HomeMy WebLinkAboutSW8970136_HISTORICAL FILE_20130926 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE Ijoye
YYYYMMDD
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Tracy E. Davis, PE, CPM Pat McCrory, Governor
Director John E. Skvarla, III, Secretary
September 26, 2013
Neal Paul, Commander
USMCB Camp Lejeune
I&E Bldg 12, PO Box 20004
Camp Lejeune, NC 28542
Subject: Approved Plan Revision
BEQ P630 / G920 Boiler Bldg. Construction
Stormwater Permit No. SW8 970136
Onslow County
Dear Mr. Paul:
On August 20, 2013, the Wilmington Regional Office received a request to revise the approved
plans for Stormwater Management Permit Number SW8 970136. The revisions include the
addition of the G920 Boiler Building which is being built in an area which was previously part of
the paved parking lot. It has been determined that a formal permit modification is not required
for the proposed changes. We are forwarding you an approved copy of the revised plan for your
files. Please add the attached plan to the previously approved plan set.
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any
development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of
the General Statutes, which is current and valid at any point between January 1, 2008, and
December 31, 2010. The law extends the effective period of any stormwater permit that is set to
expire during this time frame to three (3) years from its current expiration date. On August 2,
2010, the Governor signed Session Law 2010-177, which grants an extra year for a total of four
(4) years extension. Please note that the expiration date of this permit has been adjusted to
reflect this four year extension. The new permit expiration date has been changed to July 8,
2022.
Please be aware that all terms and conditions of the permit renewed on July 8, 2008, remain
in full force and effect. Please also understand that the approval of this revision to the
approved plans for the subject State Stormwater Permit is done on a case-by-case basis.
Any other changes to this project must be approved through this Office prior to construction.
The issuance of this plan revision does not preclude the permittee from complying with all
other applicable statutes, rules, regulations or ordinances which may have jurisdiction over
the proposed activity, and obtaining a permit or approval prior to construction.
If you have any questions concerning this matter, please do not hesitate to call Georgette Scott
or me at (910) 796-7215.
Sinc�eerrel�y,, j
Steve G. P- (
Environmental Engineer
GDS1sgp: G:IWMSharedlStormwaterlPermits&Projects120131970136 HM2013 09 permit pr 970136
cc: Galen M. Jamison, PE — Catlin Engineers & Scientists
WIRO File
Wilmington Regional Office
127 Cardinal Drive Extension,Wilmington,North Carolina 28405 Phone:(910)796-72151 Fax:(910)350-2004
• DWQ USE ONLY
Date Received/ Fee Paid (express only) Permit Number
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORNI
This form may be phoixopied for use as an original
I. G EN ERAL IN FO RMATION
I. Stormwater Management Permit Number: SW970136
2. Project Name: G920 BOILER BUILDING CONSTRUCTION
3. Permit Holder's name(specify the name of the corporation, individual,etc.):
NEAL PAUL, USMCB CAMP LEJEUNE
4. Print Owner/ Signing Official's name and title (person legally responsible for permit):
NEALPAUL
5. Mailing Address for person listed in item 2 above:
I&E BLDG 12 MARINE CORPS BASE PSC BOX 20004
Citv:CAMP LEJEUNE State:NC Zip:28542
Phone: (910 ) 451-3034 Fax: (910 ) 451-3300
EmaiI:NEAL.PAULQ( jSMC.MIL
- H. - PLAN REVISION INFORMATION
1. Summarize the plan revision proposed (attach additional pages if needed):
ADDITION OF 1 BOILER FOR BUILDING (14' X 20')G920. BOILDER BUILDING TO BE CONSTRUCTED
ON AN AREA OF EXISTING ASPHALT,THEREFORE THERE IS NO INCREASE IN IMPERVIOUS
Ill. SUBMITTALREQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the DWQ Office that issued the permit.
I. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
Initials
• Original& ! copy ofthe Plan Revision Application Form
• Two (2)copies of revised plans (must be revisions oforigincd apprwec(p/an sheet(s)) Nf
If ap-plvina for Express review (only available in 20coastal ccntnties):
Application fee of$500.00 (made pnvable to NCDENR)
VI. APPLICANT'S CERTIFICATION
1, (print or type name of person listed in General Information, item 3)NEAL PA UL
certify that I have authorized these plan revisions and that the information included on this plan revision
application is,to the be f my knowledge correct and complete. I
Signature: - Date: D _ l
11
Plan Revision Form Rev 13July) 10 PaMEOVE
2 0 2013
7
I
Casmer, Jo
From: Casmer, Jo
Sent: Monday, August 26, 2013 12:42 PM
To: 'neal.paul@usmc.mil'; 'galen.jamison@catlinusa.com'
Subject: Stormwater Submittals
Re:SW8 980204; BEQ P630 Camp Johnson/AS4006-4007 Boiler Building Construction(Plan Revision)
SW8 060832; BEQ P151/M457-458 Boiler Building Construction (Modification)
SW8 970136; BEQ P630 Camp Lejeune/G920 Boiler Building Construction(Plan Revision)
SW8 080740 Field Medical Services P828/M508 Boiler Building Construction (Modification)
The Wilmington Regional Office of the Division of Energy,Mineral,and Land Resources (Stormwater Section)
received the Stormwater Permit Applications and $505.00 fees on August 20, 2013,2013. Your projects will be
assigned to a staff member and reviewed within 75 days of receipt. You will be notified if additional information is
needed. Please be advised that the construction of built-upon area may not commence until the Stormwater
Permits are issued.
Please call if you have any questions.
Jo Casmer
Administrative Assistant for Stormwater Permitting
NC Department of Environment&Natural Resources
Division of Environmental Assistance&Customer Service
127 Cardinal Drive Extension
Wilmington, NC 2W5
Phone: (910) 796-7336
Fax: (910) 350-2004
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third.
parties
1
t.ompleieness Review MIMM11bL
Project Name: to 63a -G 9dl� eceived Date:
Project Location: ('/uS(dLJ �p — T Accepted Date: 8 2p
Rule(s) E32008 Coastal ❑1995 Coastal 11 Phase II (WiRO ) Universal El1988 Coastal
Type of Permit: New or Mod or PR I Existing Permit#(Mod or PR): PE Cert on File?
-- Density:- HD-- or_:- -LD --Type:---Commercial--or--.-Residential---- — NCG -----
%: 0(%OK?) stream Class: ❑SA Map F]Offsite to SW8
Subdivided?: Subdivision or Single Lot IMORWMan Exempt
Paperwork Emailed Engineer on:
FiSupplement(s) (1 original per BMP) BMP Type(s):
�O&M with correct/original signatures (1 original per BMP except LS/VFS and swales)
MA—ppi'ication with correct/original signatures ❑Deed
Corp or LLC: Sig.Auth. per SoS or letter Email Address: Design Engineer
F-1$505 (within 6mo) Email Address: Owner
❑Soils Report with SHWT Note to Reviewer:
r_71fal'culations (signed/sealed) 5w orn.
No obvious errors pl " .
Density includes common areas, etc U fU
Deed Restrictions, if subdivided:
❑Signed & Notarized
ElCorrect Template(Comm/Res& HD/LD) or Dec.Covenants & Rest.
Plans
2 Sets Details (roads, cul-de-sacs,curbs, sidewalks, BMPs, Buildings, etc)
Grading Wetlands: Delineated or No Wetlands
Vicinity Map Layout (proposed BUA dimensions)
egend �DA Maps Project Boundaries
Infiltration Wet Pond Offsite
Soils Report ❑Soils Report El PE Cent for Master Lot#:
SHWT: SHWT: Deed Rest for Master Lot# Matches Master
Bottom: �PP: BUA Permitted (Master): sf
Visited: BUA Proposed (Offsite): sf
Additional Information:
Permitted Proposed: Proposed: Proposed:
BUA (sf)
DA(sf)
PP(el)
SHWT(el)
Depth (ft)
SA (sf)
����� Post Office Box 10279
-� Wilmington, NC 28404-0279
Engineers and Scientists Telephone: (910) 452-5861
Fax: (910) 452-7563
TRANSMITTAL
TO: DENR, Land Qualit Section DATE: August 20, 2013
Jaaet Kassel}- � P1422 Camp Lejeune
127 Cardinal Drive Extension Steam Decentralization
Wilmington, NC 28405
CATLIN Project No. 212154.02
We Are Transmitting Herewith The Following:
ITEM ACTION TRANSMITTED BY
X Drawings 1 . For Your Use US Mail
Specifications 2. For Review X Messenger
Shop Drawings 3. Please Comment Next Day Service
Contract Documents 4. Reply ASAP Other
Correspondence 5. Urgent
Reports 6. Returned
NO. OF DESCRIPTION ACTION
COPIES CODE
2 M457/M458 SWM Permit Modification G6b g = 2
2 M508 SMW Permit Modification Si-3 r-) 8 0 . t +0 2
2 AS4006/4007 SWM Plan Revision - S H 8 0 -�; O 4 2
2 G920 SWM Plan Revision - `5 1 70, i 3 2
COMMENTS:
_ K
��
AUG 202013
COPY TO:
SIGNED:
REC'D n l l r, 2 0 2013
www.catlinusa.com
Post Office Box 10279
Wilmington, North Carolina 28404-0279
CATLIN Telephone: (910)452-5861
Engineers and Scientists Fax: (910)452-7563
www.catlinusa.com
July 29, 2013
NC Department of Environment and Natural Resources
Division of Water Quality
Attn: Ms. Linda Lewis/Christine Nelson
127 Cardinal Drive Extension
Wilmington, NC 28405
Dear Ms. Lewis/Nelson,
United States Marine Corps - Camp Geiger is submitting a plan revision to permit SW8
970136 for State Stormwater for a steam decentralization project located within a
portion of its property in Jacksonville, North Carolina. The total disturbed area for this
portion of the work is approximately 650 square feet and there is a no net increase in
built-upon area. The plan revision consists of the construction of one (1) boiler building
for Camp Geiger Building G920. The boiler building is fourteen feet by twenty feet (14'
X 20') giving 280 square feet of impervious for the boiler building. The project will be
constructed where there is currently existing asphalt, so there will be no net increase in
impervious.
Support document drawings include a site plan drawing for the entire project
development and the original construction drawing clouded to show the boiler building.
Please refer to the attached documentation for additional information concerning this
project.
Please find the following documents enclosed:
o Two copies of the applicable supportive information and two (2) sets of
Construction Plan Sheets.
Please contact me at 910-341-5515 if you have any questions or comments.
Regards,
Galen M. Jamison, P.E.
CATLIN Project Manager FIVE
Enclosures
AUG 2 0 2013
RY:_---- -
Post Office Box 10279
Wilmington, North Carolina 28404-0279
Jam' CATLIN Telephone: (910)452-5861
Engineers and Scientists Fax: (910)452-7563
w .catlinusa.com
July 29, 2013
NC Department of Environment and Natural Resources
Division of Water Quality
Attn: Ms. Linda Lewis/Christine Nelson
127 Cardinal Drive Extension
Wilmington, NC 28405
Dear Ms. Lewis/Nelson,
United States Marine Corps - Camp Geiger is submitting a plan revision to permit SW8
970136 for State Stormwater for a steam decentralization project located within a
portion of its property in Jacksonville, North Carolina. The total disturbed area for this
portion of the work is approximately 650 square feet and there is a no net increase in
built-upon area. The plan revision consists of the construction of one (1) boiler building
for Camp Geiger Building G920. The boiler building is fourteen feet by twenty feet (14'
X 20') giving 280 square feet of impervious for the boiler building. The project will be
constructed where there is currently existing asphalt, so there will be no net increase in
impervious.
Support document drawings include a site plan drawing for the entire project
development and the original construction drawing clouded to show the boiler building.
Please refer to the attached documentation for additional information concerning this
project.
Please find the following documents enclosed:
o Two copies of the applicable supportive information and two (2) sets of
Construction Plan Sheets.
Please contact me at 910-341-5515 if you have any questions or comments.
Regards,
n
Galen M. Jamison, P.E.
CATLIN Project Manager IECEOVE
Enclosures
AUG 2 0 2013
ev:.
SITE LEGEND E
% �� �: ��� .� 'j �• \�\ V-OVERHEAD STEAM DISTRIBUTION SYSTEM Design Grouping #1:
- - Ste' �.-• I 11 It
\\ V UNDERGROUND STEAM DISTRIBUTION SYSTEM Boilers Using Existing Mechanical Space
UNDERGROUND STEAM SYSTEM VAULT Boilers With Expanded Mechanical Space
- BUILDINGS
(\
� ' 1` •��i�-' � II\., ® BUILDINGS IDENTIFIED WITH HEAVY LINE TYPES ARE Needed
C \ INLUDED AS PART OF THE PROJECT Design Grouping #2:
D 1 1i 1 1 BUILDINGS IDENTIFIED WITH LIGHT LINE TYPES ARE
i 1 11 I Unit Heaters / Split Systems
NOT INCLUDED AS PART OF THE PROJECT P Y
it
ice.-�- .�T 1 i� •I \ 1
II :I 6a GIS, I^� 4U, 4112 1 •11 • • • •' 1
IS 4&!
ELM1,
Cj .
BUILDING SUMMARY - CAMP GEIGER
N@Jarv4c
361'I F,I73--Twno4 w.m
�' i ; '\ anmo I v. poi Hasa rare »•ni im
C� \ m.om noun A. u•ai ti na,m m o no •no .40
—__Ynm �� e's__ �" -" a% �. u rY• r..! Ica1 •a•v I p.mn Y »N N w•aal
45k ' .ami .a •rr •o.ce ro rcs rsl r,n rn 1 ,w I N I .p » ens aaoYv rirr,na.nv•aw
gg uaz (l x'X ay � 4n -® - ._ ro ra - w "pv I' • i W w i_- .__. _ _ -_-- -
Cg Sal r» 1 6 1w 1 aac 4a m v moos p _. i I w a
'i 1 9ewr �`
1 4 .t ^ �✓. I GSTwr 4a •0 YWi0r9 •w i I p
Y 1 -d" uR4^,II -azz RYrr alai M I I a IEMmnCY 4tLpla•a
`rl•" 4a ®6,L i rOl Yl arY NT •nY a q
.,,_ �n _111L_ 111111-------__il _=�+ _' �I (-' L� '` uv m .v rrwxa� •rar 'p I I mns aaoieaw.m.oaeu»
II I - II 4a ® .� rWBa OtY = »Y •rnY _
II I �• �n m ..wavers M 1 •rw _ I w l a
mew I I I fft I ro Iramars •, 1 ".,vu��t II 1
r.•d wrmw +o oq I »v 1 rw I p In
Ivnn agora ra».nG na•cw
Xi /I a, ® m r a� •w I •rwr u I � a I
YUU 1 1 1 6=9I 4a ® m r w rw w _ a
'.I Ji __ m •w •ni .p _ w a
�� �/ � ® ro raaam •�. ._ I--•rrYr" w -_ r• a_ i-
L 'I� I ;"L� );� rvaooi .a m an , nu ,p a erns arvc•w.,4u.4u•ar •`w
1 i II pp ® .YIN rniere ,p
a .rr _ I •zzu' .p - _ � _ a_
.M
II _!T r_ 4a .a ..OIO 1p M I n1a I p w a
1� m=�l�--- •.efF'� un ® .n as aY ors pv 1 .iu w _ w I- ra��
�I m - \ � � / _! i� 'Oa •c.aa n•rYc,s+am i •em nm w •_. _ _ I -w a es
I
.v opi__i - w i » a za _ jiau•vY twa _
II
I �_• __.- r vn ® i rage.ors r _ »v I •� I n - �p a m m
y II� I n I I __d z a.m r a6¢ - i I ra•mY u� - »v i rru-i rr -i = i iw - a _" - -. -. -_-
y ''1 I I� , _��J L �/ �a•e` c.anrK imam- i w•\'d w WI r4Y rp.'._ - rp �. - - .. ._ - —_ -
�Yme
y B , �ILi
I 11 I !.� , // ,61u. - uai . i _ _ ..._. i i. _ fevta anoY4cm•cm
.a 1 q LTW n - aY w •Mi". s•.i A R
I% Y ` 1- I_� ^I� I )/ m w„sacara - 0 1r n I- r> M I •-- - V
••. 1 � . I/ TCaf Ni•r.rgl .n 1 Y.ar rr � I •rrY� >y i I n• I a I U
I� li 1 Le 1-. ii rcw. w•m.00n ro 1 own Ta vswY ¢cr. _ 1» yZ
" 1 9 <m mYpmn(nCe ro a4 a a w
I BCr. I » ( » I (7
G920 BOILER -TOY .ar»a,.<Y4rv,w„n
�I I1I 'I 41 .-T �II •i ., BUILDING _�: <.mrK ascnur.c .a <uuooY u, •w ncr ,» r _ » a ; Z
" I �! II rOpl qe.b C.44 YC i 1 pYln p, •rFAY 6Cl rp y O
CONSTRUCTION - .
II � rar, ® v swore za •rw 1
1, •TE.aro Inrtl al). I II 1' - rW /.®rr< rnC1YF1r.< i ru•YMY Ir, •IFAY
,
c y] &F
l BI ti TOOT --- rrop -a i -;- n _ y - 3 w Vly
I i /,- U!! y <•• nm aroo ro e•:eYru za iw a¢r:" » - ,» {_ y _ _ _ - W G7�F _ I I i i _ 7
!/ w •m rro.vou ro evxra.[ •rp •w 1 ac. p p n V'
W II "� 1 e n 1 <ar xv ar "rTa ro ee. i w • 1 aer.- ,n- _ • r, .. - Z Z(7 M(�
w 4ze.n x no .v n an •rw 1 n¢_ - i I' a i' w ^ LIJ U� SSJ2Z
II n II` ? / rm -® ro rao�ona av •ruY I ¢a. i I w
III Q., Ii +<,wz. ' Ij I I § ./ �` cw em -. ro orw oral zv •,ru I acr. _ 1_ r Z w�
/
mope 'F. .. = cor A..... ry Ir via- i,w 1 cT.- j _ ,N I a C7
K c ro T.wi'� a+ nrwn ncn' n71 a 1
cw wr o«ce .0 1 am az •,rwY aci
w
n' a a 6 S rn
!E �, ^� II �p zri a 'i 7 /'�= .c.mrrc aarwcmeam .•a cw•m T ne I acr i—,p I� 1 p I a I a LL G
�o < ECIEUVEFA
z
%% .•. v
AUG 2 0 2013 "�`
y •r��
l
BY:�� s - r
� M E-101_
2 J 4 I S