Year event Inflow = 2.30 cfs @ 11.97 hrs, Volume= 0.104 of Primary = 2.30 cfs @ 11.97 hrs, Volume= 0.104 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph - 12.30 cfs —Inflow i —Primary Inflow Area=1 .490 ac 2- - 3 0 - 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 58 Summary for Link 4L: POA 2 Inflow Area = 89.850 ac, 0.00% Impervious, Inflow Depth = 1.41" for 1-Year event Inflow = 55.80 cfs @ 12.07 hrs, Volume= 10.584 af Primary = 55.80 cfs @ 12.07 hrs, Volume= 10.584 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 60- —Inflow = � 55.80 cfs � 1 i —Primary 55- 50- Inflow Area=89.850 ac 45- 40 -0 35_ u c 30- LL 25- 20- 15 10 5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 59 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 1.20" for 1-Year event Inflow = 73.06 cfs @ 12.50 hrs, Volume= 16.778 af Primary = 73.06 cfs @ 12.50 hrs, Volume= 16.778 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 80= 75_ 1 73.06 cfs I —Inflow i —Primary Inflow Area=167.950 ac 65= 60 55= 50 45- 40= 0 LL 35= 30- 25 20= 15 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 60 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE Runoff Area=1.880 ac 100.00% Impervious Runoff Depth=3.07" Tc=5.0 min CN=98 Runoff=9.06 cfs 0.481 af Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=1.22" Tc=5.0 min CN=76 Runoff=3.39 cfs 0.152 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=18.790 ac 0.00% Impervious Runoff Depth=2.85" Tc=5.0 min CN=96 Runoff=87.97 cfs 4.459 of Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=1.92" Tc=12.0 min CN=86 Runoff=16.11 cfs 0.939 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=2.74" Tc=5.0 min CN=95 Runoff=95.37 cfs 4.747 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=4.260 ac 0.00% Impervious Runoff Depth=1.35" Tc=13.3 min CN=78 Runoff=7.81 cfs 0.478 af Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=1.35" Tc=17.6 min CN=78 Runoff=6.96 cfs 0.493 af Subcatchment 22S: POST-DEV DA-2 OFFSITE ARunoff Area=35.000 ac 0.00% Impervious Runoff Depth=0.94" Tc=28.9 min CN=71 Runoff=26.28 cfs 2.738 of Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=1.35" Tc=5.0 min CN=78 Runoff=1.96 cfs 0.088 of Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=2.54" Tc=5.0 min CN=93 Runoff=152.02 cfs 7.346 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=1.35" Tc=15.0 min CN=78 Runoff=10.10 cfs 0.656 of Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=1.69" Tc=57.3 min CN=83 Runoff=39.24 cfs 5.970 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=1.22" Tc=43.2 min CN=76 Runoff=65.53 cfs 8.473 af Reach 13R: NORTH STREAM DEPRESSION Inflow=65.93 cfs 12.511 af Outflow=65.93 cfs 12.511 af Reach 14R: NORTH STREAM TO POA 2 Inflow=72.73 cfs 13.003 af Outflow=72.73 cfs 13.003 af Reach 28R: SOUTH STREAM Inflow=106.57 cfs 22.926 af Oufflow=106.57 cfs 22.926 af POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 61 Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=1.11' Max Vet=12.93 fps Inflow=39.24 cfs 5.970 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=39.23 cfs 5.970 af Pond 10P: SCM 2 Peak EIev=791.02' Storage=91,474 cf Inflow=87.97 cfs 4.459 af Primary=41.58 cfs 4.459 af Secondary=0.00 cfs 0.000 af Outflow=41.58 cfs 4.459 af Pond 12P: SCM 1 Peak EIev=788.98' Storage=138,200 cf Inflow=95.37 cfs 4.747 af Outflow=2.36 cfs 4.747 af Pond 24P: SCM 3 Peak EIev=783.89' Storage=229,430 cf Inflow=161.07 cfs 7.827 af Primary=3.74 cfs 7.827 af Secondary=0.00 cfs 0.000 af Outflow=3.74 cfs 7.827 af Link 2L: POA 1 Inflow=3.39 cfs 0.152 af Primary=3.39 cfs 0.152 af Link 4L: POA 2 Inflow=87.92 cfs 13.942 af Primary=87.92 cfs 13.942 af Link 9L: POA 3 Inflow=106.57 cfs 22.926 af Primary=106.57 cfs 22.926 af Total Runoff Area= 259.290 ac Runoff Volume=37.020 af Average Runoff Depth = 1.71" 99.27%Pervious=257.410 ac 0.73%Impervious= 1.880 ac POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 9.06 cfs @ 11.96 hrs, Volume= 0.481 af, Depth= 3.07" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 1.880 98 1.880 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 10- 19.06 cfs i —Runoff $_ Type II 24-hr 2-Year Rainfall=3.30" Runoff Area=i .880 ac 6- Runoff Vorume=0.4 1 af _ - Runoff Depth-=3.07" Tc=5.Q nin 3- C N=98 2- 0- , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 63 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 3.39 cfs @ 11.97 hrs, Volume= 0.152 af, Depth= 1.22" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 13.39 cfs i —Runoff Type II 24-hr 3- 2-Year Rainfall=3.30" Runoff Area=1 .490 ac Runoff Volume=0.152 af 2 Runoff Depth='1.22" u_ Tc=5.0 min CM=76 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 87.97 cfs @ 11.96 hrs, Volume= 4.459 af, Depth= 2.85" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 18.790 96 18.790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 95- I 87.97 cfs -Runoff 85 , 80- T_ype_11 *4-h r 70 75- 2- Year Rainfarl=3.3-O" 65 Runoff Area=18.790--ac - `, 60= Runo o�+ 55= ff lame=4,459 Of o Li 45 Runoff Depth=2.85" 40= Tc=5.0 min 35= - , , , ,30= - , , , w'C =96 25 201 , , , 15 10L , , 5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff = 16.11 cfs @ 12.04 hrs, Volume= 0.939 af, Depth= 1.92" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE B Hydrograph 18- 17- 116.11 cfs I —Runoff 16- -J 15= Type--II----4-h'1r 13 2-Year Rainfall= .30" 12_ Runoff Area=5.860 ac 11_ w 107 Runoff VoIurne='O.939 if o - Runoff Depth=1.92" ii 8- 7- Tc=1 -- 2.0 cn�n 5- C =86 4 3 2 1 0 10^ 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 66 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 95.37 cfs @ 11.96 hrs, Volume= 4.747 af, Depth= 2.74" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 105- 100=--_I 95.37 cfs l t 11 —Runoff 95= 90= I Type' II 24-hr. 85= /� 80 2 i ear Rai iif al I= .30" 75= Runoff Area 70= =20.770 2tC 65= Runoff w 60; VOlUI'YYe=4.747 if 55= _0 50= Runoff Depth=2.74" u. 45= r /� 40= #--c-5.O minn 35= CN=95 30= 25= 20= 15_ 10 5L-n. : 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 67 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 7.81 cfs @ 12.06 hrs, Volume= 0.478 af, Depth= 1.35" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 4.260 78 4.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph - i 7.81 cfs l —Runoff 8- Type II 24-hr 2-Year Rainfall=3.30" Runoff Area=4.260 ac F 5: Runoff Volume=O.478 of p LL 4 Runoff ff_De th-- 1.3_ Tc=13.3 min 3_ �+w' Q `i w =78 2- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 68 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 6.96 cfs @ 12.11 hrs, Volume= 0.493 af, Depth= 1.35" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph _ 16.96 cfs i —Runoff 7- Type II 24-hr 6= 2-Year RalnfaII=3.3O" 5- Runoff_1 r_ea=4._390__ac w = Runoff Volume=0.493 of 4 Runoff Depth=t35" LL - 3- Tc=17.6 min CN=78 2- 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 69 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE A Runoff = 26.28 cfs @ 12.26 hrs, Volume= 2.738 af, Depth= 0.94" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 35.000 71 35.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE A Hydrograph 287 r26.28 cfs Runoff 26- 247 Type---ll--24-hr 22- 2-Year---Rainfall=3.3-0" 20-- Ai Runoff rea=3$.000 ac 18- 16- Runoff Volume=2.738 af c 14- ,Runo�--Depth=O.94" 127 Tc=28 9 rn jn 10- j CN=11 6- - - , , , 4- , , 2- , , 0 . . „ 0 , r, , , r, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , � , , , , , , , , , 0 10^ 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 70 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 1.96 cfs @ 11.96 hrs, Volume= 0.088 af, Depth= 1.35" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph i 1.96 cfs —Runoff 2- i Type II 24-h r 2-Year Rainfall=3.30" Runoff Area=0.780 ac Runoff Volume=0.088 af 1 _ Runoff Depth=1.35" Tc=5.0 min CM=78 0 ^10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 71 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 152.02 cfs @ 11.96 hrs, Volume= 7.346 af, Depth= 2.54" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 170- 160_ -I 152.02 cfs f —Runoff 150_ h A 1407 Type II -11r 1307 2-Year Rai'nfalr=3.30-" 120- 110= Runoff--Area=34.680--ac 100 ---- Runoff Volume=7.346 Of = 907 80= Runoff Depth=2-.54" 0 6 _ Tc 5.V mmn 0 w' ' 50= C'` =93 40- 30 20 - 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 72 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 10.10 cfs @ 12.08 hrs, Volume= 0.656 af, Depth= 1.35" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 11- 110.10 cfs i —Runoff 10- f Type II *4-hr 9- 2-Year Rainfall=$.30" 8- 7- - Runoff Area=5.840 ac Runoff Volume=0.656 of 6- 3 = Runoff Depth=1.35" Tic=15.0 min 4- - CN=18 3- - 2- 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 73 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 39.24 cfs @ 12.60 hrs, Volume= 5.970 af, Depth= 1.69" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 42 139 24 cfs 40= —Runoff 38 36= Type II *4-hr �/ �j j� 341 2,-Year---Rainfa I1=.;�.30" 32= 301 Runoff Area=42.35Q--a_c 281 26 Runoff=Vo_ 24- CulYI1�=;,�, J0 f LL 20- Runoff Depth=1.69" 16- > I 181 Tic=57.3 m i n 14; C14=83 12- 10= 8 g 4 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 65.53 cfs @ 12.43 hrs, Volume= 8.473 af, Depth= 1.22" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 70- -I 65.53 cfs —Runoff 65- 60- Type II 24-f r 55- 2-Year -Rarnfall=3.3-0" 50- Runoff Aj rea=g�.200 ac 45- • 40- Runoff Runoff Volume=8.473 'f o 35- pep h= .2 n • 307 Tc=43.* IT jn 25- C N=16 20- 15 10 - 5 , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 75 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 79.600 ac, 0.00% Impervious, Inflow Depth = 1.89" for 2-Year event Inflow = 65.93 cfs @ 12.08 hrs, Volume= 12.511 af Outflow = 65.93 cfs @ 12.08 hrs, Volume= 12.511 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 70 165.93 cfs Inflow i —Outflow 65 60 Inflow_Area=79.600_ac 55 50 45 u 40 c 35 LL 30 25 20 15 10 5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 76 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 83.990 ac, 0.00% Impervious, Inflow Depth = 1.86" for 2-Year event Inflow = 72.73 cfs @ 12.08 hrs, Volume= 13.003 af Outflow = 72.73 cfs @ 12.08 hrs, Volume= 13.003 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 80 72.73 cfs l Inflow 75- —Outflow Inflow Area=83:9-9O ac 651 601 55= 50= 45. 3 407 o a 35= 30- - 25- 20 15 10 - 5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 77 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 1.64" for 2-Year event Inflow = 106.57 cfs @ 12.48 hrs, Volume= 22.926 af Outflow = 106.57 cfs @ 12.48 hrs, Volume= 22.926 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 115= 110= l 106.57 cfs I _Inflow Outflow 105_ 100= Inflow Area=167.950 ac 95-s 90- 85- ; 80= 75: T r 70 4) 65 80_ , 0 55= 50: 45- 40' 35= _ , 30= 25= 20- 15= 10' 5- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 78 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 1.69" for 2-Year event Inflow = 39.24 cfs @ 12.60 hrs, Volume= 5.970 af Outflow = 39.23 cfs @ 12.62 hrs, Volume= 5.970 af, Atten= 0%, Lag= 1.1 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Max. Velocity= 12.93 fps, Min. Travel Time= 0.8 min Avg. Velocity = 5.20 fps, Avg. Travel Time= 1.9 min Peak Storage= 1,775 cf @ 12.61 hrs Average Depth at Peak Storage= 1.11' , Surface Width= 3.87' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' 0 Reach 30R: DA-3 BYPASS PIPE Hydrograph 42= _i 39 23 cfs —Inflow 40= 1 l —Outflow 38; J 361 irtflow_Area=42.350-ac 34 Avg. Flow Depth=1.11' 321 l 301 t Max V OI 12.93 f s 281 26 54.0" 74 24- 22- Round PiPe Li = n=0 All 18- 161 L=585.01 14= 11 S=0.0163 ``P 10= I 8- Capacity,296.47 efs 6 . . 2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 79 Summary for Pond 10P: SCM 2 Inflow Area = 18.790 ac, 0.00°/o Impervious, Inflow Depth = 2.85" for 2-Year event Inflow = 87.97 cfs @ 11.96 hrs, Volume= 4.459 af Outflow = 41.58 cfs @ 12.04 hrs, Volume= 4.459 af, Atten= 53%, Lag= 5.3 min Primary = 41.58 cfs @ 12.04 hrs, Volume= 4.459 of Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 791.02' @ 12.04 hrs Surf.Area= 23,460 sf Storage= 91,474 cf Plug-Flow detention time= 499.2 min calculated for 4.459 af(100% of inflow) Center-of-Mass det. time= 499.5 min ( 1,268.2 - 768.7 ) Volume Invert Avail.Storage Storage Description #1 786.00' 142,346 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 13,241 0 0 787.00 15,150 14,196 14,196 788.00 17,130 16,140 30,336 789.00 19,170 18,150 48,486 790.00 21,270 20,220 68,706 791.00 23,420 22,345 91,051 792.00 25,635 24,528 115,578 793.00 27,900 26,768 142,346 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.414 0.580 0.746 0.912 1.077 1.243 #3 Device 1 789.50' 45.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 790.50' 45.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b sin 02344 ©2023 HydroCAD Software Solutions LLC Page 80 Primary OutFlow Max=41.55 cfs © 12.04 hrs HW=791.02' (Free Discharge) 4-1=Culvert (Passes 41.55 cfs of 104.36 cfs potential flow) 2=Special & User-Defined (Custom Controls 1.08 cfs) 44 3=Orifice/Grate (Orifice Controls 36.03 cfs @ 4.80 fps) =Orifice/Grate (Orifice Controls 4.45 cfs @ 2.37 fps) 5=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=786.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 10P: SCM 2 Hydrograph 95. —Inflow I 87.97 cfs 90= i —Outflow 85_ ���■ ', (� —Primary 80= ow Area=i8,.-79 c 0- —Secondary 75= Peak--Slev=79-1-.07` 70' 65= 60= Storage=91,474 of w 55- o 50- 0 45- -I 41.58 cfs 1 LL 40= 35= 301 25= 20- 15= 10= I 0.00Lcfs I- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 81 Summary for Pond 12P: SCM 1 Inflow Area = 20.770 ac, 0.00°/o Impervious, Inflow Depth = 2.74" for 2-Year event Inflow = 95.37 cfs @ 11.96 hrs, Volume= 4.747 af Outflow = 2.36 cfs @ 14.34 hrs, Volume= 4.747 af, Atten= 98%, Lag= 143.0 min Primary = 2.36 cfs @ 14.34 hrs, Volume= 4.747 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 788.98' @ 14.34 hrs Surf.Area= 39,327 sf Storage= 138,200 cf Plug-Flow detention time= 858.9 min calculated for 4.747 af(100% of inflow) Center-of-Mass det. time= 858.9 min ( 1,634.6- 775.7 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.820 1.148 1.476 1.804 2.133 2.461 #3 Device 1 787.00' 4.0"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.50' 60.0"W x 18.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=2.36 cfs @ 14.34 hrs HW=788.98' (Free Discharge) t-1=Culvert (Passes 2.36 cfs of 94.92 cfs potential flow) - 2- =Special &User-Defined (Custom Controls 1.80 cfs) -3=Orifice/Grate (Orifice Controls 0.57 cfs @ 6.48 fps) -4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 82 Pond 12P: SCM 1 Hydrograph 105: i h , h h h , 100; 195.37 cfs I I Inflow 95_ i —Primary 90: Inflow Area=20.770 ac 85= 80= Peak E fev=';788.98' 75- 70: I 1 Storage=138,200 cf 65: i 60: 55: 0 50: LL 45- 40- 35= 30= 25 4 4 4 4 + 20 15 r 1 r 10 2.36 cfs 5 0 fi_ 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 83 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 5.14% Impervious, Inflow Depth = 2.57" for 2-Year event Inflow = 161.07 cfs @ 11.96 hrs, Volume= 7.827 of Outflow = 3.74 cfs @ 14.76 hrs, Volume= 7.827 af, Atten= 98%, Lag= 167.9 min Primary = 3.74 cfs @ 14.76 hrs, Volume= 7.827 af Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 783.89' @ 14.76 hrs Surf.Area= 125,186 sf Storage= 229,430 cf Plug-Flow detention time= 880.1 min calculated for 7.826 af(100% of inflow) Center-of-Mass det. time= 880.5 min ( 1,665.7- 785.2 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 2.583 3.874 5.166 6.457 7.749 #3 Device 1 784.00' 30.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 785.50' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=3.74 cfs @ 14.76 hrs HW=783.89' (Free Discharge) L=Culvert (Passes 3.74 cfs of 45.32 cfs potential flow) -2=Special &User-Defined (Custom Controls 3.74 cfs) -3=Orifice/Grate ( Controls 0.00 cfs) -4=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) L5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 84 Pond 24P: SCM 3 Hydrograph 180- 170_-1 161 07 cfs —Inflow 160- t —Outflow C�+/� —Primary 150_ Inflow Area=36.560 ac —Secondary 140_ 130_ Peak_E_I_iv^.78_3,89' 120_ Storage=229 430 cf 110= w 100-- C.)3 90- LL 80 70 60: I I I I 50: 40-i 30_ 20_ 0.00 cfs 11374 cfs�� r 01 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 85 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 1.22" for 2-Year event Inflow = 3.39 cfs @ 11.97 hrs, Volume= 0.152 of Primary = 3.39 cfs @ 11.97 hrs, Volume= 0.152 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph I 3.39 cfs —Inflow _ —Primary Inflow Area=1 .490 ac 3— a 2- 3 _ 0 LL 1— 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 86 Summary for Link 4L: POA 2 Inflow Area = 89.850 ac, 0.00% Impervious, Inflow Depth = 1.86" for 2-Year event Inflow = 87.92 cfs @ 12.07 hrs, Volume= 13.942 af Primary = 87.92 cfs @ 12.07 hrs, Volume= 13.942 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 95 , 87.92 cfs l ' ' ' —Inflow 907 n /�,,,Q ((��. 1 80= Inflow ea 89 —Primary 85_ - _ .85D ac 75 70= 65= 60= 55- 50- 45- 40= 35= - 30 25 20 15 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 87 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 1.64" for 2-Year event Inflow = 106.57 cfs @ 12.48 hrs, Volume= 22.926 af Primary = 106.57 cfs @ 12.48 hrs, Volume= 22.926 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 115= —Inflow 11 I3 1 106.57 cfs 1 i —Primary 105= 100: Inflow- Area=167.950 ac 95: 90! r ; 85! ; 80= 75 r r 70= - 65- 3 60= O 55: 50' 45! - 1 1 1 1 40! I I 35: 30: 25 20 rII + 15 r , 4 r r r r , 10 r i 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 88 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE Runoff Area=1.880 ac 100.00% Impervious Runoff Depth=4.56" Tc=5.0 min CN=98 Runoff=13.25 cfs 0.715 of Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=2.37" Tc=5.0 min CN=76 Runoff=6.55 cfs 0.294 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=18.790 ac 0.00% Impervious Runoff Depth=4.33" Tc=5.0 min CN=96 Runoff=130.44 cfs 6.786 of Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=3.28" Tc=12.0 min CN=86 Runoff=27.02 cfs 1.602 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=4.22" Tc=5.0 min CN=95 Runoff=142.67 cfs 7.307 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=4.260 ac 0.00% Impervious Runoff Depth=2.54" Tc=13.3 min CN=78 Runoff=14.86 cfs 0.903 of Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=2.54" Tc=17.6 min CN=78 Runoff=13.34 cfs 0.930 of Subcatchment 22S: POST-DEV DA-2 OFFSITE ARunoff Area=35.000 ac 0.00% Impervious Runoff Depth=1.97" Tc=28.9 min CN=71 Runoff=59.64 cfs 5.736 of Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=2.54" Tc=5.0 min CN=78 Runoff=3.66 cfs 0.165 of Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=4.00" Tc=5.0 min CN=93 Runoff=232.01 cfs 11.565 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=2.54" Tc=15.0 min CN=78 Runoff=19.25 cfs 1.237 of Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=2.99" Tc=57.3 min CN=83 Runoff=70.19 cfs 10.565 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=2.37" Tc=43.2 min CN=76 Runoff=132.47 cfs 16.444 of Reach 13R: NORTH STREAM DEPRESSION Inflow=150.66 cfs 20.896 af Oufflow=150.66 cfs 20.896 af Reach 14R: NORTH STREAM TO POA 2 Inflow=162.67 cfs 21.827 af Oufflow=162.67 cfs 21.827 af Reach 28R: SOUTH STREAM Inflow=212.82 cfs 40.526 af Oufflow=212.82 cfs 40.526 af POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ _ _ Page 89 Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=1.49' Max Vet=15.26 fps Inflow=70.19 cfs 10.565 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=70.15 cfs 10.565 af Pond 10P: SCM 2 Peak Elev=791.96' Storage=114,662 cf Inflow=130.44 cfs 6.786 af Primary=94.76 cfs 6.786 af Secondary=0.00 cfs 0.000 af Outflow=94.76 cfs 6.786 af Pond 12P: SCM 1 Peak Elev=790.02' Storage=180,369 cf Inflow=142.67 cfs 7.307 af Outflow=20.78 cfs 7.307 af Pond 24P: SCM 3 Peak Elev=784.67' Storage=327,719 cf Inflow=245.26 cfs 12.280 af Primary=13.54 cfs 12.280 af Secondary=0.00 cfs 0.000 af Outflow=13.54 cfs 12.280 af Link 2L: POA 1 Inflow=6.55 cfs 0.294 af Primary=6.55 cfs 0.294 af Link 4L: POA 2 Inflow=189.61 cfs 23.429 af Primary=189.61 cfs 23.429 af Link 9L: POA 3 Inflow=212.82 cfs 40.526 af Primary=212.82 cfs 40.526 af Total Runoff Area= 259.290 ac Runoff Volume=64.249 af Average Runoff Depth = 2.97" 99.27%Pervious=257.410 ac 0.73%Impervious= 1.880 ac POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 90 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 13.25 cfs @ 11.96 hrs, Volume= 0.715 af, Depth= 4.56" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 1.880 98 1.880 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 14- 113.25 cfs I —Runoff 13- 12- Type II 24-hr 11- 10-Year Ra i n-f- II=4.8 }" Runoff Area=1.880 ac 9- Runoff Volume=;0.715 of 8- - Runoffe-pth=4,56" LL 7- D 67 Tc=5.0 mjn 5- CN=98 4- 3 2 - 1 - 0 , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 91 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 6.55 cfs @ 11.96 hrs, Volume= 0.294 af, Depth= 2.37" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 7- 16.55 cfs —Runoff 6- Type II 24-hr 10-Year Rainfall=4.80" Runoff area=1 .490 ac 4- Runoff Volume=0.294 af 3 = Runoff Depth=2.37" LL - 3- Tc=5.Q rain 2- CN=76 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 92 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 130.44 cfs @ 11.96 hrs, Volume= 6.786 af, Depth= 4.33" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 18.790 96 18.790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 140_ i 130.44 cfs —Runoff 130- h A 1207 Type 110= 107Y-ear Rainfatl=4.80" 100-: Runoff Area=18.790 ac ::i off_ Rump 1lQlurne=C.7$6 Of o 70- Runoff Depth=4.3" 607 Tc=5.0 mmn 50 40 CN=86 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff = 27.02 cfs @ 12.04 hrs, Volume= 1.602 af, Depth= 3.28" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE B Hydrograph 30- 28----I 27.02 cfs l —Runoff 267 Type II 24-hr 24- 22- 1 O-Year_Rainf011=4.80" 20- Runoff Area=5.850 ac '$- Runoff Volume=1.6 - 02 of 16- LL 14- Runoff_-De-pth=3.28" 12_ 1c=12.Q *in Cif=06 8- 6 4 2 t0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 94 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 142.67 cfs @ 11.96 hrs, Volume= 7.307 af, Depth= 4.22" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 150=-_I 142.67 cfs f —Runoff 140_ Type`T ype r 120_ 10 Year Rainfal 14.8G" Runoff Area=20.770 ac 100= 90_ Runoff volume=�.307 > f 3 $°- Runoff Depth=4.22" u- 70=60 T- #--c 5-.0--mi n 50= CN- 40= 30 - 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 95 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 14.86 cfs @ 12.05 hrs, Volume= 0.903 af, Depth= 2.54" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 4.260 78 4.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 16 , i 14.86 cfs I —Runoff 15- 14 Type- 11 24-h r 1312- 10-Year__Iainfall=4.84" 11- Runoff Area=4.200 ac w 9= Runoff Volume=0.903 of Runoff Depth=2.54" O LL 7 Tic=13.3 min 5- C hl= $ 4' - 3 2 1 0 , , , , , , , , , , , , 1 , , , , � , j , , , , , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 96 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 13.34 cfs @ 12.10 hrs, Volume= 0.930 af, Depth= 2.54" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 14---i 13.34 cfs i —Runoff 13- 12 Type II 24-hr 11- 1O,Year Rainfai1=4.80" 10= Runoff Area=4.300 ac 9- w = Runoff Volume=0.930 of 8- I 77 Runoff Depth=2.54" 67 Tc=17.6 mjn 5- CN= '8 4- 3 2 1 , 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 97 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE A Runoff = 59.64 cfs @ 12.24 hrs, Volume= 5.736 af, Depth= 1.97" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 35.000 71 35.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE A Hydrograph 65- I i 59.64 cfs i —Runoff ::ii 4 Type l24-6r 50- _ 10-Year Ra i nfa FI=4.0" 457 - Runoff Area=3-5. 0 0 ac 407 Runoff Volume=5.736 'f N _ 35- 3 = Runoff Depth= .97" it 30- 25- TIC=28.9-min 20- Cw'= 1 15- 10- 5- 0 , „ f , , , , , , 0 10^ 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 98 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 3.66 cfs @ 11.96 hrs, Volume= 0.165 af, Depth= 2.54" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph 4 - i 3.66 cfs i —Runoff Type II 24-h r 3- 10-Y-ear Rainfall=4.80" Runoff Area=0.780 ac Runoff Volume=0.165 af 2- Runoff Depth=2.54" Tc=5.0 min CM=78 1- 0 0 10^ 20 30r 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 99 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 232.01 cfs @ 11.96 hrs, Volume= 11.565 af, Depth= 4.00" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 240 -I 232.01 cfs —Runoff 220= Type- II 24--h r 200= 10-Year Rainfa11=+4:80" 180: Runoff Area=34.E-80 ac 160_ Runoff Volume=11.565 Of 140= Runoff Depth=4.00" 0 120= = Tc=5.0 min 100- CN-93 80- - 60 40- 20 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 100 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 19.25 cfs @ 12.07 hrs, Volume= 1.237 af, Depth= 2.54" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 21 201--i 19.25 cfs l —Runoff 19. 181 Type II 24-hr 17; Q ' 161 A 0-Year Rai nfall=4 80" 11 Runoff .14= �� - �4V Oc 13=12 Runoff-Volurne=1.2i3- � = Of ;o= Runoff Depth=2.54" $- T__c=15.0_mtrn 7- C14=18 6= 5= 4 3 2 1 0 „ f, , , , , , , , , , , , , � , , , , � , , , , � , , , , , , , , , , , , , 0 10� 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 70.19 cfs @ 12.55 hrs, Volume= 10.565 af, Depth= 2.99" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 75- 170.19 cfs —Runoff 70- 65= TYpe 11 244w 60 10 Year Rainfa11=4.8G" ::i! Runoff Area=42.350 ac 457 Runoff Volume=10.565-af 40 Runoff Depth=2.99" LL 357 Tc=57.3 m i n 30= CN=83 25- 20= 15 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 102 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 132.47 cfs @ 12.43 hrs, Volume= 16.444 af, Depth= 2.37" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 140_ , 132.47 cfs l —Runoff 130_ 120= Type II 24-hr 110_ 10-Year.Rai nfall=4-80" 100= Runoff Area=83.2-00 is 90 Runoff Volume=16.444 af $o= Runoff Depth=2.37" o 60= T-o=43.2 man 50= 7S= c � G N 40- 30- 20- 10- 0 r 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 103 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 79.600 ac, 0.00% Impervious, Inflow Depth = 3.15" for 10-Year event Inflow = 150.66 cfs @ 12.04 hrs, Volume= 20.896 af Outflow = 150.66 cfs @ 12.04 hrs, Volume= 20.896 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 160 1150.66 cfs Inflow 150= —Outflow 140_ Inflow Area=79.600 ac 130= 120-E 110- - 100- 90: 0 80: LL 70- 60= 50- 40: 30: 20: 10_ 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 104 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 83.990 ac, 0.00% Impervious, Inflow Depth = 3.12" for 10-Year event Inflow = 162.67 cfs @ 12.04 hrs, Volume= 21.827 af Outflow = 162.67 cfs @ 12.04 hrs, Volume= 21.827 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 180: 170=--I 162.67 cfs Inflow i —Outflow 160: (� n 150: Inflow 'Area=83'.990 ac 140= 130: 120: 110: - 3 90. o 80: 70: 60: 50- 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 105 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 2.90" for 10-Year event Inflow = 212.82 cfs @ 12.44 hrs, Volume= 40.526 af Outflow = 212.82 cfs @ 12.44 hrs, Volume= 40.526 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 230 212.82 cfs 220= l —Inflow 210= —Outflow 200= Inflow Area=167.950 ac 190= 180: - 170= 160] 150= - 140= 2 130E 3 120_ 0 110= 100= 90' 80 70= 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 106 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 2.99" for 10-Year event Inflow = 70.19 cfs @ 12.55 hrs, Volume= 10.565 af Outflow = 70.15 cfs @ 12.58 hrs, Volume= 10.565 af, Atten= 0%, Lag= 1.4 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Max. Velocity= 15.26 fps, Min. Travel Time= 0.6 min Avg. Velocity = 5.89 fps, Avg. Travel Time= 1.7 min Peak Storage= 2,690 cf @ 12.56 hrs Average Depth at Peak Storage= 1.49' , Surface Width= 4.24' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' Reach 30R: DA-3 BYPASS PIPE Hydrograph 75 170.15 cfs —Inflow 707 l —Outflow 65= inflow Area=42.350 ac 60= Avg. FIQw Depth='F.49` ::i Max VeI=15.26 fs = F 45_ 54.0" 3 40- Round Pitle LL 35- , :n=0.01-1 307 L=585.0' 25- 207 S=0.0163 '/' 157 Capacity=296.47 cfs 10= 5- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 107 Summary for Pond 10P: SCM 2 Inflow Area = 18.790 ac, 0.00°/o Impervious, Inflow Depth = 4.33" for 10-Year event Inflow = 130.44 cfs @ 11.96 hrs, Volume= 6.786 of Outflow = 94.76 cfs @ 12.01 hrs, Volume= 6.786 af, Atten= 27%, Lag= 3.4 min Primary = 94.76 cfs @ 12.01 hrs, Volume= 6.786 af Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 791.96' @ 12.01 hrs Surf.Area= 25,556 sf Storage= 114,662 cf Plug-Flow detention time= 353.7 min calculated for 6.786 af(100% of inflow) Center-of-Mass det. time= 354.0 min ( 1,112.7- 758.7 ) Volume Invert Avail.Storage Storage Description #1 786.00' 142,346 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 13,241 0 0 787.00 15,150 14,196 14,196 788.00 17,130 16,140 30,336 789.00 19,170 18,150 48,486 790.00 21,270 20,220 68,706 791.00 23,420 22,345 91,051 792.00 25,635 24,528 115,578 793.00 27,900 26,768 142,346 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.414 0.580 0.746 0.912 1.077 1.243 #3 Device 1 789.50' 45.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 790.50' 45.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b sin 02344 ©2023 HydroCAD Software Solutions LLC Page 108 Primary OutFlow Max=94.52 cfs @ 12.01 hrs HW=791.96' (Free Discharge) 4-1=Culvert (Passes 94.52 cfs of 112.26 cfs potential flow) 2=Special & User-Defined (Custom Controls 1.24 cfs) 44 3=Orifice/Grate (Orifice Controls 50.45 cfs @ 6.73 fps) =Orifice/Grate (Orifice Controls 9.92 cfs @ 5.29 fps) 5=Orifice/Grate (Weir Controls 32.91 cfs @ 2.22 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=786.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 10P: SCM 2 Hydrograph 140. 1130 44 cfs I —Inflow 130- , —Outflow 120: Inflow Area -Primary Z -Secondary 110_ Peak flee^ 91 .96' 100 194.76 cfs I Storagae=114,662 cf u 80- 0 70- LL 60- 50- 40: 30- 20- . in- 10.00 cfs I I 0 r 0 10 T20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 109 Summary for Pond 12P: SCM 1 Inflow Area = 20.770 ac, 0.00°/o Impervious, Inflow Depth = 4.22" for 10-Year event Inflow = 142.67 cfs @ 11.96 hrs, Volume= 7.307 of Outflow = 20.78 cfs @ 12.15 hrs, Volume= 7.307 af, Atten= 85%, Lag= 11.3 min Primary = 20.78 cfs @ 12.15 hrs, Volume= 7.307 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 790.02' @ 12.15 hrs Surf.Area= 41,835 sf Storage= 180,369 cf Plug-Flow detention time= 718.9 min calculated for 7.306 af(100% of inflow) Center-of-Mass det. time= 719.2 min ( 1,484.0- 764.8 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.820 1.148 1.476 1.804 2.133 2.461 #3 Device 1 787.00' 4.0"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.50' 60.0"W x 18.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=20.76 cfs @ 12.15 hrs HW=790.02' (Free Discharge) t-1=Culvert (Passes 20.76 cfs of 104.36 cfs potential flow) - 2- =Special &User-Defined (Custom Controls 2.14 cfs) -3=Orifice/Grate (Orifice Controls 0.71 cfs @ 8.13 fps) -4=Orifice/Grate (Orifice Controls 17.92 cfs @ 2.31 fps) -5=Orifice/Grate ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 110 Pond 12P: SCM 1 Hydrograph 150= 1 142 67 cfs I Inflow i -Primary 140: Inflow -Ar _ 130= �a 2O.770 a Q C 120_ Peak EIev=7-9O.02` 110= 100: Storage=1-80,369 Of w 90: 3 80: o - LL 70: 60: 50- 40= 30 120.78 cfs I 20 10 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 111 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 5.14% Impervious, Inflow Depth = 4.03" for 10-Year event Inflow = 245.26 cfs @ 11.96 hrs, Volume= 12.280 af Outflow = 13.54 cfs @ 12.73 hrs, Volume= 12.280 af, Atten= 94%, Lag= 46.5 min Primary = 13.54 cfs @ 12.73 hrs, Volume= 12.280 af Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 784.67' @ 12.73 hrs Surf.Area= 128,601 sf Storage= 327,719 cf Plug-Flow detention time= 742.8 min calculated for 12.279 af(100% of inflow) Center-of-Mass det. time= 743.1 min ( 1,516.5- 773.4 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 2.583 3.874 5.166 6.457 7.749 #3 Device 1 784.00' 30.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 785.50' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=13.53 cfs @ 12.73 hrs HW=784.67' (Free Discharge) t-1=Culvert (Passes 13.53 cfs of 49.17 cfs potential flow) - 2- =Special &User-Defined (Custom Controls 4.74 cfs) -3=Orifice/Grate (Orifice Controls 8.79 cfs @ 2.63 fps) -4=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) L5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 112 Pond 24P: SCM 3 Hydrograph 260 l 245 26 cfs l —Inflow i —Outflow 240= Inflow Area=36.560 ac =Se rimary ondary 220: 200- Peak EIev=784.67' 180= 5#oragTe=327,71 9 cf 160- o 140- 3 - 0 u 120- 100: 80- 60- 40- 2n-_ 13.54 cfs I 0.00 cfs 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 113 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 2.37" for 10-Year event Inflow = 6.55 cfs @ 11.96 hrs, Volume= 0.294 af Primary = 6.55 cfs @ 11.96 hrs, Volume= 0.294 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 7- 16.55 cfs —Inflow —Primary 6- Inflow Area=1.490 ac 5- w 4 3 - 0 3- 2- 1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 114 Summary for Link 4L: POA 2 Inflow Area = 89.850 ac, 0.00% Impervious, Inflow Depth = 3.13" for 10-Year event Inflow = 189.61 cfs @ 12.04 hrs, Volume= 23.429 af Primary = 189.61 cfs @ 12.04 hrs, Volume= 23.429 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 210= 200= 1189.61 cfs i rr r r —Inflow 190E —Primary 180 170= Inflow Area=89 850 ac 160E r 1 r r ; 150E 140E 130E in 120E .a 110E c 100: LT. 90- 80= 70; r 60- 50= r r r r r 40= 30 r 1 r r r 20 I 10 ` 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 115 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 2.90" for 10-Year event Inflow = 212.82 cfs @ 12.44 hrs, Volume= 40.526 af Primary = 212.82 cfs @ 12.44 hrs, Volume= 40.526 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 230= 4 4 4 4 —Inflow 220' I 212.82 cfs -- 1 i —Primary 210: 200: Inflow- Area=167.950 ac 190: 180: r , 1 170 160= 150 r r 140- 2 130- , 120:100: I 90! r r r r 80! 70: 60 50 40 r + + 30 r ; 4 4 4 4 , 20 r i 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 116 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE Runoff Area=1.880 ac 100.00% Impervious Runoff Depth=6.97" Tc=5.0 min CN=98 Runoff=19.97 cfs 1.092 of Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=4.44" Tc=5.0 min CN=76 Runoff=12.02 cfs 0.552 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=18.790 ac 0.00% Impervious Runoff Depth=6.73" Tc=5.0 min CN=96 Runoff=198.08 cfs 10.543 of Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=5.57" Tc=12.0 min CN=86 Runoff=44.63 cfs 2.719 af Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=6.61" Tc=5.0 min CN=95 Runoff=217.80 cfs 11.449 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=4.260 ac 0.00% Impervious Runoff Depth=4.67" Tc=13.3 min CN=78 Runoff=26.95 cfs 1.656 of Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=4.67" Tc=17.6 min CN=78 Runoff=24.30 cfs 1.707 of Subcatchment 22S: POST-DEV DA-2 OFFSITE ARunoff Area=35.000 ac 0.00% Impervious Runoff Depth=3.90" Tc=28.9 min CN=71 Runoff=121.41 cfs 11.378 of Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=4.67" Tc=5.0 min CN=78 Runoff=6.55 cfs 0.303 of Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=6.38" Tc=5.0 min CN=93 Runoff=358.74 cfs 18.436 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=4.67" Tc=15.0 min CN=78 Runoff=34.97 cfs 2.271 of Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=5.23" Tc=57.3 min CN=83 Runoff=121.96 cfs 18.444 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=4.44" Tc=43.2 min CN=76 Runoff=250.36 cfs 30.817 af Reach 13R: NORTH STREAM DEPRESSION Inflow=351.60 cfs 35.329 af Oufflow=351.60 cfs 35.329 af Reach 14R: NORTH STREAM TO POA 2 Inflow=373.14 cfs 37.036 af Oufflow=373.14 cfs 37.036 af Reach 28R: SOUTH STREAM Inflow=424.35 cfs 71.060 af Oufflow=424.35 cfs 71.060 af POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 117 Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=2.01' Max Vet=17.73 fps Inflow=121.96 cfs 18.444 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=121.89 cfs 18.444 af Pond 10P: SCM 2 Peak Elev=792.87' Storage=138,746 cf Inflow=198.08 cfs 10.543 af Primary=119.35 cfs 10.393 af Secondary=24.88 cfs 0.149 af Outflow=144.24 cfs 10.543 af Pond 12P: SCM 1 Peak Elev=791.32' Storage=237,007 cf Inflow=217.80 cfs 11.449 af Outflow=113.05 cfs 11.449 af Pond 24P: SCM 3 Peak Elev=785.75' Storage=469,525 cf Inflow=378.70 cfs 19.528 af Primary=54.09 cfs 19.282 af Secondary=10.20 cfs 0.246 af Outflow=64.29 cfs 19.528 af Link 2L: POA 1 Inflow=12.02 cfs 0.552 af Primary=12.02 cfs 0.552 af Link 4L: POA 2 Inflow=417.79 cfs 39.755 af Primary=417.79 cfs 39.755 af Link 9L: POA 3 Inflow=424.35 cfs 71.060 af Primary=424.35 cfs 71.060 af Total Runoff Area= 259.290 ac Runoff Volume= 111.367 af Average Runoff Depth = 5.15" 99.27%Pervious=257.410 ac 0.73%Impervious= 1.880 ac POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 118 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 19.97 cfs @ 11.96 hrs, Volume= 1.092 af, Depth= 6.97" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 1.880 98 1.880 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 22i 211 119.97 cfs I —Runoff 20- 19= 181 Type II *4-h r 171 100-Year Rainfall=7.21" 161 151 Runoff Are _ 14= .880 13 R _ unoff Volume=1.092 Of o 12= - 3 111 Runoff D Kph=6.91" LL 10= 91 Tc=5.Q 1jn 8= 7= CN=98 6= 2 1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 119 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 12.02 cfs @ 11.96 hrs, Volume= 0.552 af, Depth= 4.44" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 13- 4 i 12.02 cfs I —Runoff 12- 1 11- Type--ll--24-hr 10-: 1-00-Year--Rain--fall=7.21" Run-off Area=1.490 ac $- Runoff Vorume=O.5 52 of 7. 3 = Runoff Depth=4.44" 67 57 l-c=5.1J w,_m inc 4- C-ik'=16 3 2 - 0 , , , , , , , , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 120 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 198.08 cfs @ 11.96 hrs, Volume= 10.543 af, Depth= 6.73" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 18.790 96 18.790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 220- 210= _i 198.08 cfs —Runoff 200- a 190: Type II 24-hr 180: 170: 100-Year Rainfa11=7.21" 160= 150= Runoff Area-18.790 ac 140= R�ri4ff Vol a-1;©. 130= Um - 543 'Of 120: n ept-h 110; Ru aff Q —�.�3n LL 100= 90: TG-_-5.0_mi n so= I I 80: CN=96 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 121 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE B Runoff = 44.63 cfs @ 12.03 hrs, Volume= 2.719 af, Depth= 5.57" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE B Hydrograph 48- , 46= -i 44.63 cfs l —Runoff 44421 Time II 24-h r 4CH 36 1-00-Year Rai;nfarf=7.21" 34; Runoff- a e =_ Q 32= ' �.R0O pc N 28 Runoff-V--o - - 30= ��m���.�� af 26 24- Runoff Depth=v.57" Li 22= 20= Tc=1 2.O min 18= AwwF' 14- 12=_ 10 > 8 > 6 4 2 0 , — Ir„ , r, , , , , 1 , , , , 1 , , , , , , , , , , , , , , , , , , , , , , , i , , , , , , , , 1 , —� , , , , , , , , , , , , , , , , , , , , , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 122 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 217.80 cfs @ 11.96 hrs, Volume= 11.449 af, Depth= 6.61" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 240 2301 1217.80 cfs f —Runoff 220= a 210_ - , 200= Type==[[--24-hr 190; 180= 10O-Year- Rainfail_7.21" 170 Ru not-A►re =20.77Q ac 160= �,7 r, 140 - Runof--Vole-me=1,1.449 w = R of 13 130; Runoff--Depth=6.=V 1" 120_ LL 110_ TC 100= - 5.Q min IL , CN=95 , , : , ,, . . , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 123 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 26.95 cfs @ 12.05 hrs, Volume= 1.656 af, Depth= 4.67" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 4.260 78 4.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 30 28----I 26.95 cfs l —Runoff 26- Type II 24-hr 24- 22- 100-Year Rainfall=7.21" 20= Runoff Area=4.200 ae '$- Runoff Volume=1.656 of 16-. 14- Runoff__Depth=4.67" 127 Tc=13.3 n jn Cif=18 8- 6 4 2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 124 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 24.30 cfs @ 12.10 hrs, Volume= 1.707 af, Depth= 4.67" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 26_'124.30 cfs —Runoff 24- 22- Type II $4-hr 20= 100-Year-Ra i nfa ll=7.21" 18 Runoff Area=4.390 ac 167 Runoff Volume=1.707 Of 3 14- Runoff Depth=4.67" Li 12- Tic=17.6 min 10- w, ' Q 87 6- 4 - 2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 125 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE A Runoff = 121.41 cfs @ 12.23 hrs, Volume= 11.378 af, Depth= 3.90" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 35.000 71 35.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE A Hydrograph 130 1121.41 cfs I —Runoff 120 110 Type II 24-hr 100 100-Year- Rainfall=7.21" 90 Runoff Area=35.000 ac 80 Runoff Volume=11.37-8 of 3 70 Runoff Depth=3.90" 0 LL 60 Tc=28.9 m i n 50 C =71 40 30 20 - 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 126 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 6.55 cfs @ 11.96 hrs, Volume= 0.303 af, Depth= 4.67" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph 7- 16.55 cfs —Runoff 6- Type II 24-hr 100-Year Rainfall=7.21" 5= Runoff area=0.780 ac 4- Runoff Volume=0.303 af 3 = Runoff Depth=4.67" LL - 3- Tc=5.Q rain 2- CN=78 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 127 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 358.74 cfs @ 11.96 hrs, Volume= 18.436 af, Depth= 6.38" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 400- 380 1358.74 cfs —Runoff 360= 340= Type II 24-h r 320= 1-00 Year--Rarinfa 280= Runoff Area=34.6-80 ac 260- 240_ Runoff Volume=18.436 of - 220 Runoff D �� 3 200; ept h=0.38 LL 180_ 160= Tc=5f.?O�Imm 140; CIY=93 120 100 80 60 40 20 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 128 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 34.97 cfs @ 12.07 hrs, Volume= 2.271 af, Depth= 4.67" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 38 36 ___I 34.97 cfs l —Runoff 34; 4 32= Type 11 *4-11r 30= '100-Year Rainfar1=7.21" 28= 26_ Runoff Area=5.84 ae 24= 22 Runoff-V--oIurne==2.271 Of 3 ,$_ Runoff Depth=4.07" 167 Tc 15.O Ynjn 14= ww'' 12- hf= 8 10= 8= 6 4 2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 129 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 121.96 cfs @ 12.55 hrs, Volume= 18.444 af, Depth= 5.23" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 130_ 1 121.96 cfs l -Runoff 120- l Type II 24-hr 110- 100-Year.Rai nfal 1=7.21" 90- Runoff AreP=42.350 Pc 80_ Runoff Voki me=1,[8.4,44 of 3 70= Runoff De l =5 2-3" LL 60- Il Tc=57.3 min 50_ CN=83 40- 30- 20- 10- 0 r r 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 130 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 250.36 cfs @ 12.42 hrs, Volume= 30.817 af, Depth= 4.44" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 280- 260- 1250.36 cfs —Runoff 240_ Type 1124-h r 220= 100-Year Rainfall=7.2 200- 180= Runoff Area=83.200 ac Runoff_Vol' w 160_ .O.Q17_af uma, = 140= Runoff bepth=4.44" u_ 120 Tc=43.2 min 100= CN=76 80- 60- - 40 20 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 131 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 79.600 ac, 0.00% Impervious, Inflow Depth = 5.33" for 100-Year event Inflow = 351.60 cfs @ 12.03 hrs, Volume= 35.329 af Outflow = 351.60 cfs @ 12.03 hrs, Volume= 35.329 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 380 360: -I 351.60 cfs Inflow i —Outflow 340 320, Inflow--Area=7-9._6QD__ac 300, 2805 260; II 2405 ,1 220- o 2005 3 = 2 180- LL 160, 140, 120- 100, 80- 60; 40; 205 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 132 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 83.990 ac, 0.00% Impervious, Inflow Depth = 5.29" for 100-Year event Inflow = 373.14 cfs @ 12.04 hrs, Volume= 37.036 af Outflow = 373.14 cfs @ 12.04 hrs, Volume= 37.036 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 400 Inflow 373.14 cfs 380 �—Outflow 360 340E Inflow_Arca=88.-99D---ac 320 300= - 280 260 w 240 220 3 200 o LL 180 160 140 120 100E 80 60 40- 20 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 133 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 5.08" for 100-Year event Inflow = 424.35 cfs @ 12.43 hrs, Volume= 71.060 af Outflow = 424.35 cfs @ 12.43 hrs, Volume= 71.060 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 460 440= II I - —Inflow 424.35 cfs i i —Outflow 420f 400i Inflow Area=167.950 ac 380= 360= 340= I 320= 300= 280= t 260 3 240_ 0 220- a 200 180= 160= I 140- , 120= 100= 80- , 60= 40' 20 0= . n . i . .-. �. . . .50. . . . . i60 , , i70 8. . . . . . .. .90. . . . 0 10 20 30 40 0 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 134 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 5.23" for 100-Year event Inflow = 121.96 cfs @ 12.55 hrs, Volume= 18.444 af Outflow = 121.89 cfs @ 12.57 hrs, Volume= 18.444 af, Atten= 0%, Lag= 1.1 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Max. Velocity= 17.73 fps, Min. Travel Time= 0.5 min Avg. Velocity = 6.74 fps, Avg. Travel Time= 1.4 min Peak Storage= 4,022 cf @ 12.56 hrs Average Depth at Peak Storage= 2.01' , Surface Width= 4.47' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' Reach 30R: DA-3 BYPASS PIPE Hydrograph 130.'121.89 cfs l _Inflow 120- Outflow Inflow Area=42.350 ac 110- Avg. Flow Depth=2.01' 90_ Max Vel=17,73 fps 80= 54.0" 3 70= Round Pipe 0 607 n=0.011 50_ L=585.0-' 40= S=0.0163''/' 30- 20= Capacity=296.47 cfs 10- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 135 Summary for Pond 10P: SCM 2 Inflow Area = 18.790 ac, 0.00°/o Impervious, Inflow Depth = 6.73" for 100-Year event Inflow = 198.08 cfs @ 11.96 hrs, Volume= 10.543 af Outflow = 144.24 cfs @ 12.01 hrs, Volume= 10.543 af, Atten= 27%, Lag= 3.4 min Primary = 119.35 cfs @ 12.01 hrs, Volume= 10.393 of Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 24.88 cfs @ 12.01 hrs, Volume= 0.149 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 792.87' @ 12.01 hrs Surf.Area= 27,606 sf Storage= 138,746 cf Plug-Flow detention time= 248.4 min calculated for 10.543 of(100% of inflow) Center-of-Mass det. time= 248.3 min ( 997.8 - 749.5 ) Volume Invert Avail.Storage Storage Description #1 786.00' 142,346 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) _ (sq-ft) (cubic-feet) (cubic-feet) 786.00 13,241 0 0 787.00 15,150 14,196 14,196 788.00 17,130 16,140 30,336 789.00 19,170 18,150 48,486 790.00 21,270 20,220 68,706 791.00 23,420 22,345 91,051 792.00 25,635 24,528 115,578 793.00 27,900 26,768 142,346 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.414 0.580 0.746 0.912 1.077 1.243 #3 Device 1 789.50' 45.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 790.50' 45.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b sin 02344 ©2023 HydroCAD Software Solutions LLC Page 136 Primary OutFlow Max=119.34 cfs @ 12.01 hrs HW=792.87' (Free Discharge) 4-1=Culvert (Inlet Controls 119.34 cfs @ 16.88 fps) 2=Special & User-Defined (Passes < 1.24 cfs potential flow) 44 3=Orifice/Grate (Passes < 61.08 cfs potential flow) =Orifice/Grate (Passes < 13.13 cfs potential flow) 5=Orifice/Grate (Passes < 167.44 cfs potential flow) Secondary OutFlow Max=24.63 cfs @ 12.01 hrs HW=792.87' (Free Discharge) 4-6=Broad-Crested Rectangular Weir (Weir Controls 24.63 cfs @ 1.63 fps) Pond 10P: SCM 2 Hydrograph 220- , 210__l 198 08 cfs —Inflow 200: 1 1 1 I 1 1 —Outflow 190_ _ —Primary /� 180] Inflow Area 8.79_O_ac —Secondary 170: Peak-i`I -Xe =792.8il ' 160- 1 144.24 cfs I 1 r�150 Q 7 140] Storages= l3-V-y Of Is 130;-1 119.35 cfs I 1 0 120= 3 110: u_ 100= 90: 80= 70- 60= 50= 40- 30- i 24.88 cfs 20- : 10= 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 137 Summary for Pond 12P: SCM 1 Inflow Area = 20.770 ac, 0.00% Impervious, Inflow Depth = 6.61" for 100-Year event Inflow = 217.80 cfs @ 11.96 hrs, Volume= 11.449 of Outflow = 113.05 cfs @ 12.04 hrs, Volume= 11.449 af, Atten= 48%, Lag= 4.9 min Primary = 113.05 cfs @ 12.04 hrs, Volume= 11.449 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 791.32' @ 12.04 hrs Surf.Area= 45,075 sf Storage= 237,007 cf Plug-Flow detention time= 518.3 min calculated for 11.448 af(100% of inflow) Center-of-Mass det. time= 518.6 min ( 1,273.2 - 754.6 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.820 1.148 1.476 1.804 2.133 2.461 #3 Device 1 787.00' 4.0"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.50' 60.0"W x 18.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=113.04 cfs @ 12.04 hrs HW=791.32' (Free Discharge) L=Culvert (Barrel Controls 113.04 cfs @ 15.99 fps) -2=Special &User-Defined (Passes < 2.46 cfs potential flow) -3=Orifice/Grate (Passes < 0.86 cfs potential flow) -4=Orifice/Grate (Passes < 109.50 cfs potential flow) -5=Orifice/Grate (Passes < 11.83 cfs potential flow) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 138 Pond 12P: SCM 1 Hydrograph 240: 230=-1 217.80 cfs I i 4 Inflow 220 —Primary 200:10: Inflow Area*20 77'0ac 190] 180 Peak Ele-v=791 .32' 170: 160- Stora- e=237,007 cf 150: �, 1405 : u 130' 120'--I 113.05 cfs - 110: 1005 - 90- - 80 70= 60 , , , 50 40 4 30 I I I 20 10 0 m 1 T ,- , ,, , j , , , , , , , , , ,, , , , , , j , ,, , j , , , , � , ,, , j , , , , � , ,, , j , , , , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 139 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 5.14% Impervious, Inflow Depth = 6.41" for 100-Year event Inflow = 378.70 cfs @ 11.96 hrs, Volume= 19.528 af Outflow = 64.29 cfs @ 12.12 hrs, Volume= 19.528 af, Atten= 83%, Lag= 9.8 min Primary = 54.09 cfs @ 12.12 hrs, Volume= 19.282 af Routed to Reach 28R : SOUTH STREAM Secondary= 10.20 cfs @ 12.12 hrs, Volume= 0.246 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 785.75' @ 12.12 hrs Surf.Area= 133,423 sf Storage= 469,525 cf Plug-Flow detention time= 538.2 min calculated for 19.528 of(100% of inflow) Center-of-Mass det. time= 538.2 min ( 1,300.2 - 762.0 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 2.583 3.874 5.166 6.457 7.749 #3 Device 1 784.00' 30.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 785.50' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=54.09 cfs @ 12.12 hrs HW=785.75' (Free Discharge) L=Culvert (Barrel Controls 54.09 cfs @ 11.02 fps) -2=Special &User-Defined (Passes < 6.14 cfs potential flow) -3=Orifice/Grate (Passes < 26.75 cfs potential flow) -4=Orifice/Grate (Passes < 68.24 cfs potential flow) Secondary OutFlow Max=10.19 cfs @ 12.12 hrs HW=785.75' (Free Discharge) L5=Broad-Crested Rectangular Weir (Weir Controls 10.19 cfs @ 1.35 fps) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 140 Pond 24P: SCM 3 Hydrograph 420: , 400_-1 378 70 cfs l 1 T r I r T 1 —Inflow 380= 1 ; —Outflow it _ —Primary 360= E 340= ; inflow / Pea �7=36.JO ac —Secondary 320= I Peak EIev^78-5.75' 300- 280_ torage=46 ,52 cf 260: r w 240= -"- 220: 0 200: • LL 180= 1605 7 4 4 - I I I 140 120: 100- t T t 80 --- RA`)O rfo 1 54.09 cfs i 60 40 20 i 10.20 cfs I I I I I 0 .-r4-4 — 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 141 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 4.44" for 100-Year event Inflow = 12.02 cfs @ 11.96 hrs, Volume= 0.552 of Primary = 12.02 cfs @ 11.96 hrs, Volume= 0.552 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 13- 12.02 cfs —Inflow 12- —Primary 11- Inflow Area=1 .490 ac 10- 9- 8- w 3 0 LL 6- 5- 4- 3- 2- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 142 Summary for Link 4L: POA 2 Inflow Area = 89.850 ac, 0.00% Impervious, Inflow Depth = 5.31" for 100-Year event Inflow = 417.79 cfs @ 12.04 hrs, Volume= 39.755 af Primary = 417.79 cfs @ 12.04 hrs, Volume= 39.755 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 460= 440= 1417.79 cfs 4 1 r r I r 4 —Inflow 420 . i 4 4 , —Primary 400 . Inflow_Area=89.850 ac 380= 360 340- 320 . I 300= 280= i' 260= o 240= , , c 220 , ? Li 200 180= 160= 140= 120= 100 80= L. ' r 60= 40= 20= 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD®10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 143 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 1.12% Impervious, Inflow Depth = 5.08" for 100-Year event Inflow = 424.35 cfs @ 12.43 hrs, Volume= 71.060 of Primary = 424.35 cfs @ 12.43 hrs, Volume= 71.060 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 46 • I 0= 4404--1 424.35 cfs l , —Inflow 420= I —Primary 400= Inflow Area=967950 ac 380= 360E 340= - , , 320= 300= 280= -) 260= + , 3 240 0 220= a 200= - . , r 180= 1 160= 140= _ 1 , 120= 100. 80= + , 60 40 , , 20 0 . I — I . . , , „ r� „ r, , r„ I „ h, ,, , i , , . . . . . , I . . 1 . , , , I , ,, , i , . . . L .. . I . . . . I . .. . L . . 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) POST-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 1"WQ EVENT Event 4 Node Listing 6 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 7 Subcat 11 S: POST-DEV DA-1 ONSITE 8 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 9 Subcat 15S: POST-DEV DA-2 OFFSITE B 10 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 11 Subcat 18S: POST-DEV DA-2 ONSITE B 12 Subcat 19S: POST-DEV DA-2 ONSITE C 13 Subcat 22S: POST-DEV DA-2 OFFSITE A 14 Subcat 23S: POST-DEV DA-2 ONSITE D 15 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 16 Subcat 29S: POST-DEV DA-3 ONSITE B 17 Subcat 31S: POST-DEV DA-3 OFFSITE B 18 Subcat 32S: POST-DEV DA-3 OFFSITE A 19 Reach 13R: NORTH STREAM DEPRESSION 20 Reach 14R: NORTH STREAM TO POA 2 21 Reach 28R: SOUTH STREAM 22 Reach 30R: DA-3 BYPASS PIPE 23 Pond 10P: SCM 2 25 Pond 12P: SCM 1 27 Pond 24P: SCM 3 29 Link 2L: POA 1 30 Link 4L: POA 2 31 Link 9L: POA 3 1-Year Event 32 Node Listing 34 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 35 Subcat 11 S: POST-DEV DA-1 ONSITE 36 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 37 Subcat 15S: POST-DEV DA-2 OFFSITE B 38 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 39 Subcat 18S: POST-DEV DA-2 ONSITE B 40 Subcat 19S: POST-DEV DA-2 ONSITE C 41 Subcat 22S: POST-DEV DA-2 OFFSITE A 42 Subcat 23S: POST-DEV DA-2 ONSITE D 43 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 44 Subcat 29S: POST-DEV DA-3 ONSITE B 45 Subcat 31S: POST-DEV DA-3 OFFSITE B 46 Subcat 32S: POST-DEV DA-3 OFFSITE A POST-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC 47 Reach 13R: NORTH STREAM DEPRESSION 48 Reach 14R: NORTH STREAM TO POA 2 49 Reach 28R: SOUTH STREAM 50 Reach 30R: DA-3 BYPASS PIPE 51 Pond 10P: SCM 2 53 Pond 12P: SCM 1 55 Pond 24P: SCM 3 57 Link 2L: POA 1 58 Link 4L: POA 2 59 Link 9L: POA 3 2-Year Event 60 Node Listing 62 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 63 Subcat 11 S: POST-DEV DA-1 ONSITE 64 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 65 Subcat 15S: POST-DEV DA-2 OFFSITE B 66 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 67 Subcat 18S: POST-DEV DA-2 ONSITE B 68 Subcat 19S: POST-DEV DA-2 ONSITE C 69 Subcat 22S: POST-DEV DA-2 OFFSITE A 70 Subcat 23S: POST-DEV DA-2 ONSITE D 71 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 72 Subcat 29S: POST-DEV DA-3 ONSITE B 73 Subcat 31S: POST-DEV DA-3 OFFSITE B 74 Subcat 32S: POST-DEV DA-3 OFFSITE A 75 Reach 13R: NORTH STREAM DEPRESSION 76 Reach 14R: NORTH STREAM TO POA 2 77 Reach 28R: SOUTH STREAM 78 Reach 30R: DA-3 BYPASS PIPE 79 Pond 10P: SCM 2 81 Pond 12P: SCM 1 83 Pond 24P: SCM 3 85 Link 2L: POA 1 86 Link 4L: POA 2 87 Link 9L: POA 3 10-Year Event 88 Node Listing 90 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 91 Subcat 11 S: POST-DEV DA-1 ONSITE 92 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 93 Subcat 15S: POST-DEV DA-2 OFFSITE B 94 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 95 Subcat 18S: POST-DEV DA-2 ONSITE B 96 Subcat 19S: POST-DEV DA-2 ONSITE C 97 Subcat 22S: POST-DEV DA-2 OFFSITE A 98 Subcat 23S: POST-DEV DA-2 ONSITE D POST-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 5/29/2024 HydroCAD® 10.20-4b s/n 02344 ©2023 HydroCAD Software Solutions LLC 99 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 100 Subcat 29S: POST-DEV DA-3 ONSITE B 101 Subcat 31S: POST-DEV DA-3 OFFSITE B 102 Subcat 32S: POST-DEV DA-3 OFFSITE A 103 Reach 13R: NORTH STREAM DEPRESSION 104 Reach 14R: NORTH STREAM TO POA 2 105 Reach 28R: SOUTH STREAM 106 Reach 30R: DA-3 BYPASS PIPE 107 Pond 10P: SCM 2 109 Pond 12P: SCM 1 111 Pond 24P: SCM 3 113 Link 2L: POA 1 114 Link 4L: POA 2 115 Link 9L: POA 3 100-Year Event 116 Node Listing 118 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 119 Subcat 11 S: POST-DEV DA-1 ONSITE 120 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 121 Subcat 15S: POST-DEV DA-2 OFFSITE B 122 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 123 Subcat 18S: POST-DEV DA-2 ONSITE B 124 Subcat 19S: POST-DEV DA-2 ONSITE C 125 Subcat 22S: POST-DEV DA-2 OFFSITE A 126 Subcat 23S: POST-DEV DA-2 ONSITE D 127 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 128 Subcat 29S: POST-DEV DA-3 ONSITE B 129 Subcat 31S: POST-DEV DA-3 OFFSITE B 130 Subcat 32S: POST-DEV DA-3 OFFSITE A 131 Reach 13R: NORTH STREAM DEPRESSION 132 Reach 14R: NORTH STREAM TO POA 2 133 Reach 28R: SOUTH STREAM 134 Reach 30R: DA-3 BYPASS PIPE 135 Pond 10P: SCM 2 137 Pond 12P: SCM 1 139 Pond 24P: SCM 3 141 Link 2L: POA 1 142 Link 4L: POA 2 143 Link 9L: POA 3 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 6 7 4 3 8 9 10 11 12 13 Outfall 1 • N Project File: BEG-STRM-A.stm Number of lines: 15 Date:5/29/2024 Storm Sewers v2022.00 MyReport Page 1 Line Runoff i Flow Line Line Line Capac Vel Invert Invert HGL HGL Gnd/Rim Inlet DnStm Line Drng No. Coeff Inlet Rate Length Size Slope Full Ave Dn Up Dn Up El Up Depth Ln No ID Area (C) (in/hr) (cfs) (ft) (in) (%) (cfs) (ft/s) (ft) (ft) (ft) (ft) (ft) (ft) (ac) 1 0.00 0.00 91.95 210.771 54 1.01 197.23 10.49 791.00 793.12 793.16 795.93 800.16 .... Outfall PIPE-1560 0.00 2 0.69 3.65 92.58 193.773 54 1.00 196.78 8.84 793.12 795.06 795.93 797.88 801.52 .... 1 PIPE-1550 36.77 3 0.71 6.86 58.05 60.552 42 0.74 86.73 8.98 785.00 785.45 787.10 787.83 797.45 .... Outfall PIPE-1360 0.48 4 0.95 6.86 30.93 237.248 36 0.74 57.44 6.80 785.95 787.71 787.83 789.51 j 802.55 .... 3 PIPE-1350 0.69 5 0.95 6.86 28.53 351.000 30 0.74 35.37 7.73 788.21 790.82 789.91 792.64 802.55 .... 4 PIPE-1340 2.00 6 0.92 6.86 18.52 387.000 24 0.74 19.51 7.04 791.07 793.95 792.64 795.50 802.54 .... 5 PIPE-1330 1.84 7 0.83 6.86 9.34 369.000 24 0.74 19.49 4.62 794.20 796.94 795.62 798.03 j 802.52 .... 6 PIPE-1320 1.64 8 0.65 6.86 40.47 248.748 42 0.51 72.17 6.51 785.45 786.73 787.83 788.71 j 795.68 .... 3 PIPE-1470 0.13 9 0.90 6.86 40.36 157.338 36 0.52 48.15 7.63 787.23 788.05 789.33 790.15 797.18 .... 8 PIPE-1460 1.89 10 0.95 6.86 35.40 228.000 36 0.51 47.78 6.53 788.05 789.22 790.51 791.15 797.48 .... 9 PIPE-1450 1.97 11 0.95 6.86 29.92 258.000 36 0.52 47.89 6.55 789.22 790.55 791.15 792.32 j 797.54 .... 10 PIPE-1440 1.97 12 0.95 6.86 24.30 222.304 30 0.52 29.50 6.71 791.05 792.20 792.78 793.93 797.84 .... 11 PIPE-1430 1.80 13 0.73 3.12 19.10 251.696 24 0.52 16.25 6.08 792.70 794.00 794.70 796.50 797.75 .... 12 PIPE-1420 8.40 14 0.00 0.00 20.78 158.288 36 2.21 99.17 8.58 779.00 782.50 779.93 783.96 790.50 .... Outfall PIPE-1570 0.00 15 0.00 0.00 20.78 40.000 6 3.00 1.26 105.84 782.50 783.70 783.96 1109.16 785.00 .... 14 PIPE-1640 0.00 Project File: BEG-STRM-A.stm Numher of lines: 15 Date: 5/29/2024 NOTES: Intensity= 12.41 /(Inlet time+0.10)A 0.36--Return period= 10 Yrs. ; ""Critical depth Storm Sewers Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 37 16 20 24 30 15 17 19 18 Outfall 2 23 29 13 28 12 '7 14 11 26 25 2 3 4 5 6 31 7 8 10 9 36 1 35 39 34 38 33 32 Outfall Project File: New.stm Number of lines:39 Date:5/29/2024 Storm Sewers v2022.00 MyReport Page 1 Line Runoff i Flow Line Line Line Capac Vel Invert Invert HGL HGL Gnd/Rim Inlet DnStm Line Drng No. Coeff Inlet Rate Length Size Slope Full Ave Dn Up Dn Up El Up Depth Ln No ID Area (C) (in/hr) (cfs) (ft) (in) (%) (cfs) (ft/s) (ft) (ft) (ft) (ft) (ft) (ft) (ac) 1 0.91 7.01 87.76 118.245 54 0.50 138.92 8.94 782.00 782.59 784.60 785.33 794.10 .... Outfall PIPE-1150 1.72 2 0.95 7.01 78.09 160.000 48 0.65 115.81 8.62 782.59 783.63 785.33 786.30 794.14 .... 1 PIPE-1140 1.88 3 0.93 7.01 70.43 161.997 42 0.48 69.81 8.27 783.62 784.40 786.52 787.30 794.08 .... 2 PIPE-1160 1.94 4 0.91 7.01 64.33 161.933 42 0.49 70.27 7.56 784.40 785.19 787.46 787.95 794.14 .... 3 PIPE-1170 2.02 5 0.90 7.01 58.05 162.070 42 0.48 69.79 7.34 785.19 785.97 788.10 788.48 794.08 .... 4 PIPE-1180 2.05 6 0.90 7.01 49.78 162.315 42 0.49 70.19 6.49 785.97 786.76 789.44 788.96 794.14 .... 5 PIPE-1190 2.06 7 0.90 7.01 43.29 161.685 42 0.40 63.79 7.04 786.76 787.41 788.96 789.48 794.07 .... 6 PIPE-1200 2.07 8 0.90 7.01 36.69 162.176 42 0.40 63.69 6.35 787.41 788.06 789.61 789.95 j 794.13 .... 7 PIPE-1210 2.07 9 0.77 7.01 21.54 111.824 36 0.39 41.84 3.52 788.06 788.50 790.69 790.76 794.57 .... 8 PIPE-1220 2.46 10 0.85 7.01 14.27 132.316 30 0.40 25.96 3.13 788.50 789.03 790.95 791.06 799.46 .... 9 PIPE-1230 0.15 11 0.86 7.01 14.11 291.576 24 0.80 20.18 5.37 789.02 791.34 791.08 792.69 j 798.59 .... 10 PIPE-1240 1.36 12 0.87 7.01 10.52 368.952 24 0.79 20.16 5.11 791.34 794.27 792.69 795.43 j 798.59 .... 11 PIPE-1250 1.33 13 0.77 7.01 2.48 12.579 18 8.03 29.76 3.55 794.77 795.78 795.43 796.38 j 800.73 .... 12 PIPE-1290 0.46 14 0.62 4.16 2.99 12.492 18 8.00 29.71 7.39 794.27 795.27 794.59 795.93 800.73 .... 11 PIPE-1280 1.16 15 0.80 7.01 5.42 115.973 36 0.50 47.16 3.02 784.09 784.67 785.33 785.40 j 799.64 .... 1 PIPE-1130 0.11 16 0.92 7.01 5.22 110.529 30 0.50 28.93 4.32 785.17 785.72 785.89 786.47 800.22 .... 15 PIPE-1120 0.37 17 0.95 7.01 4.35 348.536 30 0.50 28.98 3.73 785.72 787.46 786.47 788.15 j 798.81 .... 16 PIPE-1110 0.67 18 0.00 0.00 1.74 66.633 30 0.51 29.29 2.35 787.46 787.80 788.15 788.23 j 798.78 .... 17 PIPE-1690 0.00 19 0.93 7.01 2.17 356.660 24 0.50 15.98 3.49 788.30 790.08 788.80 790.59 798.31 .... 18 PIPE-1100 0.32 20 0.81 7.01 0.62 117.941 18 0.50 7.43 2.54 790.58 791.17 790.87 791.47 799.58 .... 19 PIPE-1300 0.11 21 0.67 7.01 3.52 44.938 18 6.56 26.91 7.38 789.12 792.07 789.49 792.79 797.03 .... 5 PIPE-1260 0.75 22 0.64 4.16 8.66 50.805 24 5.00 50.57 3.97 788.33 790.87 790.69 791.92 j 800.64 .... 8 PIPE-1270 3.25 23 0.75 7.01 3.21 26.222 18 0.99 10.46 4.10 785.62 785.88 786.30 786.56 j 790.97 .... 2 PIPE-1680 0.61 Project File: New.stm Number of linag:39 Date: 5/29/2024 NOTES: Intensity=66.36/(Inlet time+ 12.00)A 0.79--Return period= 10 Yrs. ; **Critical depth Storm Sewers MyReport Page 2 Line Runoff i Flow Line Line Line Capac Vel Invert Invert HGL HGL Gnd/Rim Inlet DnStm Line Drng No. Coeff Inlet Rate Length Size Slope Full Ave Dn Up Dn Up El Up Depth Ln No ID Area (C) (in/hr) (cfs) (ft) (in) (%) (cfs) (ft/s) (ft) (ft) (ft) (ft) (ft) (ft) (ac) 24 0.91 7.01 67.36 60.709 54 0.49 138.24 8.24 786.00 786.30 788.22 788.69 794.08 .... Outfall PIPE-1090 2.44 25 0.95 7.01 57.18 161.829 54 0.48 136.54 7.05 786.30 787.08 788.69 789.27 794.05 .... 24 PIPE-1070 1.88 26 0.00 0.00 48.46 149.648 42 0.49 70.27 7.68 787.08 787.81 789.27 789.98 j 796.03 .... 25 PIPE-1060 0.00 27 0.00 0.00 48.91 88.955 42 0.48 69.95 7.77 787.81 788.24 789.98 790.42 796.26 .... 26 PIPE-1730 0.00 28 0.95 7.01 49.51 118.045 42 0.48 69.91 7.82 788.24 788.81 790.42 791.01 794.86 .... 27 PIPE-1050 1.88 29 0.95 7.01 40.29 162.418 36 0.49 46.51 7.36 788.81 789.60 791.01 791.74 795.31 .... 28 PIPE-1040 1.88 30 0.95 7.01 30.91 161.582 36 0.49 46.64 6.18 789.60 790.39 791.87 792.19 j 795.55 .... 29 PIPE-1030 1.88 31 0.95 7.01 21.16 162.230 30 0.49 28.62 6.06 790.39 791.18 792.19 792.75 795.62 .... 30 PIPE-1020 1.88 32 0.92 7.01 10.97 111.771 24 0.48 15.72 4.44 791.18 791.72 792.85 793.05 796.06 .... 31 PIPE-1010 1.87 33 0.80 7.01 0.95 131.714 18 0.49 7.32 0.64 791.72 792.36 793.37 793.38 799.49 .... 32 PIPE-1000 0.17 34 0.00 0.00 4.42 57.526 54 1.39 231.92 4.64 781.37 782.17 781.80 782.76 789.01 .... Outfall PIPE-1480 0.00 35 0.80 3.15 4.42 372.949 54 1.41 233.33 3.60 782.17 787.42 782.76 788.01 796.01 .... 34 PIPE-1520 42.61 36 0.00 0.00 0.01 97.884 54 1.41 233.51 0.39 787.42 788.80 788.01 788.83 j 793.84 .... 35 PIPE-1620 0.00 37 0.00 0.00 94.76 66.746 36 0.49 46.90 13.41 779.67 780.00 782.67 784.02 792.00 .... Outfall PIPE-1610 0.00 38 0.00 0.00 13.54 116.982 30 0.50 28.88 5.69 778.71 779.29 779.91 780.53 790.78 .... Outfall PIPE-1580 0.00 39 0.00 0.00 13.54 94.290 30 0.50 28.96 5.59 779.29 779.76 780.53 781.00 783.14 .... 38 PIPE-1590 0.00 Project File: New.stm Number of linos:39 Date: 5/29/2024 NOTES: Intensity=66.36/(Inlet time+ 12.00)A 0.79--Return period= 10 Yrs. ; **Critical depth Storm Sewers APPENDIX E: EROSION CONTROL CALCULATIONS Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a� ,1 ��.. . „ . 4 ..m.,.,L, 1 „, is ,*y o.•. f Project: Salisbury Logistics Center a d,°w�^` gi /f�: Calculated By: EM Date: 10/19/2023 •� � a � „jr;; Revised By: SM Date: 5/29/2024 w",.m ,. 1. i$ ' e A:co,�� , kr311:_, Revised By: Date: _ "( _ °, ddr4c.', ID: 2200-FES TW< 0.5 Do: Y Use Fig. 8.06a i . i STA: N/A TW_ 0.5 D : ~ J��"� v gg p .r rre 8 o N Use Fig. 8.06b i �',1 � �'I ,,,mI�t�i{�w � , ..�{:( i . M�" I�R`�4'�Wllio DIA: 36 in 19 ftEs ,,, ,,, IMO Q: 20.78 cfs d50: 0.6 ft =,�•�•.��•�.• .. dmax: 0.9 ft 1�1 Ou,Nt -D.•0..1. L• 110 -6 ." .1, ,�'llll(JI'��W11yi 1r asp I lirK Irilrflg 00 Do = 36 in ��� / A A;a�,: BEE Do 00 3Do Do+La 3D0 = 9 ft i:, '�! v0 89 , La - 19 ft �,F� i �' ! 1/1 I AIhIi::ff��11l1l i Do + La = 22 ft Iwp a' �� �Ja�r``ggll����liti''�P i . il, n r ,_ 4 La Rime . ..,e ' '. sx—,--•4,,we�,��C€€'�,7�q�C�` F ) — a 1) A WttclwW(�/Nq'ro ]00 wo laoo Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 294.5 sf Apron thickness*: 1.35 ft Rip Rap: 19.9 tons Rip Rap Class: B Filter Fabric: 33 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a.« 1 ��.. . „ . 4 ..m.,.,L: 1 .. is• ,..y 0,•. f Project: Salisbury Logistics Center ,,,,,,.r�^` gg /f� Calculated By: EM Date: 10/19/2023 • IN •;alit „jr:, Revised By: Date: w,=",`,. 1 N !� .1 , erli:'. Revised By: Date: "( j� ,.- ' 41;51..;;' ID: 1610-FES T, < 0.5 Do: Y Use Fig. 8.06a I i , i STA: N/A T�„_ 0.5 D N J �" gg p .r rre 8 o N Use Fig. 8.06b � �'.,.� -.—� ��'I�n�'dIa�'t�i{�w'� � ��{:( ., i �' �M�" I�R`�4'�Wllio DIA: 30 in La: E-__ �i a-i% J, II�1i mi 18 ft 0 mSo KO 200 ,m ,OW Q: 13.54 cfs d50: 0.6 ft =,�•�•.��•�.• .. dmax: 0.9 ft 1�1 a„« r ammo«lWl _ i .iri I p� „o _6 ` 1 ,FEINT flr 1 J �I�E' -19I1! 00Ali Do = 30 in ��� A rir. W,b LF. Do co 3Do Do+La 3Do = 7.5 ft Sr Il.' e ror y�J r?it � °° � Il,il, . II r a 0 89 , La = 18 ft ,�^ i .i 1: 1/i I iI! :i!IPiIl�, 1 I,I Do + La = 20.5 ft �wp ai' �� Ja�r``ggll��l�l�'lPi +�ia� or'r � ,A l�Il�a tRAl! l'i o� Y�IIi,'~ a n r �,_ La Whin .� .,: I -�y�`�11�,91,, �?,'3�.a'��,q it Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 252.0 sf Apron thickness*: 1.35 ft Rip Rap: 17.0 tons Rip Rap Class: B Filter Fabric: 28 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a•« 1 ��.. . . 4 ..m.,.,,,'. 1 is *y ` •••, f Project: Salisbury Logistics Center ,,,,,,.r„^` gi 7,4 Calculated By: EM Date: 10/19/2023 '• i 1111 •;a t „jr;; Revised By: Date: :",'''i �,,•i ,. 1 it • e Aic o ',, kr311:_, Revised By: Date: _ "(IL_ -,.• ' 41,4..;:' ID: 1700-FES TW< 0.5 Do: Y Use Fig. 8.06a Ii . ; STA: N/A TW_ 0.5 Do: N Use Fig. 8.06b ,1 ~ ����d" i p .r 4- IV , Es '� DIA: 36 in 20 ft ,,, ,•, ,M; Q: 94.76 cfs d50: 1.1 ft =•,�•�•.�•••�.• ..• dmax: 1.65 ft 1�1 00 lk Do = 36 in _r_ ,j31,33/37,r,via s0,3 "8 _i `, .1, ,IIr J Iir�ll�l ,c �` J OM 19r11! Do 00 3Do Do+La 3D0 = 9 ft I•., 74140v0 Q9 , La - 20ft �,F� i; �' ! 1/ l fl:i:� l1l i Do + La = 23 ft �wp 'i' rear�l�'1P i +4ia�r. �i 4� 'A III° °� 6111 '.,_ a n r � t. 4 La 1 Whin .— ..,: ' ',y�`- 1��,9/a'z'r?,'3�.a'ro,qsgr' E �if`;/�ZAB� r/��Pen , $ ) — -S 3) A aKwW(�]/NC,'OD ]00 wo laoo Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 320.0 sf Apron thickness*: 2.475 ft Rip Rap: 39.6 tons Rip Rap Class: 2 .sm.,° �•,,a�.,� Filter Fabric: 36 sy .,�...... .�.a�,.�....�., .•m.�.�•.•�.�•�.�.�•m��._ „).>•.a..,.,, Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a� ,1 �f.. . „ . ..m.,.,L, 1 „, is ,:y 0,•. f Project: Salisbury Logistics Center a d,°w*^` li /fd Calculated By: EM Date: 10/19/2023 •� � a � „jr;; Revised By: Date: 0," ,`. 1 n ii ,� .1 , • k earF. Revised By: Date: ( j� -,,- ' ¢11.51.;;' ID: 1610-FES T, < 0.5 Do: Y Use Fig. 8.06a I iArif , i STA: N/A TW_ 0.5 D : N J l" gg p .r rre 8 „ N Use Fig. 8.06b i �',.� —� �'In�dIa�'t�i{�w ��{:( �' �M�" I�R`�4'�Wllio DIA: 54 in La: E-__ tiuii% J, 111i ni 32 ft 0 mSo on 200 ,m ,OW Q: 91.95 cfs d50: 0.9 ft =,�•�•.��•�.• .. dmax: 1.35 ft 1�1 „o _i `, .1, ,IIr J IlT�ll�li lc . 1` J 1I1EI 19r11! 00 Ali Do = 54 in _r_ ,_,.”-sar,via so,, Do 00 3Do Do+La 3Do = 13.5 ft �o I nil Lic 1.. e. r��l y�J r t D °° � Il,il, . II r a v0 Q�, La - 32 ft ,F'^ i .. 1/ � �Ihlia���l�l � 1�,'lillI f ill!Isi,: II; IG , Do + La = 36.5 ft �wp a' �� Ja�r Kira ggll��l�l�'1Pi +�ia� n r viirA _ -' � ar Ir. /F {: . ' ; ' �r0, gy p,. 4 La li� .� .,: ' '�y�`A1��9/a' 'r,�ro,qsi��' �Z�AB� r/V�.Pen ' $ Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 800.0 sf Apron thickness*: 2.025 ft Rip Rap: 81.0 tons Rip Rap Class: 1 Filter Fabric: 89 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a� ..m.,.,,1 �f.. . „ . L, 1 „, is ,*.y o••. • •d f Project: Salisbury Logistics Center d�� r�^` � /• Calculated By: EM Date: 10/19/2023 •,f a 1111 •;a t „jr:, Revised By: Date: 0." l`. 1 n ii o � o ',, • earF. Revised By: Date: ( j� -,,- ' ¢11.51.;;' ID: 1660-FES T,„< 0.5 Do: Y Use Fig. 8.06a I i , i STA: N/A TW_ 0.5 D : N g J �" gg p rre 8 o N Use Fig. 8.06b i �',.� —� �'In�dIa�'t�i{�w ��{:( �' �M�" I�R`�4'�Wllio DIA: 30 in La: E-__:boil% J, II�1i mi 18 ft „ mSo 103 200 ,m ,OW Q: 11.46 cfs d50: 0.5 ft =,�•�•.��•�.• .. dmax: 0.75 ft 1�1 OP 00 Ali Do = 30 in _r_ ,_,.”-sar,rvia su, 1 J / EI iir If1I1! Do �� 3Do Do+La 3Do = 7.5 ft �o I1.' ri ylJ r?igo o 111,d.', 1 iris,ie. i I' ' � °° � Il,il, . II r a 0 89 , La = 18 ft ,F�^ . .i 1: I/ I iI! :i!IPIII�, 1 ,,I Do + La = 20.5 ft Mr ai' �� Ja�r`pII��I�I�'1Pi +�ia� n r _ La whin .� .,: ' '�y�`�1��9/a' '�?,'3�.a'��,q��' ; o%�AB� r/V�.Pen ' $ ) --S --3) A aKwW(�]/N0:'0D ]00 wo 1000 Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 252.0 sf Apron thickness*: 1.125 ft Rip Rap: 14.2 tons Rip Rap Class: B Filter Fabric: 28 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a� ,1 �f.. .-. „ . ..m.,.,L, 1 is ,.y 0,•. f Project: Salisbury Logistics Center ,,,,,,.r�^` gi /f� Calculated By: EM Date: 10/19/2023 • ' IN MN •;at „jr:, Revised By: Date: w,m",`,. 1 N ARV.1 , earF. Revised By: Date: ''( j� -,,- ' ¢11.51.;;' ID: 5000-FES T,„< 0.5 Do: Y Use Fig. 8.06a ii , i STA: N/A TW_ 0.5 D : NJ l" �- gg p .r rre 8 o N Use Fig. 8.06b I �',.� � �'In�dIa�'t�i{�w ��{:( �' �M I�R`�4'�Wllio DIA: 54 in La: 1-__ tiuii% J, IIl1i mi 40 ft 0 m50 ma 200 ,m ,OW Q: 209.66 cfs d50: 1.25 ft =,�•�•.��•�.• .. dmax: 1.875 ft 1�1 iiiviji,',FgritYlti O00 li Do = 54 in a,� I 7:: �` J �I�E' girl 1! Do ©0 3Do Do+La 3Do = 13.5 ft �o I1.. e. r��l y�J 'ittO wirr 1,, 1 iris i� i I' ' � °° � Il,il, . II r a vo 89 , La = 40 ft ,F�^ i .i ': mar Amur]] I ,,I 8 Do + La = 44.5 ft �wp a' it �JaEi Ajar �r,,gR,111l4,'1Pi .ti n r �,_ 4 La 0 .� .,e I '�'7�`��j'�"�t?,��.r.o,qsi i.i. I �Z�AB� r/�.Pen ' $ Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 1160.0 sf Apron thickness*: 2.8125 ft Rip Rap: 163.1 tons Rip Rap Class: 2 ,sm•,°'� ,,,•oo.,� Filter Fabric: 129 sy .,�...•.. .�.a�,.�....�., .om.�.�a..�.�o�.�.�.m��._ „r.>o••.,,.,, Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a.« °.m.,..,1 ��.. .-. „ . L, 1 is .." °,•. f Project: Salisbury Logistics Center a,,,°wr^` gi /-"id: Calculated By: EM Date: 10/19/2023 •. i1 111 ,a . „jr, Revised By: SMC Date: 12/12/2023 w°,m'm'`,. I II �:c .1 ra3 Revised By: Date: __ �( �j� ;, 'I � ,.y- ��' .�.40: ¢�r�ke..;' 1. ID: 1000-FES T,„< 0.5 Do: Y Use Fig. 8.06a I i , i STA: N/A T�„_ 0.5 D N J o" �- gg o N Use Fig. 8.06b � �,,.1 -.-� e �'I�n�'dIa�t�i{�w'� � ��{:( , i DIA: 42 in La: E- tiuii% J, IIlli 111. 26 ft ° tW ,m ,ma Q: 58.05 cfs d50: 0.7 ft =°,�•�•.��•�.• ..° .,.........,.rod. ,>.. .M.a.�.� ,.e. � .. _�_..�.�,...°.,... dmax: 1.05 ft 1�1 „° _1 .`, .1, ,I�riJ Ir�ll�lI lc 1` J 11�E' 19r11! 00 Do = 42 in �,•� / A �;a�,: W,b I? Do 00 3Do Do+0.4La 3D0 = 10.5 ft �o I1.' e. r�i F ij � °° � Il,il, . II r a vo 89 , La = 26 ft .0,. i .i is � � .fl :1!IPiIF ii : In Do + 0.4L b .arig lf�ig!'lli!lk. y l!: , O 8 a 13.9 ft �p ^r:;if) WINVISAR111,1,, +4ia nli: r �,_ � La ..,: '�y�`�1��9/a' �?,3�a��,q��' �ic`;/�%�AB� r/�.Pen ' $ --s • „ ,m ,. ,. ,� Quantity Calculations a" `��`) Outlet Pad: 317.2 sf Apron thickness: 1.575 ft Rip Rap: 25.0 tons Rip Rap Class: 1 vBSTeY°°°°°•°°°°° Filter Fabric: 36 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a.« °.m.,..,1 �f.. .-. „ . L, 1 is ..1 ` °,•. f Project: Salisbury Logistics Center d�,,,,.r�^` n /f� Calculated By: EM Date: 10/19/2023 • a 1111 •;at „jr:, Revised By: Date: w.--'' ,. I n ii o Ak .1 , efF. Revised By: Date: "( j� -,,- ' 411.51..;;' ID: 3100-FES T, < 0.5 Do: Y Use Fig. 8.06a Ii , , STA: N/A T�„_ 0.5 D N J o" �- gg p .r ..- rro 8 o N Use Fig. 8.06b � �,,.1 -.-� e �'I�n�'dIa�t�i{�w'� � �i{:( , i DIA: 54 in La: E- tiuii% J, IIlli Mi. 29 ft ° tW ,m ,ma Q: 72.01 cfs d50: 0.9 ft =°,�•�•.��•�.• ..° dmax: 1.35 ft 1�1 „° _1 'Ill .1, ,I�r Jl'Ir�ll�ll lc 1` J 11�E' 19r11! 00 Do = 54 in �,•� / A �;a�,: W,b I? Do 00 3Do Do+0.4La 3Do = 13.5 ft �o I1' e. ra y� Ot � °° � Il,il, . II r a vo 89 , La = 29 ft .0,. i .i is � � .fl :1!IPiIF ii : In Do + 0.4L b .arig lf�ig!'lli!lk. y l!: , O a 16.1 ft ., iiiEVr.;if) WINVISAR111.1, +�iai n r �,_ -'li; art r /r : . ' •1' �r0� p - i� � La .,: '�y�`�1��9/a' �?,3�a��,q��' � P%�d8� r/�.Pen ' $ - s .- „ ,m ,. No ,� Quantity Calculations a" `�,—) Outlet Pad: 429.2 sf Apron thickness: 2.025 ft Rip Rap: 43.5 tons Rip Rap Class: 1 vBSTeY°°°°°•°°°°° Filter Fabric: 48 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: 05/29/24 P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a.« ,1 ��.. .-. „ . °.m.,..L, 1 is ..1 °,.. f Project: Salisbury Logistics Center d,,,,,.r�^` n /f1 Calculated By: EM Date: 10/19/2023 • a 1111 •;at „jr:, Revised By: Date: ..---'`,. I n ii �� .1 , • ra3.:. Revised By: Date: "( j� -,,- ' ,it-,,II51..;;' ID: 3000-FES T,„< 0.5 Do: N Use Fig. 8.06a Ii , , STA: N/A T�„_ 0.5 D N J o" �- gg p .r ..- lro 8 o Y Use Fig. 8.06b � �,,.1 -.—� ��'I�n�'dIa�t�i{�w'� � ��{:( , i DIA: 54 in La: E- tiuii% J, IIlli Mi. 29 ft . ,.. ,. Q: 89.51 cfs d50: 0.9 ft =°,�•�•.��•�.• ..° dmax: 1.35 ft 1�1 0.1•1 -D.•0.•l. t. -i �, . ammo«lWl , R i aU1 I p� ,l0 _Y `, .1, ,IIr1J 'Ir�ll�l lc O a,� I 1` J 1I��' i9I�1xr 00 Do = 54 in �,.� / A �;a�,: W,b Do 00 3Do Do+0.4La 3D0 = 13.5 ft moo,/ 1. e. ra y� Ott' (� °° � Il,il, . II r a „V Q�, La = 29 ft .0,. i . is I/1►�i d� :�II;Ii:1!IPiIF I i,,I O Do a 16.1 ft .p' iiiEVr.;if) trattlAR111,1,, +�iai n r �,_ � La � .: '�y�`�1��9/a' �?3a����' Quantity Calculations a" `�.) Outlet Pad: 429.2 sf Apron thickness: 2.025 ft Rip Rap: 43.5 tons Rip Rap Class: 1 vBSTeY°°°°°•°°°°° Filter Fabric: 48 sy STORM WATER CONVEYANCE NETWORK CALCULATIONS DISSIPATOR PAD CALCULATIONS(HEC14) Project Information: Project Name: TRACK WEST ROWAN KHA Project#: 013335005 Designed by: BEG Date: Revised by: XXX Date: Checked by: XXX Date: TABLE 10.1 RIPRAP CLASSES AND APRON DIMENSIONS RIP-RAP CLASS NOMINAL SIZE NOMINAL SIZE APRON LENGTH APRON DEPTH (#) D50 D50 MULTIPLIER MULTIPLIER (in.) (ft) (X) (Z) 1 5.0 0.4 4 3.5 2 6.0 0.5 4 3.3 3 10.0 0.8 5 2.4 4 14.0 1.2 6 2.2 5 20.0 1.7 7 2.0 6 22.0 1.8 8 2.0 `TABLE 10.1 WAS UVELOPED FROM HYDRAULIC ENGINEERING CIRCULAR 141HEC-141-"ENERGY DISSIPATORS"REVISED 13-AUG-2012 RIPRAP APRON ANALYSIS TABLE SYMBOL(UNITS) CALCULATE NOMINAL RIP-RAP SIZE SDI SD2 SD3 SD5 SD6 SD7 SD8 SD9 SD10 NOMINAL RIP-RAP SIZE D50(ft) 0.812 0.468 0.638 0.275 0.565 0.566 0.580 0.279 0.602 (10-YR)DESIGN DISCHARGE 0(ft^3/s) 55.81 26.84 61.05 12.20 20.93 30.95 43.38 3.66 73.75 PIPE DIAMETER(FT) D(ft) 3 2.5 3.5 2 2 2.5 3 1 4 TAIL WATER DEPTH(ASSUMED TO BE 0.4*D) TW(ft) 1.2 1 1.4 0.8 0.8 1 1.2 0.4 1.6 GRAVITY CONSTANT g(ft/s) 32.2 32.2 32.2 32.2 32.2 32.2 32.2 32.2 32.2 RIP RAP APRON CHARACTARISTICS RIP RAP CLASS CLASS 3 2 1 3 3 3 1 APRON WIDTH(FT)(START) 3*D(ft) 9 7.5 10.5 6 6 7.5 9 3 12 LENGTH(FT) X*D(ft) 15 10 17.5 8 10 12.5 15 4 20 DEPTH(INCHES) Z*D50(in.) 24.00 20.00 24.00 18.00 24.00 24.00 24.00 18.00 24.00 APRON WIDTH(END) 3*D+(2/3)*L(ft) 19.00 14.20 22.20 11.40 12.70 15.90 19.00 5.70 25.40 ALL RIP RAP CALCULATIONS WERE PERFORMED IN ACCORDANCE WITH THE FHWA"HYDRAULIC ENGINEERING CIRCULAR"14 Kimley>»Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 1 -Phase 1 Drainage Area(Site)(ac)= 16.42 Disturbed Area(ac)= 16.42 Runoff Coefficient(C)= 0.60 Time of Concentration= 30.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 2.53 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 3.42 Flow(Q2)(cfs)= 24.9 (Q=c*i*drainage area) Flow(Q10)(cfs)= 33.7 (Q=c*i*drainage area) Required Storage(cf)= 29,556.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 14,656.8 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 785.00 30,293 0 786.00 32,482 31,388 787.00 34,718 64,988 788.00 37,020 100,857 789.00 39,378 139,056 Riser Elevation 789.75 41,188 169,268 790.00 41,792 179,640 Spillway Elevation 790.50 43,028 200,845 791.00 44,264 222,668 Top of Basin 792.00 46,791 268,196 Designed Storage Elevation(ft)= 790.00 Designed Storage Volume(cf)= 179,640 O.K.>Minimum Required Storage Designed Surface Area(sf)= 41,792 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 24.9 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 2.3 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH7'S 24.9 (Weir equation) H=head above riser crest(ft) 2.25 (fixed based on design parameters) L=circumference of riser(ft) 2.24 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 8.5 Therefore choose Riser size(in)= 18.0 Barrel Size(in)= 12.0 Orifice Flow:Q=CA(2gH)°'S 24.9 H=head above riser crest(ft) 2.3 (C=oriflce coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 3.5 Riser Size determined from A(in) 25.2 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 24.9 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 9.8 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kn for common pipe sizes) a=cross-sectional area of barrel in SF 2.15 Barrel Size(in)= 19.9 Therefore choose Barrel size(in)= 30.0 Riser Size(in)= 36.0 <-From Figure 8.07b Required Riser Size(in)= 36.0 Required Barrel Size(in)= 30.0 Page 1 of 10 Kimley>»Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 789.75 ft Bottom Riser Elev.: 785.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 6.8 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 168.8 cf (Water Displaced) *Bouyancy force 10,530 lbs Water=62.4lb/cf *Weight of Riser 9,113 *Required antifloatation block weight 2,126 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 29,556 (Required Storage Volume Provided for Riser Basin) Days to Drain 2 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.70 Orifice Diamter(in) 3.50 Page 2 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 2-Phase 1 Drainage Area(Site)(ac)= 42.37 Disturbed Area(ac)= 40.00 Runoff Coefficient(C)= 0.60 Time of Concentration= 30.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 2.53 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 3.42 Flow(Q2)(cfs)= 64.3 (Q=c*i*drainage area) Flow(Q10)(cfs)= 86.9 (Q=c*i*drainage area) Required Storage(cf)= 72,000.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 37,820.3 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation 779.00 27,795 0 780.00 29,956 28,876 781.00 32,171 59,939 Riser Elevation 781.40 34,441 73,261 Spillway Elevation 782.40 37,824 109,394 Top of Basin 784.00 39,264 171,064 Designed Storage Elevation(ft)= 782.40 Designed Storage Volume(cf)= 109,394 O.K.>Minimum Required Storage Designed Surface Area(sf)= 37,824 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 64.3 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 2.6 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 64.3 (Weir equation) H=head above riser crest(ft) 2.60 (fixed based on design parameters) L=circumference of riser(ft) 4.65 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 17.8 Therefore choose Riser size(in)= 24.0 Barrel Size(in)= 18.0 Orifice Flow:Q=CA(2gH)°'S 64.3 H=head above riser crest(ft) 2.6 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 8.3 Riser Size determined from A(in) 39.0 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 64.3 L=barrel length(ft) 70.0 Invert elevation of outlet end of barrel(ft) 780.5 h=head above the centerline of the outlet end of 1.8 barrel(ft) (Iterative based on barrel size) Kn, 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kn for common pipe sizes) a=cross-sectional area of barrel in SF 11.92 Barrel Size(in)= 46.8 Therefore choose Barrel size(in)= 42.0 Riser Size(in)= 54.0 <-From Figure 8.07b Required Riser Size(in)= 54.0 5'x5'box equivalent diameter equal to 67.7" Required Barrel Size(in)= 42.0 Page 3 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 784.00 ft Bottom Riser Elev.: 779.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 7.0 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 175.0 cf (Water Displaced) *Bouyancy force 10,920 lbs Water=62.4lb/cf *Weight of Riser 9,450 *Required antifloatation block weight 2,205 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Emergency Spillway: Qv)(cfs)= 86.9 Water Depth Over Spillway(ft)= 0.5 Spillway Length(ft)= 80.0 Spillway Crest Elevation(ft)= 782.4 O.K.>1'Separation Provided Freeboard(ft)= 1.09 O.K.>Minimum Required Freeboard Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 72,000 (Required Storage Volume Provided for Riser Basin) Days to Drain 4 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.80 Orifice Diamter(in) 3.60 Page 4 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 3 Phase 7 Drainage Area(Site)(ac)= 13.62 Disturbed Area(ac)= 13.62 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 3.66 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.60 Flow(Q2)(cfs)= 29.9 (Q=c*i*drainage area) Flow(Q10)(cfs)= 45.8 (Q=c*i*drainage area) Required Storage(cf)= 24,516.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 19,907.0 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 2.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 782.00 116,982 0_ 783.00 121,284 119,133 784.00 125,643 242,597 784.25 126,747 274,145 784.75 128,955 338,071 Riser Elevation 785.00 130,059 370,448 Top of Basin 786.00 134,531 502,743 Designed Storage Elevation(ft)= 784.00 Designed Storage Volume(cf)= 242,597 O.K.>Minimum Required Storage Designed Surface Area(sf)= 125,643 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: QRs(cfs)= 29.9 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.0 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 29.9 (Weir equation) H=head above riser crest(ft) 1.00 (fixed based on design parameters) L=circumference of riser(ft) 9.06 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 34.6 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Orifice Flow:Q=CA(2gH)e'S 29.9 H=head above riser crest(ft) 1.0 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 6.2 Riser Size determined from A(in) 33.7 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)]e'S 29.9 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 2.5 barrel(ft) (Iterative based on barrel size) K> 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kp for common pipe sizes) a=cross-sectional area of barrel in SF 5.09 Barrel Size(in)= 30.6 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 Based on Permanement Pond Routing,the Permanent Outfall Required Barrel Size(in)= 36.0 Structure if sufficient and passes the 100 year event Page 5 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 9.00 ft Riser Width: 9.00 ft Top Riser Elev.: 785.00 ft Bottom Riser Elev.: 778.00 ft Depth of Antiflotation(beyond bottom of riser): 5.00 Overall Height of Riser(including anti-float block): 12.0 ft Outside Area of Riser: 81.0 sf (Water Displaced) Total Volume of Riser: 972.0 cf (Water Displaced) *Bouyancy force 60,653 lbs Water=62.4lb/cf *Weight of Riser 30,600 *Required antifloatation block weight 45,079 factor of safety 1.50 Depth of Antifloatation block: 5 Weight of Anti-flotation block 48,000 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Emergency Spillway: O10(cfs)= 45.8 Ignore this. As Routed,the 100 Passes Thru the Principal Riser Water Depth Over Spillway(ft)= 0.8 Spillway Length(ft)= 20.0 Spillway Crest Elevation(ft)= 785.0 NOT O.K.1'Separation Required Between Riser and Spillway! Freeboard(ft)= 0.2 NOT O.K.INCREASE FREEBOARD! Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 242,597 (Required Storage Volume Provided for Riser Basin) Days to Drain 2 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4 Orifice Radius(in) 1.60 Orifice Diamter(in) 3.3 Page 6 of 10 Kimley>>>Horn SEDIMENT TRAP DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Trap A Drainage Area(Site)(ac)= 3.79 Disturbed Area(ac)= 3.79 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 3.66 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 4.72 Flow(Q2)(cfs)= 8.3 (Q=c*i*drainage area) Flow(Ow)(cfs)= 10.7 (Q=c*i*drainage area) Required Storage(cf)= 13,644.0 (3600 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 4,669.0 (435 s.f.per cfs of Quo peak inflow) Storage Dimensions: Basin Side Slopes(X: 1 )= 2.0 Storage Depth"R"(ft)= 4.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation 775.00 6,006 0 776.00 7,135 6,571 777.00 8,317 14,297 Spillway Elevation 777.50 8,930 18,608 Top of Basin 779.00 9,558 32,474 Designed Storage Elevation(ft)= 777.50 Designed Storage Volume(cf)= 18,608 O.K.>Minimum Required Storage Designed Surface Area(sf)= 8,930 O.K.>Minimum Required Surface Area Sizing of Emergency Spillway: QspiHway(cfs)= 10.7 (spillway designed to pass peak discharge of 10-year storm) Water Depth Over Spillway(ft)= 0.4 Spillway Length(ft)= 15.0 (4'minimum) Spillway Crest Elevation(ft)= 777.5 (1 ft min.above sediment storage depth) Freeboard(ft)= 1.1 (1 ft minimum) Page 7 of 10 Kimley>>>Horn SEDIMENT TRAP DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Trap B Drainage Area(Site)(ac)= 1.64 Disturbed Area(ac)= 1.48 Runoff Coefficient(C)= 0.60 Time of Concentration= 5.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 5.46 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 7.01 Flow(Q2)(cfs)= 5.4 (Q=c*i*drainage area) Flow(Ow)(cfs)= 6.9 (Q=c*i*drainage area) Required Storage(cf)= 5,328.0 (3600 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 3,000.6 (435 s.f.per cfs of Q,o peak inflow) Storage Dimensions: Basin Side Slopes(X: 1 )= 2.0 Storage Depth"R"(ft)= 4.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation 777.00 1,218 0 778.00 1,910 1,564 779.00 2,731 3,885 Spillway Elevation 779.50 3,166 5,359 Top of Basin 781.00 3,615 10,445 Designed Storage Elevation(ft)= 779.50 Designed Storage Volume(cf)= 5,359 O.K.>Minimum Required Storage Designed Surface Area(sf)= 3,166 O.K.>Minimum Required Surface Area Sizing of Emergency Spillway: QspiHway(cfs)= 6.9 (spillway designed to pass peak discharge of 10-year storm) Water Depth Over Spillway(ft)= 0.3 Spillway Length(ft)= 15.0 (4'minimum) Spillway Crest Elevation(ft)= 779.5 (1 ft min.above sediment storage depth) Freeboard(ft)= 1.2 (1 ft minimum) Page 8 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 1 -Phase 2 Drainage Area(Site)(ac)= 25.78 Disturbed Area(ac)= 20.78 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 4.37 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.60 Flow(Q2)(cfs)= 67.6 (Q=c*i*drainage area) Flow(Q10)(cfs)= 86.6 (Q=c*i*drainage area) Required Storage(cf)= 37,404.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 37,680.0 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 785.00 30,293 0 786.00 32,482 31,388 787.00 34,718 64,988 788.00 37,020 100,857 789.00 39,378 139,056 Riser Elevation 789.75 41,188 169,268 790.00 41,792 179,640 Spillway Elevation 790.50 43,028 200,845 791.00 44,264 222,668 Top of Basin 792.00 46,791 268,196 Designed Storage Elevation(ft)= 790.00 Designed Storage Volume(cf)= 179,640 O.K.>Minimum Required Storage Designed Surface Area(sf). 41,792 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 67.6 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.0 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH7'S 67.6 (Weir equation) H=head above riser crest(ft) 1.00 (fixed based on design parameters) L=circumference of riser(ft) 20.48 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 78.2 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Orifice Flow:Q=CA(2gH)°'S 67.6 H=head above riser crest(ft) 1.0 (C=oriflce coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 14.0 Riser Size determined from A(in) 50.7 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 67.6 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 8.5 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kn for common pipe sizes) a=cross-sectional area of barrel in SF 6.24 Barrel Size(in)= 33.8 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 Required Barrel Size(in)= 36.0 Page 1 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 789.75 ft Bottom Riser Elev.: 785.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 6.8 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 168.8 cf (Water Displaced) *Bouyancy force 10,530 lbs Water=62.4lb/cf *Weight of Riser 9,113 *Required antifloatation block weight 2,126 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 37,404 (Required Storage Volume Provided for Riser Basin) Days to Drain 3 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.70 Orifice Diamter(in) 3.50 Page 2 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 2-Phase 2 Drainage Area(Site)(ac)= 18.06 Disturbed Area(ac)= 18.06 Runoff Coefficient(C)= 0.60 Time of Concentration= 12.50 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 4.02 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.16 Flow(Q2)(cfs)= 43.6 (Q=c*i*drainage area) Flow(Q10)(cfs)= 55.9 (Q=c*i*drainage area) Required Storage(cf)= 32,508.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 24,322.5 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 786.00 11,925 0 787.00 14,330 13,128 788.00 16,811 28,698 789.00 19,370 46,789 790.00 22,003 67,475 Riser Elevation 791.00 24,574 90,764 Spillway Elevation 792.25 27,278 123,197 Top of Basin 793.00 30,039 144,662 Designed Storage Elevation(ft)= 791.00 Designed Storage Volume(cf)= 90,764 O.K.>Minimum Required Storage Designed Surface Area(sf)= 24,574 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 43.6 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.3 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 43.6 (Weir equation) H=head above riser crest(ft) 1.25 (fixed based on design parameters) L=circumference of riser(ft) 9.43 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 36.0 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Orifice Flow:Q=CA(2gH)°'S 43.6 H=head above riser crest(ft) 1.3 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 8.1 Riser Size determined from A(in) 38.5 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 43.6 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 9.8 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kr for common pipe sizes) a=cross-sectional area of barrel in SF 3.76 Barrel Size(in)= 26.3 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 5'x5'box equivalent diameter equal to 67.7" Required Barrel Size(in)= 36.0 Page 3 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 791.00 ft Bottom Riser Elev.: 786.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 7.0 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 175.0 cf (Water Displaced) *Bouyancy force 10,920 lbs Water=62.4lb/cf *Weight of Riser 9,450 *Required antifloatation block weight 2,205 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 32,508 (Required Storage Volume Provided for Riser Basin) Days to Drain 2 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.80 Orifice Diamter(in) 3.60 Page 4 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 3-Phase 2 Drainage Area(Site)(ac)= 36.56 Disturbed Area(ac)= 30.00 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 4.37 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.60 Flow(Q2)(cfs)= 95.9 (Q=c*i*drainage area) Flow(Q10)(cfs)= 122.8 (Q=c*i*drainage area) Required Storage(cf)= 54,000.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 53,436.1 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 2.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 782.00 116,982 0_ 783.00 121,284 119,133 784.00 125,643 242,597 Riser Elevation 784.25 126,747 274,145 784.75 128,955 338,071 Spillway Elevation 785.00 130,059 370,448 Top of Basin 786.00 134,531 502,743 Designed Storage Elevation(ft)= 784.00 Designed Storage Volume(cf)= 242,597 O.K.>Minimum Required Storage Designed Surface Area(sf)= 125,643 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: QRs(cfs)= 95.9 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.0 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 95.9 (Weir equation) H=head above riser crest(ft) 1.00 (fixed based on design parameters) L=circumference of riser(ft) 29.05 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 111.0 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Orifice Flow:Q=CA(2gH)°'S 95.9 H=head above riser crest(ft) 1.0 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 19.9 Riser Size determined from A(in) 60.4 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Pipe Flow:Q=a[2gh/(1+Km+K,L)]°'S 95.9 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 2.5 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kp for common pipe sizes) a=cross-sectional area of barrel in SF 16.33 Barrel Size(in)= 54.7 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 Required Barrel Size(in)= 36.0 Page 5 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 784.00 ft Bottom Riser Elev.: 782.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 4.0 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 100.0 cf (Water Displaced) *Bouyancy force 6,240 lbs Water=62.4lb/cf *Weight of Riser 5,400 *Required antifloatation block weight 1,260 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Emergency Spillway: Qio(cfs)= 122.8 Water Depth Over Spillway(ft)= 1.6 Spillway Length(ft)= 20.0 Spillway Crest Elevation(ft)= 785.0 O.K.>1'Separation Provided Freeboard(ft)= -0.6 NOT O.K.INCREASE FREEBOARD! Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 54,000 (Required Storage Volume Provided for Riser Basin) Days to Drain 4 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4 Orifice Radius(in) 1.60 Orifice Diamter(in) 3.3 Page 6 of 8 Kimley>>Horn TEMPORARY DIVERSION ANALYSIS Project Information Project Name: Salisbury Logistics Center KHA Project#: 013335005 Designed by: Revised by: Date: DIVERSION DITCH AND CHECK DAM DATA TABLE Ditch/ Ditch Side Bottom Min.Ditch Max.Ditch Drainage Composite -lc Intensity Peak Flow Max.Depth Min.Depth Max.Calculated Check Dam Phases of Berm Dimensions Slopes Width Gradient Gradient Area C-Value (min) (inlhr) Q,o Manning's of Flow** of Flow** Velocity** Height Construction No. (H:V) (ft.) (ac) (%) (ac) (cfs) "n"" (ft) (ft) (fps) (ft) Required DD1 2'Deep I TRAPEZIODAL 2:1 4.0 1.00% 1.95% 27.20 0.60 30.00 3.42 55.81 0.03 1.57 1.32 6.37 2.00 1,2,FINAL DD2 2'Deep 3:1 4.0 0.75% 0.75% 13.08 0.60 30.00 3.42 26.84 0.03 1.08 1.08 3.45 1.50 1 TRAPEZIODAL DD3 2'Deep 3:1 4.0 0.50% 4.50% 29.75 0.60 30.00 3.42 61.05 0.03 1.78 1.04 8.27 2.00 1 TRAPEZIODAL 2'Deep DD4 3:1 2.0 0.75% 2.25% 2.90 0.60 10.00 5.60 9.74 0.03 0.81 0.62 4.06 1.00 1 TRAPEZIODAL _ _ _ _ _ DD5 2'Deep 3:1 4.0 0.50% 0.50% 3.63 0.60 10.00 5.60 12.20 0.03 0.80 0.80 2.39 1.00 1,2 TRAPEZIODAL DD6 2'Deep 8:1 4.0 0.75% 0.75% 6.23 0.60 10.00 5.60 20.93 0.03 0.78 0.78 2.63 1.00 2 TRAPEZIODAL DD7 2'Deep 8:1 4.0 0.50% 0.88% 9.21 0.60 10.00 5.60 30.95 0.03 1.02 0.90 3.12 1.50 2 TRAPEZIODAL DD8 2'Deep 3:1 4.0 0.50% 0.75% 12.91 0.60 10.00 5.60 43.38 0.03 1.01 0.93 2.78 1.50 2 TRAPEZIODAL DD9 2'Deep 10:1 4.0 0.80% 1.30% 1.09 0.60 10.00 5.60 3.66 0.03 0.32 0.28 1.92 0.50 2 TRAPEZIODAL DD10 2'Deep 10:1 4.0 1.00% 1.00% 4.26 0.60 10.00 5.60 14.31 0.03 0.58 0.58 2.52 1.00 2 TRAPEZIODAL DD11 2'Deep 3:1 2.0 0.75% 2.25% 3.01 0.60 10.00 5.60 10.11 0.03 0.83 0.63 4.10 1.00 1 TRAPEZIODAL DD12 2'Deep 3:1 2.0 1.00% 3.00% 1.50 0.60 10.00 5.60 5.04 0.03 0.55 0.42 3.76 1.00 1 TRAPEZIODAL DD13 2'Deep 3:1 1.0 3.75% 4.50% 0.69 0.60 10.00 5.60 2.32 0.03 0.35 0.33 3.92 0.50 1 TRAPEZIODAL "Manning's"n"roughness coefficient from Manufacturer Specification Sheet. **From Bently Flowmaster channel design software. Ditch/ ECB Max.Calculated Permissible Min.Depth Calculated Permissible Berm Type Velocity** Velocity" of Flow** Shear stress Shear stress" No. (fps) (fps) (ft) 1 (Ibs/ft') (Ibs/fta) DD1 SC150 or 6.37 .. 1.32 1.60 2.00 Greater DD2 DS150 or • 3.45 6.00 1.08 0.51 1.75 Greater _ _ _ DD3 SC150 or - 8.27 8.00 1.04 2.93 2.00 Greater DD4 DS150 or 4.06 6.00 0.62 0.87 1.75 Greater DD5 DS150 or 2.39 6.00 0.80 0.25 1.75 Greater DD6 DS150 or 2.63 6.00 0.78 0.37 1.75 Greater DD7 SC150 or 3.12 6.00 0.90 0.49 1.75 Greater DD8 SC150 or 2.78 6.00 0.93 0.43 1.75 Greater DD9 SC150 or 1.92 6.00 0.28 0.23 1.75 Greater DD10 SC150 or 2.52 6.00 0.58 0.36 1.75 Greater DD11 SC150 or 4.10 6.00 0.63 0.89 1.75 Greater DD12 SC150 or 3.76 6.00 0.42 0.78 1.75 Greater DD13 SC150 or 3.92 6.00 0.33 0.93 1.75 Greater APPENDIX F: SUPPLEMENTAL INFORMATION r ierracon 2701 Westport Road Charlotte, NC 28208 P (704) 509-1777 NC License No. F-0869 Terracon.com May 29, 2024 RP Salisbury Partners, LLC c/o Rooker 445 Bishop St NW Atlanta, Georgia 30318 Attn: Cason Bufe P: (470) 235-3530 E: CasonBufe@RookerCo.com Re: Supplemental Geotechnical Consulting Services - Seasonal High Water Table (Rev 1) Honbarger Tract Lane Parkway Salisbury, North Carolina Terracon Project No. 71225131 Dear Mr. Bufe: Terracon Consultants, Inc. (Terracon) has completed a seasonal high water table (SHWT) exploration for the above-referenced project. This study was performed in general accordance with Terracon Supplement to Agreement for Services dated November 7, 2023. This letter presents the findings of the Seasonal High Water Table (SHWT) Evaluation performed by others. Please refer to our Geotechnical Engineering Report (Revision 1) - Honbarger Tract, Terracon Project No. 71225131, dated January 27, 2023, for additional geotechnical information for design and construction. Our subconsultant, Willcox & Mabe Soil Solutions, evaluated the soil samples in the borings for the evidence of seasonal high water table (SHWT). Based on the evaluation, the soil samples in the observed borings indicated the following SHWT results: Seasonal High Apparent Depth Boring Approximate Water Table Terminated Boring Water Table 1 Boring Elevation (AWT) (inches) Location (SHWT) (feet)1 Depth Depth (inches)2 (inches)2 B-37 791 172 >240 240 B-39 783 55 >120 120 SHWT-1 791 >144 >144 144 SHWT-2 785 >120 >120 120 Facilities I Environmental I Geotechnical I Materials Supplemental Geotechnical Consulting Services -Seasonal High Water Table (Rev 1) .wrrwwwr� Honbarger Tract I Salisbury, North Carolina ICI I QVV� May 29, 2024 I Terracon Project No. 71225131 Apparent Depth Boring Seasonal High Approximate Water Table Terminated Boring Water Table 1 Boring Elevation (AWT) (inches) Location (SHWT) (feet)1 Depth (inches)2 Depth (inches)2 1. Elevations based on topographic map provided by civil engineer. 2. The "Stormwater Control Measure (SCM) Soil Testing, Seasonal High Water Table (SHWT) Evaluation" report is attached to this letter. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this letter, or if we may be of further service, please contact us. Sincerely, Terracon Sean M. Pardy, P.E. Janette M. Prosser, P.E. Project Engineer Senior Engineer Facilities I Environmental I Geotechnical I Materials Supplemental Geotechnical Consulting Services -Seasonal High Water Table Aft rrwwwM Honbarger Tract I Salisbury, North Carolina ICI I QbVI May 29, 2024 I Terracon Project No. 71225131 Attachments Contents: Willcox & Mabe Soil Solutions "Seasonal High Water Table (SHWT) Evaluation - Energy United Statesville Site" dated 11/16/2023 (9 pages) Facilities I Environmental I Geotechnical I Materials willcox&mabe SOIL SOLUTIONS November 16, 2023 Terracon Consultants, Inc. 2701 Westport Road Charlotte,North Carolina 28208 Attention: Ms. Janette M. Prosser, P.E. Transmitted by e-mail:janette.prosser@terracon.com Reference: Stormwater Control Measure(SCM) Soil Testing Seasonal High Water Table(SHWT)Evaluation Proposed SCMs Honbarger Tract II—Rowan County,N.C. Willcox&Mabe Soil Solutions, PLLC Project No. 21-04; Phase: 66 Dear Ms. Prosser: Willcox&Mabe Soil Solutions, PLLC (WMSS)has conducted Stormwater Control Measures (SCM) Soil Testing in accordance with Terracon Consultants, Inc. (Terracon) Subcontract Master Services Agreement dated March 23, 2021, and WMSS Subcontract Work Authorization No. 20-22 dated August 15, 2022 and WMSS Subcontract Work Authorization No. 33-23 dated November 7, 2023. The SCM Soil Testing was performed to provide information for technical assistance with the design of proposed SCMs. A soil scientist investigation was conducted to evaluate the soil properties at four(4)proposed SCM locations, to determine suitability for stormwater management systems. The soil scientist investigation was conducted to evaluate: seasonal high water table (SHWT) elevations below existing ground surface (bgs). A "Site Plan"was provided to WMSS by Terracon that identified relative site features and potential location for the proposed SCMs. PROJECT BACKGROUND The areas evaluated were located within the areas associated with the planned SCMs. The SCMs are planned in conjunction with proposed site improvements associated with the Honbarger tract in Rowan County,North Carolina(N.C.). The proposed SCM locations (Boring location SHWT-1)was located in an existing crop field, and(Boring locations SHWT-2, B-37 and B-39)were located in former pastures. The site is located east of Interstate 85 and south of Lane Parkway in Salisbury,N.C. (Figure 1). Use of on-site stormwater management systems, is being considered to comply with stormwater management requirements. The use of stormwater SCMs is subject to the suitability of site soils and regulatory approval. Regulatory guidance on requirements for Willcox&Mabe Soil Solutions,PLLC/7231 B Summerfield Road/Summerfield,NC 27358/Rob 336.339.9128 or Martin 336.312.1396/www.willcoxmabesoil.com SHWT Evaluation WMSS Project No. 21-04; Phase: 66 Honbarger Tract II November 16, 2023 permitting of stormwater SCMs is provided in the North Carolina Department of Environmental Quality(NCDEQ), Division of Energy, Mineral and Land Resources (DEMLR)— Stormwater Design Manual (NCDEQ-DEMLR-SDM), (Revised, 2017). The NCDEQ-DEMLR-SDM requires that the SHWT shall be taken into consideration for the design of most SCMs. A WMSS soil scientist conducted an evaluation of the soils through the review of hand auger borings (SHWT-1 and SHWT-2), and drill rig borings (B-37 and B-39)within the areas identified on a base map provided by Terracon, and were located in the field by Terracon. Maps were prepared using Arcview 10.8 a Geographic Information System (GIS). Base maps were generated using information from the ESRI Web site and maps provided by Terracon (Figures 1 and 2). FINDINGS Seasonal High Water Table Evaluation The SHWT evaluation was performed on August 23, 2022 by evaluating 2 drill rig borings (B-37 and B-39), and on November 14, 2023 by evaluating 2 hand auger borings (SHWT-1 and SHWT-2)to depths ranging from approximately 120 to 240 inches bgs (Figure 2). The soils were evaluated by a NC Licensed Soil Scientist for evidence of seasonal high water table influence. This evaluation involved observing the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate processes that are driven by SHWT fluctuations such as iron reduction and oxidation and organic matter staining. B-37 was observed to consist of brown sandy clay loam in the upper soil horizon,to dark yellowish brown sandy clay loam and yellowish brown clay in the subsurface horizons. B-37 transitioned into yellowish brown clay with massive structure at approximately 28 inches bgs, followed by multicolored clay loam and multicolored sandy loam and silt loam. Evidence of a SHWT was identified at approximately 172 inches bgs, and no apparent water table (AWT)was observed prior to the boring being terminated at 240 inches bgs. B-39 was observed to consist of dark brown sandy clay loam in the upper soil horizon, to yellowish brown sandy clay loam and multicolored clay in the subsurface horizons. B-39 transitioned into multicolored silt loam and silty clay loam with massive structure at approximately 20 inches bgs, followed by multicolored silty clay loam and silt loam. Evidence of a SHWT was identified at approximately 55 inches bgs, and no AWT was observed prior to the boring being terminated at 120 inches bgs. SHWT-1 was observed to consist of dark yellowish brown sandy clay loam in the upper soil horizon, to yellowish brown clay in the subsurface horizons. SHWT-1 transitioned into multicolored clay loam and sandy loam with massive structure at approximately 28 inches bgs, followed by multicolored clay loam and sandy loam parent material / saprolite. No evidence of a SHWT was identified, and no AWT was observed prior to the boring being terminated at 144 inches bgs. 2 SHWT Evaluation WMSS Project No. 21-04; Phase: 66 Honbarger Tract II November 16, 2023 SHWT-2 was observed to consist of dark yellowish brown sandy clay loam in the upper soil horizon, to yellowish brown clay in the subsurface horizon. SHWT-2 transitioned into yellowish brown clay with massive structure at approximately 13 inches bgs, followed by multicolored clay loam and loam with massive structure at approximately 28 inches bgs, followed by multicolored clay loam and sandy loam parent material/ saprolite. No evidence of a SHWT was identified, and no AWT was observed prior to the boring being terminated at 120 inches bgs. Reference attached Figure 2 for the approximate SHWT test locations, and Table 1 and the attached soil profile descriptions for the approximated SHWT depths. Please note that SHWT evaluations are based on secondary evidence and not on direct groundwater level measurements. Groundwater levels fluctuate for numerous reasons and these findings do not indicate that groundwater levels have not or will not rise above the noted depths. Table 1: Approximated SHWT and AWT Depths Seasonal High Apparent Water Boring Water Table Table Depth Boring Location (SHWT) (AWT) Terminated (inches bgs) (inches bgs) (inches bgs) B-37 172 [ >240 240 B-39 55 >120 120 SHWT-1 >144 >144 144 SHWT-2 >120 >120 120 CONCLUSIONS Based upon our findings associated with the locations evaluated, a SHWT was identified at boring location B-37 at approximately 172 inches bgs, and at boring location B-39 at approximately 55 inches bgs. These findings should be taken into careful consideration when designing appropriate SCMs for the proposed locations. If the proposed SCM locations change from the locations evaluated, further evaluation may be necessary. 3 SHWT Evaluation WMSS Project No.21-04; Phase: 66 Honbarger Tract II November 16,2023 CLOSING Willcox & Mabe Soil Solutions appreciates the opportunity to provide these services to you. If you have any questions,please contact us. Sincerely, Wilcox & Mabe Soil Solutions, PLLC �9 5O11 SC 2S A W I L/ /F • 4" A, C. cSrATE `CO re, tVr- colli rite Nf O 1098 ,O NORTH GP v Martin Mabe Rob Willcox, L.S.S. Partner/ Agronomist Partner/ Soil Scientist Tables: Approximated SHWT and AWT Depths Attachments: Figure 1 —Vicinity Map Figure 2—Boring Location Map Boring Profile Sheets Shared\WMSS Projects\2021\21-04 Terracon Consultants\Phase 66-Honbarger Tract II SHWT\21-04 Honbarger Tract II Stormwater SCM Soil Report.doc 4 • IN �, , r . /s 0•0 0 0 0 0 : 185 / ...,/////. usso1 '''''') .---i-,- • �a d ``av 507 ai 71ff- ;is:v; P46'41 409d------ '� 185 v`� U56ot 1 /,, 185 I IS Dukemortt Street E T. it To- • l,1_��1' f ...�_--- tr Arrowhead Circle N -e Circle 2 p 0 cos I Hey Road min d o_ -a- 0 REFERENCE: m GIS DATA LAYERS WERE OBTAINED FROM ESRI,INC. PLEASE NOTE THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. IT IS NOT MEANT FOR DESIGN,LEGAL,ORANY OTHER USES. THERE ARE NO o GUARANTEES ABOUT ITS ACCURACY. WMSS,PLLC ASSUMES NO RESPONSIBILITY FOR ANY DECISION N MADE OR ANY ACTIONS TAKEN BY THE USER BASED UPON THIS INFORMATION. ©OpenStreetMap(and)contributors,CC-BY-SA o N SCALE: 1 „= 1 000, FIGURE NO. ti • DATE: 11-14-23 VICINITY MAP DRAWN BY: MEM \Mllcox&mabe I `m PROJECT NO: SOIL SOLUTIONS HONBARGER TRACT II ` 21-04 Ph:66 ROWAN COUNTY, NORTH CAROLINA Nit• • 11 - try .1a �.� A� T x,� \ - "" „�,' . , ��% .: , ,\ ,. 'I V � � ,� VV • • V1 ,, ' '- `, ' ?-§. L.y .ten • •�! 1, ..F. 4/ 1 1 It: fir\ I' , _ �• �� r'a., -., • �11 �Ll *,11 C ���y-,�� r ., 4 +., ..,,' �JLrLIUJ ll 2 . J y' f' J r, y a\I� �.rid y i '.. �' r ;.- -- - • , ��. , 1 s� r. i Y r F . it � ' It. age' '` ?" ;�' '1,,.1"r+._, -te c.: ,;14'0'l'f/:/., ;I,',.. - t,, ' ' "; ' iii tti!1 z Ps Alt f f 1 i� 0. . •-°`'.1-o ' „ b 4,T• ;- ...4.4„,, ‘ ,,, Itpk ; :," e'. ' yr./ lip. 0: .. ,, ^ig .` ' ' Nili, I / illi-- co ok!--11— ' .,, - , 4 ''',;s ..,•„ ;,i:Vp41.717 b7;1 41, It v 6 :.;........ ' -a. - it . . 2 r•-»* '.7 ' .-'i-. '4•jv ,4•Filit f.. l' 2 '�� �' °' 0cn 9 Approximate Boring Location to a c REFERENCE: m - GIS DATA LAYERS WERE OBTAINED FROM ESRI,INC. PLEASE NOTE THIS MAP IS FOR INFORMATIONAL ''? • PURPOSES ONLY. IT IS NOT MEANT FOR DESIGN,LEGAL,ORANY OTHER USES. THERE ARE NO o • GUARANTEES ABOUT ITS ACCURACY WMSS,PLLC ASSUMES NO RESPONSIBILITY FOR ANY DECISION N F MADE OR ANY ACTIONS TAKEN BY THE USER BASED UPON THIS INFORMATION. N l ri a,— SCALE: 1 .._ 500' FIGURE NO. ti DATE: 11-14-23IICO BORING LOCATION MAP 2 DRAWN BY: MEM PROJECT NO: SOIL SOLUTIONS HONBARGER TRACT II 21-04 Ph:66 ROWAN COUNTY, NORTH CAROLINA WILLCOX & MABE SOIL SOLUTIONS, PLLC i/ of -- SITE/SOIL EVALUATION Project No. 2 f-04' ptIA5E: Z4 Phone No. Date: gf 23127- Location 1Lloti Bei2L,ER 7 fPin County: l,JA l , Property Size Proposed Facility: ,jTpf(Mw,' r 5'iip Water Supply: On-Site Well ❑ Evaluation: Auger Boring El Community ❑ Pit ❑ Described By: c r3 /'1/1LLCo'C Public ❑ Cut ❑ Weather: ` ur� ,ji 4pj d' Antecedent Moisture / ,i �7 Surface Water: r. /)f-/ L[ De/LL FACTORS PROFILE PROFIL PROFILE PROFILE ,t3- 3C t3- 3 (can +) S- 3q 8- 3`/coo4% Landscape Position% 2 ,_ 2% L - Z-3'7o LEGEND Horizon Depth I b- a Q - 5 LANDSCAPE POSITION Color Munsell /6 ye 3/4- JO /K. 4.13 R Ridge Interfluve Texture ,g.C. I /SC I S Shoulder Structure w sib K Aisb/€. L Linear Slope Consistence 55 ;p 4-( 55 s -Pi FS Foot Slope 1 I N Nose Slope H Head Slope Cc Concave Slope Boundary Cv Convex Slope Horizon Depth II e-_ 4s_ /20 t S - it 1 46)_ 50 T Terrace Color-Munsell /0 Y,e $J(p al K 4-! /D�j/Z 414 j't U l-I-( P Flood Plain Texture e (r 13 I t c l TEXTURE Mottles - s sand Structure Vihatk /fiCjs/for 1 Sb(�/INQbX lyr'gss/v' Is loamy sand Consistence 5 f SS Sb P? S$ Sr .4\r SS S r -P Sl sandy loam I loam si silt sil silt loam Boundary sicl silty clay loam Horizon Depth III /2- 2g te 2? SD - 240 cl clay loam Color-Munsell .6 L// S/(o /6 e sl(p ink I4 1 sel sandy clay loam Texture /C i G c 7 she's to 51150 sc sandy clay Mottles M-,5c ) Inc, — — I sic silty clay Structure rylcr!.s;de 19/SJ //rtlabt neor5,,/ c clay Consistence S p v P l $ p 4 55- S P4611 cf CONSISTENCE WET 1 Ns non-sticky /72"- reabstompl4e Ss slightly sticky -4a re S/ S sticky Boundary Horizon Depth IV 2 We F(tt5 5 Vs very sticky $— 4S 2g 46 Np non-plastic Color-Munsell /n u (1- /awe sly Sp slightly plastic Texture C C I C P plastic Mottles PI' /.$ g (o/Q c- �PP, WC Vp very plastic Structure ma >S1 ive 7ni SS i ke MOIST Consistence 5 r ./.; s p -P vfr Very friable i fr friable fi firm y vfi Very firm Boundary STRUCTURE Soil Wetness } i 2i O I j r7 Z i r sg single grain Restrictive Horizon m massive Saprolite I g.,,- S) tie 28"- massive cr crumb LTAR gr granular Classification sbk subangular blocky abk angular blocky pl platy pr prismatic WILLCOX & MABE SOIL SOLUTIONS, PLLC SITE/SOIL EVALUATION 2 of Project No. 2/-04 pi4 c ,.2¢Phone No. Date: PI 23) 22 Location ] //e,grem, jeiatr Pin County: /(.duJ,q N Property Size Proposed �« �� ty: S7ortnwA.,t,' r l vI W Facili ater Supply: On-Site Well ❑ Evaluation: Auger Boring Community ❑ Pit ❑ Described By: 7a13 l/1f1LL[D v" Public ❑ Cut ❑ Weather: Sa >t ; 14,/qtett Antecedent Moisture i i'/4 Surface Water: FACTORS PROFI E PROFILE 29 PROFILE PROFILE Landscape Position% 7_I 2% l - 3- 4,0 LEGEND Horizon Depth I ,) 6) D _ S LANDSCAPE POSITION Color Munsell w u S 14 10 1, 313 R Ridge Interfluve Texture ] ( 5C1 S Shoulder Structure w b4 wsbe L Linear Slope Consistence 3'5' p c- $S S? " FS Foot Slope N Nose Slope H Head Slope Cc Concave Slope Boundary Cv Convex Slope Horizon Depth II _ I Z. S- 1 S 30- C0 5 T Terrace Color-Munsell Or (S14 /t viz s)4- n 1 f P Flood Plain Texture SG( s; I TEXTURE • Mottles c' S'' ' WIC •r- 30e ,RC 55n_ rcdpx s sand Structure Nab- inarc,Je NJ b,t dla5 s I lie Is loamy sand Consistence $S p-: SS SP „1`,' SS s D .P, sl sandy loam 1 p l loam si silt sil silt loam Boundary sicl silty clay loam Horizon Depth III I Z— ,'(- /5 2O 6,5 - 12 O el clay loam Color-Munsell Mu i--, /Y)A 14-il ma l r< , scl sandy clay loam Texture C C s 1/ sc sandy clay Mottles ri-ID 6,13 41- /Orig. Sr?'> m. /o y,P ( r 2 sic silty clay Structure MG? Si J/�L Y✓ab /!yl SS1✓2 /hASS I ✓G c clay Consistence 5 • -1--r S p 41: SS 5 p f i' CONSISTENCE WET M- 5 4/40 ,4- so? litC Ns non-sticky I Ss slightly sticky S sticky Boundary Vs very sticky Horizon Depth IV z4 alb 2p D Np non-plastic Color-Munsell M j}- r /4 k/ i Sp slightly plastic Texture 4.1 ; 1 Si / /! S;G( P plastic Mottles _ Vp very plastic Structure ,1 . 5111a- /YIAS$1tie MOIST Consistence SS.$ ' P+ .S 1 IC; vfr Very friable /J51I- E'LIDX' 2 ChfaMA - fr friable 112"- Bh/aNl4 011 ockgAm)C fi firm , Y vfi Very firm Boundary STRUCTURE Soil Wetness 514) - I0S tl Si-Ivi r_ SS" sg single grain Restrictive Horizon m massive Saprolite _12°- lass"/de ' cr crumb LTAR 20' Nl�tsS,Jel p✓� gr granular Classification sbk subangular blocky abk angular blocky pl platy pr prismatic WILLCOX & MABE SOIL SOLUTIONS, PLLC SITE/SOIL EVALUATION ���( - of Project No. 2/- i'PHRSE', 64Phone No. Date: a / 14(23 Location liONl�4ee ew *re4GT Pin County: Kptoc)/J Property Size Proposed Facility: SITpP,y'vimrfitv 1 ,D Water Supply: On-Site Well ❑ Evaluation: Auger Boring Community ❑ Pit ❑ Described By: ,8 Prazetlgr' e94/N Miler Public ❑ Cut III Weather: SMAIAIy' W4 'frt Antecedent Moisture De Surface Water: C2e/' FLo�/E S -/e,6 FACTORS PROFILE PROFILE PROFILE PROFILE ji-i'W7 -- I 51f -l6;onr-) sn i- -Z Landscape Position% L , ( _ 2 ®,,, • T— 3-4 476 LEGEND Horizon Depth I 0 -10 O _ 5 LANDSCAPE POSITION Color Munsell /4 Vie 3/4 /Q LI,Q ,414 R Ridge Interfluve Texture SC( < a/ S Shoulder Structure tils,be Sys h Z L Linear Slope Consistence SS S12 $s Sp 7C— FS Foot Slope N Nose Slope H Head Slope Cc Concave Slope Boundary Cv Convex Slope Horizon Depth II /6- 20 /44 5— (3 T Terrace Color-Munsell /Q�Q S!(o M it/ t. /, /D 2- S/f P Flood Plain Texture C // / / S ' C TEXTURE Mottles %e- bye 5)4 — -/)_/Q y, G•f¢ s sand Structure /�jQ+/ij,[' ll245st,re `(/Gbid/4,9 4/ve Is loamy sand Consistence SS- S-p A SS SP P. r -i sl sandy loam F 1/e- res/t raQ , I loam 11- Clay Mettles si silt uy dep)1.2,2 sil silt loam Boundary / sicl silty clay loam Horizon Depth III 26_ 22 13_ 4' cl clay loam Color-Munsell /4 sly /b u e s/e, scl sandy clay loam Texture 7 C C sc sandy clay Mottles -A/t 4.13 {'/R- /Q 4, sic silty clay Structure u/q /l] SS!V : MA se re c clay Consistence .S S S S F+ S p {�,� CONSISTENCE WET 2 thr6tii — '!e— e,/$_fv Lav Ns non-sticky /;fheelt✓oM'C H6- /d y/d £ /2 Ss slightly sticky 1,Mochie0,,c S sticky Boundary Vs very sticky Horizon Depth IV 2$ - 45 /f _ /261, Np non-plastic Color-Munsell /) a/IL,' Mill 4-/ Sp slightly plastic Texture C / C C( I P plastic Mottles ✓n-/A et c/2 l r�1 )_ �j ,fir` ly Vp very plastic Structure in*.SS1 Le MR SS"/ye* MOIST Consistence 5S sp Ss 5r vfr Very friable Z eh /rlj/yb _ fr friable //{ i cimorrIlG fi firm vfi Very firm Boundary STRUCTURE Soil Wetness sfi 7 /44 " s/+ y leo it sg single grain Restrictive Horizon m massive Saprolite all✓WY/lve /3 if ,5.4t cr crumb LTAR gr granular Classification sbk subangular blocky abk angular blocky pl platy pr prismatic 9/6/23, 10:17 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 SALISBURY Station ID:31-7615 ""T°"°44. Location name: Salisbury, North Carolina,USA* '''''''`'* 1 It " Latitude:35.6836°, Longitude:-80.4811° - non 1 Elevation: �°�� Elevation(station metadata):700 ft** '1e„w,,,,,, *source:ESRI Maps **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.384 0.455 0.530 0.583 0.642 0.681 0.716 I 0.745 0.777 0.798 (0.354-0.417) (0.420-0.495) (0.488-0.576) (0.536-0.632) (0.587-0.696) (0.620-0.738) (0.647-0.776)1(0.670-0.810) (0.691-0.847) (0.703-0.872) 10-min 0.614 0.727 0.849 0.933 1.02 1.08 1.14 1.18 1.23 1.26 (0.566-0.665) (0.671-0.791) (0.782-0.923) (0.856-1.01) (0.935-1.11) (0.987-1.18) (1.03-1.23) _(1.06-1.28) (1.09-1.34) (1.11-1.37) 15-min 0.767 0.914 1.07 1.18 1.30 1.37 1.44 1.49 1.55 1.58 (0.707-0.832) (0.844-0.994) (0.989-1.17) (1.08-1.28) (1.18-1.40) (1.25-1.49) (1.30-1.56) (1.34-1.62) (1.38-1.69) (1.39-1.72) 30-min 1.05 1.26 1.53 1.71 1.92 2.07 2.20 2.32 2.46 2.55 (0.970-1.14) (1.16-1.37) (1.41-1.66) i (1.57-1.85) (1.76-2.08) (1.88-2.24) (1.99-2.39) (2.09-2.52) (2.19-2.68) (2.25-2.79) 60-min 1.31 1.58 1.96 2.23 2.56 2.80 3.04 3.26 3.53 3.73 (1.21-1.42) (1.46-1.72) (1.80-2.13)_ (2.04-2.41) (2.34-2.77) (2.55-3.04) (2.74-3.29) (2.93-3.54) (3.14-3.85) (3.28-4.07) 2-hr 1.51 1.83 2.28 2.61 3.04 3.36 3.67 3.98 4.37 4.66 (1.39-1.64) (1.68-1.99) (2.09-2.48)_ (2.39-2.84) (2.77-3.30) (3.04-3.65) (3.30-4.00) (3.55-4.34) (3.85-4.78) (4.06-5.10) 3-hr 1.61 1.94 2.43 2.79 3.28 3.65 4.01 4.38 4.86 5.22 (1.48-1.75) (1.79-2.12) (2.23-2.65) (2.56-3.04) (2.98-3.56) (3.30-3.96) (3.60-4.35) (3.89-4.76) (4.26-5.30) (4.53-5.71) 6-hr 1.95 2.34 2.93 3.38 3.98 4.45 4.93 5.40 6.04 6.53 (1.79-2.12) (2.16-2.56) (2.69-3.20) (3.10-3.68) (3.62-4.32) (4.02-4.83) (4.42-5.34) (4.79-5.86) (5.28-6.57) (5.63-7.11) 12-hr 2.29 2.76 3.46 4.01 4.76 5.35 5.96 6.59 7.44 8.09 (2.11-2.50) (2.54-3.02) (3.18-3.77) (3.68-4.37) (4.32-5.16) (4.83-5.79) (5.33-6.44) (5.82-7.11) (6.46-8.02) (6.93-8.74) 24-hr 2.73 3.30 4.14 4.80 5.70 6.41 7.13 7.88 8.89 9.68 (2.56-2.93) I(3.09-3.54) (3.88-4.44) (4.48-5.14) (5.30-6.10) (5• .96-6.86) (6.61-7.64 (7.28-8.44) (8.18-9.54) (8.88-10.4) 2-day 3.17 3.82 4.75 5.48 6.47 7.24 8.04 8.84 9.94 10.8 (2.97-3.38) (3.58-4.07) (4.45-5.07) (5.12-5.84) (6.03-6.89) (6.74-7.72) (7.46-8.56) (8.18-9.44) (9.16-10.6) (9.91-11.5) 3-day 3.37 4.05 5.02 5.78 6.81 7.62 8.45 9.30 10.4 11.3 (3.17-3.59) (3.81-4.32) (4.71-5.35) (5.41-6.15) (6.36-7.25) (7.10-8.12) (7.85-9.00) (8.61-9.91) (9.64-11.2) (10.4-12.1) 4-day 3.58 4.29 5.29 6.08 7.15 8.00 8.86 9.75 11.0 11.9 (3.37-3.80) (4.04-4.57) (4.97-5.63)_ (5.70-6.46) (6.68-7.60) (7.46-8.51) (8.24-9.44) (9.04-10.4) (10.1-11.7) (10.9-12.7) 7-day 4.13 4.93 6.00 6.84 7.99 8.91 9.84 10.8 12.1 13.1 (3.91-4.39) (4.66-5.24) (5.66-6.36)_ (6.45-7.26) (7.51-8.48) (8.35-9.44) (9.19-10.4) (10.1-11.5) (11.2-12.9) (12.1-14.0) 10-day 4.71 5.60 6.73 7.61 8.79 9.71 10.6 11.6 12.8 13.8 (4.47-4.98) I (5.32-5.91) (6.38-7.10) (7.21-8.02) (8.30-9.27) (9.16-10.2) (10.0-11.2) I (10 9-12.2) (12.0-13.6) (12.9-14.7) 20-day 6.34 7.48 8.83 9.89 11.3 12.4 13.6 14.7 16.3 17.4 (6.04-6.64) (7.13-7.84) (8.40-9.25)_ (9.40-10.4) (10.7-11.9) (11.8-13.1) (12.8-14.3) (13.8-15.5) (15.2-17.1) (16.3-18.4) 30-day 7.84 9.22 10.7 11.9 13.4 14.5 15.7 16.8 18.3 19.4 (7.50-8.20) (8.82-9.63) (10.2-11.2) (11.3-12.4) (12.7-13.9) (13.8-15.2) (14.8-16.4) (15.9-17.6) (17.2-19.2) (18.3-20.4) 45-day 9.86 11.5 13.2 14.4 16.1 17.3 18.5 19.6 21.2 22.3 (9.48-10.3) (11.1-12.0) (12.7-13.7) (13.8-15.0) (15.4-16.7) (16.5-18.0) (17.6-19.3) (18.7-20.5) (20.1-22.1) (21.1-23.3) 60-day 11.7 13.7 15.4 16.8 18.5 19.8 21.1 22.3 23.8 25.0 (11.3-12.2) (13.2-14.2) (14.9-16.0) (16.2-17.4) (17.8-19.2) (19.0-20.6) (20.2-21.9) (21.3-23.2) (22.7-24.8) (23.8-26.1) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 1/4 9/6/23, 10:17 AM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.6836`, Longitude: -80.4811` 25 - Average recurrence interval (years) c 20 . 1 -C 2 ate, 15 - — 5 v — 10 o — 25 A'rigio0 — 50 1010 - •a — 100 Va �� — 200 5 -- 500 -= f� — 1000 0 I 1 1 I I 1 I I 1 1 I 1 I I C_ C _C C_ .>. >,C - ' " - - >. > >, >. >. >.>. E E E E E N Rti 6 N v v 10-0 -0 -0 -0 v -0-0 LA O ,N O O.) Duration IN N A V ^ O O O 'Cr O 25 - ^. 20 - c Duration s 15 - —.Mil —...1 — 5�nrn — 2-day C — 10-non — 3-day 011 z., 0 15-min — 4-day a10 �� — 30-mon — 7-day 1= — 60-mm — 10-day al EL ' — 2-hr — 20-day 5 —�� — — 3fir — 30-day ------� — 6-hr — 45-day 0_ _f — — 12-hr — 60-day ' ' ' ' ' 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Sep 6 14:14:24 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 2/4 9/6/23, 10:17 AM Precipitation Frequency Data Server Franklin' o i • spo / 5t Salisbury' r-•„ , ( �, — 3km 2miEft ail . R l Large scale terrain • i t• Bristol • 0 City. 0 f•,:` Winston-Salem • • Durham Greensboro • ;• lit Mitchell I Raleic ri •Asheville NORTHICAROLINA •Charlotte Fayetteville ).ji 100km l 1i ' ii I H i- ARCI I N . ..., J Large scale map ipott BO ;Johnson City ti instonS lem p Greensboro D -J I �� Asheville North Carolina arl offs —� + ill Gr le 100km , J 60mi .7, Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 3/4 9/6/23, 10:17 AM Precipitation Frequency Data Server igsRort_•-Bristol—; _ • ) - -- Johnson City • Winston-Salem • • Greensboro Durham • Rateic Asheville • North Carolina Charlotte • I evil • Greenville • 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 4/4 9/13/23,3:06 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 °`' .°\. Location name: Salisbury, North Carolina,USA* �'''"``P g A Latitude:35.6672°, Longitude:-80.4696° - none 1. . p Elevation: 782 ft** 1 i? �o�•E �,a`' *source:ESRI Maps "�s„� J s **source:USGS """`' POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90%confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 4.62 5.46 6.37 7.01 7.72 8.18 8.59 8.94 9.32 9.56 (4.26-5.02) (5.04-5.94) (5.87-6.92) (6.43-7.60) (7.04-8.35) (7.44-8.87) (7.78-9.32) (8.04-9.72) _(8.29-10.2) (8.44-10.4) 10-min 3.68 4.37 5.11 5.60 6.14 6.52 6.83 7.09 7.37 7.53 (3.40-4.00) I (4.03-4.75) (4.70-5.54) (5.14-6.07) (5.62-6.65) (5.93-7.06) (6.17-7.40) (6.38-7.70) (6.56-8.03) (6.64-8.22) 15-min 3.07 .•• 1 '.7 5. • 5.51 5.7. 5.96 6.19 6.30 (2.83-3.34) (3.38-3.98) (3.96-4.68) (4.34-5.12) , 4.74-5.62) 55.00-5.96) (5.20-6.24) (5.36-6.48) (5.50-6.74) (5.56-6.88) 30-min 2.11 2.53 3.06 3.42 3.85 4.14 4.41 4.64 4.92 5.10 (1.94-2.29) (2.33-2.75) (2.82-3.32) (3.14-3.71) (3.51-4.17) (3.77-4.49) (3.98-4.78) (4.17-5.04) (4.38-5.36) (4.50-5.57) 60-min 1.31 1.59 1.96 2.23 2.56 2.80 3.04 3.26 3.53 3.72 (1.21-1.42) (1.46-1.73) (1.80-2.13)_ (2.05-2.42) (2.34-2.77) (2.55-3.04) (2.74-3.29) (2.93-3.54) (3.14-3.84) (3.28-4.06) 2-hr 0.757 0.916 1.14 1.31 1.52 1.68 1.84 1.99 2.18 2.33 (0.696-0.824) (0.842-0.999) (1.05-1.24)_ (1.20-1.42) (1.38-1.65) (1.52-1.82) (1.65-2.00) (1.77-2.17) (1.92-2.39) (2.03-2.55) 3-hr 0.536 0.648 0.809 0.931 1.09 1.22 1.34 1.46 1.62 1.74 (0.493-0.585) (0.597-0.707) (0.744-0.883) (0.852-1.01) (0.992-1.18) (1.10-1.32) (1.20-1.45) (1.30-1.58) (1.42-1.76) (1.51-1.90) 6-hr 0.325 0.392 0.489 0.565 0.665 0.744 0.823 0.903 1.01 1.09 (0.299-0.355) (0.361-0.428) (0.450-0.535) (0.517-0.615) (0.605-0.723) (0.673-0.807) (0.738-0.893) (0.801-0.979) (0.883-1.10) (0.942-1.19) 12-hr 0.190 0.229 0.287 0.333 0.395 0.445 0.496 0.548 0.619 0.673 (0.175-0.207) (0.211-0.251) (0.264-0.313) (0.305-0.363) (0.359-0.429) (0.401-0.481) (0.443-0.535) (0.484-0.591) (0.537-0.667) (0.576-0.727) 24-hr 0.114 0.137 0.172 0.200 0.237 0.267 0.297 0.328 0.371 0.404 (0.106-0.122) (0.129-0.147) (0.161-0.185) (0.187-0.214) (0.221-0.254) (0.248-0.286) (0.275-0.318) (0.303-0.352) (0.341-0.398) (0.370-0.433) 2-day 0.066 0.079 0.099 0.114 0.134 0.151 0.167 0.184 0.207 0.225 (0.061-0.070) (0.074-0.085) (0.092-0.105) (0.106-0.121) (0.125-0.14J(0.140-0.161) (0.155-0.178) (0.170-0.197) (0.191-0.221) (0.206-0.240) 3-day 0.046 0.056 0.069 0.080 0.094 0.106 0.117 0.129 0.145 0.157 (0.044-0.050) (0.053-0.060) (0.065-0.074) (0.075-0.085) (0.088-0.100) (0.098-0.113) (0.109-0.125) (0.119-0.137) (0.134-0.155) (0.145-0.168) 4-day 0.037 0.044 0.055 0.063 0.074 0.083 0.092 I 0.101 0.114 I 0.124 (0.035-0.039) (0.042-0.047) (0.051-0.058) (0.059-0.067) (0.069-0.079) (0.077-0.088) (0.086-0.098) (0.094-0.108) (0.105-0.122)i (0.114-0.132) 7-day 0.024 0.029 0.035 0.040 0.047 0.053 0.058 I 0.064 0.072 0.078 (0.023-0.026) (0.027-0.031) (0.033-0.037) (0.038-0.043) (0.044-0.050) (0.049-0.056) (0.054-0.062) (0.059-0.068) (0.066-0.076) (0.072-0.083) 10-day 0.019 0.023 0.028 0.031 0.036 0.040 0.044 0.048 0.053 0.057 (0.018-0.020) (0.022-0.024) (0.026-0.029) (0.030-0.033) (0.034-0.038) (0.038-0.042) (0.041-0.046) (0.045-0.051) (0.050-0.056) (0.053-0.061) 20-day 0.013 0.015 0.018 0.020 0.023 0.025 0.028 I 0.030 0.033 I 0.036 (0.012-0.013) (0.014-0.016),(0.017-0.019) (0.019-0.021) (0.022-0.024) (0.024-0.027) (0.026-0.029),(0.028-0.032) (0.031-0.035)1(0.033-0.038) 30-day 0.010 0.012 0.014 0.016 0.018 0.020 0.021 0.023 0.025 0.027 (0.010-0.011) (0.012-0.013) (0.014-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.022) (0.022-0.024) (0.023-0.026) (0.025-0.028) 45-day 0.009 0.010 0.012 0.013 0.014 0.016 0.017 I 0.018 0.019 0.020 (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.014-0.015) (0.015-0.016) (0.016-0.017) (0.017-0.019) (0.018-0.020) (0.019-0.021) 60-day 0.008 0.009 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 (0.007-0.008) (0.009-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015)i(0.014-0.016) (0.015-0.017) (0.016-0.018)1 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lot=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 1/4 9/13/23,3:06 PM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.6672°, Longitude: -80.4696° 101 - Average recurrence ,__ inter\al (years l TZ r 1 I 10 „_-:::::_. 5 — 10 10-1 _ \` a \\ — 200 a �,- — 500 — 1000 10-2 i i i 1 1 1 1 1 1 •_C C C C_ C 6- 6- 6- 6- 1- T TT >. A A T TT E E E E E A r6 kb N 4 v v v v 7 -o v v v .-1 NO ,,-1 m Duration N N O N m cr 1.0 101 - I — iimmill111111111111111111111111111111111 10° - — Duration Y. IIIMIIIII. 1.1 == — 5-min — 2-day __ — 10i1M — 3-day— 15aNn — 4-dayc10-1 - — 30nNn — 7-day — 60 nNr — 1 da ya — 2-hr — 20-day ar a` momomeim — 3-hr — 30-day — 6-hr — 45-day 10-2 — 12-hr — 60-day — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Sep 13 19:05:33 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 2/4 9/13/23,3:06 PM Precipitation Frequency Data Server c' 1 `S . Spencer East Spencer Ltd i cs• s Salisbu ROWANC0, ^ ✓off, +AIRPORT r T nd.910S. • 3km \1 2mi rimer, � Large scale terrain f- • ' .. t• Bristol � 1 • 0 Ci� Winston-Salem • • Durham Greensboro • c, Nit Michell I ` Raleic •Asheville NORTHICAROLINA •Charlotte Fayetteville• + 100km l lJ Li son C: ARO1 TNA Large scale map IPA B ist l Johnson City inston8 gem Greensboroam • _ Ralep Ash North Carolina arlotte III .p Greenvale a 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lit=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 3/4 9/13/23,3:06 PM Precipitation Frequency Data Server Iss2ort_.-tan st of Johnson City Winston Salem • Greensboro Durham Raleie • Asheville • North Carolina Charlotte f evil Greenville • • 100km 60mi \ Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.aov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 4/4