Loading...
HomeMy WebLinkAboutSW3240202_Supplemental Info Review_20240530 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 5/30/2024 5:11:03 PM(Supplemental Submittal) Accept by bethany.georgoulias 6/3/2024 7:41:21 AM(Supplemental Info Submittal) • The task was assigned to DEMLR Post-Construction Team 5/30/2024 5:11:09 PM • The task was assigned to bethany.georgoulias by round robin distribution 5/30/2024 5:11:09 PM =DEQ • Submittal from 5/30/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW3240202 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Rowan 85 Trade Center Owner/Operator* RP SALISBURY PARTNERS LLC County: Rowan Submitter Name:* Shannon Craven Who is submitting this information? E-mail Address:* shannon.craven@kimley-horn.com Phone Number* 9802965393 Additional E-mail for austin.watts@kimley-horn.com Submittal (Optional) Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Plansheet-Cover Sheet File Upload Click the upload button,or drag and drop files to attach C001 -Cover Sheet.pdf 708.34KB Only PDF files are accepted. File Type* Plansheet-Notes File Upload Click the upload button,or drag and drop files to attach C002 General Notes.pdf 496.35KB Only PDF files are accepted. File Type* Plansheet-Existing Conditions/Survey File Upload Click the upload button,or drag and drop files to attach C101-109-Existing Conditions.pdf 38.13MB Only PDF files are accepted. File Type* Plansheet-Proposed Conditions/Site Plan File Upload Click the upload button,or drag and drop files to attach C301-C306-Site Plans.pdf 3.92MB Only PDF files are accepted. File Type* Plansheet-Grading/Drainage Plan File Upload Click the upload button,or drag and drop files to attach C401-C411 -Grading and Drainage Plans.pdf 9.48MB Only PDF files are accepted. File Type* Plansheet-SCM Detail File Upload Click the upload button,or drag and drop files to attach C451-C454-SCM Details.pdf 3.99MB Only PDF files are accepted. File Type* Plansheet-Existing Drainage Area File Upload Click the upload button,or drag and drop files to attach C431 Pre-Development Drainage Map.pdf 6.25MB Only PDF files are accepted. File Type* Plansheet-Proposed Drainage Area File Upload Click the upload button,or drag and drop files to attach C432-Post-Development Drainage Map.pdf 6AMB Only PDF files are accepted. File Type* USGS Topographic Site Map File Upload Click the upload button,or drag and drop files to attach USGS Topo Map.pdf 41.08MB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach Rowan 85 Trade Center-SuppEZ-Signed.pdf 1.38MB Only PDF files are accepted. File Type* Wetland Determination/Report File Upload Click the upload button,or drag and drop files to attach Rowan 85 Trade Center-PJD Approval.pdf 1.41 MB Only PDF files are accepted. File Type* Stormwater Report File Upload Click the upload button,or drag and drop files to attach Rowan 85 Trade Center-Stormwater Report- 66.59MB Signed.pdf Only PDF files are accepted. File Type* Application Form File Upload Click the upload button,or drag and drop files to attach Rowan 85 Trade Center-Stormwater Application- 2.26M6 Signatures.pdf Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: A hard copy submittal package has been sent to the Central NCDEQ office for review as well. * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Shannon Craven Signature: �llli4'�YO�Y t%�Itlezwl' Date Submitted: 05/30/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW3240202 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 06/03/2024