Loading...
HomeMy WebLinkAboutNCC230375_MODIFICATION Supporting Documents_20240531 (2) ©copyright 2022 Appian consulting Engineers. P.A. These drawings have been prepared as instruments of service fora particular site or building improvement and remains the property of the Engineer for use under his supervision. No reproduction or other use is allowed without his permission. EROSION CONTROL NOTES i / II.II� Revised L/74/73 HELENA CHEMICAL COMPANY MATCH LINE(SEE SHEET 7B) / NELL L BUEEION REVOCABLE TRUST AFM TAX DEPARTMENT �I BB 9J0 PG 441 Lw 936 PG SPE g FIX OIJt02-89-7JJ9,000 PTO:0131,02-59-758I.000 MATCH LINE(SEE SHEET 7A) "g 1, NC CONSTRUCTION GENERAL PERMIT(NCG011: 16. SEEDING:Refer to Stabilization Timeffame Table in Erosion Control Narrative. /� / ,''I11 II a. Federal rules require that NCDEQ DEMLR receives a Notice of Intent(NOT)on each construction a. Vegetation shall be established on all disturbed areas within 7 or 14 days of completion of any phase I 7 ACCESS FOR LINE MAINTENANCE.E%ISTNG GRASSED project and issue each construction project its own Certificate of Coverage(COC). Both the NCDEQ of grading activities or where construction will temporarily cease for more than 7-14 calendar days(as /' SURFACE TO BE USED FOR ACCESS PATH(NO GRADING, E&SC permit and COC must be obtained before and land disturbing activities occur. A copy of the shown on Stabilization Timeframes Table). I I EARTHWORK,STONE,ETC.PROPOSED)NO LAND approved E&SC permit,the Certificate of Coverage and a hard copy of the plan must be kept on site, b. Permanently seed areas that will not be re-disturbed. DO NOT ALLOW ANY DISTURBED AREAS TO / DISTURBANCE PROPOSED.ANY DISTURBED GRASS TO BE SEEDED preferably in a permits box,and accessible during inspection. REMAIN DISTURBED ANY LONGER THAN NECESSARY and do not remove protection devices until / b. Contractor to refer to and follow instructions on the NCGO1 Ground Stabilization and Materials adequate ground cover has been achieved. I // III Handling plan sheet and the NCGO1 Inspection,Recordkeeping,and Reporting plan sheet.Contractor c. Areas to receive PERMANENT SEED shall receive 2-Inch thick blanket of COMPOST(not as soil NORTH to follow notes on those NCGO1 sheets or as shown on plans,whichever is more strict, amendment)and seed.Compost not to be used for temporary applications, ""� / \ I `' qu / I \ I 2. Obtain copy of approved permits prior to disturbing site. Retain copy of all the following approved d. Ensure vigorous stand of grass before removing temporary control measures. '• / 7 II permits on site:Contractor to install a permit box on site in a conspicuous place,which should contain: 17. All applicable E&S control must be maintained until a vigorous stand of permanent ground cover is / a. Set of complete construction plans established.Any additional land disturbing activities outside limits of disturbance must be addressed in a `\ I / /'t b. NCDEQ Erosion and Sedimentation Control Permit and DEMLR Certificate of Coverage revised E&S control plan. c. NPDES NCGO1 Inspection Log 18. After the permanent cessation of construction activities,any areas with temporary ground stabilization I7 / d. Self-Inspection Reports shall converted to r nstabilizationb t in nocaselonger than 9 -- - p p s a be co a edgall das soonas practicable but o g 0 - ----- ----- -- e. Rain gauge calendar days after the last land disturbing activity.Temporary ground stabilization shall be maintained in `\ / j/ gr' 3. PRECONSTRUCTION CONFERENCE WILL BE REQUIRED WITH CONTRACTOR,APPIAN AND DEP. a manner to render the surface stable against accelerated erosion until permanent ground stabilization is I III 4. To notify of project startup,Contractor to call NCDEQ Land Quality Section(Washington Regional Office) achieved.Refer to NCGO1 Ground Stabilization and Materials Handling plan sheet. (910)796-7326. Pre-Con may be requested at NCDEQ option. All applicable E&S control must be 19. If Contractor exceeds limits of disturbance,a revised Erosion Control Permit will be required from NCDEQ. \, , g, I1 maintained until a vigorous stand of permanent ground cover is established. Any additional land Revised E&S plan,permit and/or violation fees will be at Contractor's expense. 1� I V / 1111 disturbing activities outside limits of disturbance must be addressed in a revised E&S control plan. 20. The Contractor shall maintain erosion control measures on a daily basis. These items will only be paid for ‘ / 5. Contractor shall contact the 811 One Call Center for locations of existing utilities at least 72 hours prior to once.Maintenance shall be an incidental to installation.The Contractor is responsible for any sediment :�� / I �`� beginning construction(1-800-632-4949), that leaves the site and any associated clean up and fines issued by NCDEQ. �® / i g 6. Contractor is to notify NCDEQ,DEP,and Appian at least 48 hours prior to starting work.Erosion control 21. The Contractor is responsible for control of sediment on site until the project is handed over to the �� . / is under the jurisdiction of NCDEQ Wilmington Regional Office. Owner.If erosion and sedimentation control measures shown on the plans prove insufficient,Contractor " •00 7. No clearing,construction or land disturbance activity may begin on the site until erosion and is to take additional steps to stop sediment from leaving this site.Adequate and appropriate measures ����®4, I sedimentation control measures have been installed in locations as shown on these plans. must be properly installed within the limits of disturbance to prevent sediment from leaving the site, / 44 ����4 8. Contractor shall NOT disturb any wetlands,buffers or streams,except as shown. entering existing drainage systems,and impacting natural watercourses or adjoining property. /.��♦��.\N I ,. ADDMONAL PERMITTED AREA 9. Maintain construction site in a condition to prevent mud or sediment from leaving the site.Mud and dirt 22. DEP shall conduct project NPDES inspections of erosion control measures and stormwater outlets once .`�' tracked into the paved areas must be removed immediately, every seven calendar days and within 24 hours of every rain event 1 inch or greater.All control devices ♦♦•♦♦ I 10. All construction debris shall be disposed of off-site in a statepermitted landfill. shall be maintained as specified in the NCDEQErosion&Sediment Control Planningand Design Manual.p p r ♦���♦�♦�♦SA \ / a. Contractor shall remove all of the wood,trees,stumps and trash from the substation and access areas A rain gauge shall be installed at the project site to facilitate rainfall monitoring. The Contractor shall (�,�►��� g,JYI including the cut and fill slopes,and erosion control areas and dispose of this material in a DEP maintain these records in the permit box for audit by regulatory agencies. t ((�♦a e,♦ \\\5I/I approved and NCDEQ permitted landfill site.Grinding the wood,trees,stumps and roots with a tub- 23. DEP shall conduct NCDEQ Self-Inspections for erosion and sedimentation control and complete the self- TABOR pie sssM COMMITTEE r ai°F 100 /I•♦�♦+•♦a)� type grinder is acceptable,but the resulting mulch shall be removed from the site inspection report for land disturbing activity form as required by NCGS 113A-54.1 after each phase of the vmg ma<.02-sz-72ee.000 ♦ `�t'�'�(� 11. STOCKPILE: Due to the small,manageable segmented plan of construction for this project,NO approved erosion and sedimentation control plan.DEP shall maintain the reports on site to be available � STOCKPILING of earthen materials or vegetation shall be allowed. All topsoil,unclassified excavation, to the erosion control inspector at all times. !y r\ clearing/grubbing debris and any other construction debris shall be hauled off-site in a state permitted 24. Contractor shall maintain erosion control measures as described in the Erosion Control Narrative • "5 b landfill. There shall be NO STOCKPILING of these materials,as they will be placed into a dump truck throughout construction. �'�A 1 �: f ...�'.� I I INSTALL TEMPORARY BRIDGE PANELS, immediately upon excavation. 25. ONCE THE SITE IS COMPLETELY STABILIZED AND THE PROJECT COMPLETE,NOTIFY DEP AND APPIAN PRIOR -�♦r♦�♦r��O,, 6I�/,rya WATTLES,MATTING,ETC„ 13. All disturbed pervious areas(not receiving stone)shall be seeded and shall receive 4 inches of topsoil, CONSTRUCTION SEQUENCE-TRANSMISSION LINE MAINTENANCE _e.w o,', ` ��`141 I V \\,�� PER CT-65382 " 12. CONTRACTOR TO COORDINATE CLOSELY WITH DEP AND APPIAN DURING CONSTRUCTION.ANY AREA TO REMOVING TEMPORARY MEASURES. pod,._ �l.A.• THAT IS NOT EXPECTED TO BE DISTURBED WITHIN 7 DAYS SHALL RECEIVE TEMPORARY SEEDING. I♦♦.♦� 1\ Iv' �^ -- unless otherwise specified.Topsoil is to be placed and leveled by the Site Contractor, PERFORMED BY DEP PERSONNEL ONLY ��.�♦.'*♦ 4 1`I •\"I� ..00,•a NELL L TRUST "� 14. All disturbed pervious areas(not receiving stone)shall be seeded and shall receive 4 inches of topsoil per Reviser � AW''NJ �'/I •t'�'Ly� BOA R oi34.°z-es-7sJs.°°0 DANGER TREE ZONE ������ o l� '•� timeline in the Erosion Control Notes-All Phases and Erosion&Sedimentation Control Narrative,Topsoil LOW IMPACT/SELECTIVE CLEARING .►x'v..��A�.�: ♦4A -ex field- is to be placed and leveled by the Site Contractor,Permanent seeding shall be installed on all areas that 1. Refer to Erosion Control Notes and Construction Sequence. v A•\ 'I I ♦♦, \ TABOR CITY will not be re-disturbed. Areas to receive PERMANENT SEED shall receive 2-Inch thick blanket of 2. ACCESS FOR LINE MAINTENANCE: Existinggrassed surface to be used for access path(no grading, LOW IMPACT/SELECTIVE CLEARING SHALL COMPLY WITH B 0����1 � � �'+A'O� Jk COMMITTEE oe ssz ac 4a� THE SAME REQUIREMENTS AS'HAND CLEARING"IN THE �.. .�I 9 '4. .ap�a COMPOST(not as soil amendment)and seed.Compost not to be used for temporary applications.Refer earthwork,stone,etc.,proposed). No land disturbance proposed. Any disturbed grass to be seeded DEP TRANSMISSION ROW CLEARING SPECIFICATONS, LOW II�� ��',titter 91' PI°,p 013402-59-72e6.600 to Compost Blankets Specifications on theseplans. immediatelye,within 24 hours). IMPACT/SELECTIVE CLEARING INVOLVES MACHING -ex woods- � -NA,0 le.:e nn 't1i'' -Ax - P P e ) �'•0'... Y �. 62.5#:,64 15. Provide the following protection on slopes: 3. DEP personnel to install temporary span bridge crossing/panels with stone approach,waterbars,wattles, SuRFACE. THERE WILL BE NO CLEARING FROM MATS WITIHN 4"OF THE GROUND •..®'�'1Pf'b`-11 •I ,w {`.` J z" Slope Material Detail matting,etc.,per CT-65383 and CT-65382. STUMPING AND NOT DISTURBANCE EOFI THE GROOT MAT. , ♦•♦•��A S�� f••r-�- (g'� '/ 4:l orflatter Fiberglass Netting CT-65389 4. DANGER TREE ZONE LOW IMPACT/SELECTIVE CLEARING shall comply with the same requirements as owe F, 4..4..�.sf `;. Asi-- :' Z ---- ---- _ 3:1to4:1 Permanent Erosion Control blanket CT-65389 "hand clearing"in the DEP Transmission ROW Clearing Specification, Low Impact/Selective Clearing T _ SS ..h ` --- (over neatost)Rip involves machine clearing v lowtur pressure the root tnt or mats as needed. There will be no _'0i's�P`'NiS% _ / - _•��� I� ,pWAT1LES. A TING. BRIDGE PANELS, Steeper than 3:1 Per(overcmpRp Rap NCDOT 1802.01 inwI grounduTi li'f ♦��- V _ _ INSTALL TEMPORARY clearing, grading,stump removal or disturbance Of the root mat. Da -Ki� WATTLES,MATTING,ETC., ' 'I 5382 q3 \ / 'ASS I I LINE MAINTENANCE. E%ISTNDI GRASSED SURFACE \ • SO NE USED FOR ACCESS PATH(ND DRADIRG,EARTHWORK, �_ Z� �o j.,Sp STONE,ETC.,PROPOSED). NO LAND DISTURBANCE PROPOSED. • Z6 ' O ANY DISTURBED GRASS TO BE SEEDED, -ex field-�\ \ E6 ".= T / e%°e,d AII i PREVIOUSLY PERMITTED AREA:4,9 AC. \ _-_-_-_ s1\\\\ i�i�- - - E6'4-/ I' • Plo.°tOR T 6mlCKlANo RR o ,e B42900° ADDITIONAL AREA DISTURBED 3.0 Ac. �� � V / ' I 1 Ii "�2, TOTAL AREA DISTURBED= 7.9 AC. , I V MI EL DA° TAI1 PG CKLAN° k > n„ °'�°"'02 55-9862°°° mff PREVIOUSLY PERMITTED AREA [ [ H D 8 II I\ Lt / '� N ) (OBJECT PEN COLOR/THICKNESS/SHADE MAY '� ve - / VARY PER SHEET REQUIREMENTS) -ex geld- ,. --o ) __� - _ - _I7 - - / _-- --_ EX,ADJACENT PROPERTY LINES I !' `l �'9 I n6- c6 / ) EX.STD.RIGHT-OF-WAY II 9, ___"_-� �i I� , 0 I I / EX.ESMENT LINE i \ --'\ - - ._ys_ -F� / -5--1 86 I I i I' ire, EX CONTOURS(1'INTERVAL) EDGE EX PAVEMENT 556 II 96 711 96 I q�' L5 __^__' EDGE EX GRAVEL G Y� EX WOODS LINE \\ 5 \ `cr 96/ \ I I/ 0 / ------ ------ ---- EX BUSH/BRUSH LINE ,;gam,' \ Ss -__ i \ 61 I/P i - EX DITCH ������ NO LAND \9s I mP e o = EX STORM DRAINAGE c6 I-6 ` -II / - gc EX.U.G.GROUNDING CABLE ����� SEE NOTES)DISTURBANCE 1 I \ 1 �dN' ����: ( , 96 -- I EROSION CONTROL SEGMENT 9 °ne EX,o.H.POWER V / \ ADDITIONAL PERMITTED AREA _- aq0- /II AII•m. CONTINUES(LINE MAINTENANCE). r---- EX GUY WIRE(S) _ _ EX TRANSFORMER STRUCTURES N\ REFER TO CONSTRUCTION SEQUENCE --Po-- EX U.G.FIBER OPTIC LINE / LOD LOD / I m / / I56 / EX,CONC STRUCTURES O N V ,L-O-CSF ❑ ` • • SF�-e ^ I LG / avr�..wr 1 / II/I II o EX.WALL STRUCTURE ~�• IIIF SF t� / sREN mrcKLANO J / N EX,BOLLARD INSTALL TEMPORARY BRIDGE PANELS, AG/ °34 s pc ems°° -=9e EX U.G.POWER I WATTLES,MATTNG,ETC., e e 3 �& m`' 7 unk - EX.UNKNOWN U.G.LINE CONSTRUCTION DOUBLE SILT FENCE PER CT-65382 ACCESS FOR LINE MAINTENANCE.E%ISTING GRASSED PO °e✓geld ° / / eh° I. /:I OHE PRO O,H,POWER FENCE 10' WHERE SHOWN JAMES CHRISTOPHER FAULK and KRIS A 5 AULK SURFACE TO BE USED FOR ACCESS PATH O 0,r02 x3f9 8bl EARTHWORK,STONE,ETC.PRWOSED)NO lgNp GRADING, / / / ^h"` . -e geld - E i UGE PRO U.C..POWER vIO:Out 02-5B-J873000 g6DISTURBANCE PROPOSED,ANY DISTURBED CRgSS TO BE SEEOEO ELEV PROPOSED ONTOUR II GREE ENT CONSTRUCT10N EASEMENT gf 3 �`q` 2 / i DANGER TREE ZONEEROSION LEGEND I \nr 95 Fa D PER AGREEMENT BE WEEN MITCHE TSTRICKLAND/ / ' m -- LOW IMPACT/SELECTIVE CLEARING OD MITS OF DISTURBANCE AND DUKE ENERGY CAROLINAS DATED 3/13/24 �S �� .�. / 1 /1�1 LOW IMPACT/SELECTIVE CLEARING SHALL COMPLY Ff EXISITING POLE CT65376 Wattle �D8 I-- b (®� W11H THE SAME REQUIREMENTS AS"HAND CLEARING" 6: !�-() @. WI THE DEP TRANSMISSION ROW CLEARING X PROPOSED POLE LSO 1 1 Q4 I A y`�•S'II:I SPECIFICATONS, LOW IMPACT/SELECTIVE CLEARING UG UNDERGROUND I�M CT-65380 Silt Fence ex field- a t -1'I INVOLVES MACHINE CLEARING WAOW GROUND OH OVERHEAD � n „EE \64 o I THE SAME IMPACT/ ELECTIVE CLEARING ARING SHALL CLEARINCPIN THE DEP / / y I ♦•• ®� f PRESSURE EQUIPMENTOE ROOT TABS AS NEEDED. THERE n ® • II ` WILL BE NO CLEARING,GRADING,STUMPING AND NO TEMP TEMPORARY a CT-65395 Construction Entrance �- a DISTURBANCE OF THE ROOT MAT. cm DO NOT DISTURB F----- J S---- ( I I 02 TO BE REMOVED ® PAIK K.DERR and K/MBERLY M.OERR Q 1 /L Lw IOBB PO 5l9 TRANSMISSION ROW CLEARING SPECIFICATONS, LOW a°uKE vk..`'SS ENERcv ���®, /= 'g"g �f/ `V I� rh, WETLAND#2(0,01 AC)MAY BE FILLED IFG 41 PRO,FINISHED GRADE ELEVATION ® PTO:0f31,02-58-51fI,W0 IMPACT/SELECTIVE CLEARING INVOLVES MACHINE CLEARING Ip. _ _ ... a .�ge rf,. i,• ONLY UNDER THE DIRECT SUPERVISION OF CT-65387 Concrete Washout Pit ss9.a°o _ .�� -� E L o DEP ENVIRONMENTAL PERSONNEL ISG el PRO.SUBGRADE ELEVATION WAOW GROUND PRESSURE EQUIPMENT OR MATS AS i i NEEDED. THERE WILL BE NO CLEARING,GRADING, A °sr/w ���s a lXo /2 1;, WETLANDS OUTSIDE DEP PROPERTY LINE EX/ EXISTING ELEVATION '+�`� O ,•SHALL NOT BE DISTURBED! 104.06/ Impervious Dike `� / \ EPoO/HOLAN SLUMPING AND NO DISTURBANCE OF THE ROOT MAT. / *•4fr gT • \ 'm I'J FES# 55 F i DB a2-i'G 6sa /a�'��,- I / .CONTACTOR TO INSTALL IMPERVIOUS DIKE 104.07 &Pump around 99/v0,OIJt 02 59 BJ9)gpD.k / / RE /REs �� ; TR 2' f z AND EMPLOY PUMP-AROUND PRACTCE PER LOD Limits of Disturbance a .. G Gr` -- '-T"--1 DETAILS 104,06&104,07, �CBF a CGF Construction Fence PAUL K.DER lone 5RLY M.DERR ro / / t, / • • rl a ,iy e •(0 JO CONSULTING ENGINEERS, P.A. BOUNDARY DESCRIPTION SHOWN A�... CIVIL, MUNICIPAL& DUKE SCALE: 1'=60' Y " •r STRUCTURAL ENGINEERS 4iiks IS NOT FOR RECORDATION. 0 60 120 150 180 210 240 ;�a�` 1g'•.'': 11nininir BLN = C0562 ENERGY® SEAL i _ E E E E 2317 Professional Dr- CONSTRUCTION SAFETY EXISTING CONDRIONS: = 46959 / P.O. Box 7966 PROGRESS The contractor shall be responsible for reviewing all Rocky Mount, N.C. 27804 These drawings do not contain the requirements for existing job conditions. Any adverse existing conditions O""VG INcc.' �.`` Phone: (252) 972-7703 Job safety. All provisions for safety shall be the sole affecting work shown on these drawings shall be BEFORE YOU DIG, ��''Y9�ia �.� TABOR CITY 115KV SUBSTATION REBUILD responsibility of the contractor. brought to the attention of the engineer for possible CALL • M4 C. 1LE s.. www.app www.appianengineers.com or reconciliation. CAUTION: WARNING: adminfeapplanenglneers.com 126 SEALS STREET,TABOR CITY,NC 28463 0,th,sAZAw,` These plans are for bidding purposes uction only and I EROSION AND SEDIMENTATION CONTROL PLAN LINE MAINTENANCE(SOUTH) arenot to be used as Construction drawings RECORD DRAWINGS: 8 UNDERGROUND TELEPHONE AND OVERHEAD POWER IN VICINITYA unless initialed and dated as d for These drawings are believed to be a correctA FIBER OPTIC LINES ARE IN A OF WORK AREA. CONTRACTOR approve /.--„,, COUNTY:COLUMBUS SCALE RATIO 1:1 DEP PROJ NO: 1 708 01 001 Construction below by the Engineer, representation of actual field conditions but VICINITY OF SUBSTATION. not warranted as such. CONTRACTOR TO VERIFY ©SHALL USE CAUTION WHILE WORKING AROUND ENERGIZED A SCALE: 1" = 60' CHK. David Revoir TASK ED02 are NORTH CAROLINA Approved for Construction: e ONE-CALL CENTER LOCATION PRIOR TO DIGGING. POWER LINES. 04/26/24 REVISED LOD FOR LINE MAINTENANCE KAW DCR DRAWN: Kelly Williams APP - DEP DWG NO: 81084 Date: By: Date: www.ncocc.org NO. DATE REVISION BY CK, APP. DATE: 04/26/24 ACE J.N.: 22-023 SHEET 7A OF 17