Loading...
HomeMy WebLinkAboutSW8970218_HISTORICAL FILE_20230814 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 011 0 219 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 23 O s \L� YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Wednesday, August 9, 2023 2:20 PM To: crafthardware@aol.com' Cc: Smith, Ashley M Subject: SW8 970218 - Craft Hardware The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 4, 2023. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. If you have any questions about the project or status of the review, please contact Ashley Smith (cc'd). Best Regards, Tina Burd Administrative Associate II 910-796-7215 New email: tina.burd.@deg.nc.gov NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Vvebsite http:' cey.nce.ov about/divislons/energy-mineral-land-resources/storrnwater Polanv crn Pluvices are wortcing remotely or are on staggered shifts. Please check with the appropriate staff before visiting our offices, as they may be able to handle your requests by phone or email. 1 Non I ranster A{plication Completeness Review Checklist Project Name: Date Delivered to WIRO: Project County/Location: J214RIMS Received/Accepted Date: n Date Given to Admin: Permit Action: New New Permit#2: RIMS Acknowledged Date : J ❑Not located in the ETJ of the following delegated sy and functioning programs: NHC:Carolina Beach/Kure Beach/Wilmington/Wrightsville Beach Bruns: Leland/Navassa (?)/Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mo / Renewal Existing Permits#: Applicant&Permittee are the same?a Expiration Date°: �- Permit Type: ND D/LD Overall/HD&LD Combo GeneralP rmit/Off'ite/Exempt + Redevelopment �Offsite to SW8: Development Typ Commercial . esidential/Other �Is Offsite Lot approved in Master Permit?s Subdivided?: Subdivisio or Single Lot i Rule(s): �2017 Coastal e[]2008 Coastal .a/7 IZ Coastal Phase II Universal /01988 Coastal P mlttee ype&Documents Needed: Property Owner(s) Purchaser Lessee QHOA Developer QViable? Viable? QViable? QViable? QViable? Deed QPurchase Agmt QLease Election Minutes *Papek a tion OS(within 6mo) Check#(s): I ONo Fee / FISu pplement'(1 new form or for alder forms:1 original per SCM) FT&M / Soils Report(Infil or PP) 1✓/ Calculations(signed/sealed) Deed Restrictions,if subdivided' /=� •V// F-1Project Narrative FTSGS Map(or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N Plans(2 Sets) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 'For New Projects-Enter New Permit#on Supplements&Deed Restriction Templates. / ' Permittee is different,STOP. Needs transferred first. °If w/in 6 months and they are requesting ag a mod,STOP. Needs a renewal first. slf Lot not approved in master permit,STOP. Master permit needs mod. EMAILED ENGINEER DATE: Comments: REVIEWER NAME: V CA\\Reference Library\Procedures\Checklists\Completeness Review Clecklist_202109 01