Loading...
HomeMy WebLinkAboutNCC230375_Modification Confirmation Email_20240603 Georgoulias, Bethany From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Monday, June 3, 2024 7:16 AM To: nuwan.wijesuriya@duke-energy.com; reubenjones@dukeenergy.com Cc: Georgoulias, Bethany; Holloman, Tevye L Subject: [External] Construction SW Permit Contact Information Update for NCC230375 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. This email is to notify you that contact information has been updated for Duke Energy Progress Tabor City Substation Rebuild, under COC No. NCC230375. You can review the information in the permit folder in our Laserfiche Repository. The following contact information is now associated with this permit record. If anything is in error, please contact Bethany Georgoulias at bethany.georgoulias@deq.nc gov. Legally Responsible Individual Nuwan Wijesuriya nuwan.wijesuriya@duke-energy.com (919) 546-2090 (Mailing Address)410 South Wilmington Street, , Raleigh, NC, 27601, US (Street Address)410 South Wilmington Street, , Raleigh, NC, 27601, US Site Contact Reuben Jones (Organization) Duke Energy Progress, LLC reuben.jones@dukeenergy.com 919-210-2532 (Mailing Address)411 Fayetteville Street, , Raleigh, NC, 27601, US Billing Contact (if available) nuwan.wijesuriya@duke-energy.com (919) 546-2090 This change was requested by: Nuwan Wijesuriya (Lead Transmission Permitting Manager)via Modification request submitted on 5/31/2024. Be sure to add laserfiche.ncdenr.gov@mccic loud.io to your contacts to avoid future e-mails about this application from going into Spam filters. The NC DEMLR Stormwater Program 512 N. Salisbury Street,Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 1 D� Q� This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. 2 Georgoulias, Bethany From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Monday, June 3, 2024 7:17 AM To: Nuwan.Wijesuriya@duke-energy.com Cc: Georgoulias, Bethany;Josh.witherspoon@duke-energy.com; reubenjones@dukeenergy.com; rtjoyner@appianengineers.com Subject: [External] Modification Confirmation CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. This e-mail is to notify you that the modification information for COC No. NCC230375 for the project Duke Energy Progress Tabor City Substation Rebuild that you submitted on 5/31/2024 has been added to the permit file records as of 6/3/2024. Modification Reason: Legally Responsible individual has changed, additional acreage disturbed Additional Details (if provided):This project was previously approved by NCDEQ per Letter of Approval (COLUM-2023-007), dated 2/6/23, for 4.9 acres of disturbance. The revised plan enlarges the Limits of Disturbance to expand the transmission line maintenance area and allow additional"Danger Tree Zone" Low Impact/Selective Clearing.As shown on sheets 7A and 7B, existing grassed surfaces will be used for access for line maintenance (no grading, earthwork, stone, etc., proposed).Any disturbed grass will be seeded. A new Temporary Construction Easement is shown per agreement between Mitchel Strickland and Duke Energy.Approximately 3.0 additional acres will be disturbed, for a new total land disturbance of 7.9 acres. You can find all Construction COC Permit files in our Document Repository here. Questions? Please contact The NC Stormwater Program at(919) 707-3640. Be sure to add laserfiche.ncdenr.gov@mccic loud.io to your contacts to avoid future a-mails about this application from going into Spam filters. The NC DEMLR Stormwater Program 512 N. Salisbury Street,Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. i