HomeMy WebLinkAboutSW8990913_HISTORICAL FILE_20000308 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
® HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE 2 a o 0 03 O 8-
YYYYMMDD
State of North Carolina
Department of Environment
•and Natural Resources
Wilmington Regional Office
—._.oRL
James B. Hunt, Jr., Governor NCENR
Bill Holman, Secretary NOR,,,GAOUNA DEPARTMENT OF
Division of Water Quality ENVIRONMENT AND NATURAL RESOURCES
March 8, 2000
Mr. Sean Scalon, Project Coordinator
Coastal Communities. Inc. \A I
I31 Ocean Blvd. West
Holden Beach,NC 28462
Subject: Permit No. S 8 99 13 Modification
SeaScape at Ho n Plantation
Low Density vision Stormwater Permit
Brunswick unty
Dear Mr. Scalon:
The Wilmington Regional Office received a complete Stormwater Management Permit Application for SeaScape
at Holden Plantation on March 7,2000. Staff review of the plans and specifications has determined that the project,
as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are
forwarding Permit No. SW8 990913 Modification, dated March 8, 2000, for the construction of the project
SeaScape at Holden Plantation.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and
limitations as specified therein, and does not supercede any other agency permit that may be required.
If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an
adjudicatory hearing upon written request within thirty(30)days following receipt of this permit.This request must
be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh,NC 2761 1-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact either Noelle
Lutheran or me at (910) 395-3900.
Sincerely,
i,
Rick Shiver
Water Quality Regional Supervisor
RSS/nml: S:\WQS\STORMWAT\PERMIT\990913.MAR
cc: Perry Davis
Delaney Aycock, Brunswick County Inspections
David Thomas, NCDOT Division 3, District 3
Wilmington Regional Office
Central Files
Noelle Lutheran
127 Cardinal Dr. Est.,Wilmington,North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004
An Equal Opportunity Affirmative Action Employer 50"/ recycled/10% post-consumer paper
State Stormwater Management Systems
Permit No.SW8 990913 Modification
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
LOW DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143,General Statutes of North Carolina as amended,and
other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Coastal Communities, Inc.
Seascape at Holden Plantation
Brunswick County
FOR THE
construction,operation and maintenance of a 25%low density subdivision with a curb outlet system in compliance
with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved
stormwater management plans and specifications, and other supporting data as attached and on file with and
approved by the Division of Water Quality and considered a part of this permit for SeaScape at Holden Plantation.
The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific
conditions and limitations:
I. DESIGN STANDARDS
1. The project is permitted for 280 lots, each limited to a maximum of 6,000 square feet of built-upon area, as
defined by the stormwater rules,and as indicated in the approved plans. CAMA regulations may reduce the
built-upon area for those lots within the AEC.
2. The overall tract built-upon area percentage for the project must be maintained at 25%,per the requirements
of Section .1005 of the stormwater rules.
3. Approved plans and specifications for projects covered by this permit are incorporated by reference and are
enforceable parts of the permit.
4. This project proposes a curb outlet system. Each designated curb outlet swale shown on the approved plan
must be maintained at a minimum of 100' long with 5:1 (H:V) side slopes or flatter, have a longitudinal
slope no steeper than 5%, carry the flow from a 10 year storm in a non-erosive manner, and maintain a
dense vegetated cover.
2
IState Stormwater Management Systems
Permit No.SW8 990913 Modification
5. No piping shall be allowed except:
a. That minimum amount necessary to direct runoff beneath an impervious surface such as a road or
under driveways to provide access to lots.
b. That minimum amount of perforated piping necessary to convey runoff after treatment as shown on
the approved plans.
C. That minimum amount needed associated with the outlet structures of the wetland ponds for the
purpose of flood control as shown on the approved plans.
6. Runoff conveyances other than the curb outlet system swales, such as perimeter ditches, must be vegetated
with side slopes no steeper than 3:1 (H:V).
II. SCHEDULE OF COMPLIANCE
1. Curb outlet swales and other vegetated conveyances shall be constructed in their entirety,vegetated, and be
operational for their intended use prior to the construction of any built-upon surface,per the approved plans
2. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other
vegetated conveyances will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted
stormwater management systems at optimum efficiency to include:
a. Inspections
b. Sediment removal.
C. Mowing, and revegetating of the side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f. Cleaning and repair of catch basin grates, flumes, piping, and the flow spreader mechanism..
4. The permittee is responsible for verifying that the proposed built-upon area does not exceed-the allowable
built-upon area. Once the lot transfer is complete, the built-upon area may not be revised without approval
from the Division of Water Quality, and responsibility for meeting the built-upon area limit is transferred
to the individual property owner.
5. Deed restrictions are incorporated into this permit by reference and must be recorded with the Office of the
Register of Deeds prior to the sale of any lot. Recorded deed restrictions must include, at a minimum, the
following statements related to stormwater management:
a. "The allowable built-upon area per lot is 6,000 square feet. This allotted amount includes any built-
upon area constructed within the lot property boundaries, and that portion of the right-of-way
between the front lot line and the edge of the pavement. Built upon area includes, but is not limited
to, structures,asphalt, concrete, gravel,brick, stone, slate; and coquina, but does not include raised,
open wood decking, or the water surface of swimming pools."
b. "The covenants pertaining to stormwater regulations may not be changed or deleted without
concurrence of the Division of Water Quality."
C. "Filling in,piping or altering any 3:1 vegetated conveyances (ditches, swales, etc.) associated with
the development except for average driveway crossings, is prohibited by any persons."
d. "Lots within CAMA's Area of Environmental Concem may have the permitted built-upon area
reduced due to CAMA jurisdiction within the AEC."
3
State Stormwater Management Systems
Permit No.SW8 990913 Modification
e. "Filling in,piping or altering any designated 5:1 curb outlet swale associated with the development
is prohibited by any persons."
f. "A 30' vegetated buffer must be maintained between all built-upon area and the Mean High Water
line of surface waters."
6. The permittee shall submit a copy of the recorded deed restrictions within 30 days of the date of recording.
7. The permittee must certify in writing that the project's stormwater controls, and impervious surfaces have
been constructed within substantial intent of the approved plans and specifications. Any deviation from the
approved plans must be noted on the Certification. The permittee shall submit the Certification to the
Division within 30 days of completion of the project.
8. The permittee shall submit all information requested by the Director or his representative within the time
frame specified in the written information request.
9. Each lot in the subdivision covered by this permit will maintain a minimum 30 foot wide vegetative buffer
between all impervious areas and surface waters.
10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a
written time schedule to the Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director that the changes have been
made.
11. The following items will require a modification to the permit.Revised plans,specifications and calculations
must be permitted prior to the permittee beginning construction on the modification:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built-upon area.
C. Further subdivision,acquisition or sale of the project area.The project area is defined as all property
owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, piping, or altering any vegetative conveyance shown on the approved plan.
12. The Director may determine that other revisions to the project should require a modification to the permit.
III. GENERAL CONDITIONS
I. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes
143-215.6A to 143-215.6C.
2. The permit issued shall continue in force and effect until revoked or terminated.
3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance, or termination does not stay any permit condition.
4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit,
revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations
contained in Title 15A oftheNorth Carolina Administrative Code,Subchapter 2H.1000;andNorth Carolina
General Statute 143-215.1 et. al.
4
State Stormwater Management Systems
PermitNo.SW8 990913 Modification
5. The permit is not transferable to any person or entity except after notice to and approval by the Director.The
Director may require modification or revocation and reissuance of the permit to change the name and
incorporate such other requirements as may be necessary. A formal permit request must be submitted to the
Division of Water Quality accompanied by the appropriate fee,documentation from both parties involved,
and other supporting materials as may be appropriate. The approval of this request will be considered on
its merits, and may or may not be approved.
6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes,rules,
regulations, or ordinances which may be imposed by other government agencies (local, state and federal)
which have jurisdiction. If any of those permits result in revisions to the plans, a permit modification must
be submitted.
7. The permittee grants permission to DENR Staff to enter the property during business hours for the purposes
of inspecting the stormwater control system and it's components.
8. The permittee shall notify the Division of Water Quality of any mailing address changes within 30 days of
moving.
Permit issued this the 8th day of March, 2000.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
--------------------
9�7 Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW8 990913 Modification
5
` OFFICE USE ONLY
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION:
1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project):
Coastal Communities, Inc.
2. Print Owner/Signing Official's name and title (person legally responsible for facility and
compliance):
Sean Scanlon, Project Coordinator
3. Mailing Address for person listed in item 2 above:
13 1 Ocean Blvd. West
City: Holden Beach State: NC Zip: 28462
Telephone Number: (910 ) 842-4939
4. Project Name (subdivision, facility, or establishment name - should be consistent with project name
on plans, specifications, letters, operation and maintenance agreements, etc.):
Seascape at Holden Plantation
5. Location of Project(street address):
Stone Chimney Road (SR I 1 19),
City: Holden Beach County: Brunswick
6. Directions to project(from nearest major intersection):
Approx. 3/4 of a mile south of the Sabbath Home road and Stone Chimney road intersection across from the
Entrance to the Lockwood Folly Golf Course Community
7. Latitude: N 33003'48" Longitude: W G 1 034'4 1 " Of project
8. Contact person who can answer questions about the project:
Name: Sean Scanlon Telephone Number: (910)842-4939
II. PERMIT INFORMATION:
1. Specify whether project is (check one): New Renewal X Modification
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number SW8 990913 And its issue date (if known) September 21, 1999
Form: SWU-101 Version3.99 Page 1 of
I/
3. Specify the type of project(check one):
X Low Density High Density Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6747.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
Stormwater will be conveyed to 5: 1 vegetative 5wale5 at a minimum length of 1 00' prior to d15char6jm6j
Into wetland areas, amenity ponds and the proposed marina Site.
2. Stormwater runoff from this project drains to the Lumber River basin.
3. Total Project Area: 226.78 acres 4. Project Built Upon Area: 24.91 %
5. How many drainage basins does the project have? 1
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
Basin Information Drainage Area 1 Drainage Area 2
Receiving Stream Name Atlantic Intracoastal Waterway
Receiving Stream Class SA
Drainage Basin Area 226.78 ac.
Existing Impervious* Area O
Proposed Impervious* Area 56.5 ac.
% Impervious* Area(total) 24.9 1
Impervious* Surface Area Drainage Area 1 Drainage Area 2
On-site Buildings 2501ot5 @ GOOD WOt = 35.57 ac.
On-site Streets 14. 14 ac.
On-site Parking I .G9 ac.
On-site Sidewalks 1 .78 ac.
Other on-site 0.32ac.
Off site 0
Total: 56.50 ac. Total:
•Impervious area is defined as the built upon area including, but not limited to,buildings,roads,parking areas,
sidewalks,gravel areas, etc.
7. How was the off-site impervious area listed above derived? Topographic information
Form: SWU-101 Version 3.99 Page 2 of
.`1
1
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built-upon area for each lot must be provided as an
attachment.
1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit
number 5ti 2 990913 as issued by the Division of Water Quality. These covenants may
not be changed or deleted without the consent of the State.
2. No more than 6 000 square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone,slate or similar material but do not include wood
Decking or the water surface ofswimming pools.
3. Swales shall not be filled in,piped, or altered except as necessary to provide driveway crossings.
4. Built-upon area in excess area of the permitted amount requires a state stormwater management permit modification prior to
construction.
5. All permitted runofffrom outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the required covenants will be binding on all parties and
persons claiming under them,that they will run the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for
Each BMP specified for this project. Contact the Stormwater and General Permits Unit at(919) 733-5083 for the
status and availability of these forms.
Form SWU-102 Wet Detention Basin Supplement
Form SWU-102 Infiltration Basin Supplement
Form SWU-102 Low Density Supplement
Form SWU-102 Curb Outlet System Supplement
Form SWU-102 Off-Site System Supplement
Form SWU-102 Underground Infiltration Trench Supplement
Form SWU-102 Neuse River Basin Supplement
Form SWU-102 Innovative Best Management Practice Supplement
Form: SWU-101 Version 3.99 Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality
(DWQ)•
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
Ini 'als
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
- Legend
-North Arrow
- Scale
- Revision number and date
-Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours,proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans none exist
- Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
-Vegetated buffers (where required)
VIL AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf,please complete this section.
Designated agent (individual or
firm): Cape Fear Engineering
Mailing Address: 5040 New Centre Dr.; 5uite D
City: Wilmington State: NC Zip: 28403
Phone: (91 0) 790-8584 Fax: (9 10)790-8583
VIII. APPLICANT'S CERTIFICATION
I, (print or type name ofperson listed on General Information, item 2) Sean Scanlon
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000.
Signature: Date: ;2 .rp�&O
Form: SWU-101 Version 1 Page 4 of 4
Permit No. 5 W 9 9 90 9/3
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
LOW DENSITY SUPPLEMENT
This form may be photocopied for use as an original
A low density project is one that meets the appropriate criteria for built upon area and transports stormwater
runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater
collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can
be found in 15A NCAC 2H .1005 through .1007.
I. PROJECT INFORMATION
Project Name SeaScape at Holden Plantation
Contact Person : Sean Scanlon Phone Number: 910-842-4939
Number of Lots: 280 Allowable Built Upon Area Per Lot*: 6,000 sf
*If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon
area for each lot. The attachment must include the project name, phase, page numbers and provide area
subtotals and totals.
11. BUILT UPON AREA
See the Stormwater Management Permit Application for specific language that must be recorded in the deed
restrictions for all subdivisions.
For uniform lot sizes, complete the following calculations in the space provided below where:
• SA Site Area- the total project area above Mean High Water. Wetlands may be excluded when the
development results in high density pockets.
• DF Density Factor- the appropriate percent built upon area dived by 100.
• RA Road Area - the total impervious surface occupied by roadways.
• OA Other Area- the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc.
• No. Lots - the total number of lots in the subdivision.
• BUA/Lot - the computed allowable built upon area for each lot including driveways and impervious
surfaces located between the front lot line and the edge of pavement.
Form: SWU-104 Rev 3.99 Page 1 of 2
(SA x DF) - RA - OA = BUA
No. Lots Lots
Calculation:
.2-80 4W
(17-4, 78ac x O.zS%) -ly.1'4&r- -3.79ac - O . ]qacl1A
Z.80
111. REQUIRED ITEMS CHECKLIST
Initial in the space provided to indicate that the following requirements have been met and supporting
documentation is provided as necessary. If the applicant has designated an agent on the Stormwater
Management Permit Application Form, the agent may initial below.
Applicant Initials
YA a. A 30 foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse
River basin may require additional buffers.
b. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive
covenant. A copy of the recorded document shall be provided by DWQ within 30 days of
platting and prior to sale of any lots.
C. Built upon area calculations are provided for the overall project and all lots.
d. Project conforms to low density requirements within the ORW AEC (if applicable).
[15A NCAC 2H .1007(2)(b)]
Form: SWU-104 Rev 3.99 Page 2 of 2
Feb-'29-00 10 . 14A Cape Fear Engineering P . 06
Permit No. 507 990913
(Io be provided by DWQ
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGI MEN'r PERMIT APPLICATION FORM
CURB OUTLET SYSTEM SUPPLEMENT
POR LOW DENSITY DEVELOPMENT WITH CURD AND GUTTER
1 his form may be pholocupied fur use as an original
DWO StonnWater Management Plan Review:
A complete stomiwater management plan submittal includes a stormwaler management permit application, a
curb outlet system supplement, a low density supplement,design calculations, and plans and specifications
showing all storn3Water conveyances and curb outlet details.
I. PROJECT INFORMATION
Project Name : 5eascaoc_at Holden Plantation
Contact Person: Se:ari Scanlon Phone Number: (9 1 O) 840-1000
Curb outlets to (check one): q Swale 0 Vegetated Area
it, REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A
NCAC 211 ,1008.
Initial in the space provided to indicate that the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent on the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met,attach justification.
AppI' s Initials
a. Curb outlets direct flow to a Swale or vegetated area.
b. SWaICS or vegetated areas receiving curb outlet flow arc designed to carry, at a minimum, the
peak flow from the 10-year stone.
c. Flow velocity is non-erosive for peak flow from the 10-year stone event.
d. Longitudinal slope of the Swale or vegetated area does not exceed 5%.
e. Side slopes of the Swale or vegetated area are no steeper than 5:1 (horizontal to vertical).
f. Length of swale or vegetated are is> 100 feet.
g. The system takes into account the run-off at ultimate built-out potential from all surfaces
draining to the system (delineate drainage area for each Swale).
144 h. Swales are located in recorded drainage easements.
i. Grass type(s)for permanent vegetative cover specified on detail.
j. Swale detail provided on plan
Farm SWU-105 ver3.99 Page 1 of 3
III. • ' DESIGN INFORMATION
Complete the following table. If additional space is needed the information should be provided in the same
format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State
of North Carolina Erosion and Sediment Control Planning and Design Manual.
Table 1. Swale Design Information
Swale No. Drainage Impervious Grassed C Q V allow V actual Flow
Area ac Area ac Area(ac) (cfs (fps) (fps) Depth ft
A 0.7 0.3 0.4 0.52 2.9 5.0 0.54 1.03
B 0.3 0.3 0 0.95 2.3 5.0 0.57 0.90
C 0.9 0.3 0.6 0.43 3.1 5.0 0.87 0.84
D 5.8 1.6 4.2 0.39 16.4 5.0 1.21 1.64
E 0.5 0.2 0.3 0.5 2.0 5.0 2.15 0.43
F 6.2 1.3 4.9 0.36 16.1 5.0 1.01 1.78
G 8.2 1.5 6.7 0.34 20.1 5.0 0.59 2.62
H 1.0 0.1 0.9 0.28 2.3 5.0 1.98 0.48
I 3.3 1.2 2.1 0.47 12.6 5.0 3.04 0.91
J 1 0.5 0.5 0.58 4.7 5.0 3.23 0.54
g 3.7 1.2 2.5 0.44 13.2 5.0 4.01 0.81
L 0.4 0.2 0.2 0.58 1.9 5.0 1.42 0.52
M 5.4 1.9 3.5 0.46 17.9 5.0 0.86 2.04
N 2.5 0.9 1.6 0.47 9.5 5.0 0.95 1.41
0 4.5 1.5 3.0 0.45 14.6 5.0 0.99 1.72
P 0.86 0.86 0 0.95 6.6 5.0 0.75 1.33
Q 4.3 1.4 2.9 0.44 13.6 5.0 0.80 1.84
R 6.0 1.9 4.1 0.44 19.0 5.0 1.37 1.67
S 4.5 1.2 3.3 0.4 13.0 5.0 3.26 0.89
T 4.6 1.4 3.2 0.43 14.2 5.0 0.54 2.30
U 2.4 0.7 1.7 0.42 8.2 5.0 2.73 0.78
V 3.5 1.1 2.4 0.44 12.5 5.0 0.52 2.19
W 1.2 0.42 0.78 1 0.46 4.5 5.0 2.26 1 0.63
X 2.8 0.9 1.9 0.44 10.0 5.0 1.02 . 1.40
Y 1.0 0.2 0.8 0.35 2.8 5.0 2.15 0.51
Z 5.5 1.5 4.0 0.4 15.8 5.0 3.78 0.91
Form SWU-105 Ver 3.99 Page 2a of 3
I11. DESIGN INFORMATION
Complete the following table. If additional space is needed the information should be provided in the same
format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State
of North Carolina Erosion and Sediment Control Planning and Design Manual.
Table 1. Swale Design Information
Swale No. Drainage Impervious Grassed C Q V allow V actual Flow
Area ac Area ac Area(ac) (cfs s s Depth ft
AA 1.8 0.3 1.5 0.33 4.8 5.0 1.26 0.87
BB 1.2 0.4 0.8 0.45 4.4 5.0 1.74 0.71
CC 2.2 0.6 1.6 0.4 7.1 5.0 1.39 1.01
DD 2.0 0.7 1.3 0.46 7.5 5.0 4.07 0.61
FF 4.5 1.5 3.0 0.45 14.6 5.0 2.51 1.08
GG 2.5 1.0 1.5 0.5 10.1 5.0 1.52 1.15
HH 2.5 0.6 1.9 0.38 7.6 5.0 1.09 1.18
II 1.0 0.4 0.6 0.5 4.1 5.0 1.21 0.82
JJ 1.4 0.6 0.8 0.52 5.9 5.0 0.72 1.28
KK 1.9 0.8 1.1 0.52 8.0 5.0 0.78 1.43
LL 3.0 1.1 1.9 0.48 11.7 5.0 0.77 1.74
MM 2.0 0.9 1.1 0.54 8.7 5.0 3.11 0.75
NN 0.9 0.4 0.5 0.53 3.9 5.0 2.72 0.54
00 2.6 0.9 1.7 0.46 9.7 5.0 1.50 1.14
PP 2.4 0.8 1.6 0.45 8.7 5.0 1.46 1.09
QQ 2.3 1.0 1.3 0.53 9.9 5.0 2.41 0.91
RR 2.8 1.0 1.8 0.47 10.7 5.0 1.35 1.26
SS 4.3 1.2 3.1 0.41 12.6 5.0 1.6 1.25
TT 2.7 0.9 1.8 1 0.45 1 9.8 1 5.0 1 1.5 1.14
UU 1.6 0.6 1.0 0.48 6.2 5.0 1.34 0.96
Form SWU-105 Ver 3.99 Page 2b of 3
; ' Feb=29-00 10 : 15A Cape Fear Engineering P _ 09
Ill. CURB OUTLET SYSTEM MAINTENANCE REQUIREMENTS
1. Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches
at any time.
2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up,
erosion, and trash accumulation-
3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded
following sediment removal.
4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a
timely manner based on the monthly inspections.
5. Catch basins,curb cuts, velocity reduction devices, and piping will be inspected monthly or after every
significant runoff producing rainfall event. Trash and debris will be cleared away from grates,curb cuts,
velocity reduction devices, and piping.
6. Swales will not be altered, piped,or filled itt without approval from NCDENR Division of Water Quality.
I acknowledge and agree by my signature below that I am responsible for the performance of the six
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to
changes to the system or responsible party.
Print Name and Title: Span Scanlon, Project_ Coordinator
Address: 10 1 Ocean Blvd. We-it J�g�
Phone: (91 O) 842-4939 Date: 28 r 2000
Signature: _ ...
Note: 77ie legally responsible parry should root be a homeowners a.ssomation unless mare than 30%of the lots have been sold and a
resident of the subdivision has heen named the president.
I, $Co{� �ertr7 .,,{f. ,a Notary Public fir the State of /fpLTNCaAU41 ✓b ,County of
� AHOY[ ,doh iby,,rt&thut SQL SGRNLOry personally appeared before me this 28 '54
day of Februae y ZOO o ,and aeknuwlcdge the due execution of the foregoing infiltration basin mainturancc
rcqu irenunts. Witneu my hand and official semi,
```\\\avV ttu u n u luiiii�
� .BBhE..�Y �iy My commission expires z 7. 200 Z
i
Z rp'tA Y ,
jDUat-\4 •Z �
4�O Af4t4t)itsG\\`\���
Fonn SWIJ-105 ver.3.09 Page of 3
AVCAPE FEAR
Engineering, Inc.
5040 New Ch/R1c Drive. Suite D
Wilmington, N.G. 2d403
Voica (910) 790-8584
Fox (910) 79(�d5H3
E maH cte(noheN "Lith.ner
Fax Transmittal
To: NOELLE LUTHERN Fax:350-2004
From:ANDREW OSBORN CC: Seascape
Re: SWALE CALCULATION Pages: 1 plus cover
Date:8 March 2000 Job N: 901-01
IF YOT7 DO NOT It.LCLIVE THIS DOCiTMF.NI'CLL'ARLY,PLEASE CALL(910) 790-8584
®'this is your original copy D Original Copy to be mailed
NOTES:
Noelle,
Included is a sample calculation of velocity and flow depth as per your request. These
values were computed using FlowMaster software, which manipulates Manning's
equation to salve for the depth and velocity. The enclosed calculation reflects the
method used for all values submitted on form 5WU-105 where the differing variables
for each swale are the flow and the channel slope. The Mannings Coefficient and
sideslopes are the some for each swale. If you have any questions please feel free to
contact myself or Davis Fennell.
Thanks
Andrew M. Osborn
t
LO" d 6UL. aaUL6UA ..(eat ade7 V09 : 60 00-90--AE
SAMPLE C ALCULAT1 v N
Swale "L"
Worksheet for Triangular Channel
Project Description
Project File c:\calc\hoestad\fmw\project2.fm2
Worksheet Sample Swale Calculation
Flow Element Triangular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.03
Channel Slope 0,51 % j y p iC AL Fo R M ki W A%QED
Left Side Slope 5.000000 H : V
Right Side Slope 5,000000 H : V3 G P,As i
Discharge 1.90 cfs C FUR /ELL
O V�lS i�i
SMLES
Results
Depth ` ft
Flow Area 1.34 ft2
Wetted Perimeter 5.28 ft
Top Width 5.18 ft
Critical Depth 0.39 ft
Critical Slope 0.023224 ft/ft
Velocity JAZ If Us
Velocity Head 0.03 ft
Specific Energy 0.55 ft
Fmude Number 0.49
Flow is subcritical.
03/08/00 Cape Fear Engineering FlowMasler v5.05
09:27..50 AM Haestad Methods.Ina 37 Brookside Road Waterbury,CT 08708 (203)755-1666 Page 1 of t
ZO' d 6u I-.waaut_6u3 .,rea_A adeO Vz9 = 60 00-90-aQW
CAPE FEAR nECEIVE �
Engineering, Inc.
504O New Centre Drive,Suite D Wilmington, N.C. Za403 MAR 0 6 2000
Voice(910) 7.0-8584
Fax (910) 790-a5a3 D E ro
E-mail c7ePpbellsouth.net PROJ p�
Transmittal
TO: NCDENR DATE: 3-6-00
Water Quality Section PROJECT NO: 801-01
RE: SeaScape at Holden Plantation
ATTENTION: Noelle Lutheran
Quantity Drawing No. Description
2 COPIES REVISED STORMWATER MANAGEMENT PLAN-SHEET 2
2 COPIES PAGE 2B OF 3, FORM SWU-105
REMARKS Noelle: Attached please revised sheet 2 of the Stormwater Management Plan
and also corrected sheet 2b of 3 for the Curb Outlet supplement. Please call if you have any further
questions or require additional information regarding this matter.
CC: File 801-01 CAP ngineering, Inc.
Signed
K. Davis Fennell, PE
P:\801\801-01\aemin\Stovnwater 01-01 DWOTmns-06march00.dx
R.FEElVEA�
CAPE FEAR MAR 0 • �000
Engineering, Inc. ��
5040 New Centre Drive, Suite D 13Y:r
Wilmington, N.G. ZH403
Voice(910) 79(Y851?4
Fax (910) 790-8583
E-mail cto(Wbollsouth.net
Transmittal
TO: NCDENR DATE: 3-3-00
Water Quality Section PROJECT NO: 700-07
RE: SeaScape at Holden Plantation
ATTENTION: Noelle Lutheran
Quantity Drawing No. Description
2 SETS REVISED STORMWATER MANAGEMENT PLANS AND DETAILS
2 COPIES PLANNED UNIT DEVELOPMENT CONCEPT PLAN
2 COPIES REVISED PAGE 2, APPLICATION
2 ORIGINAL + COPY, CURB OUTLET SYSTEM SUPPLEMENT
2 COPIES REVISED STORMWATER NARRATIVE AND CALCULATIONS
1 SET CONSTRUCTION PLANS
REMARKS Noelle: Attached please find the above described materials to supplement your review of
the SeaScape Stormwater Management Plan. You will find all slope information pertinent to Water Quality
Swales in the calculation section of the narrative. I trust this information to be sufficient for your review, but
should you have any questions, comments, or require additional information regarding this matter, please
contact this office.
CC: File 801-01 CAPER Es gineering, Inc.
Signed 7�l/
K. Davis Fennell, PE
P58011807-0PadrtinlSlor waieMOl0 1-OWQTrans-03m reh00.doc !
1{\
r r 1
Design Narrative and
Supporting Calculations
For
SeaScape at Holden Plantation
Brunswick County,North Carolina
Prepared for
Coastal Communities, Inc.
131 Ocean Blvd.West
Holden Beach,North Carolina 28462
(910)842-4939
�Ki5 iAOa
CAR0"",,
Date:August 29°, 1999 pFss/p �'4 f
Rc%ised: Febnrary 28, 2000
SEAL
024"
Awl :>
Prepared by
Cape Fear Engineering, Inc.
5040 Now Centre Drive,Suit D
Wilmington,North Carolina 28403
(910)790-8584
DESIGN iNARRATIVE
1. GENERAL:
The project site is located off of(SRI 119)Stone Chimney road approximately 3/4 of a mile south
of the Stone Chimney road and Sabbath Home road intersection within Brunswick County,North
Carolina. This phase of the project site is approximately 231.14 acres. Drainage considerations
are to be in accordance with DWQ stomtwater requirements.
The intent of this project is to develop streets, drainage improvements and a development office
with parking. This development will support 281 single-family homesites in this first phase of
construction. The impervious coverage has been kept to a minimum to promote infiltration as
much as possible. These home sites will average 1/2 of an acre in area and limited to no more
than 6.000 sq. ft.of built upon area per lot.
2. EXISTING SITE:
Site topography in the area is relatively flat with slopes typically less than(2)percent. There are
low areas throughout the site that drain to wetlands, which will provide positive drainage for the
area to the Spring Creek and to the Atlantic Intracoastal Waterway. Vegetation consists primarily
of grasses and minor ground cover within the area of the improvements. Subsurface soils are
typically a mixture of sands,silty sands and organics.
3. PROPOSED IMPROVEMENTS:
improvements proposed include drainage devices,streets,utilities and a development office with
parking. Drainage for the most part will sheet flow from the lots into the streets which will have
curb and gutter to direct drainage to low points or curb outlets in the roads. Drainage at the low
points in the streets will flow into trench drains and curb inlets which then outlet into vegetative
swales that will be constructed with SA side-slopes and a minimum length of 100 feet. In some
instances in this project, once the storm water flows through the vegetative swales at the
minimum design criteria, it will drop into an inlet box and be directed via subsurface pipe to an
outlet source. This outlet source will be either a drainage ditch or the proposed marina basin. In
the case of a pipe directed into the marina basin, the pipe will be set to an elevation so that the
pipe will be below the marina basin water surface. The storm water that enters the proposed
subsurface pipe will be treated prior to entering this conveyance pipe.The pipe lengths have been
kept to a minimum and are needed only to convey treated storm water due to the topography
limitations. Piping will be perforated and installed at relatively flat slopes to promote infiltration
when possible.The soils are very sandy and ideal for infiltration.
Design Narrative
SeaScape at Holden Plantation Phase One
Page 1
CAPE FEAR ]EZ C EWED
Engineering, inc. FEB 18 000
5040 New Centre Drive,Suite D 'p
Wilmington, N.C. 28403 B2J �
Voice(910) 790-8584
Fax (910) 790-8583
E-mall c1e@beltsouth.net -�
Transmitta Q ED
TO: NCDENR DATE: 2-18-00
Water Quality Section PROJECTNO: HOO-01
RE: Seascape at Holden Plantation
ArrENTION Noelle Lutheran
Quantity DraWng No. Description
2 sets 1-4 Revised Plans
2 copies (1) original and (1) copy of the revised application, supplements and narrative
t Check in the amount of$420.00
i
II
REMARKS
CC: File 801-01 C PE FEAR Engi Bring, Inc.
Signed
e avis, PE