Loading...
HomeMy WebLinkAboutSW8981008_HISTORICAL FILE_19990412 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 61r61008 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE I Kyl 6K 10. YYYYMMDD ". Sta`re of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor N C®E Wayne McDevitt, Secretary Division of Water Quality NORTH CAROLWA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURczs April 12, 1999 Mr. W. Christopher Stephens, President Landmark Developers, Inc. PO Box 4127 Wilmington.NC 28406 Subject: Perin it No. SW8 981008 Magnolia Greens Sections 9 & 10 High Density Subdivision Stormwater Project Brunswick County Dear Mr. Stephens: The Wilmington Regional Office received the Stormwater Management Permit Application for Magnolia Greens Sections 9 & 10 on October 9, 1998, with final information on March 16, 1999. Staff review of the plans and specifications ha_s determined that the project, as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.i 000. We are forwarding Permit No. SW8 981008, dated April 12. 1999, for the construction of the project, Magnolia Greens Sections 9 & 10. This permit shall be effective from the date of issuance until April 12. 2009, and shall be subject to the conditions an: limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormvvater management system will result in future compliance problems. Ifany parts:requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicator. hearing upon written request within thirty(30) days following receipt of this permit. This request must be in the form of c written petition,confomnng to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Adminisuali\e Hearings, P.O. Drawer 27447,Raleigh,NC 2761 1-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis. or me at (910i 395-3900. Sincerely, Rick Shiver Water Qual in, Regional Supervisor RSS/arl: S:\WQS\STORMWAT\PERMIT\981008.APR cc: Greg- Hetzler, P.E. Delaney Aycock, Brunswick County Inspections Linda Lewis Wilmington Regional Office Central Files 127 Cardinal Dr. Est.,Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportuniq Affirmative Action Employer 50% recycled/10% post-consumer paper State Stormwater Management Systems Permit No. SW8 981008 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Landmark Developers, Inc. Magnolia Greens Sections 9 & 10 Brunswick Counry FOR THE construction, operation and maintenance of 2 detention ponds in compliance with the provisions of 1 SA NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 12, 2009 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS P_ 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. These sections within the Magnolia Greens subdivision are permitted for 99 lots, each allowed 4,000 square feet of built-upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2 State Storm water.Management Systems Permit No. SW8 981008 DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Magnolia Greens Sections 9 & 10 Permit Number: SW8 981008 Location: Brunswick County Applicant: Mr. W. Christopher Stephens, President Mailing Address: Landmark Developers, Inc. PO Box 4127 Wilmington, NC 28406 Application Date: October 9, 1998 Water Body Receiving Stormwater Runoff: Jackey's Creek (CFR18-77-3) , Classification of Water Body: "C Sw" POND 9-1 POND 10 Pond Depth, feet: 7 7 Permanent Pool Elevation, FMSL: 23 19 Total Impervious Surfaces, 112: 369,551 359,146 (99 lots at 4,000 ft2: 210,000 236,000 Roacis/Parkina. ft2 62,057 121.146 Other, ft2 97,494 (Grandiflora) 1000 (Miscellaneous) Offsite Area entering Pond, ft2: None; per Engineer Required Surface Area, ft2: 13,430 13.279 Provided Surface Area, ft2: 13.582 '22 558 Required Storage Volume, ft': 32.599 32.016 Provided Storage Volume, ft3: 31,159 31,984 Temporary Storage Elevation, FMSL: 25.1 )0 3 Controlling Orifice: 2 each @2"$ 2 each @2"$pipe 3 State Stormwater Management Systems Permit Z. SW8 681008 II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built-upon area does not exceed the allowable built-upon area. Once the lot transfer is complete, the built-upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built-upon area limit is transferred to the individual property owner. 3. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. ` d. Redesign or addition to the approved amount of built-upon area. e. Further subdivision of the project area. f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4. The Director may determine that other revisions to the project should require a modification to the permit. 5. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the perrittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 6. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface except roads. 7. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 8. The permittee grants permission to DENR Staff to enter the property for the purposes of inspecting the project for compliance with the conditions of this permit. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. Decorative spray fountains are not allowed in the pond. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4 State Stormwater Management Systems Permit No. SU'S 981008 12. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 13. Records of maintenance activities must be kept and made available upon request to authorized personnel of D,WQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 14. Prior to the sale of any lot, deed restrictions must be recorded which limit the built-upon area per lot to the amount as shown on the Project Data Sheet, per Section I, Part 2. The recorded statements must follow the form: a. "The maximum built-upon area per lot is 4,000 square feet, inclusive of that portion of the right-of- way between the lot line and the edge of pavement, structures, pavement, walkways of brick, stone, or slate, but not including open wood decking." b. "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the State." C. "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State." d. "Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built-upon area due to CAMA regulations." 15. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat. The recorded copy must be signed by the Permittee, dated, stamped with the deed book number and page, and bear the stamp/signature of the Register of Deeds. 16. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 17. Prior to transfer of ownership, the pond must be inspected by DWQ personnel, and determined to be in compliance with all permit conditions. Records of maintenance activities will be required. 18. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 5 State Stonnwater Management Systems Permit No. SN18 981008 III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved, such as a copy of the deed of trust. Other supporting materials, such as a signed Operation and Maintenance plan in the case of engineered systems,will also be required. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality,'in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. '-. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. Permit issued this the 12th day of April, 1999. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Kerr T. Stevens. Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 981008 6 State Storm water•Nlanas ern ent Systems Permit No. SN18 981008 Magnolia Greens Sections 9 & 10 Stormwater Permit No. SW8 981008 Brunswick County Engineer's Certification 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for _' (Project Owner)hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date C_ 7 v McKIM&CREED v March 15, 1999 M&C 0383-0048.OW Ms. Linda Lewis NCDENR 127 Cardinal Drive, Extension Wilmington, NC 28405 RE: Acknowledgement of Receipt and Request for Additional Information Dear Ms. Lewis: This iletter is in response to your request for information on the Stormwater Management Permit Application for Magnolia Greens, Parcels E and O, Sections 9 & 10 on January 5, 1999. 1. Pond 9-1 detail sheet still shows the Normal Water Surface Elevation as 24, while the calculations and plans use 23. Please revise and submit two copies of the revised detail sheet. The detail sheet has been revised and two copies are attached for your review. 2. As previously stated, the drawdown rate and orifice sizing are based on the volume PROVIDED in the pond. You have again used the 1"volume for determining the orifice size. Also, the average head of H/2 should be used in the orifice equation, resulting in an average flowrate, or the falling head orifice equation could be used. I do not understand the theory behind using 1-1/3. 1 thought that had ,something to do with hydrostatic pressure acting on a submerged surface, not elevation head. Please resize the orifice for Pond 9-1 using an average head, (or the falling head equation) and the temporary storage volume actually provided in the pond. Per my calculation, the drawdown time is less than 2 days using 2-2"p orifices. The average flowrate needs to be between .19 and .076 cfs. I am returning the supplement form for use in making this change. Please also provide revised calculations. Orifice draw down calculations have been revised per your comments and the copies are attached for your review. 3. When making corrections to the application, please do so in ink and initial and date the changes. Or you may simply white out the old numbers and replace them. I am returning the application for your use in making this change. The old numbers have been replaced with the correct numbers. If you have any questions or comments please feel free to call me. Sincerely, M (I & ED GINEERS P.A. ZF � /vww Enclosures 0',M383\004MO315910 tr.doc 243 N. FRONT ST., WILMINGTON, NORTH CAROLINA 28401 TEL910.343.1048 FAX910.251.8282 www.Mckimcreed.com to of North Carolina )artment of Environment l Natural Resources • lilmingttin Regional Office pr ®®_M AN James B. Hunt, Jr., Governor Wayne McDevitt, Secretary DNCDENR ivision of Water Quality NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES March 2, 1999 Mr. Jeff Roney McKim and Creed 243 N. Front Street Wilmington, NC 28401 Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 981008 Magnolia Greens, Parcels E and 0, Sections 9 & 10 Brunswick County Dear Mr. Roney: The Wilmington Regional Office received previously requested information for the Stormwater Management Permit Application for Magnolia Greens, Parcels E and 0, Sections 9 & 10 on January 5, 1999. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Pond 9-1 detail sheet still shows the Normal Water Surface Elevation as 24, while the calculations and plans use 23. Please revise and submit two copies of the revised detail sheet. ,2. As previously stated, the drawdown rate and orifice sizing are based on the volume PROVIDED in the pond. You have again used the minimum 1" volume for determining the orifice size. Also, the average head of H/2 should be used in the orifice equation, resulting in an average flowrate, or the falling head orifice equation could be used. I do not understand the theory behind using H/3. I thought that had something to do with hydrostatic pressure acting on a submerged surface, not elevation head. Please resize the orifice for Pond 9-1 using an average head, (or the falling head equation) and the temporary storage volume actually provided in the pond. Per my calculation, the drawdown time is still less than 2 days using 2-2"$ orifices. The average flowrate needs to be between .19 and .076 cfs. I am returning the supplement form for your use in making this change. Please also provide revised calculations. 3. When making corrections to the application, please do so in ink and initial and date the changes. Or, you may simply white out the old numbers and replace them. I am returning the application for your use in making this change. 127 Cardinal Dr. Ext.,Wilmington,North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post-consumer paper Mr. Roney March 2, 1999 Stormwater Project No. SW8 981008 ---------------------------------------------- Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 2 1999, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\981008.MAR cc: Linda Lewis Chris Stephens Central Files Permit No. )U:;9 g S i CX) f (to be provided by D 1,VQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Magnolia Greens Sections 9 and 10 Contact Person: Greg Hetzler, McKim & Creed Phone Number: ( 910 ) 343-1048 For projects with multiple basins, specify which basin this worksheet applies to: Pond #9 -1 Basin Bottom Elevation 16.0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 23.0 ft. (elevation of the orifice) Temporary Pool Elevation 25.1 ft. (elevation of the discharge structure overflow) Permanent Pool Surface Area 13,582 sq. ft (water surface area at the orifice elevation) Drainage Area 26.9 ac. (on-site and off-site drainage to the basin) Impervious Area .$8 7�89- ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 48,281 - cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 32,751 cu. ft. (volume detained above the permanent pool) Forebay Volume 9,413, cu. ft. SA/DA' used 6 1.15 (surface area to drainage area ratio) Diameter of Orifice 2`2 in. Design TSS Removal 90 % (85% TSS removal required, see item k below) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources,November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 Rev I/August 1998 Page I of 3 g8<W8 3. Specify the type of project(check one): X Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check appropriate blanks): CAMA Major X Sedimentation/Erosion Control 404 Permit 1II. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Curb and cutter storm drain collection system with enhanced treatment via wet detention ponds. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: **47.4 acres 4. Project Built Upon Area: 28.2 % 5. How many drainage basins does the project have? 2 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. Basrii3nforaiation. ,. .,, Drama etBasm.FP.OND#10.:d _` i=.:;Drama`"eBasm 2!P.OND Receiving Stream Name Sturgeon Creek Sturgeon Creek Receiving Stream Class C-SW C-SW Drainage Basin Area 1,219,220 SF 28.0 AC 1,171,764 SF 26.9 AC Existing Impervious* Area 18,455 SF 47- g� 17 4 q Proposed Impervious* Area 328,798 SF / o5' 7 %Impervious* Area total 28.5% 31,E Im ergtous.*,- Surface Area� „ ,,,,�, ;..,.,.... Drama e'•Basm 1,,�...,. �; _,Drama On-site Buildings 214,658 SF "i 1 .3 0,UUO' On-site Streets 89,676 SF 49,032 SF On-site Parking 0 SF 0 SF On-site Sidewalks 22,464 SF 13,025 SF Other on-site 2,000 SF PS SITE 0 SF ✓ Off site 18,455 SF }fir Total: Y—=347,253 SF E=444 i 66 2 64,SS/ *Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 7. How was the off-site impervious area listed above derived? From design information for Phase 1 of subdivision (considered "Existing"). IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. **PROJECT AREA FOR SECTIONS E & O ONLY(SEE MASTER PLAN) Form: SWU-101 January 1998 Page 2 of v RFC ) 1992q*�McKIM&CREED JAN 0 3 199sa BY: December 30, 1998 M&C 0383-0 . Ms. Linda Lewis NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: December 1, 1998 request for additional information Stormwater Project No. SW8 981008 Magnolia Greens, Parcels E &O, Section 9 & 10 Brunswick County, NC Dear Linda, As requested in your December 1, 1998 letter, please find enclosed the additional information you requested for the above referenced stormwater submittal. • (3) copies of supporting calculations • (3) copies of revised plans • (3) copies of revised applications In addition to the enclosures we offer the following items to answer your questions and comments: 1. We will insure that all future submittals will be with the April, 1998 version of the application form. 2. The application form has been revised to indicate that a portable pump will be used as an emergency drain for Ponds 9 and 10. Pond 9-1 has been reshaped to provide the 3:1 ratio, and the application form has been revised to reflect this. 3. The Pond section has been revised to indicate the 7' depth. 4. The inlet to Pond 10 Forebay has been moved, as indicated on the revised plans. 5. Additional Pond dimensions have been added to Pond 9 & 10 details. 6.' Lot numbering has been revised for clarification. The master plan indicates that the lot sizes of parcels E and O is 4,000 ftZ. 7.' Details have been revised to reflect the calculations elevations. 8. The impervious area and drainage calculations have been revised to reflect 52.5 lots at 4,000 ftz of impervious area. 9. The Pond 9-1 orifice size has been recalculated and revised on the drawings. If,you have any additional questions or require additional information, please contact this office. Sincerely, Mc e ineers P.A. Roney 41Senior Designer cc: Margaret Gray, Landmark Development 243 N. FRONT ST., WILMINGTON, NORTH CAROLINA 28401 TEL 910.343.1048 FAX 910.251.8282 www.mckimcreed.com Stale of North Carolina Department of Environment / and Natural Resources R'ilmingtpn Regional Office ®RJRA James B. Hunt, Jr., Governor WARENK Wayne McDevitt, Secretary NORTH CAROLINA DEPARTMENT OF Division of Water Quality ENVIRONMENT AND NATURAL RESOURCES December 1, 1998 Mr. Davis Fennell McKim and Creed 243 N. Front Street Wilmington, NC 28401 Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 981008 Magnolia Greens, Parcels E & O, Sections 9 & 10 Brunswick County Dear Mr. Fennell: The Wilmington Regional Office received a Stormwater Management Permit Application for Magnolia Greens, Parcels E & O, Sections 9 & 10 on October 9, 1998. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The application form submitted is dated January, 1998, at the bottom. Please discard all applications with this date and begin using the April, 1998, version, which was mailed to your company on September 22, 1998. Future packages received With the older forms will be returned. For this project only, the older form will be accepted. 2. Several items on the wet detention supplement sheet have either been marked N/A, or have not been satisfied. For Pond 9-1: the length to width ratio of 3:1 has not been satisfied; and an emergency drain has not been specified (for ponds in the coast, a portable pump is acceptable). For Pond 10, the emergency drain has not been provided. Please revise. 3. The pond section detail indicates a pond depth of 7.5', but the the ponds are only 7' deep. If an additional 6" of depth is desired for sediment storage, please indicate this on the plans. 4. Relocate the inlet into the forebay of Pond 10 so that it enters at the top of the forebay, not alongside the berm. This is needed so that the forebay area is totally utilized for its purpose. 5. Please provide additional dimensions for the permanent pools. The dimensions provided state that they are for the permanent pool, but are drawn such that they appear to be for some unknown higher elevation. Please dimension each side of the figure created by the permanent pool contour, including all radii, to the best of your ability. 127 Cardinal Dr.Ext.,Wilmington,North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10°/ post-consumer paper Mr. Fennell December 1, 1998 Stormwater Project No. SW8 981008 ---------------------------------------------- 6. There are now duplicate lot numbers on the Master Plan. Two sections are labelled as 10. Please renumber the lots in one of the duplicate sections to avoid confusion. The master plan limits the lots in Section 10 to 3,500 ftz, but the application is for 4,000 ftz. 7. The supplement sheets and details for Pond 9-1 do not match up. The supplement shows a permanent pool of 23 and an overflow at 25.1. The details show the orifice invert at 26, and the overflow at 26.1. Please revise. 8. When you calculate the impervious area on the lots that drains to the pond, it is more conservative to total up the number of whole lots and portions of lots that drain to the pond, and determine an impervious area from that. For example, I count 52.5 lots that drain to Pond 9-1, which equates to 210,000 ft2 of impervious area, but you only account for 183,615 ftz. 9. For Pond 9-1, the two 2"$ orifices will draw down the pond in less than 2 days. The orifice calculation is based on the volume provided in the pond, (32,751 ft3) not the minimum required volume (30,632 ft3). Please revise. The same will apply to Pond 10, however, since the volume provided and the volume required in Pond 10 was so close, the two 2"� orifices specified do drawdown the pond in 2-5 days. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 4, 1999, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The Division is allowed 90 days from the receipt of a completed application to issue the permit. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\981008.DEC cc: Linda Lewis Chris Stephens Central Files J3. Specify the type of project (check one): X Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check appropriate blanks): CAMA Major X Sedimentation/Erosion Control 404 Permit III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative(one to two pages) describing stormwater management for the project. Curb and cutter storm drain collection system with enhanced treatment via wet detention ponds. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: **47.4 acres 4. Project Built Upon Area: 28.2 % 5. How many drainage basins does the project have? 2 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. Basin€Information Drama a Basm;le-POND#10.. _ " !`...=..:D rauia'dMasm'`2$©ND Receiving Stream Name Sturgeon Creek Sturgeon Creek Receiving Stream Class C-SW ' C-SW Drainage Basin Area 1,219,220 SF (28.0 AC 1,171,764 SF 26.9 AC Existing Impervious* Area 18,455 SF 173,359 SF Proposed Impervious* Area 328,798 SF 169,807 SF % Impervious* Area (total) 28.5% 1 29.3% On-site Buildings 214,658 SF 107,750 SF On-site Streets 89,676 SF 49,032 SF Oh-site Parking 0 SF 0 SF On-site Sidewalks 22,464 SF 13,025 SF Other on-site 2.000 SF (PS SITE) 0 SF Off site 18,455 SF 173,359 SF Total: Y=347,253 SF E=343,166 SF *Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 7. How was the off-site impervious area listed above derived? From design information for Phase 1 of subdivision (considered "Existing"). IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. **PROJECT AREA FOR SECTIONS E & O ONLY (SEE MASTER PLAN) Form: SWU-101 January 1998 Page 2 of "1 Permit No. `1 LU F �9 I cxi f (to be provided by DWQf State of North Carolina ,Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Manaeement Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Magnolia Greens Sections 9 and 10 Contact Person: Greg Hetzler, McKim & Creed Phone Number: ( 910 ) 343-1048 For projects with multiple basins, specify which basin this worksheet applies to: Pond #9 -1 Basin Bottom Elevation 16.0 ft. r (average elevation of the floor of the basin) Permanent Pool Elevation 23.0 ft. (elevation of the orifice) Temporary Pool Elevation 25.1 ft. (elevation of the discharge structure overflow) Permanent Pool Surface Area 13,582 sq. ft (water surface area at the orifice elevation) Drainage Area 26.9 ac. (on-site and off-site drainage to the basin) Impervious Area 7.89 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 48,281 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 32,751 cu. ft. (volume detained above the permanent pool) Forebay Volume 9,413, cu. ft. SA/DA' used 0 .9186 (surface area to drainage area ratio) Diameter of Orifice 2x 2 in. Design TSS Removal 90 % (85% TSS removal required, see item k below) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources,November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 Rev 1/August 1998 Page I of 3 Applic�als a. The temporary pool controls runoff from the 1 inch storm- y ' / b. The basin length to width ratio is greater than 31 Ala —t Z: I c. The basin side slopes above the permanent pool are no steeper than 3:1. d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). e. Vegetation above the permanent pool elevation is specified. f An emergency drain is provided to empty the basin. f g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). A10h. The temporary pool draws down in 2 to 5 days. i. A trash rack is provided for both the overflow and orifice. zp o t j. The forebay volume is approximately equal to 20% of the total basin volume. k. Sediment storage is provided in the permanent pool.. L 1 1. A 30-foot vegetative filter is provided at the outletz (include erosive flow calculations) m. Recorded drainage easement for each basin including access to nearest right-of-way. n. A site specific operation and maintenance (O&M) plan is provided. o. A vegetation management/mowing schedule is provided in the O&M plan. p. Semi-annual inspections are specified in the O&M plan. q. A debris check to be performed after every storm event is specified in the O&M plan. T. Specific clean-out benchmarks are specified in the O&M plan (elevation or depth). s. A legally responsible party is designated in the O&M plan' (include name and title). — t. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior to use as a wet detention basin. r Footnotes: When using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-standard table entries. 'The requirement for a vegetative filer may be waived if the wet detention basin is designed to meet 90%TSS removal. 'The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, forebay, non-integrated pretreatment systems (pretreatment other than forebays), and the vegetated filter if one is provided. L9nd This system (check one) ❑does does not incorporate a vegetated filter. This system (check one) ❑does M/does not incorporate non-integrated pretreatment. Maintenance activities shall be performs as follows: 1. After every significant runoff producing rainfall event and at least monthly: Form SWU-102 Rev 1/August 1998 Page 2 of 3 �1 a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, grass cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The original design depth is: 7' The sediment removal benchmark depth is : 5.25' 5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These plants shall be encouraged to grow along the basin perimeter. r 6. If the basin must be drained for an emergency dr to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Print name: W. Christopher Stephens Address : P. O. Box 4127 ilmington, NC 2 406 Phone: (910) 392-7f_� Title : Presi Signature Date I, -Be S. _ a Notary Public for the State of AAA CQ/011A � 7 County of lt✓ do hereby certify that fly• Cri �aP�Q� /L5 personally appeared before me this � day of Ocfz6n 19 and acknowledge the due execution of the forgoing infiltration system maintenance requirem�gwokViVess my hand and official seal, D ,,��.•4 DIY S.PO%' 1 SEAL NOTARY My corn rmision expires Vim•• PUBUC i2V� .......... ���l��o. Forth SWU-102 Rev 1/August 1995 Page 3 of 3 ������/VO,EI ,;t i Permit No. s t.- i Q s t oo's (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Magnolia Greens Sections 9 and 10 Contact Person: Greg Hetzler, McKim & Creed Phone Number: ( 910 ) 343-1048 For projects with multiple basins, specify which basin this worksheet applies to: Pond #10 Basin Bottom Elevation 12.0 ft. r (average elevation of the floor of the basin) Permanent Pool Elevation 19.0 ft. (elevation of the orifice) Temporary:Pool Elevation 20.3 ft. (elevation of the discharge structure overflow) Permanent Pool Surface Area 22,558 sq. ft (water surface area at the orifice elevation) Drainage Area 28.0 ac. (on-site and off-site drainage to the basin) Impervious Area 7.97 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 83,516 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 31,984 cu. ft. (volume detained above the permanent pool) Forebay Volume 16,975 cu. ft. SA/DA' used 0 .917 (surface area to drainage area ratio) Diameter of Orifice 2x 2 in. Design TSS Removal 90 % (85% TSS removal required, see item k below) II. REQUIRED ITEMS CHECKLIST' The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 Rev I/August 1998 Page I of 3 Applicants I itials a. The temporary pool controls runoff from the 1 inch storm event. 71 l b: The basin length to width ratio is greater than 3:1. c. The basin side slopes above the permanent pool are no steeper than 3:1. d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). e. Vegetation above the permanent pool elevation is specified. NO An emergency drain is provided to empty the basin. i g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. i. A trash rack is provided for both the overflow and orifice. Zp j. The forebay volume is approximately equal to 20% of the total basin volume. k. Sediment storage is provided in the permanent pool. IV l• 1. A 30-foot vegetative filter is provided at the outlet'' (include erosive flow calculations) in. Recorded drainage easement for each basin including access to nearest right-of-way. n. A site specific operation and maintenance (O&M) plan is provided. . A vegetation managemenUmowing schedule is provided in the O&M plan. p. Semi-annual inspections are specified in the O&M plan. q. A debris check to be performed after every storm event is specified in the O&M plan. r. Specific clean-out benchmarks are specified in the O&M plan (elevation or depth). A legally responsible party is designated in the O&M plan' (include name and title). t. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior to use as a wet detention basin. r Footnotes: When using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-standard table entries. 'The requirement for a vegetative filer may be waived if the wet detention basin is designed to meet 90%TSS removal. 'The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, forebay, non-integrated pretreatment systems (pretreatment other than forebays), and the vegetated filter if one is provided. This system (check one) ❑does Qdoes not incorporate a vegetated filter. This system (check one) ❑does Q"does not incorporate non-integrated pretreatment. Maintenance activities shall be performs as follows: 1. After every significant runoff producing rainfall event and at least monthly: Form SWU-102 Rev I/August 1998 Paget of 3 a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, grass cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins,piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The original design depth is: 7' The sediment removal benchmark depth is : 5.25' 5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These plants shall be encouraged to grow along the basin perimeter. r 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. 1 agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Print name: W. Christopher Stpphens a Address : P. O. Box 41 7, it in" on, NC 28406 Phone: (910) 2-7 0 Title : Presi t/ Signature : � j Date : v ,,,ff � '� //� �I 1 �1t� $ —RD2 a Notary Public for the State of_lV0lTr1 �1U'GVInL County;of (1 _ Q✓ o hereby certify that /Q, !s personally appeared before me thi! " day of OCJ264.4f 19 , and acknowledge the due execution of the forgoing infiltration system maintenance require�WH "°4lagjess my hand and official seal, SEAL NOTARY I: My commission expires ptl,g 601 —�— :2• PUBUC :V :;nay'• • ?:` Forth SWU-102 Rev I/August 1998 Page 3 of 3 �040 �n,O, '.�.�``��, v�MCKIN4&CREEDVE� LETTER OF TRANSMITTAL OCT a 8 °AI E: October 5, 1998 TO: NCDENR 1 ,_w? FIR i JECTNo: 03830048 TASK"°` DESIGN 127 Cardinal Drive Extension RE: Magnolia Greens - Sections 9 & 10 Wilmington, NC 28401 Stormwater ATTENTION: Linda Lewis TRANSMITTAL NO. PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ® Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ® Calculations ® Other-Application, Calc.'s Quantity Drawing No. Rev. Description Status 2 Stormwater Management Permit Application Form G 1 Low Density Supplement G 1 ea. Wet Detention Basin Supplements G 1 Design Narrative G 1 Supporting Calculations G 2 sets Plans, Details G 1 Application Fee ($225.00) G Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review& Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: Attached please find for your review and approval the above notated materials. If you have any questions or require additional information regarding this matter, please contact this office. 243 N.FRONT ST.,WILMINGTON,NC 28401 9101343-1048 FAX 9101251-8282 cc: Margaret Gray, Landmark(2) McKIM & CREED ENGINEERS, PA Greg Hetzler file (03830048(40)) Signed K. Davis ennell, E.I.T. s:\0383\0048\ad min\Sto"Tra ns.d oc .OFFICE USE ONLY"" „-., . Fee Paid CO 5 O U State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION: 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): Landmark Developers, Inc. 2. Print Owners/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): W. Christopher Stephens, President 3. Mailing Address for person listed in item 2 above: P. O. Box 4127 City: Wilmington State: NC Zip: 28406 Telephone Number: ( 910 ) 392-7201 4. Project Name (subdivision, facility,or establishment name - should be consistent with project name on plans, specifications, letters,operation and maintenance agreements, etc.): Magnolia Greens Q a l 0 1 '�h G2�� E 0 5. Location of Facility (street address): Highway 17 just south of highway 74/76 interchange. City: Leland County: Brunswick 6. Directions to facility (from nearest major intersection): From Wilmington, take 17 south in Brunswick County. Subdivision fronts highway 17 just south of highway 74/76 interchange. 7. Latitude: 340 13' 42" Longitude: 780 2' 59" of facility 8..Contact person who can answer questions about the facility: Name: Greg Hetzler, McKim&Creed Telephone Number: ( 910 ) 343-1048 H. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal X Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SWS ')"10104 and its issue date (if known) -5[RO hB Form: SWU-101 January 1998 Page I of 98 too 3. Specify the type of project(check one): X Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements(check appropriate blanks): CAMA Major X Sedimentation/Erosion Control 404 Permit III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Curb and cutter storm drain collection system with enhanced treatment via wet detention ponds. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: **47.4 acres 4. Project Built Upon Area: 28.2 % 5. How many drainage basins does the project have? 2 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. Basin:Information Draina c Basm,l"POND-#10<<: �i -Drainage Basm"2 POND#9,1 ', Receiving Stream Name Stur eon Creek Sturgeon Creek ReceivingStream Class C-SW C-SW Drainage Basin Area 1,219,220 SF 28.0 AC 1,171,764 SF 26.9 AC Existing Impervious* Area 18,455 SF 177 494 SF Proposed Impervious* Area 328,798 SF 192,057 .SF Impervious* Area total 28.5% 1 5 Im eiious*-Surface Area. Draina eBasin•1 ' .+:Draina e:Basin,2 , On-site Buildings 214,658 SF 130,000SF ,On-site Streets 89,676 SF 49,032 SF On-site Parking 0 SF 0 SF On-site Sidewalks 22,464 SF 13,025 SF Other on-site 2,000 SF PS SITE 0 SF Off site 18,455 SF 177,494 SF Total: I Y—=347,253 SF E_ 369,591 SF *Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 7. How was the off-site impervious area listed above derived? From design information for Phase I of subdivision(considered "Existing"). IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. **PROJECT AREA FOR SECTIONS E & O ONLY(SEE MASTER PLAN) Form: SWU-101 January 1998 Page 2 of By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your,behalf,please complete this section: Designated agent(individual or firm): McKim& Creed Engineering Mailing Address: 243 North Front Street City: Wilmington State: NC Zip: 28401 Phone: ( 910 ) 343-1048 Fax: ( 910 ) 251-8282 VII. SUBMITTAL REQUIREMENTS This application package will not be accepted by the Division of Water Quality unless all of the applicable items are included with the submittal. 1. Please indicate that you have provided the following required information by signing your initials in the space provided next to each item. Applicant's Iq�ti • Original and one cop m v of the Storwater Management Permit Application Form GJ1A !J • One conv of the applicable SUDDlement Form(s) for each BMP (see Attachment A }N • Permit application orocessing fee (see Attachment Al • Detailed narrative description of stormwater treatment/management: • Two conies of Dlans and specifications including: Development/Project name Engineer and firm Legend North arrow Scale Revision number& date Mean high water line Dimensioned property/project boundary Location map with named streets or NCSR numbers Original contours,proposed contours, spot elevations, finished floor elevations Details of roads, parking, cul-de-sacs, sidewalks, and curb and gutter Wetlands delineated, or a note on plans that none exist Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage basins delineated Vegetated buffers(where required) VIII. APPLICANT'S CERTIFICATION I, (Iirint or type name ofperron listed in General Information, item 2) W. Christopher Stephens certify that the information mclud d on this enri t application form is correct, that the project will be constructed in conformance w' th approv ans, that the deed restrictions in accordance with Attachment A of this form will be recorde w' all re it permit conditions, and that to the best of my knowled e the proposed project cp s h it e A NCAC 2H.1000. / Signature: VV Date: [ + Title: President Form: SWU-101 January 1998 Page 3 of 4 ATTACHMENT A 1. Deed Restriction Requirements The following statements must be recorded for all low density projects and for all projects that involve the subdivision and selling of ots or outparcels: 1. Nomorethan4600 square feet of any lot, including that portion of the right-of-way between the edge ofpavement and the front lot line, shall be covered by impervious structures, including asphalt, gravel, concrete, brick, stone, slate or similar material but not including wood decking or the surface of swimming pools. This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina. The covenant may not be changed or deleted without the consent of the State. 2. No one may fill in,pipe, or alter any roadside swale except as necessary to provide a mininhum driveway crossing. NOTE: If lot sizes vary significantly, the owner/developer must provide,an attachment listing each lot number, size, and the allowable built-upon area for each lot. For commercial projects that have outparcels or future development the following statements must also be recorded. 3. The connection from the outparcel or future area into the stormwater system must be made into the forebay such that short-circulating of the system does not occur. 4. All built-upon area from the outparcel or future development must be directed into the permitted stormwater control system. 5. Built-upon area in excess of the permitted amount will require a permit modification prior to construction. For curb outlet systems, the following statement in addition to items 1 and 2 above must be recorded: 6. No one may pipe,fill on or alter any designated 100 foot long grassed Swale used to meet the requirements of NCAC 2H.1008(g). 2. Supplement Forms The applicable supplement form(s) listed below must be submitted for each BMP specified for this project: Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement .Form SWU-105 Curb Outlet System Supplement -Form SWU-106 Off-Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River basin Nutrient Management Strategy Supplement 3. Permit Application Fees (check made payable to NCDENR and submitted to the appropriate Regional Office) Type of Permit New, Modification, or Timely Renewal Without Late Renewal Modification Low Density $225 n/a High Density $385 $225 Other $225 n/a Director's Certification $350 n/a General Permit $50 n/a Form: SWU-101 January 1998 Page 4 of Permit No. sw Viz of (to be provided by DWQ State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low destiny projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in 15A NCAC 21-1 .1005 through .1007. I. PROJECT INFORMATION (please complete the following information): Project Name: Magnolia Greens Sections 9 and 10 Contact Person: Greg Hetzler, McKim & Creed Phone Number: (910) 343-1048 Number of Lots: 99 Square Feet Per Lot*: 4,000 SF/Lot *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. II. BUILT UPON AREA See the Stormwater Management Permit Application Attachment A for specific language that must be recorded in the deed restrictions for all low density projects. For uniforin lot sizes, complete the following calculation in the space provided below where: • SA Site Area- the total project area above Mean High Water. Wetlands may be excluded when the development results in high density pockets. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area- the total impervious surface occupied by roadways. • OA Other Area- the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. Lots is the total number of lots in the subdivision. • BUA/Lot is the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. (SA x DF) - RA - OA = BUA No. Lots Lot Calculation: (2,064,744 SF x 0.30) - 140,956 SF - 35,141 SF =4478 SF 99 Lot —> Say 4000 SF/Lot Form: SWU-104 Rev 1/August 1998 Page 1 of III. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Ap licants I /�I ( A 30 foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse . River basin may require additional buffers. b. Deed restriction language shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided by DWQ within 30 days of platting and prior to sale of any lots. c. Built upon area calculations are provided for the overall project and all lots. (� Project conforms to low destiny requirements within the ORW AEC (if applicable). [15A NCAC 2H .1007(2)(b)] Form: SWU-104 Rev I/August 1998 Page 2 of 2 Permit No. f 8 1 cx) (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form nuty be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Magnolia Greens Sections 9 and 10 Contact Person: Greg Hetzler, McKim & Creed Phone Number: ( 910 ) 343-1048 For projects with multiple basins, specify which basin this worksheet applies to: Pond#9 -1 Basin Bottom Elevation 16.0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 23.0 ft. (elevation of the orifice) Temporary Pool Elevation 25.1 ft. (elevation of the discharge structure overflow) Permanent Pool Surface Area 13,582 sq. ft (water surface area at the orifice elevation) Drainage Area 26.9 ac. (on-site and off-site drainage to the basin) Impervious Area 8.48 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 48,281 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 32,751 cu. ft. (volume detained above the permanent pool) Forebay Volume 9,413, cu. ft. SAIDA' used 1.15 (surface area to drainage area ratio) Diameter of Orifice 2'2 in. Design TSS Removal 90 % (85% TSS removal required, see item k below) IL REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 Rev I/August 1998 Page I of 3 Applic t als a. The temporary pool controls runoff from the I inch storm event. ± 30 b. The basin length to width ratio is greater than 3:1. - c. The basin side slopes above the permanent pool are no steeper than 3:1. d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). e. Vegetation above the permanent pool elevation is specified. P f. An emergency drain is provided to empty the basin: f g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). It. The temporary pool draws down in 2 to 5 days. i. A trash rack is provided for both the overflow and orifice. ZD o. j. The forebay volume is approximately equal to 20% of the total basin volume. k. Sediment storage is provided in the permanent pool.. 1. A 30-foot vegetative filter is provided at the outlet' (include erosive flow calculations) in. Recorded drainage easement for each basin including access to nearest right-of-way. n. A site specific operation and maintenance (O&M) plan is provided. o. A vegetation management/mowing schedule is provided in the O&M plan. p. Semi-annual inspections are specified in the 0&M plan. q. A debris check to be performed after every storm event is specified in the O&M plan. r. Specific clean-out benchmarks are specified in the O&M plan (elevation or depth). s. A legally responsible party is designated in the O&M plan' (include name and title). t. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior to use as a wet detention basin. Footnotes: When using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-standard table entries. 'The requirement for a vegetative filer may be waived if the wet detention basin is designed to meet 90%TSS removal. 'The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, forebay, non-integrated pretreatment systems (pretreatment other than forebays), and the vegetated filter if one is provided. This system (check one) ❑does Mdoes not incorporate a vegetated filter. This system (check one) ❑does 5does not incorporate non-integrated pretreatment. Maintenance activities shall be performs as follows: 1. After'every significant runoff producing rainfall event and at least monthly: Form SWU-102 Rev 1/August 1998 Page 2 of 3 a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, grass cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The original design depth is: 7' The sediment removal benchmark depth is : 5.25' 5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These plants shall be encouraged to grow along the basin perimeter. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project,responsible party, or address. Print name: W. Christopher Stephens Address : P. O. Box 4127 ilmington, NC 2 406 Phone: (910) 392-7 Title : Presi Signature : ,/ Date : 11 - I ` 'a I, �G�[, S. RrZ _ a Notary Public for the State of AV �'` ceyo l a County of 2Lt) Q✓ _ dp hereby certify that /I)• C kris}aP�n tL personally appeared before me this _� day of ��n 19�—, and acknowledge the due execution of the forgoing infiltration system maintenance requiremgptoj Wi2;iess my hand and official seal, mil • G� SEAL NOTFRY Y p 1AD1 M coon ex fires = —�— Z: PUBIJC ; V R` '•. r 2. ,,ty • �y % Form SWU-102 Rev 1/August 1998 Page 3 of 3 •,,��'�•,�,ND,Ea, �,,, Permit No. SW � Q?100$ (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Magnolia Greens Sections 9 and 10 Contact Person: Greg Hetzler, McKim & Creed Phone Number: ( 910 ) 343-1048 For projects with multiple basins, specify which basin this worksheet applies to: Pond #10 Basin Bottom Elevation 12.0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 19.0 ft. (elevation of the orifice) Temporary Pool Elevation 20.3 ft. (elevation of the discharge structure overflow) Permanent Pool Surface Area 22,558 sq. ft (water surface area at the orifice elevation) Drainage Area 28.0 ac. (on-site and off-site drainage to the basin) Impervious Area 7.97 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 83,516 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 31,984 cu. ft. (volume detained above the permanent pool) Forebay Volume 16,975 cu. ft. SA/DA' used 0 .917 (surface area to drainage area ratio) Diameter of Orifice 2' 2 in. Design TSS Removal 90 % (85%TSS removal required, see item k below) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU=102 Rev I/August 1998 Page I of 3 STORMWATER DESIGN NARRATIVE AND SUPPORTING CALCULATIONS SECTIONS 9 & 10 at MAGNOLIA GREENS Brunswick County, North Carolina prepared for Landmark Developers, Inc. PO Box 4127 Wilmington,North Carolina 28406 (910) 392-7201 August, 1998 L E 022 7 i s F YIN �f'•�� Prepared by McKim and Creed Engineers 243 North Front St. Wilmington, North Carolina 28401 (910) 343-1048 DESIGN NARRATIVE 1. GENERAL: The project site is located within the Magnolia Greens subdivision near the entrance from Hwy. 17 within Brunswick County, North Carolina. The project site is approximately 48 acres. Drainage considerations are to be in accordance with DEM stormwater requirements. The intent of this project is to construct roadway and drainage systems within Sections 9 and 10. 2. EXISTING SITE: Site topography in the area is relatively flat with slopes typically less than (1) one percent. Vegetation consists primarily of grasses and minor ground cover within the area of the improvements. Subsurface soils are typically a mixture of sands, silty sands and organics. 3. PROPOSED IMPROVEMENTS: Improvements proposed include the construction of roadways, sanitary sewer and storm drainage collection systems, and water distribution systems to serve Sections 9 and 10. 4. STORMWATER TREATMENT CONSIDERATIONS: All stormwater collected in the curb and gutter system will be provided enhanced treatment via. two proposed wet detention ponds. Compliance with all parameters of stormwater treatment is documented in the attached calculations.