HomeMy WebLinkAboutSW8960120_APPROVED PLANS_20240214 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. S W 8 ��iQ�o2y
DOC TYPE [d URRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE M ,4 U2
YYYYMMDD
ROY COOPER F
Govemor
ELIZABETH S.B1SER
Secretary
WILLIAM E.TOBY VINSON,JP NORTH CAROLINA
intertn Director Environmental Quality
February 141, 2024
Cape Fear Community College
Attn: James Morton,President
411 N. Front Street
Wilmington,NC 28401
Subject: Permit Renewal
Post-Construction Stormwater Management Permit No. SW8960120
CFCC Work Force Training and Student Activity Center
New Hanover County
Dear Mr.Morton:
Effective August 1, 2013 the Post-Construction Stormwater Management Program has been transferred from the
Division of Water Quality("DWQ")to the Division of Energy,Mineral and Land Resources("DEMLR"). All
previous references to DWQ will remain in older permits issued prior to August 1,2013 until they are modified.
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit.
On August 5,2009, the Governor signed Session Law 2009-406. This law impacted any development approval
issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes,which
was current and valid at any point between'January 1, 2008, and December 31,2010. The law extended the
effective period of any permit that was set to expire during this time frame to three(3)years from its current
expiration date. On August 2, 2010, the Governor signed Session Law 2010-177,which granted an extra year for
a total of four(4)years extension.
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on February 5",2024. The Division is hereby notifying you that permit SW8960120 has been
renewed, updated, and re-issued on February 141, 2024, as attached. As requested, a copy of the current
operation and maintenance agreement is also enclosed. Please be aware that the renewal and re-issuance of this
stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until September 4t6,2028,which includes all available extensions, and does not
supersede any other agency permit that may be required. The project shall be subject to the conditions and
limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it
clarifies the rules and requirements of this program to provide you with a better understanding of your obligations
under this permit. Failure to comply with these requirements will result in future compliance problems. Please
note that this permit is not transferable except after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center,
Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Logan Inman in the Wilmington Regional Office,
at(910)796-7215 or logan.inman@deq.nc.gov.
Sincerely, 1 (�
LinJ'rl i t" /7C,'9,
,William E. Toby Vinson, Jr., PE,CPM, Interim Director
Division of Energy,Mineral and Land Resources
of ®W A ,, North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
r�J/p Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 28405
/ 910.7963215
State Stormwater Permit No. SW8 960120
Page 2 of 2
Enclosures: Attachment C—Permitting History
copy of the Renewal Application Documents
Copy of the current operation and maintenance agreement
DESAwi: %Storrnwater\Permits&Projects\1996\960120 HD\2024 02 permit 960120
cc: Engineering Department,City of Wilmington
Wilmington Regional Office Stormwater File
®��„ North Carolina Department of Environmental Quality I Division of Energy.Mneral and Land Resources
J!p Wilmington Regional Office 1127 Cardinal Drive E;aension I Wilmington.North Carolina 28405
! 910.796.7215
Post-Construction Stormwater Management
Permit No. SW8 960120
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Cape Fear Community College
Work Force Training & Student Activity Center
1" Street & Hanover Street, Wilmington, New Hanover County
FOR THE
construction, operation and maintenance of a wet pond in compliance with the provisions of 15A
NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the
application, approved stormwater management plans, supplement, calculations, operation and
maintenance agreement, recorded documents, specifications, and other supporting data (the
"approved plans and specifications") as attached and/or on file with and approved by the
Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall
be constructed, operated, and maintained in accordance with these approved plans and
specifications. The approved plans and specifications are incorporated by reference and are
enforceable part of this permit.
This permit shall be effective from the date of issuance until September 41", 2028, and shall be
subject to the following specified conditions and limitations. The permit issued shall continue in
force and effect until the permittee files a request with the Division for a permit modification,
transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance
of this permit does not prohibit the Director from reopening and modifying the permit, revoking,
and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and
regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.7.of this permit. The stormwater control has been designed to
handle the runoff from 21,780 square feet of impervious area.
3. The proposed system must be operated with a vegetated filter.
Page 1 of 5
Post-Construction Stormwater Management
Permit No. SW8 960120
4. The tract will be limited to the amount of built-upon area indicated in Section 1.7 of this
permit, and per approved plans.
5. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
6. The runoff from all built-upon area within the permitted drainage area of this project must
be directed into the permitted stormwater control system.
7. The following design criteria have been permitted for the wet pond and must be provided
and maintained at design condition:
a. Drainage Area, acres: 0.5
Onsite, ft2: 21,780
Offsite, ft2: 0
b. Total Impervious Surfaces, ft2: 21,780
G. Design Storm, inches: 0.75
d. Average Pond Depth, feet: 4.0
e. TSS removal efficiency: 90%
f. Permanent Pool Elevation, FMSL: 20
g. Permanent Pool Surface Area, ft2: 1,950
h. Permitted Storage Volume, ft3: 2,440 (Provided)
i. Temporary Storage Elevation, FMSL: 21
j. Controlling Orifice: .75"0 pipe
k. Permitted Forebay Volume, ft3: N/A
I. Fountain Horsepower: N/A
M. Receiving Stream/River Basin: Cape Fear
n. Stream Index Number: 18-71
o. Classification of Water Body: "SC"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built-upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to
assure the permitted stormwater system functions at the design condition. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 2 of 5
Post-Construction Stormwater Management
Permit No. SW8 960120
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, the permittee shall cause a certification from
an appropriate designer for the system installed to be submitted, certifying that the
permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A modification
may be required for those deviations
6. The facilities shall be constructed, operated, and maintained in accordance with the
provisions of this permit, the approved plans and specifications, and the supporting
documents attached to this permit and on file with the Division.
7. If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate easements at all
times.
9. No person or entity, including the permittee, shall alter any component shown in the
approved plans and specifications. Prior to the construction of any modification to the
approved plans, the permittee shall submit to the Director, and shall have received
approval for modified plans, specifications, and calculations including, but not limited to,
those listed below. For changes to the project or SCM that impact the certifications, a
new or updated certification(s), as applicable, will be required and a copy must be
submitted to the appropriate DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size
including the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement
on-site stormwater systems. These additional or replacement measures shall receive a
permit from the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days
prior to the expiration date of this permit. The renewal request must include the
appropriate application, documentation and the processing fee as outlined in Title 15A
NCAC 02H.1045(3).
Page 3 of 5
Post-Construction Stormwater Management
Permit No. SW8 960120
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT
INFORMATION. The permittee shall submit a completed Permit Information Update
Application Form to the Division within 30 days to making any one of these changes.
4. TRANSFER. This permit is not transferable to any person or entity except after notice to
and approval by the Director. Neither the sale of the project and/or property, in whole or
in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate
application, documentation and the processing fee as outlined in 15A NCAC
02H.1045(2). This request must be submitted within 90 days of the permit holder
meeting one or more of the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved;
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur.
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2),
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on-site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and
conditions of this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved
plans, application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee
at all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the
stormwater rules is subject to enforcement procedures as set forth in NCGS 143
Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division
an annual certification completed by either the permittee or their designee confirming
the project's conformance with permit conditions.
Page 4 of 5
Post-Construction Stormwater Management
Permit No. SW8 960120
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the
permitted site does not meet one or more of the minimum requirements of the permit.
Within the time frame specified in the notice, the permittee shall submit a written time
schedule to the Director for modifying the site to meet minimum requirements. The
permittee shall provide copies of modified plans and certification in writing to the
Director that the changes have been made.
f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals
to do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated, and reissued this the 14th day of February 2024,
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
CRC 2A
William E. Toby Vinson, Jr., PE, CPM, Interim Director
Division of Energy. Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 960120
Page 5 of 5
Attachment C-Permitting History
CFCC Workforce Training and Student Activity Center
Permit No.SW8 960120
Approval permit Action BIMS Description of the Changes
Date Version
construction,operation and maintenance of a Detention Pond to serve 0.5 acres of
Original new built-upon area, and the redevelopment of 2.8 acres of existing impervious areas
9/4/1996 Approval 1 0 in compliance with the provisions of 15A NCAC 2H .1000.Total Impervious
Surfaces Allowed: 21,780 square feet(2.8 acres have been redeveloped).
11/18/2008 Renewal 2.0 1 Expired 9/4/2020
2/14/2024 1 Renewal 1 3.0 lExpires 9/4/2028
Page 1 of 1
Andrew & Kuske John R. Andrew, P.E.
J. A. Kuske, P.E.
CONSULTING ENGINEERS, INC. J. Phillip Norris, P.E.
STORMWATER MAINTENANCE SYSTEM
MAINTENANCE PROCEDURES
CAPE FEAR COMMUNITY COLLEGE
WORKFORCE TRAINING CENTER
A&K PROJECT NO. 95034
1. RESPONSIBLE PARTY g' }L; k'l'^
H VS��YJ9C
A. The project will be built and maintained by: \ p E C E I V E
Cape Fear Community College JAN 2 31996 D
411 North Front Street
Wilmington, NC 28401
(910)251-5100 PROJ it cu 46&01Z0
2. DETENTION POND AND COLLECTION SYSTEM
A. The detention pond will be checked after every major storm event to insure that the
outlet structure is working properly and is not clogged with debris. Remove any accumulated
sediment or debris. Any signs of erosion or deterioration of the pond side slopes or any other feature
must be repaired before the next storm event.
B. The depth of the pond will be checked every six months to determine the depth of the
�q permanent pool. The pond will be cleaned out when silt deposits reduce the depth of the permanent
pool below si6et. The side slopes of the pond shall be mowed as required to maintain a grass
height not to exceed 8 inches in height.
C. Collection basins and piping will be checked every six months and kept clear as
necessary.
3. CERTIFICATION
The owner will submit to the Department of Environment, Health and Natural Resources an
Engineer's Ce cation that the stormwater facilities were constructed in accordance with approved
PI , ,
9
Eric Mc ei an President date
NOTARY'S CERTIFICATION ''
State of /Ve, �/� fpl ( County of /i,�a y� mye/—
I, _j�2 k l P. C5Q rI i s a Notary Public m and for the State and County
aforesaid, certify thdt �^ r�'� personally appeared before me this
day and acknowledged the due execution of the foregoing ins
my hand and notarial seal, this the tl/, day of q-11.1mdAy 199Y.6
My Commission Expires:
/13eA6 Notary Public
202 North Fifth Avenue Wilmington, North Carolina 28401 Telephone: 910/343-9653 Facsimile: 910/343-9604
P.O. Box 2889 Shallotte, North Carolina 28459 Telephone: 910/754-5900
DEMLR USE ONLY
Dato Re4eived Fee Paid Permit Number
5 0 3 ? D— Sws Woolao
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stonnwater Permit Number: SW8960120
2. Project name: CFCC Workforce Training and Student Activity Center
3. Project street address: 604 and 610 N. Front Street
City: Wilmington County: New Hanover Zip : 28401
4. What, if any, changes have been made to the project as permitted? None
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energy-
m i neral-la nd-reso u rces/e ne rgy-m i neral-I a n d-ru les/stormwate r-prog ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at:https://deg.nc.gov/abouttdivisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Cape Fear Community College
2. Signing Official's Name: James P. Morton
3. Signing Official's Title: President
4. Mailing Address: 411 N. Front Street
City: Wilmington State: NC ZIP : 28401
5. Street Address: 411 N. Front Street
City: Wilmington State: NC Zip : 28401
6. Phone: ( 910- 2-7555 Email: imorton@cfcc.edu
rF
R.r�tom.0 V/ �
EB 0 5 2024
BY:-----
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/0RV19. Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
($750.00'
1. A permit application processing fee of$595;09 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
/j named on this application to represent the current permittee must meet one of the following:
a. Corporation—a principle executive officer of at least the level of vice-president;
b. Limited Liability Company(LLC)—a manager or company official as those terms are defined
in G.S. 57D"North Carolina Limited Liability Company Act;"
& Public Entity—a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership—the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a—e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
�'Jh 4. O&M Agreements, Please select one:
❑ 'I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
x❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
A copy of the certification(s)confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
N/A 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
NIA 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
httos://www.sosnc.gov/online services/search/by tithe/ Business Registration
ECEIV . -.
FEB 0 5 2024 C
BY:
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
James P. Morton the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site(or I will obtain a copy and it will be kept on site),that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built-upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete.
Signature: Date:
NOTA—RIZZA'TION:
I, .J �n n%tor C C,W eN r<�S a Notary Public for the State of
N Or-'rk Cora`i ng County of No.W }+Qr\yyer , do hereby certify
that zT�t.vme..5 P. m Or+(:-,,r-) personally appeared before me
this the 19 day of a✓'t LA_Qr 20d, and acknowledge the due
execution of the forgoing instrument. Witness my hand an official seal,
ONOTARY
(Notary Seal)
���
Notary Signature:My commission expires tarG1� �202N
fl
V E 2V
FEB 0 5 2024
Stormwater Permit Renewal Application Form Page 3 of 3 May 11,2018
/# y AT q �_ \
\ 5 aa
;
y J. Phillip Norris, P.E.
NORRIS, KUSKE &TUNSTALL John A. Kuske, III, RE.
John$. f Couunstall,nsel
P.E.
CONSULTING ENGINEERS , INC . J.A. Kuske, P.E.ofCounsel
Stormwater Project Number SW8 960120 t
Project Name Work Force Training and Student Activity Center p
New Hanover County ��
NKT Project No. 95005
11
Designer's Certification
I, John Phillip Norris. P.E., as a duly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically/
weekly/full time) the construction of the project,
Work Force Training and Student Activity Center (Project) for Cape Fear
Community College (Project Owner) hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the project construction
such that the construction was observed to be built within substantial compliance
and intent of the approved plans and specifications.
Required Items to be checked for this certification to be considered complete are
on page 2 of this form.
Noted deviations from approved plans and specifications:
o•`,�N SCAR
�oFESS/p liy�s
Q
-7SEAL
Signature
Registration Number 11966
Date August 30, 200 % fLLlPd�•a
JPN/asn EF 0 5 200�
95005 08-30-07-s-sw-cert.for renewal
$y:
Page 1 of 2
902 Market Street • Wilmington, NC 28401-4733 • Phone:910.343.9653 • Fax: 910.343.9604
Designer Certification Requirements:
The drainage area to the system contains approximately the
/ permitted acreage.
2. The drainage area to the system contains no more than the
/ permitted amount of built-upon area.
3. All the built-upon area associated with the project is graded such
/ that the runoff drains to the system.
4. The outlet/bypass structure elevations are per the approved plan.
The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7All
slopes are grassed with permanent vegetation.
Vegetated slopes are no steeper than 3:1.
The inlets are located per the approved plans and do not cause
short-circuiting of the system.
I- The permitted amounts of surface area and/or volume have been
provided.
_11 Required drawdown devices are correctly sized per the approved
plans.
12. All required design depths are provided.
�13. All required parts of the system are provided, such as a vegetated
shelf, and a forebay.
�4• The dimensions of the system, per the approved plans, are
provided.
cc: NCDENR-DWQ
Tony Roberts, Building Inspector/ NHC Building Inspections
Carl Brown / Cape Fear Community College
Page 2 of 2