HomeMy WebLinkAboutSW8970136_HISTORICAL FILE_20220906 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
5
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Burd, Tina J
From: Burd, Tina J
Sent: Monday, August 1 S, 2022 10:13 AM
To: Barraco CIV Talia M
Subject: SW8 970136 - BEQ P630/G920 Bolier Bldg. Construction
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance &Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COVED-rg, the Department of 8nvironmen tal Quality has adjusted operations to
protect the health and safety of the staff and public. Many employees are win hing remotely at-are on staggered shifts. To accommodate these
staffing changes,all DEQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before
visiting our offices, as we may be able to handle your requests by phone at entail. We appreciate your patience as we continue to serve the
public during this challenging time.
1
-� Non-Transfer Application Completeness Review Checklist /
Project Name: rUta DL, (E2 �„/�Cj Date Delivered to WIRO: rg / /a! ?p Z'Z
Project County/Location: "f ((�$Lor.�/ I"L c`!j BIMS Received/Accepted Date: { ld 7P2-z
Date Given to Admin: �b ,ate ;I �-
Permit Action: New New Permit k': BIMS Acknowledged Date':
Not located in the ETJ of the following delegated
and functioning programs:
NHC:Carolina Beach/Kure Beach/Wilmington/Wrightsville Beach
Bruns: Leland/Navassa(?)/Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City
Major Mod / Minor Mod enewal Existing Permit N: S 9 7013
Applicant&Permittee are the same?3 Expiration Date': 7 Z,o ZZ
Permit Type: tiD LD/LD Overall/HD&LD Combo
General Permit/Offsite/Exempt + Redevelopment El Offsiteto SWB:
Development Type: Commercial/Residential Other Ols Offsite Lot approved in Master Permit?s
Subdivided?: Subdivision or Single Lot
Rule(s): �2017 Coastal E12008 Coastal 1995 Coastal
Phase II Universal E11988 Coastal
Permittee Type&Documents Needed:
EProperty Owner(s) QPurchaser Lessee 0HOA Developer
Viable? �Vlable? Viable? Viable? Viable?
Deed Purchase Azmt QLease Election Minutes
Paperwork
®Application .t ��
Fee: �$505(within 6mp) Check#(s): W tQ.� FiNo Fee
Supplement'(1 newform orfor olderforms:1 original per SCM)
FIO&M2
Soils Report(Infil or PP)
Calculations(signed/sealed)
Deed Restrictions,if subdivided'
Project Narrative
QUSGS Map(or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N
Plans(2 Sets)
NOTES:
'Enter BIMS Acknowledged Date on this Sheet
'for New Projects-Enter New Permit#on Supplements&Deed Restriction Templates.
3 If permittee is different,STOP.Needs to be transferred first.
°If w/in 6 months and they are requesting a mod,STOP. Needs a renewal first.
slf Lot not approved in master permit,STOP. Master permit needs mod.
EMAILED ENGINEER DATE: Comments:
REVIEWER NAME: -A Sq LA Y
G:WQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist_2021 09 08