Loading...
HomeMy WebLinkAboutSW8931222_HISTORICAL FILE_20001205 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW803 1 )_ )- DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD i / F `NA TF Michael P.Easley,Governor . ^ Y William G.Ross Jr.,Secretary r North Carolina Department of Environment and Natural Resources Coleen If Sullins Director Division of Water Quality z r y^ December 5, 2008 Michael Gardner, Regional VP of Real Estate and Design Sam's.East, Inc. 2001 SE 101h Street Bentonville, AR 72716 Subject: Stormwater Permit No. SW8 931222MOD Sam's Club Expansion Store No. 6573-04 High Density Subdivision Project Onslow County Dear Mr. Gardner: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Sam's Club Expansion Store No. 6573-04 on December 1, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 931222MOD, dated December 5, 2008, for the construction of the project, Sam's Club Expansion Store No. 6573-04. " This permit shall be effective from the date of issuance until December 5, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days . following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincerely, Georgette Scott Stormwater Supervisor Division of Water Quality GS/csb: S:\WQS\STORMWATER\PERMIT\931222MOD.dec08 cc: Austin L. Watts, P.E., Kimley-horn.com Onslow County Inspections Chris Baker Wilmington Regional Office No nCamhna Central Files Naturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington,NC 28405 Phone(910)796-7215 Customer Service Wilmington Regional Office Internet www.ncwateroualitvore Fax (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled110%Post Consumer Paper _ State Stormwater Management Systems Permit No. SW8 931222MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Michael E. Gardner and Sam's East, Inc. Sam's Club Expansion Store No. 6573-04 1170 Western Blvd., Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwaterrules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 5, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 484,410 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 931222MOD 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Pond #1 Pond #2 a. Drainage Area, acres: 12.49 4.08 On site, ft : 527,938 170,572 Offsite, ft2: 16,126 7,153 b. Total Impervious Surfaces, ft2: 405,979 78,431 C. Design Storm, inches: 1.5 1.5 d. Pond Depth, feet: 9.15 (5.32 avg) 6 (3.5 avg) e. TSS removal efficiency: 90% 90% f. Permanent Pool Elevation, FMSL: 40.15 42 g. Permanent Pool Surface Area, ft2: 30,958 23,144 h. Permitted Storage Volume, ft3: 54,845 14,591 i. Temporary Storage Elevation, FMSL: 41.7 1 42.6 j. Controlling Orifice, inches: 6.25 x 2 3 x 1.5 k. Permitted Forebay Volume, ft3: 26,519 14,300 I. Fountain Horsepower, HP: 1/2 1/4 M. Receiving Stream: Sandy Run Branch Northeast Creek n. Drainage Basin: White Oak n. Stream Index Number: 19-10-1 19-16-(0.5) o. Classification of Water Body: "SC;NSW" "SC;NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 931222MOD 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re-vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in pond #1 is 1/2 horsepower, in pond #2 is 1/4 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 931222MOD 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 931222MOD 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re-issuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 5th day of December, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION � D sc,- for C;oleefi H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 931222MOD Sam's Club Expansion Store No. 6573-04 Stormwater Permit No. SW8 931222MOD Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 7 of 8 State Stormwater Management Systems Permit No. SW8 931222MOD Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 8 of 8 P. 01 I TRANSACTION REPORT DEC-05-200B FRI 02:48 PM I FOR: NCDENR 910 350 2004 K SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP K DEC-05 02:43 PM 914792736503 4' 42" 9 FAX TX OK 708 TOTAL 4M 42S PAGES: 9 >K � NCDENR North Carolina Department of Environment and Natural Resources 1NCDENR) Wilmington Regional Office (910) 796-7215 Michael F.Easley,Governor William G.Ross Jr.,Secretary FAX COVER SHE);T ZO° ------$- ------------------- - llate:--- ---,-------"_ ----- #pages----------------._------- H s� I1 To: A�`�-t�._l.h.�_L}_�S.__ -----------From: ----_____—�___. _ C;kmr l C-x e+* ��r•° r ) Co:— - --Division:— 9 - - 1 p�- 333- 09'� Fax: Fax: # 910- 350- 2004 -- Remarks 127 Cardinal Drive Ext.Wilmington,North Carolina 28405-3845 *Fax#-910-350-2004 Revised 7/2008 1;Mc1;��1K1C1;�1C�lK%K1;�lK�Mc1;�r<>;;��II;IKI(l;l;�lC�%Kl<�1;�X��I1;1K�1;lKl;l;l;�lCl;�lC1;1;1(1;:KlC>;;1;�1;1K�I1;lKIC1;iK�l;l;��l;�X<W K>kX1;�Mc1;�1;��11;iK1;�KM�>;; P. 01 TRANSACTION REPORT DEC-05-2008 FRI 02:43 PM FOR: NCDENR 910 350 2004 SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE Mll DP DEC-05 02:40 PM 917043330845 2' 39" 9 FAX TX OK 707 TOTAL 2M 39S PAGES: 9 uZAand Na MCDEh+R North Carolina Department of Renional Off ceural Resources{NCO Wilming B (910) 796-7215 William G.Ross Jr.,Secretary Michael F.Easley,Governor FAX COVER SHEET J�� ry ss�11 ------------__---- ���-5 �00 -------- #Pages--cl---�-------_ - - ------ Date:-- - -�---___-- Qoe ,n_S�1 S — --------------From: ---: ----------- .. To: t'ri� 5 —��+r u S_ -- ------Division:-- —C- co:----pa, 3"53- o94S '1 Fax # 910- 350-2004 - Fax: �L5 R 3- 6113 — Remarks: 127 Cardinal Drive E:t Wdmm ton North Carolina 28d05 3&15 "Fax#-910-35(h2004 Revised 7/2009 l IJEC 0 1 2008 DWQ USE ONLY - l Date Received Fee Pad Permit Number o`er o� S State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name(specify the name of the corporation,individual,etc.who owns the project): Sam's East,Inc 2. Print Owner in fficial' name and title(person legally responsible for facility and compliance): SVi0el E. Gardner 3. Mailing Address for person listed in item 2 above: A °street � 00 1 3 E 1 O'6 �+4 City:Bentonville State:AR Zip:72716 Phone: (479 1 273-4000 Fax: (479 1 273-6503 Email:ka thygriffithOwal-mart.c om 4. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Sam's Club Expansion Store No 6573-04 5. Location of Project(street address): 1170 Western Blvd City:Tacksonville County:Onslow Zip:28546 6. Directions to project(from nearest major intersection): From the Intersection of NC Highway 17(N Marine Highway/Ocean Boulevard)and Western Boulevard, head northwest on Western Boulevard toward Circuit Lane approximately 0.5 miles 7. Latitude:34°47'03"N Longitude:77°23'46"W of project 8. Contact person who can answer questions about the project: Name:Austin L.Watts,P.E. Telephone Number: (704 1 319-5698 Email:austin.watts@kimley-hom.com 1I. PERMIT INFORMATION: 1. Specify whether project is(check one): []New ❑Renewal ®Modification FormSWU-101 Version09.25.08 Page Iof4 f - ._ DEC Q 1 2008 2. If this application is being submitted as the result of I renewal.or.modification to an existing permit,list the PP g existing permit number n/a and its issue date(if known) 3. Specify the type of project(check one): Flow Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP []Other 4. Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control Z404/401 Permit ❑NPDES Industrial Stormwater III. PROJECT INFORMATION 1. In the space provided below,summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. Stormwater will be treated onsite by 3 different wet detention basins For more information please see the attached detailed narrative. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Property Area: 16.57 acres 4. Total Coastal Wetlands Area:0 acres 5. Total Property Area(3) — Total Coastal Wetlands Area (4) = Total Project Area**:16.57 acres 6. (Total Impervious Area/Total Project Area)X 100 = Project Built Upon Area(BUA):71.64 7. How many drainage areas does the project have?3 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. For high density projects,com lete the table with one drainage area for each engineered stormwater device. Basin Information v.. Drainage Area 1.? Drainage Area 2 Receiving Stream Name Sandy Run Branch Northeast Creek Stream Class&Index No. SQNSW - 19-10-1 SQNSW - 19-16-(0.5) Total Drainage Area (so 544,064 177,725 On-site Drainage Area(so 527,938 170,572 Off-site Drainage Area(so 16,126 7,153 Existing Impervious*Area(sf) 447,361 2,613 Proposed Impervious*Area(so 405,979 88,427 %Impervious*Area (total) 74.62% 49.75% Impervious*Surface Area '" Drainage Area 1 Drainage Area 2. On-site Buildings(so 139,625 0 On-site Streets (so 0 0 On-site Parking (so 253,036 73,731 On-site Sidewalks (so 13,318 4,700 Other on-site (so 0 0 Off-site (so 0 0 leb)Ll Total (so: 405,979 -8&,427— *Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, sidewalks,gravel areas,etc. **Total project area shall be calculated to exclude Coastal Wetlands from use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area(BUA). FormSWU-101 Version09.25.08 Page 2of4 2008 9. How was the off-site impervious area listed above derived?n/a PLEASE NOTE TO SEE ATTACHED FOR INFORMATION ON DRAINAGE AREA 3 Projects in Union County: Contact the DWQ Central Office staff to check to see if you project is located within a Threatened&Endangered Species watershed that may be subject to more stringent stormwater requirements. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS C NA One of the following property restrictions and protective covenants are required to be recorded for all subdivisions,outparcels and future development prior to the sale of any lot. If lot sizes vary significantly,a table listing each lot number,size and the allowable built-upon area for each lot must be provided as an attachment. Forms can be downloaded from htti27 /d 2o.enr.state.nc.us/su/bmp forms.htm-deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below,you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DWQ,and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS (tJ A The applicable state stormwater management permit supplement form(s)listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at(919)807-6300 for the status and availability of these forms. Forms can be downloaded from htt2://h2o.enr.state.nc.us/su/bml2 forms htm. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off-Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SW401-Permeable Pavement Permeable Pavement Supplement Form SW401-Cistem Cistern Supplement Form SWU-101 Version 09.25.08 Page 3 of I VI. SUBMITTAL REQUIREMENTS DEC 0 1 2008 Only complete application packages will be accepted and reviewed by'the'Divisidfi of-Water Quality(DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at hav://h2o.enr.state.ne.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions&Protective Covenants Form(if required as per Part IV above) • Original of the applicable Supplement Form(s)and O&M agreement(s)for each BMP • Permit application processing fee of$505(Express:$4,000 for HD,$2,000 for LD) payable to NCDENR • Calculations&detailed narrative description of stormwater treatment/management • Copy of any applicable soils report • Two copies of plans and specifications(sealed,signed &dated),including: -Development/Project name -Engineer and firm -Legend -North arrow -Scale -Revision number&date -Mean high water line -Dimensioned property/project boundary - Location map with named streets or NCSR numbers -Original contours,proposed contours,spot elevations,finished floor elevations -Details of roads,drainage features,collection systems,and stormwater control measures -Wetlands delineated,or a note on plans that none exist -Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations -Drainage areas delineated -Vegetated buffers(where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf(such as additional information requests),please complete this section. (ex. designing engineer or firm) Designated agent(individual or firm):Kimley-Hom and Associates,Inc. Mailing Address:4651 Charlotte Park Drive,Suite 300 City:Charlotte State:NC Zip:28217 Phone: (704 1 333-5131 Fax: (704 333-0845 Email: VIII. APPLICANT'S CERTIFICATION Michael E. Gardner' 1,(print or type name of person listed in General Information, item 2) certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of 15A NCAC 2H.1000. Signature: i Date: FormSWU-101 Version09.25.08 Page 4of4 yg9e ,/I Y� ®0❑ Kimley-Horn ® and Associates, Inc. November 26, 2008 Suite 300 4651 Charlotte Park Drive Chris Baker Charlotte,North Carolina NCDWQ—Wilmington Office 2e217 127 Cardinal Drive Extension Wilmington, NC 28405 Subject: Sam's Club Expansion, Store#6573-04, Jacksonville,NC NPDES Phase II Stormwater Management Permit Our Ref: 015476084 Dear Mr. Baker: Please find attached our submittal for the NPDES Phase II Stormwater Management Permit per comments from our initial express review meeting held on November 3 d, 2008. This submittal contains • 2 Copies of the Stormwater Management Permit Application (I with Original Signature) • 2 Copies of the required Operations and Maintenance Agreements (I for each with original signature) • 2 Copies of the Stormwater Management Calculations(Signed and Sealed) • 2 Full Size sets of Plans (Signed and Sealed) • 2 Copies of the Required Items Checklist • Check in the amount of$4,000 payable to NCDWQ The Geotechnical Report was hand delivered on November 3'd If you have any questions or concerns please do not hesitate to call me at (704) 954-7489. Sincerely yoursYE OCIATES, INC. .I. 71C�Q� r s s TEL 704 333 5131 FAX 704 333 OW I .0� Applicant 2I � ` Date Stormwater Application No. SW8 ( y lQ November 14, 2008 Chris Callaway, Vice President of Design and Real Estate Sam's Real Estate Business Trust 2001 SE 10t' Street Bentonville, AR 72716-0550 Subject: Request for Additional Information Stormwater Project No. SW8 931222MOD Sam's Club Expansion Store No. 6573-04 Onslow County Dear Mr. Callaway: The Wilmington Regional Office received an NPDES Phase II Post Construction Permit Application for Sam's Club Expansion Store No. 6573-04 on November 5, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Drawdown time for both wet ponds #1 & #2 are less than the required 2 days minimum, please correct. 2. Orifice #2 is shown to be 3.5" x 2" on the plans but recorded to be 3.5" x 1.5" on the supplemental form and in the calculations, please correct. 3. "Sam's Real Estate Business Trust" is not listed on the NC Secretary of State's web site. The applicants name recorded in Section 1.1 of the Stormwater Management Permit Application Form must be an organization registered in the state of North Carolina. The individual signing the permit (Chris Callaway) must then appear in the as a signing officer in the articles of incorporation. Please make necessary corrections. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to November 14, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at chris.baker@ncmail.net. Sincerely, Page 1 of 2 Applicant Date Stormwater Application No. SW8 Chris Baker Environmental Engineer II ENB/csb: S:\WQS\STORMWATER\ADDINFO\2008\931222MOD.nov08 CC: Austin Watts, P.E., Kimley-Horne Page 2 of 2 1. �F WATF9 i //� . _n Ot OG �/ � ,, Michael F.Easley,Governor Y / William G.Ross Jr.,Secretary r North Carolina Department of Environment and Natural Resources O C Coleco H.Sullins Director Division of Water Quality November 14, 2008 Chris Callaway, Vice President of Design and Real Estate Sam's Real Estate Business Trust 2001 SE 10" Street Bentonville, AR 72716-0550 Subject:Request for Additional Information Stormwater Project NO.iSW8 931222MOD1 Sam's Club Expansion Store No. 6573-04 Onslow County Dear Mr. Callaway: The Wilmington Regional Office received an NPDES Phase 11 Post Construction Permit Application for Sam's Club Expansion Store No. 6573-04 on November 5, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Drawdown time for both wet ponds#1 &42 are less than the required 2 days minimum,please correct. 2. Orifice#2 is shown to be 3.5" x 2"on the plans but recorded to be 3.5" x 1.5"on the supplemental form and in the calculations, please correct. 3. "Sam's Real Estate Business Trust" is not listed on the NC Secretary of State's web site. The applicants name recorded in Section 1.1 of the Stormwater Management Permit Application Porm must be an organization registered in the state of North Carolina. The individual signing the permit(Chris Callaway)must then appear in the as a signing officer in the articles of incorporation. Please make necessary corrections. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to November 14, 2008, or the application will be returned as incomplete.The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information,please mail,email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at(910)796-7215 or email me at chris.baker@ncmail.net. Sincerely, c�kt.:4, 3 Chris Baker Environmental Engineer 11 ENB/csb: S:\WQS\STORMWATER\ADDINFO\2008\931222MOD.nov08 NQo(" Carolina CC: Austin Watts, P.E.,Kimley-Horne �/VWmally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington,NC 28405 Phone(910)796-7215 Customer Service Wilmington Regional Office Internet: www.ncwateroualitvorg Fax (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled110%Post Consumer Paper WET DETENTION POND ANALYSIS FILE NAME: S:\WQS\STORMWATER\EXCELSPREADSHEETS\POND\931222MOD.WK1 PROJECT#:SW8 931222MOD REVIEWER: C. Baker PROJECT NAME: Sam's Club Expansion Srote No.6573-04 Original Run Date: 11/12/08 Last Modified: 01-May-09 Pond 1 Pond 2 Pond 3 Pond 4 Pond 5 Pond 6 Receiving Stream: Sandy Run Branch Sandy Run BrancM1 Classification: SC; NSW SQNSW Index Number: 19-10-1 19-10-1 Onsite DA,sf= 527938.00 170572.00 Offsite DA, sf= 16126.00 7153.00 Total Drainage Area: 544064.00 177725.00 0.00 0.00 0.00 0.00 Built-Upon Area Buildings/Lots, 00 5. Streets/Parking,sf 2530300 89386.00 Sidewalk/Concrete,sf= 13318.00 4704.00 Other,sf= Offsite, sf= Total Built-upon Area: 405979.00 94090.00 0.00 0.00 0.00 0.00 Surface Area %impervious 74.62% 52.94% #DIV/O! #DIV/O! #DIV/0! #DIV/O! Design Depth, ft: 5.32 3.26 TSS(85%or 90%): 90 90 SA/DAratio 5.32% 6.01% #DIV/O! #DIV/O! #DIV/01 #DIV/0! Req. Min. Surface Area 28963 10684 #DIV/01 #DIV/01 #DIV/O! #DIV/O! Volume Calculations Design Storm, inches: 1.5 1.5 Rational Cc= 0.77 0.60 #DIV/01 #DIV/O! #DIV/O! #DIV/O! Rational Volume, cf: 52186 13264 #DIV/O! #DIV/01 #DIV/01 #DIV/O! Rv= 0.722 0.526 #DIV/O! #DIV/O! #DIV/O! #DIV/O! Min.Req.Volume= 49073 11696 #DIV/01 #DIV/01 #DIV/01 #DIV/01 Bottom Elevation= 30.00 36.00 Permanent Pool Elev= 40.15 42.00 Perm Pool Area= 30968.00 21861.00 Temp. Pool Elevation= 41.70 42.60 Temp.Pool Area= 37541.00 24189.00 Total Volume Prov.= 53086.73 13816.00 0.00 0.00 0.00 0.00 Forebay Volume Permanent Pool Vol.= 135422.00 77203.00 Req. Forebay Volume= 27084.4 15440.6 0 0 0 0 Prov. Forebay Volume= 26519.00 14325 Percent=(22>%>18) 20% 19% #DIV/O! #DIV/O! #DIV/O! #DIV/01 Pond 1 Pond 2 Pond 3 Pond 4 Pond 5 Pond 6 Drawdown OrificeMfeir Avg. Head, ft= 0.52 0.20 0.00 0.00 0.00 0.00 Average Flow 02,cfs 0.284 0.068 #DIV/O! #DIV/O! #DIV/01 #DIV/01 Average Flow Q5, cfs 0.114 0.027 #DIV/O! #DIV/01 #DIV/O! #DIV/0! Q2 Area, sq. in. _ 11.82 4.53 #DIV/01 #DIV/O! #DIV/0! #DIV/01 Q5 Area, sq. in. = 4.73 1.81 #DIV/O! #DIV/O! #DIV/O! #DIV/O! No. of Orifices 1 1 Orifice Diameter, in.= Orifice Area, sq. in.= 13.500 5.250 0.000 0.000 0.000 0.000 Weir Height, inches= Weir Length, inches= Weir C= #DIV/0! #DIV/0! #DIV/01 #DIV/O! #DIV/O! #DIV/O! Weir U,eff. length= -0.103 -0.040 0.000 0.000 0.000 0,000 Avg. Flowrate, Q, cfs= 0.324 0.079 0.000 0.000 0.000 0.000 Drawdown,days= 1.9 2.0 #DIVI01 #DIV/01 #DIV/01 #DIV/01 9312-Z`L �o For DENR Use ONLY Reviewer: y� North Carolina Department of Environment and Submit Natural Resources Na•®EMIR Request for Express Permit Review Time: Confirm: 110-3o-06 FILL-IN all the information below and CHECK the Permits)you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative,site plan(PDF file)and vicinity map(same items expected in the application package of the project location.Please include this form in the application package. • Asheville Region-Alison Davidson 828-296-4698;alison.davidson(rDncmail.net • Fayetteville or Raleigh Region-David Lee 919-791-4203;daviddee(rDncmail.net • Mooresville&-Patrick Grogan 704-663.3772 or patrick.grogan(ancmail.net • Washington Region-Lyn Hardison 252-946.9215 or Iyn.hardison(dncmail.net • Wilmington Region-Janet Russell 910-350-2004 or ianet✓usse/100cmail.net ® E C E t V E D NOTE:Project application received after 12 noon will be stamped in the following work day. Project Name: SAM'S CLUB EXPANSION STORE NO.6573-04— County: ONSLOW OCT 2 a 2008 Applicant:J. CHRIS CALLAWAY Company: SAM'S REAL ESTATE BUSINESS TRUST Address: 2001 SE 10TH STREETCity: BENTONVILLE, State:AR Zip:72716-0550 DWO Phone:479-273-8277 Fax: :479-273-6503 Email:chris.callaway@wal-mart.com PROJ u Physical Location:1170 WESTERN BLVD,JACKSONVILLE, NC Project Drains into SANDY RUN BRANCH/NORTHEAST CR waters—Water classification SC:NSW(for classification see- http://h2o.enr.state.nc.us/bims/reports/reportsWB.htmi) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters?N ,within''/3 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters?N Engineer/Consultant:AUSTIN L.WATTS, P.E.. Company: KIMLEY-HORN AND ASSOCIATES— Address:4651 CHARLOTTE PARK DRIVE,SUITE 300 City: CHARLOTTE,State: NC Zip 28217-_ Phone:704-319-5698 Fax: :704-333-0845 Email: austin.watts@kimlev-horn.com— SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑Scoping Meeting ONLY ❑ DWQ, ❑ DCM,-❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM(S)YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑401 Unit ❑Stream Origin Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑ IntermiltenUPerennial Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑401 Water Quality Certification ❑ Isolated Wetland(_linear ft or_acres) El Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ®State Stormwater ❑General ❑SFR, ❑Bkhd&Bt Rmp, ❑Clear&Grub, [:] Utility ❑Low Density ❑ Low Density-Curb&Gutter _#Curb Outlet Swales ❑Off-site[SW_ (Provide permit#)j ®High Density-Detention Pond 2#Treatment Systems ❑ High Density-Infiltration _#Treatment Systems ❑ High Density-Bio-Retention _#Treatment Systems ❑ High Density—Stormwater Wetlands _#Treatment Systems El High Density-Other _#Treatment Systems /❑MODIFICATION: El Major El Minor El Revision SW_(Provide permit#) ❑Coastal Management ❑Excavation&Fill ❑ Bridges&Culverts ❑ Structures Information ❑Upland Development ❑ Marina Development ❑Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with acres to be disturbed.(CK# (for DENR use)) SECTION THREE—PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT(for both scoping and express meeting request) Wetlands on Site❑Yes® No Buffer Impacts: ®No❑YES: —acre(s) Wetlands Delineation has been completed: ❑Yes❑No Isolated wetland on Property❑Yes® No US ACOE Approval of Delineation completed: ❑Yes❑No 404 Application in Process w/US ACOE: ❑Yes ® No Permit Received from US ACOE ❑Yes❑ No For DENR use only Fees lit for multiplepermits: Check# Total Fee Amount $ SUBMITTAL DATES - Fee SUBMITTAL DATES Fee CAMA $ Variance(❑Maj;❑Min) $ SW(❑1[1LD,El Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDENR EXPRESS September 2008 swa �3tZzZ f(-,oa -J,� ' tG<i'ofz Reviewer: t_ North Carolina Department of Environment and submit� 'tp Q �►� Natural Resources NC®ENIi Request for Express Permit Review Time: �110 Confirm: -, FILL-IN all the information below and CHECK the Permit(s)you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative,site plan(PDF file)and vicinity map(same items expected in the application package of the project location.Please include this form in the application package. 2 o or 2 3 • Asheville Region-Alison Davidson 828.296-4698;alison.davidson(a)ncmail.net • Fayetteville or Raleigh Region-David Lee 919-791-4203;david.lee(7a,ncmail.net • Mooresville&-Patrick Grogan 704-663.3772 or patrick.proaan(a)ncmail.net • Washington Region-Lyn Hardison 252-946-9215 or Ivn.hardison(o)ncmail.net • Wilmington Region-Janet Russell 910-350-2004 or janet.russell(a.ncmail.net NOTE:Project application received after 12 noon will be stamped in the following work day. Project Name: SAM'S CLUB EXPANSION STORE NO. 6573-04 County: ONSLOW Applicant:J. CHRIS CALLAWAY Company: SAM'S REAL ESTATE BUSINESS TRUST Address:2001 SE 10TH STREETCity: BENTONVILLE,State:AR Zip:72716-0550 Phone:479-273-8277 Fax: :479-273-6503 Email:chris.callaway@wal-mart.com Physical Localion:1170 WESTERN BLVD,JACKSONVILLE, NC Project Drains into SANDY RUN BRANCH/NORTHEAST CR waters-Water classification SC:NSW(for classification see- http://h2o.enr.state.nc.us/bimstreports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters?N ,within %,mile and draining to class SA waters N or within 1 mile and draining to class HOW waters?N Engineer/Consultant:AUSTIN L.WATTS, P.E. Company: KIMLEY-HORN AND ASSOCIATES— Address:4651 CHARLOTTE PARK DRIVE, SUITE 300 City: CHARLOTTE, State:INC Zip 28217- E C E I d E D Phone: 704-319-5698 Fax: :704-333-0845 Email:austin.watts@kimlev-horn.com— SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® Scoping Meeting ONLY R DWQ, ❑ DCM,-❑ DLR, ❑ OTHER: OCT 14 2008 SECTION TWO: CHECK ONLY THE PROGRAM (S)YOU ARE REQUESTING FOR EXPRESS PERMITTING DWO PROJ # ❑401 Unit ❑Stream Origin Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑401 Water Quality Certification ❑ Isolated Wetland(_linear It or_acres) El Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ®State Stormwater ❑General ❑SFR, ❑Bkhd&Bt Rmp, ❑ Clear&Grub, ❑ Utility ❑ Low Density ❑ Low Density-Curb&Gutter _#Curb Outlet Swales ❑Off-site[SW_ (Provide permit#)] ® High Density-Detention Pond 2#Treatment Systems ❑High Density-Infiltration _#Treatment Systems ❑ High Density-Bio-Retention _#Treatment Systems ❑ High Density—Stormwater Wetlands _#Treatment Systems ❑ High Density-Other _#Treatment Systems /❑ MODIFICATION: El Major El Minor El Revision SW—(Provide permit#) ❑Coastal Management ❑ Excavation&Fill ❑ Bridges&Culverts ❑Structures Information ❑ Upland Development ❑ Marina Development ❑Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with—acres to be disturbed.(CK# (for DENR use)) SECTION THREE-PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT(for both scoping and express meeting request) Wetlands on Site❑Yes® No Buffer Impacts: ® No❑YES: acre(s) Wetlands Delineation has been completed: ❑Yes ❑No Isolated wetland on Property❑Yes® No US ACOE Approval of Delineation completed: ❑Yes ❑No 404 Application in Process w/US ACOE: ❑Yes ® No Permit Received from US ACOE❑Yes❑ No For DENR use only Fees lit for multiplepermits: Check# Total Fee Amount It SUBMITTAL DATES I Fee SUBMITTAL DATES Fee CAMA $ Variance(❑Mal;❑Min) $ SW(❑HD,❑LD,❑Gen) I I $ 401: $ Los I I $ Stream Deter— $ NCDENR EXPRESS September 2008 Sam's Club Expansion Store No. 6573-04,Jacksonville, NC -NCD... -Z Subject: Sam's Club Expansion Store No. 6573-04, Jacksonville, NC - NCDENER Scope Meeting Request From: <Justin.Houston a kimley-horn.com> Date: Tue, 14 Oct 2008 10:15:07 -0400 To: <Janet.Russel I@ncmai1.net> CC: <Austin.Watts@kimley-horn.com> Dear Ms. Russell The following is the narrative for the scope meeting request for the expansion of Sam's Club Store No. 6573-04. This is a request for a scoping meetingfor the expansion of Sam's Club Store No. 6573-04 located at 1170 Western Blvd, in Jacksonville, NC in Onslow County. The site is a combination of three tracts jar a total of 16.57 acres(PIN Nunt ers. 345- 00.3, 345-10.6, 345-10.9). The current owners of these sites are.Sams Real Estate Business Trust, Man H Chow and Tony Chow, respectively. The site consists of an existing 111,849 square foot Sam's Club Store. The store will be expanded approximately 27,776, to 139,625 total squarefootage. The proposed improvements will disturb approximately 16.0 acres. There are no wetlands located on the site. Water and Waste Water services will e supphe y the existing infrastructure that supports the existing Sam's Club Store.,Additionally, there are no historic sites and/or projects being fitnded with public monies. 7'he stormwater system for this project will be designed for high density commercial and will be designed to NPDES Phase 1i regulation. The proposed impervious area on site is approximately 70%. There will be three wet detenGon� basins onsite to treat all stormwater runoffgenerated by the site, inclut upon area. The first wet detention basin is Wet Detention Basin 91, is the modification of the existing large basin onsite to be brought to Phase Ii standards. The second wet detention basin, Wet Detention Basin 92, is a newly designed basin on the Man II Chow acquired property. The final basin, Wet Detention Basin 93, is an existing offsite basin that the stormwater flow to this basin will be a decrease from existing conditions. All wet detention basins will receive stormwater through the underground storm drainage system. There is no anticipated off-site runoff into the on-site wet detention basins. Additionally there will be no off-site road construction across other properties, and the North Carolina DOT is not requesting any additional off-site roadway improvements. Wal-Mart is considering helping DOT with an already planned turn lane improvement on Western Blvd At this time, the work is planned to be performed by DOT. Stormwater from the site will flow into the White Oak River Basin. Stormwater from Wet Detention Basins #i & #3 will flow into the City of Jacksonville stormwater facilities and ultimately into,Sandy Run Branch. Sandy Run Branch has a water qualification o(SC;NSW Stornnvater from the new pond 92 flows into a series of unnamed tributaries and ultimately Northeast Creek. Northeast Creek also has a classification of SC;N.SW. Additionally,please find attached We would like to request a scoping meeting on either October 21 st or October 23rd. If you have any questions or comments please feel free to contact me. � E C E I V ED Justin M. Houston, El ICJ^{u OCT 14 2008 Kimley-Horn and Associates,Inc. 4651 Charlotte Park Drive,Suite 300 1 Charlotte,NC 28217 704.954.7489(office) 1704.942.7639(cell) 1704.333.0845(fax) PROJ NDWO Content-Description: Express Request Oct.doc Express Request Oct.doe� Content-Type: application/msword 11 1 Content-Encoding: base64 roPo $c r( oPo 1 c.y­ s �; r- t t Li" 11 1 of 2 C_)6% 5 V�t tit-) W`I '1 ^ (.,O M V 10/14/2008 10:25 AM .•11 i. I I F [dI - � III ,/! /�� ene eewwm.irc --- Li oEsrory avl� �• 1^ �•• I I Ili i I\I I ABBRFMTKKJS .w.u.w.. SSW VTMWEX V.LF® 'II tE.pSAK111"m DIIINO8W8 .�lvam.i �• p �G1Vf,LL t � 1 1�'�^^^^"''' �' a •az a��w.wae.•.mom.w¢evm�em YS CZD STORM DRAINAGE a 77 W11 _I O O Q® • O I STdiM DRAINAGE TABIE mr,m C! IT o 11 a III I ( 1 O I 1 e.n :ii+ib y I ��� � • O Qi� � T I�• + � I �-^+� 3d3d Y CD CD CD 43 1 n�-w - na 1 _�-1_L ���•r V S uP cR.rnlc succ _ �..maws c .msnmec q�"J , CO3 _�_ WE LEGEND c D ❑_❑ _ _ =�—__ _O ,—�� — _ p. � �� i � OO � M,m—.®r•�a.,�m...r .air.- m ---rl ° y. SITEDATATASLE w°�0o NN9¢MBUHWAIp"11 � �� i .I i pu�O=—..e roE nmsEaIMIRI WfiOtLI =_.L_T t^r I m .,--T A.,.....a Room n+ewatEmmowrB -�' I O^_ 131.®Si NAD�TOfµ avn..wu _ `•• rj ®p a 4 ° g a cwe slTE DATAAll III W { CMum..eme 3r• tl im-e Y NOTES SPM USE ISTINGPAItKINGDATR r _ I 1 aw�T�.•.wi�Y fny LJI °..ew �vx T[ .... •'•, ., i ma ro'�m[ urwimw° mx�mwrar"x a —nnr'.vutr v—uus.vc SMIS CLUB PROPOSED PARKING OPTA '��_���'• �::' �'�— a �•. m• �__ •mw.J wu nrm�wwS�fvy s0.a CODE REOUIREO FARgNG WTA®v ro WESTERN BOULEVARD NC.S.R 1470_ `{I ` _ _ _ mw..®n•�o.o..,...w". 'm"� STOP GR.1 we SCATS D H Bm about:blank October 15, 2008 Sam's Club Expansion Justin: The Express Stormwater Scope meeting has been scheduled with Chris Baker on October 21, 2008 at 10:00 AM here in the Wilmington Regional Office, 127 Cardinal Drive Extension, Wilmington, 28405. If you need directions, please let me know. If 10:00 AM is too early, let me know. The chart for stormwater rules (cities/counties and which rules they fall under) is not on the water quality web site yet. The person to contact is bradley.bennett@ncmail.net. Bradley is over the stormwater section in Raleigh. Eventhough this is a scope meeting, I am attaching the "submittal requirements" since there may be information presented there that would be helpful to you. Please respond within 2 business days to confirm and reserve the meeting date/time. Thanks, Janet Russell Express Coordinator 1 0f 1 10/15/2008 1:56 PM ' RE: Sam's Club Expansion Subject: RE: Sam's Club Expansion From: <Justin.Houston@kimley-horn.com> Date: Wed, 15 Oct 2008 14:55:20 -0400 To: <Janet.Russell@ncmail.net> That sounds like a plan. Thanks! Justin M. Houston, EI Kimley-Horn and Associates, Inc. 704 .954 .7489 -----Original Message----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Wednesday, October 15, 2008 2:55 PM To: Houston, Justin Subject: Re: Sam's Club Expansion Justin: Could you come in at 11:30 on Monday, October 20th to meet with Chris? We' re 3 miles from Wrightsville Beach - you can have lunch at the beach. Janet Justin.Houston@kimley-horn.com wrote: Wilmington is about a 5 hour drive. It is honestly not preferred, but if that is what is best for your group we can leave early. Justin M. Houston, EI Kimley-Horn and Associates, Inc. 704 . 954 .7489 -----Original Message----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Wednesday, October 15, 2008 2:36 PM To: Houston, Justin Subject: Re: Sam' s Club Expansion Before, we look at a different date, is a 10:00 AM appointment too early? Janet Justin.Houston@kimley-horn.com wrote: The 21st is not an open date for us, which is completely my fault as I read the wrong date on my calendar. I am very sorry for this mistake. Is there any way that preferably the 23rd, or maybe the 20th is available? Justin M. Houston, EI Kimley-Horn and Associates, Inc. 704 . 954.7469 -----Original Message----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Wednesday, October 15, 2006 1:58 PM To: Houston, Justin Subject: Sam's Club Expansion I of2 10/15/2008 3:02 PM Janet Russell NCDENR Wilmington Region October 10, 2008 RE: Sam's Club Expansion Store No. 6573-04 NCDENR Scope Meeting Request Dear Ms. Russell The following is the narrative for the scope meeting request for the expansion of Sam's Club Store No. 6573-04. This is a request for a scoping meeting for the expansion of Sam's Club Store No. 6573-04 located at 1 170 Western Blvd, in Jacksonville, NC in Onslow County. The site is a combination of three tracts for a total of 16.57 acres (PIN Numbers: 345-10.3, 345-10.6, 345- 10.9). The current owners of these sites are Sams Real Estate Business Trust, Man H Chow and Tony Chow, respectively. The site consists of an existing 111,849 square foot Sam's Club Store. The store will be expanded approximately 27,776, to 139,625 total square footage. The proposed improvements will disturb approximately 16.0 acres. There are no wetlands located on the site. Water and Waste Water services will be supplied by the existing infrastructure that supports the existing Sam's Club Store. Additionally, there are no historic sites and/or projects being funded with public monies. The sformwater system for this project will be designed for high density commercial and will be designed to NPDES Phase 11 regulation. The proposed impervious area on site is approximately 70%. There will be three wet detention basins onsite to treat all sformwater runoff generated by the site, including all built upon area. The first wet detention basin is Wet Detention Basin #1, is the modification of the existing large basin onsite to be brought to Phase If standards. The second wet detention basin, Wet Detention Basin #2, is a newly designed basin on the Man H Chow acquired property. The final basin, Wet Detention Basin #3, is an existing offsite basin that the sformwater flow to this basin will be a decrease from existing conditions. All wet detention basins will receive sformwater through the underground storm drainage system. There is no anticipated off-site runoff into the on-site wet detention basins. Additionally there will be no off-site road construction across other properties necessary, and the North Carolina DOT is not requesting any additional off-site roadway improvements. Stormwater from the site will flow into the White Oak River Basin. Stormwater from Wet Detention Basins #1 & #3 will flow into the City of Jacksonville sformwater facilities and ultimately into Sandy Run Branch. Sandy Run Branch has a water qualification of SC;NSW. Stormwater from the new pond #2 flows into a series of unnamed tributaries and ultimately Northeast Creek. Northeast Creek also has a classification of SC;NS W. nE C E I V ED I�InI(I OCT 2 8 ?008 DWp PROJ # Additionally, please find attached the NCDENR Scoping meeting request form. We would like to request a scoping meeting on either October 21 st or the October 23rd. If you have any questions or comments please feel free to contact me. � ECEIVED OCT 2 8 2008 DWO PROJ # -- - >am's Club Expansion Store No. 6573-04,Jacksonville,NC- Express... Subject: Sam's Club Expansion Store No. 6573-04, Jacksonville, NC - Express Review From: <Justin.Houston@kimley-horn.com> Date: Tue, 28 Oct 2008 14:36:08 -0400 To: <Janet.Russell@ncmail.net> Janet, Attached is the express request and associated narrative. These are the tiles that we sent for the scoping meeting, and 1 believe work for the Express Review request, I simply unchecked the"scoping Meeting Only" box. The I I o'clock time works well for us, but if scoping meetings must be held earlier getting a hotel for the night before is not out of the question if it means we can go through this process sooner rather than later. November 3rd(if it is early only) tro,.N Novembe Stt tl- November I0th (if it is early only) mad N�t; November Thanks! Justin M. Houston, El Kimley-Horn and Associates,Inc. 4651 Charlotte Park Drive,Suite 300 1 Charlotte,NC 28217 704.954.7489(office) 1704.942.7639(cell) 1704.333.0845(fax) I Content-Description: Narrative.doc FNarrative-doc.,"I Content-Type: application/msword Content-Encoding: base64 Content-Description: Express Request Oct.doc Express Request Oct.doe, Content-Type: application/msword Content-Encoding: base64 I of 1 10/28/2008 3:04 PM about:blank October 29,2008 Sam's Club Expansion Store#6573-04 Gentlemen: The Express storrawater submittal meeting has been scheduled with Chris Baker on November 3,2008 at 9:O0 AM here in the Wilmington Regional Office, 127 Cardinal Drive Ext.Wilmington,28405. The store manager or someone representing Sam's must attend the meeting. Please review the submittal requirements,attached Review the application checklist on the limp web site. It can be very helpful in providing a complete application package. Note that plans should be submitted folded to 9"x 14"to fit our file system. Please respond within 2 business days to confirm and reserve the submittal meeting date/time. Thanks, Janet Russell Express Coordinator l of 1 10/29/2008 4:57 PM RE:.Sanis Club Expansion Store#6573-04 Jacksonville,NC Subject:RE:Sam's Club Expansion Store 46573-04 Jacksonville,NC From:<Iustin.Houston a kimley-hom.com> Date:Thu,30 Oct 2008 14:31:51 -0400 To:4anet.liussell n ncmail.net> Sorry about that. Not meant for you. See you on Monday. Justin M. Houston, EI Kimley-Horn and Associates, Inc. 704.954.7489 -----Original Message----- From: Janet Russell (mailto:Janet.Russell@ncmail.net) Sent: Thursday, October 30, 2008 2:11 PM To: Houston, Justin Subject: Re: Sam's Club Expansion Store #6573-04 Jacksonville, NC Did you mean to send this to me? Janet Justin.Houston@kimley-horn.com wrote: Watts FYI, Looks like Hotel room for the Sunday night. Can you contact someone for them to be at the meeting? Will you be going, or can I handle it. Justin M. Houston, EI Kimley-Horn and Associates, Inc. 704.954.7489 -----Original Message----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Wednesday, October 29, 2008 4:58 PM To: Watts, Austin; Houston, Justin; chris.callaway@wal-mart.com Subject: Sam's Club Expansion Store 06573-04 Jacksonville, NC October 29, 2009 'Sam's Club Expansion Store 06573-04 Gentlemen: The Express stormwater submittal meeting has been scheduled with *Chris Baker on November 3, 2008 at 9:00 AM* here in the Wilmington Regional Office, 127 Cardinal Drive Ext. Wilmington, 28405. The store manager or someone representing Sam's must attend the meeting. Please review the submittal requirements, attached. Review the application checklist on the bmp web site. It can be very helpful in providing a complete application package. Note that plans should be submitted folded to 9" x 14" to fit our file system. Please respond within 2 business days to confirm and reserve the submittal meeting data / time. Thanks, Janet Russell Express Coordinator l of 1 10/30/2008 3:34 PM / SUBSURFACE EXPLORATION REPORT SAM'S CLUB STORE#6573-04 EXPANSION 1170 WESTERN-BOULEVARD JACKSONVILLE, NORTH CAROLINA S&ME PROJECT NO. 1051-08-173 Prepared for: Kimley-Horn and Associates 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 Wal-Mart Realty Division 2001 SE 10`h Street Bentonville, Arkansas 72712-6489 Prepared By: S&ME, Inc. 3201 SpringTorest Road Raleigh;North"Carolina 27616 June 30, 2008 *S&ME Celebrating 35 Years 1973 . 2008 June 30, 2008 Kimley-Horn and Associates Wal-Mart Realty Division 4651 Charlotte Park Drive, Suite 300 2001 SE 10'h Street Charlotte,North Carolina 28217 Bentonville,Arkansas 72712-6489 Attention: Mr. Jeff Albertson, E.I. Reference: Subsurface Exploration Report Sam's Club Store#6573-04 Expansion 1170 Western Boulevard Jacksonville,North Carolina S&ME Project No. 1051-08-173 Dear Mr. Albertson: S&ME, Inc. is pleased to submit this subsurface exploration report for the referenced project. Our services were performed in general accordance with our revised Proposal P063-08E REV-01 dated March 20, 2008, and our Change Order(CO-2)dated May 15, 2008. The exploration was performed to evaluate general subsurface conditions as they relate to geotechnical aspects of the proposed building addition,proposed Sam's gas station,proposed detention pond, new pavements and pavement improvements. This report presents a summary of our understanding of the project, the findings of our field exploration, laboratory test results, and our geotechnical conclusions and recommendations. This report was prepared by S&ME, Inc. on behalf of Kimley-Horn and Associates and Wal-Mart Stores, Inc. and Wal-Mart Real Estate Business Trust and their respective affiliates, successors, and assigns (hereinafter referred to collectively as "Wal-Mart"). Wal-Mart may rely on this report as if it was prepared for them. We appreciate the opportunity to work with Kimley-Horn and Associates and Wal-Mart during this phase of the project. If you have any questions concerning this report,please do not hesitate to contact us. Sincerely, S&ME, Inc. """"• J. Adam Browning. E.I. fin R. Browning, P. e d 0 Staff Professional Senior Engineer N.C. Registration No. 24 �M• _ \\RALNC1\Share\PROJECTS\2008\08-173 Sams Club Jacksonvil1e\1GE0TECH\ReportT IClub Expansion.doc i wwM SBME,INC./3201 Spring Forest Road/Raleigh, NC 27616/p 919.872,2660 /919.876.3958/www.smeine.com TABLE OF CONTENTS PAGE 1.0 EXECUTIVE SUMMARY........................................................................................................ 1 2.0 PROJECT AND SITE INFORMATION .............................................................................2 2.1 PROJECT INFORMATION......................................................................................................2 2.1.1 Building Expansion.............................................................................................................. 2 2.1.2 Proposed Sam's Gas Station............................................................................................. 3 2.1.3 Proposed Pavement Areas and Detention Ponds.......................................................... 3 2.1.4 Existing Pavement Improvements..................................................................................... 3 2.2 SITE INFORMATION...............................................................................................................4 3.0 EXPLORATION PROGRAM..................................................................................................4 3.1 CONE PENETRATION TEST(CPT)SOUNDINGS............................................................. 5 3.2 PAVEMENT EVALUATION SURVEY.................................................................................... 6 3.3 CORING/IN-PLACE CALIFORNIA BEARING RATIO(CBR)TESTING........................... 6 3.4 LABORATORY TESTING........................................................................................................ 6 4.0 AREA GEOLOGY/SOIL SURVEY/CLIMATE..................................................................7 4.1 AREA GEOLOGY..................................................................................................................... 7 4.2 SOIL SURVEY................................................................................................ .......................... 7 4.3 CLIMATE.................................................................................................................................... 7 5.0 SITE CONDITIONS..................................................................................................................7 5.1 SUBSURFACE CONDITIONS.............................................................................................— 7 5.2 LABORATORY TESTING........................................................................................................ 9 5.3 EXISTING PAVEMENT CONDITIONS................................................................................ 10 5.3.1 Existing Pavement Surface Evaluation........................................................................... 10 5.3.2 Asphalt/Concrete Coring Results.................................................................................... 11 5.3.3 Existing Pavement Subgrade Conditions....................................................................... 12 6.0 CONCLUSIONS AND RECOMMENDATIONS............................................................. 12 I6.1 SITE PREPARATION............................................................................................................. 14 6.1.1 Site Preparation— General............................................................................................... 14 6.1.2 Site Preparation—New Construction.............................................................................. 14 6.1.3 Site Preparation—Pavement Areas to be Replaced.................................................... 15 6.2 EXCAVATIONS....................................................................................................................... 15 6.2.1 Excavations— General...................................................................................................... 15 6.2.2 Excavations—Below Groundwater................................................................................. 16 6.3 FILL PLACEMENT AND COMPACTION.......................................—................................... 16 6.4 SURCHARGE LOADING....................................................................................................... 17 6.4.1 Surcharge Loading— Gas Station................................................................................... 17 6.4.1 Surcharge Loading—Building Expansion...................................................................... 17 6.5 BUILDING EXPANSION........................................................................................................ 17 6.5.1 Foundations........................................................................................................................ 17 6.5.2 Floor Slab............................................................................................................................ 19 6.6 GAS STATION ........................................................................................................................ 19 6.6.1 Kiosk and Canopy Foundations....................................................................................... 19 6.6.2 Settlement...................................—..................................................................................... 20 6.7 UNDERGROUND GAS TANKS............................................................................................20 6.8 SITE SEISMICITY................................................................................................................... 21 6.9 CORROSION AND REACTIVITY POTENTIAL.................................................................. 21 6.9 PAVEMENT RECOMMENDATIONS................................................................................... 21 6.9.1 Rigid Pavement— Truck Turnaround Area and Sam's Gas Station........................... 22 6.9.2 Flexible Pavement—New Parking Area and Gas Station........................................... 23 6.9.3 Existing Pavement Improvements................................................................................... 24 7.0 LIMITATIONS OF REPORT................................................................................................26 FIGURES Figure 1 CPT Sounding & CBR Test Location Plan Figure 2 Pavement Evaluation Survey APPENDICES Appendix I Geotechnical Investigation Fact Sheet Foundation Design Criteria Foundation Subsurface Preparation Site Subsurface Preparation Climatic Data I Appendix II CPT Sounding Location Sheet Summary of CPT Samples CPT Soil Classification Legend Cone Penetrometer Test Results Appendix III Pavement Evaluation Survey Summary Sheet Pavement Evaluation Survey Photos Coring and In-Place California Bearing Ratio (CBR) Test Records Appendix IV Summary of Laboratory Test Results Laboratory Results Appendix V Site Pictures Appendix VI Pavement Design Calculations Appendix VII Original Geotechnical Report 1.0 EXECUTIVE SUMMARY For your convenience, this report is summarized in outline form below. This brief summary should not be used for design or construction purposes without reviewing the more detailed conclusions and recommendations contained in this report. 1. The exploration included a visual site reconnaissance, pavement evaluation survey, performance of 18 cone penetration test (CPT) soundings, 8 asphalt/concrete corings and in-place California Bearing Ratio (CBR) tests, quantitative laboratory testing, and evaluation and analysis of this information relative to geotechnical conclusions and recommendations. 2. Five feet of surcharge fill loading will be required in the canopy and kiosk areas of the proposed gas station and in the building expansion where more than 2 feet of fill will be required (west side of building). We anticipate a waiting period of 30 to 45 days will be required. 3. We recommend the building expansion column and wall shallow foundations be supported on a Geopier Impact System consisting of vertical displacement Rammed Aggregate Piers TM (RAPs). The Geopier Impact System should be designed by a specialty contractor for a minimum allowable bearing pressure of 3,000 pounds per square foot and maximum total settlement of 1/4 inch. The a specialty contractor should indicate to the structural engineer the minimum distance required between existing foundations and new foundations to avoid disturbance to existing foundations during construction. Pre-drilling of the upper firm soils may be required to reduce this impact. Vibration monitoring of the existing building west wall line is recommended during installation of the impact piers. 8 4. Assuming the surcharge fill loading is placed and monitored in accordance with the recommendations of this report, the kiosk and canopy foundations in the gas D station may be designed as conventional spread footings using an allowable soil bearing pressure of 2,500 pounds per square foot. Total settlements of less than 3/4-inch and differential settlements between columns of approximately 1/2 inch aor less are anticipated. 5. Floor slabs may be supported as a slab-on-grade bearing on 6 inches of a compacted aggregate base course (ABC) stone placed on the prepared soil subgrade. Based on CBR test results we recommend a design subgrade reaction modulus of 150 pounds per square inch per inch. 6. The proposed underground gas tanks will be exposed to buoyancy forces associated with shallow groundwater levels. Based on cone penetration test a t Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 (CPT) soundings performed in the gas station area, groundwater levels typically exist at approximate depths of 2.5 to 3 feet below the existing ground surface. 7. Based on shear wave velocity data and the 2006 North Carolina Building Code, the site is considered a seismic site class D. 8. Several utilities are present in the proposed detention pond area. These utilities will need to be removed or re-routed in order to excavate the detention pond. Shallow groundwater also exists in this area. 9. The majority of the existing asphalt pavement areas are in relatively good condition. However, in order to meet Sam's Club requirements, an overlay will be required in asphalt pavement areas which are currently in relatively good condition. I 10. Medium to high severity fatigue cracking within asphalt pavements was observed in several areas. In these areas we recommend that the existing asphalt and stone be removed where medium to high severity fatigue cracking is present. Once the I existing asphalt and stone have been removed, subgrade soils should be evaluated for pavement support suitability. If the subgrades are determined to be unsuitable, these areas should be undercut to suitable soils and then replaced with properly compacted ABC stone. 11. The existing concrete in the truck loading dock area is in relatively good condition. However, routing, cleaning and sealing of joints and cracks will be required. 2.0 PROJECT AND SITE INFORMATION 1 2.1 PROJECT INFORMATION Wal-Mart Stores, Inc. is planning to expand its existing Sam's Club (Store No. 6573-04) located at 1170 Western Boulevard in Jacksonville, North Carolina. The expansion project will include an approximately 26,065 square foot building expansion along with a new Sam's Gas Station, new parking area, new detention pond, and improvements to the existing pavement. Information for these improvements was obtained from the "Geotechnical Investigation Specifications and Report Requirements(including gas station)"dated March 7,2008. 2.1.1 Building Expansion The 26,065 square foot expansion will be constructed along the west side of the existing building. The footprint of the proposed expansion will extend into a portion of the 2 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion-Jacksonville NC June 30 2008 existing detention pond on the west side of the building. We assume that the final floor elevation of the proposed expansion will match the finished floor elevation of the existing building. We assume that the proposed building expansion will be a one-story steel-framed structure consisting of non-load bearing concrete block walls and steel columns supporting roof loads by means of steel joist girders and steel bar joists. It is anticipated that gravity loads for the interior column loads will be on the order of 80 kips with occasional columns loads of 150 kips due to severe live loading. Maximum column uplift forces from wind are estimated at 30 kips. The estimated typical exterior column gravity load is 50 kips. The concrete masonry wall gravity loads range from 1.5 to 3.0 kips per linear foot. The estimated maximum uniform floor slab live load is 250 pounds per square foot (pso. The estimated maximum floor slab concentrated load is 16 kips. Wal-Mart specifications require that total settlements not exceed '/a inch beneath individual foundations. 2.1.2 Proposed Sam's Gas Station We also understand that a Sam's Gas Station will be constructed on an open grass lot southwest of the existing Sam's Club. The gas station will consist of a canopy area, kiosk store, and underground gas tanks. We understand the columns and kiosk footings must be designed for a minimum bearing pressure of 2,500 pounds per square foot. We anticipate a maximum column load of 40 kips for canopy and kiosk foundations. 2.1.3 Proposed Pavement Areas and Detention Ponds A parking area and detention pond are proposed for construction in the open lot on the east side of the existing parking area east of the existing building. We understand the parking area will consist of standard duty asphalt pavement. The proposed detention pond will be approximately 32,000 square feet. Based on excavation depths for the existing detention pond, we anticipate excavation depths for the proposed detention pond will be on the order of 5 to 6 feet. The existing detention pond on the west side of the existing building will be decreased approximately 9,175 square feet to allow for the building expansion and extension of the concrete paved truck turnaround area. 2.1.4 Existing Pavement Improvements We understand that asphalt parking improvements and possible replacement of the concrete pavement in the existing truck loading dock area are planned. At this site these areas include the main access ways that are located parallel and perpendicular to the front of the Wal-Mart building along with the access road on the east side of the building. 3 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville. NC June 30, 2008 2.2 SITE INFORMATION S&ME performed the original geotechnical exploration for the existing Sam's Club in 1993. This report is included in the Appendix. We understand the existing building and parking were constructed in 1996. The site currently consists of the existing 111,764 square feet Sam's Club building with associated parking and a heavy duty concrete truck loading dock area. A detention pond exists on the west side of the existing building. Site photographs are included in Appendix V. The existing building is a metal sided building with steel columns supporting roof loads by means of steel joist girders and steel barjoists. We understand that the existing building foundations are supported on shallow foundations designed for an allowable bearing pressure of 1,500 pounds per square foot. The footings are underlain by 2 feet of clean NCDOT No. 67 stone placed within the footing dimensions. We understand that the existing floor slab is subgrade supported. The structural plans for the original building indicate 5 feet of uncompacted surcharge fill was to be placed in the building and expansion areas for a period of 2 to 3 months. The location and dimensions of the proposed expansion at that time and the actual amount of time the surcharge was left on the building pad is unknown. The west side of the existing Sam's Club, in the area of the proposed building expansion, is currently grassed. A 10 foot electric easement exists in the center of the proposed expansion. The west side of the proposed building expansion will extend into a portion of the detention pond. A metal fence and bushes line the existing detention pond. Based on our geotechnical report for the original construction, excavation depths for the detention pond were on the order of 6 feet. Water was observed in the detention pond at time of exploration. The east side of the site, where the new parking area and detention pond will be constructed, is mostly open with some trees. An approximately 24-inch reinforced concrete pipe(RCP) daylights near sounding P-2 and appears to exist along the east side of the existing parking area. Based on utility locating performed by North Carolina One-Call,multiple telecommunication utilities exist throughout this area. The proposed Sam's Gas Station will be located on an open grass lot on the southwest portion of the site. An approximately 20 foot by 20 foot depression exists on the northeast comer of this lot. We understand that this area has been sinking over time and filling the depression with material to keep it level with the existing ground surface has not worked. It appears this depression is associated with a storm water yard inlet. The continuation of loss of soil would indicate that there is an open pipejoint or broken section of pipe in this area. 3.0 EXPLORATION PROGRAM The exploration program included a visual site reconnaissance, performance of 20 cone penetration test (CPT) soundings, pavement evaluation survey, 8 asphalt/concrete corings 4 Subsurface Exploration Report SBME Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30.2008 and in-place California Bearing Ratio (CBR) tests, and laboratory testing. CPT sounding/coring locations were selected and located in the field by S&ME personnel estimating distances and right angles from existing site features. Approximate sounding/coring locations are shown on Figure 1 in the Appendix. 3.1 CONE PENETRATION TEST (CPT) SOUNDINGS Eleven (B-1 through B-9, B-8A, B-9A) CPT soundings were advanced to cone refusal depths ranging from approximately 26 to 28 feet below the existing ground surface in the proposed building expansion and to approximately 25 below the existing ground surface in the proposed Sam's Gas Station. CPT soundings B-8A and B-9A were performed in close proximity to soundings B-8 and B-9 to further evaluate the very soft soils encountered in the proposed gas station. Nine (P-1 through P-4, DP-1 through DP-5) CPT soundings were also performed to depths ranging from approximately 10 to 17 feet below the existing ground surface in the proposed parking area and approximately 16 to 18 feet in the proposed detention pond. The cone penetration test (CPT) soundings were advanced using a hydraulically-powered Vertek unit mounted on an all-terrain carrier. The cone penetration test consists of hydraulically pushing a steel cone of specific dimensions into the ground. The cone used has a tip area of 15 cm and a sleeve friction area of 150 em2. The piezometer consists of a 5 min plastic porous element located immediately behind the cone tip. As the cone is advanced, electronic sensors continuously measure and record tip resistance, sleeve friction, and pore water pressure. The recorded CPT data was then used to approximate soil stratigraphy, soil behavior types, and other soil parameters. Two dissipation tests were performed in soundings B-5 and B-7 at approximate depths of 21.5 and 14 feet, respectively, beneath existing ground surface. Shear wave velocity testing was performed on five foot intervals in sounding B-3. MacroCore®-type soil samples were also obtained in soundings B-2, B-4, DP-1, and DP-4 from the ground surface to a depth of 4 feet with CPT testing equipment. One bulk sample of upper soils was obtained from boring DP-2. Cone penetration testing was performed in general accordance with ASTM D 5778. All sounding holes were observed for groundwater at completion of drilling and several after twenty-four hours through temporary piezometers. MacroCore°-type and bulk samples were returned to our laboratory for quantitative testing and visual classification in accordance with Unified Soil Classification System guidelines. A Table of CPT Sounding Test Locations, Summary of CPT Samples, Cone Penetrometer Test Results, Pore Pressure Dissipation Test Results, and Shear Wave Velocity Test Results are included in the Appendix. Ground surface elevations are not shown on the test results since topographic information was not available. Soil types presented on CPT sounding logs are more representative of soil behavior characteristics than traditional soil classification that is based on grain size and plasticity. 5 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville. NC June 30,2008 3.2 PAVEMENT EVALUATION SURVEY A pavement evaluation survey was performed to observe the condition of the existing asphalt and concrete pavement. The evaluation survey consisted of noting areas of medium to high severity stress, measuring their approximate dimensions, and taking photographs. Areas of distress were noted in accordance with the FHWA LTTP Distress Identification Guide (Publication No. FHWA-RC-05-001, August 2005). A summary table of medium to high severity distress areas along with pavement evaluation survey photographs are provided in the Appendix. 3.3 CORING/IN-PLACE CALIFORNIA BEARING RATIO (CBR) TESTING S&ME cored the existing asphalt at seven test locations and existing concrete at I test location. After coring, the asphalt/concrete thicknesses were measured. Within each corehole S&ME performed dual mass DCP testing in general accordance with ASTM D6951-03 to an approximate depth of 3 feet below the bottom of pavement. The dual mass DCP consists of a steel extension shaft assembly with a 60 degree hardened steel cone tip attached to one end. The tip is driven into the subgrade by dropping an 8 kilogram (17.6 pounds) dual mass hammer 575 millimeters (1.9 feet). The depth of penetration is measured at selected hammer drop intervals and recorded values are converted to California Bearing Ratio (CBR) values through correlations used by the North Carolina Department of Transportation (NCDOT). After performance of the dual mass DCP tests, the existing aggregate base course(ABC) stone was excavated and thicknesses were measured. S&ME personnel performed hand auger borings to approximate depths ranging from 2 to 2.5 feet below the CABC stone at each of the test locations. Soils encountered in hand auger borings were visually classified and representative samples brought back to our laboratory for testing. Boreholes were backfilled with auger cuttings upon completion of hand auger borings and coreholes were patched with cold patch asphalt or grout. 3.4 LABORATORY TESTING Laboratory testing was performed on bulk and MacroCore°-type samples of near surface soils obtained from within and near CPT soundings along with samples of subgrade soils from within the coreholes where in-place CBR testing was performed. Laboratory testing included standard Proctor moisture-dry density, California Bearing Ratio (CBR), organic content, pH, resistivity, natural moisture content, Atterberg limits (plasticity index), and grain size analysis tests. All laboratory testing was performed in general accordance with applicable ASTM standards. 6 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville. NC June 30 2008 4.0 AREA GEOLOGY/SOIL SURVEY/CLIMATE 4.1 AREA GEOLOGY The site is located within the Coastal Plain physiographic and geologic province of North Carolina in Onslow County. The Coastal Plain geologic region has been formed during past transgressive and regressive movements of the ocean into and out of North Carolina. As such, the Coastal Plain province is characterized by subdued topographic features in flat, low-lying terrain. The primary geologic formation within the depth of exploration at this site is the River Bend formation. The River Bend formation is a marine deposit typically consisting of limestone overlain by interbedded hardened sandy limestone. Based on the cone penetration test (CPT) soundings, it appears the River Bend formation exists at an approximate depth of 25 to 30 feet below the existing ground surface at this site. 4.2 SOIL SURVEY S&ME reviewed the Onslow County Soil Survey provided by the United States Department of Agriculture, Soil Conservation Service to obtain near surface soil classification information for the subject site. The subject site lies in the Goldsboro Series. The Goldsboro Series consists of moderately-drained soils on uplands that formed in moderately fine textured sediments. Slopes in the Goldsboro Series typically range from 0 to 2 percent. The near surface soils consist of sands and sandy clays which are noted to be medium to strongly acid. 4.3 CLIMATE Based on the U.S. Department of Commerce Climate Atlas of the United States, the months of July and August generally receive more precipitation, through predominantly thunderstorms, than the remainder of the year. October through April typically receive less precipitation. The first freezing day (32' or below) is typically late October, and the last freezing day is the beginning of April. A tabulation of climatic data for the Jacksonville, North Carolina area is included in Appendix 1. 5.0 SITE CONDITIONS 5.1 SUBSURFACE CONDITIONS The subsurface conditions at this site consist of the following based on soil test borings performed during the original geotechnical exploration and cone penetration test (CPT) soundings performed during this subsurface exploration. 7 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 Approximately 3 inches of grass/topsoil was encountered at the ground surface of each of the CPT soundings. Below the grass/topsoil, approximately 1 to 2.5 feet of fill materials were encountered in soundings B-I through B-9. Based on CPT soil behavior type (SBT) classifications, MacroCore-type samples, and tip resistance values, the fill materials appear to consist of moderately to well-compacted clayey sands. Samples of fill materials were visually observed as moist. The typical subsurface profile consists of the following: Top Bottom Average Depth Depth Soil Behavior Type CPT Tip (feet) (feet) Resistance (tsf) 0 1 —2.5 FILL: Loose to Medium Dense Clayey 25 — 75 Fine SAND, Moist 1 —2.5 1 5 - 7 Soft to Firm Sandy CLAY, Moist to Wet 8— 10 5 - 7 6 - 9 Loose to Medium Dense Clayey Fine 10—45 SAND, Wet 6- 9 16 — 18 Very Loose Clayey Fine SAND, Wet 3 — 10 16— 18 19 - 21 Medium Dense Clayey SAND, Wet 50—90 19 - 21 22 - 25 Soft to Firm Sandy CLAY, Wet 4— 15 22 —25 25 —28 Very Dense Clayey SAND (SC) 200 - >400' /LIMESTONE Cone refusal was typically encountered at tip resistances greater than 400 tsf It should be noted that a layer of very soft material was encountered in CPT sounding B- 8 (Sam's Gas Station) from an approximate depth of 7 to 15 feet. Tip resistances of less than 1 ton per square foot (tsf) were encountered throughout this layer indicating very loose or very soft soils. Water was encountered within the soundings after termination of sounding at approximate depths ranging from 2 to 4 feet. Groundwater levels were measured at least twenty-four hours after termination of sounding within temporary piezometers installed in soundings B-1 through B-9, DP-1, and DP-4. Twenty-four hour water levels were encountered at approximate depths ranging from 2 (DP-1) to 6 (B-4) feet. It is important to realize that seasonal fluctuations in water levels do occur with changes in rainfall and evaporation rates. The above description of subsurface conditions is relatively brief and general. More detailed descriptions of conditions at each sounding location are included on individual Cone Penetration Test Records which can be found in Appendix II and Test Boring Records included with the original geotechnical report in Appendix VII. 8 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion-Jacksonville NC June 30 2008 5.2 LABORATORY TESTING Laboratory testing included standard Proctor moisture-dry density, California Bearing Ratio (CBR), organic content, pH, resistivity, natural moisture content, Atterberg limits (plasticity index), and grain sire analysis tests. Results for the individual laboratory tests are included in Appendix IV. A standard Proctor moisture-density test was conducted on the bulk sample of near surface soils obtained near sounding DP-2. A maximum dry density of 116 pounds per cubic foot and optimum moisture content of 12.9 percent were determined using the ASTM D 698 Method A testing procedure. A California Bearing Ratio (CBR) test was performed on a recompacted bulk sample of the near surface soils obtained near sounding DP-2. The test specimen was recompacted to about 95 percent of the standard Proctor maximum dry density at approximately the optimum moisture content and soaked for 96 hours. The test specimen swelled approximately 0.1 percent after being soaked for 96 hours. A California Bearing Ratio of 7.6 percent was recorded for the soaked sample. Organic content testing was performed on a bag sample of subgrade soils obtained in- place at CBR test location C-7 from 1.5 to 2.5 feet. Organic content testing indicated the sample contained 6.7 percent organics. pH and resistivity testing was performed on bag samples of subgrade soils obtained from test locations C-1 and C-8, which were performed near the proposed building expansion and Sam's Gas station footprints. pH testing indicated pH values of 5.1 to 7.1. Resistivity testing performed on samples soaked for 24-hours indicated resistivity values ranging from 1,395 to 1,524 ohm-cm. Natural moisture content tests performed on the bulk, MacroCore°-type, and subgrade samples obtained from the in-place CBR test locations showed moisture contents ranging from 12.7 to 44.6 percent. Based on the standard Proctor optimum moisture content of the bulk sample, natural contents of near surface soils are near to significantly wet of their optimum moisture content. Natural moisture content testing performed on a bag sample of aggregate base course (ABC) stone obtained from test location C-7 indicated a a moisture content of 6.4 percent. This moisture would appear to be near or slightly wet of the stone's optimum moisture content. Atterberg limit testing was performed on the bulk sample of near surface soils obtained near sounding DP-2, MacroCore°-type samples obtained from CPT soundings B-4, and DP-2, and near surface samples obtained from in-place CBR test locations C-3 and C-8. Testing indicated liquid limits ranging from 30 to 40%, plastic limits ranging from 15 to 21%, corresponding to plasticity indices ranging from 12 to 19%. Testing indicates the tested soils have low plasticity characteristics. 9 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion-Jacksonville NC June 30 2008 Grain size analysis testing was performed on the bulk sample of near surface soils obtained near sounding DP-2. Grain size analysis testing indicated the bulk sample consists of approximately 57 percent fines (silt/clay) and 43 percent fine sand. 5.3 EXISTING PAVEMENT CONDITIONS 5.3.1 Existing Pavement Surface Evaluation We understand the existing pavement is 12 years old. Based on the original geotechnical report, light duty and heavy duty pavement areas were design for 20-year design life traffic loadings of 14,600 and 335,800 18-kip equivalent single axle loads (ESALs), respectively. Based on this information,we interpolate that light and heavy duty pavements have been subjected to approximately 8,760 and 201,480 ESALs, respectively, at the time of this report. Based on our site reconnaissance, the majority of the existing asphalt and concrete pavements appear to be in relatively good condition. Typical of asphalt pavement this age, low severity oxidation (stripping) of the asphalt surface has occurred and if left untreated will show signs of more rapid oxidation and deterioration in the coming years. Further oxidation causes the pavement to lose its strength and become more brittle, leading to low to moderate severity fatigue cracking. This cracking can provide avenues for water penetration and softening of subgrades. Softening of subgrades can lead to high severity distresses necessitating removal and replacement. The following moderate to high severity distresses were observed. These areas are noted on the Pavement Evaluation Survey(Figure 2) in the Appendix. High Severity Fatigue Cracking High severity fatigue cracking (commonly referred to as "alligator" or"chicken-wire" cracking due to its cracking pattern) exists in areas labeled 2, 3, 4, 5, 7, and 9 on Figure 2. Theses areas ranged in size from approximately 400 to 1,400 square feet. Some of the causes of high severity cracking include high traffic loading, weak subgrade conditions, and asphalt concrete with high void ratios. Pictures 2, 3, 4, 5, 6, 7, 10 and 11 in Appendix III show areas of high severity fatigue cracking. Moderate Severity Fatigue Cracking Moderate severity fatigue cracking exists along the east entrance drive labeled as area 6 on Figure 2. This area is approximately 7,600 square feet. The moderate severity fatigue cracking in this area is likely a result of high traffic loading. Pictures 8 and 9 in Appendix III show areas of moderate severity fatigue cracking. 10 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30,2008 Moderate Severity Rutting Moderate severity rutting transverses the access drive in front of the existing building near the building's southwest corner. The rutting appears to exist above an underground utility and has been previously patched. This area is approximately 430 square feet with rut depths ranging from % to '/4 inch. Typically rutting over utilities is a result of poorly compacted backfill placed above the utility. Picture I in Appendix III shows the moderate severity rutting described above. Moderate Severity Longitudinal (Non-Wheel Path) Cracking Moderate severity asphalt longitudinal cracking outside of the wheel path was observed in areas 8 and 10 shown on Figure 2. These cracks range in length from approximately 435 to 570 feet. The longitudinal cracks appear to exist along paving joints between asphalt paving runs. Pictures 12, 13, 16, and 17 in Appendix III show the moderate severity longitudinal cracking in asphalt pavement. Moderate severity longitudinal cracking was also observed in the concrete turnaround area (see area 12 on Figure 2). The longitudinal crack is approximately 50 feet long and exists approximately 2 feet from a contraction (saw)joint. The contraction joint nearest this crack is approximately 17 feet from the next closest joint in its perpendicular direction. Typical joint spacing throughout the concrete paved areas is 13 to 15 feet. This indicates that the contraction joints spacing in this area near the longitudinal crack are greater than the maximum required spacing. The longitudinal crack has served as the stress relief of the slab instead of it occurring along the saw joint. Pictures 21 and 22 in Appendix III show the moderate severity longitudinal cracking in concrete pavement. High Severity Concrete Spalling High severity concrete spalling is present in the concrete turnaround area(see area 1 1 in Figure 2). Concrete spalling occurs when relatively incompressible objects lodge within joints, not allowing the joint to move with thermal changes. Typical contraction and expansion movements at the joints cause these objects to spall the concrete. Traffic over the open and weakened joints increases the spalling problems. High severity spalling exists along a total of approximately 110 linear feet of joints within the concrete turnaround area. Pictures 18, 19, and 20 in Appendix III show the high severity concrete spalling in concrete pavement. 5.3.2 Asphalt/Concrete Coring Results The following table presents asphalt, concrete, and ABC stone thicknesses measured during coring operations along with an estimated structural equivalency value for the asphalt pavement. tt Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion —Jacksonville NC June 30 2008 Estimated Test Traffic Asphalt Concrete ABC Stone Structural Location Loading Thickness Thickness Thickness Equivalency (inches) (inches) (inches) Value of Pavement C-1 Heavy Duty 3.0 - 11.0 2.6 C-2 Light Duty 2.25 - 7.0 1.8 C-3 Light Duty 1.75 - 4.5 1.2 C-4 Light Duty 1.75 - 4.0 1.2 C-5 Heavy Duty 3.0 - 3.0 2.0 C-6 Light Duty 2.25 - 5.0 1.5 C-7 Heavy Duty 3.0 - 11.0 2.6 C-8 Heavy Duty - 7.25 8.0 - New asphalt surfaces and base stone are typically given structural equivalency values of 0.44 and 0.14, respectively. Because of the asphalt surface age we have assigned the existing asphalt a structural equivalency value of 0.35. For the base stone we have assigned a structural equivalency value of 0.14. As previously mentioned, ABC stone obtained from test location C-7 indicated a natural moisture content of 6.4 percent based on laboratory testing. Based on the asphalt corngs performed, light and heavy duty pavement areas have average structural equivalency values of 1.4 and 2.4, respectively. 5.3.3 Existing Pavement Subgrade Conditions Dual mass dynamic cone penetrometer (DCP) testing and hand auger borings performed through existing pavement subgrades indicated the subgrade soils typically consist of loose to medium dense clayey sands and very soft to firm sandy clays. The moisture contents of the subgrade soils transition from moist to wet with depth as the groundwater table is approached. Based on dual mass DCP testing the subgrades have a typical CBR value of about 5 percent. The subgrade beneath the pavement at test location C-7 consists of black sandy clay with a relatively high amount of wood fragments and other organics. Organic testing performed on the bag sample obtained from 1.5 to 2.5 feet indicated an organic content of 6.7 percent. This material is unsuitable for pavement subgrade support. 6.0 CONCLUSIONS AND RECOMMENDATIONS The following conclusions and recommendations are based upon review of test borings, coring, in-place CBR tests, laboratory data, our engineering analysis, our understanding of 12 Subsurface Exploration Report SBME Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 the proposed construction, and past experience with similar projects and subsurface conditions. If structural loads or site grades are significantly different from those presented in this report, we should be contacted to review and comment upon the recommendations of this report so that they may be confirmed, extended, or modified as necessary. Additionally, if subsurface conditions adverse to those indicated by this report are encountered during construction,those differences should be reported to us for review and comment. The subsurface exploration findings indicate the site is adaptable for the proposed construction. Our geotechnical conclusions and recommendations include the following: • Five feet of surcharge fill loading will be required in the canopy and kiosk areas of the proposed gas station and in the building expansion where more than 2 feet of fill will be required. We anticipate a waiting period of 30 to 45 days will be required for fill surcharges to sufficiently preload the underlying soft sandy clays. • We recommend the building expansion shallow foundations be supported on a Geopier ]mpact System consisting of vertical displacement Rammed Aggregate PiersTM (RAPS). The specialty contractor should indicate to the structural engineer the minimum distance required between existing foundations and new foundations to avoid disturbance to existing foundations during construction. Pre-drilling of the upper firm soils may be required to reduce this impact. Vibration monitoring of the existing building west wall line is recommended during installation of the impact piers. • Assuming the surcharge fill loading is placed in accordance with the recommendations of this report, the kiosk and canopy foundations in the gas station may be designed as conventional spread footings using an allowable soil I bearing pressure of 2,500 pounds per square foot. • Floor slabs may be supported as a slab-on-grade bearing on 6 inches of compacted ABC placed on the prepared soil subgrade. Based on CBR test results I we recommend a design subgrade reaction modulus of 150 pounds per square inch per inch. • The proposed tanks will be exposed to buoyancy forces associated with shallow groundwater levels. Based on cone penetration test (CPT) soundings performed in the gas station area, groundwater levels typically exist at approximate depths of 2.5 to 3 feet below the existing ground surface. • Based on shear wave velocity data and the 2006 North Carolina Building Code, the site is considered a seismic site class D. • Several utilities are present in the proposed detention pond area. These utilities will need to be removed or re-routed in order to excavate the detention pond. Shallow groundwater also exists in this area. • The majority of the asphalt pavement areas are in relatively good condition. However, in order to meet Sam's Club requirements, an overlay will be required in asphalt pavement areas which are currently in relatively good condition. I 13 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 • Medium to high severity fatigue cracking within asphalt pavements was observed in several areas. We recommend that the existing asphalt and stone be removed from any areas where medium to high severity fatigue cracking is present. Once the existing asphalt and stone have been removed, subgrade soils should be evaluated for pavement support suitability. if the subgrades are determined to be unsuitable, these areas should be undercut to suitable soils and then replaced with properly compacted ABC stone. • The existing concrete in the truck loading dock area is in relatively good condition. However, cleaning, routing of spalled joints and sealing of joints and cracks will be required. The following paragraphs present more detailed conclusions and geotechnical recommendations regarding site development and building and pavement construction. When reviewing these recommendations, please note that the site has been previously developed. Past experience with previously developed sites indicates that unexpected conditions can exist. These may include areas of poorly compacted fill, deleterious materials within the fill, active or abandoned underground utilities, and other conditions. Such conditions, if encountered, can be handled by engineering evaluations made in the field. 6.1 SITE PREPARATION 6.1.1 Site Preparation — General Subgrade preparation will be difficult during periods of extended rainfall and cold temperature that generally occur during the typically wetter months of late fall, winter, I and early spring. This difficulty in grading will result from the near surface fine grained soils found on the site and the difficulty of drying these soils during those months. In a wet of optimum condition these clayey soils tend to rut and pump under continued I rubber-tired traffic. To reduce potential earthwork problems, construction should be scheduled during the drier months of May through October, if possible. If grading during wetter months is attempted, more undercutting and replacement will be necessary to eprepare subgrades adequately for new pavement and building slab-on-grades. . 6.1.2 Site Preparation — New Construction General Site preparation for new construction should be initiated by removing topsoil, I construction debris, and any other unsuitable materials from the proposed new construction areas. Based on our site reconnaissance, underground utilities are located within the proposed new construction areas. All existing underground utility lines should be relocated outside proposed building limits. Past experience indicates that poorly compacted fill soils are often a 14 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30.2008 located within utility trenches. For utilities that are to be removed, we recommend that trenches be cleaned of all backfill soils and backfilled with structural fill compacted to levels recommended in this report. If certain utility lines must remain in place in their current location, we recommend that the suitability of trench backfill be evaluated on a case-by-case basis. After surface materials have been removed and underground utilities relocated in proposed building areas, the proposed new construction should be cut to grade and areas at grade or areas to receive fill should be proofrolled with a loaded dump truck or similar pneumatic tire vehicle (minimum loaded weight of 20 tons) to identify areas requiring subgrade repair. Areas of the subgrade that rut or deflect excessively in the opinion of the project geotechnical engineer should be repaired. Possible repair measures may include discing/drying/recompacting, undercutting and replacement with suitable fill or stone, or some combination of the above. 6.1.3 Site Preparation — Pavement Areas to be Replaced Site preparation for the pavement areas to be replaced should begin with the removal of existing asphalt by saw cutting at least one foot outside fatigued areas. Once the asphalt has been removed, the ABC stone and subgrade should be evaluated by a geotechnical engineer or his representative for pavement support. This evaluation should be done by proofrolling (if accessible) using a fully loaded tandem axle dump truck and checking ABC stone thickness. Any areas which are observed to rut, pump or deflect excessively during the proofrolling process and fail to density with continued rolling should be repaired as determined in the field by the geotechnical engineer. In confined areas subgrades should be evaluated by using probing tools and hand auger and dynamic cone penetrometer(DCP) testing. Repair of unstable soils may include discing, drying and recompaction of in-place soils or undercutting and replacement with ABC stone, or a combination of the above. 6.2 EXCAVATIONS 6.2.1 Excavations — General Based on the CPT soundings natural soils consisting of low to moderate consistency sands and clays were encountered at the site within the expected depths of earthwork activities. Past experience indicates that these materials can be excavated by conventional earth moving equipment. Local excavation for shallow utility trenches and foundations I can be accomplished with a conventional backhoe. Deeper excavations will require large backhoe equipment. Care should be taken in excavating footings or utilities adjacent to the existing structure so as not to undermine existing footings. With the use of impact piers for support of column and wall footings for the new expansion some separation of the new footings 15 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30. 2008 from the existing foundations will be required. The impact pier contractor should work with the structural engineer in determining the separation needed to minimize vibrations to the existing building. New footings should not extend below the bearing level of the existing footings without adequate separation or temporary shoring. The contractor should select the temporary shoring method, if necessary. All excavations and shoring should be performed in accordance with OSHA excavation guidelines. 6.2.2 Excavations — Below Groundwater Excavations below groundwater should be anticipated for the proposed gas tanks and in the proposed detention pond. Dewatering techniques will be required in these areas to reach design grade. The contractor should be responsible for determine the means and methods required for dewatering. 6.3 FILL PLACEMENT AND COMPACTION After proper site preparation, areas requiring fill may be raised to their design subgrade levels using on-site or off-site borrow materials. Laboratory testing on anticipated cut materials from the proposed detention pond indicate moisture contents slightly to well above optimum moisture. Laboratory testing also indicates these materials have are clayey soils which will require significant drying time. As such, we recommend that off- site soils borrow be used. Off-site borrow soils should be free of construction debris and contain less than 3 percent organics. Soils having Unified Soil Classifications of SW, SP, SP-SM, SP-SC, and SM may be used as structural fill, provided compaction moisture is controlled. Borrow soils should have a maximum liquid limit of 50 percent, maximum plasticity index of 20 percent, and standard Proctor maximum dry density of at least 100 pounds per cubic foot (pcf). The moisture content of the fill soils should be maintained within 3 percent of optimum moisture. All structural fill should be placed in 6 to 8 inch loose lifts and compacted to at least 95 percent of the standard Proctor maximum dry density except within the final foot of subgrade in building and pavement areas where this requirement should be increased to at least 98 percent. Fill placement along the west wall of the 1 proposed expansion should extend at least 10 feet outside the building footprint. Site preparation including subgrade repair and fill placement and compaction should be monitored by a qualified soils technician working under direction of the geotechnical engineer. During fill placement, a sufficient amount of in-place density tests should be conducted to verify that compaction is in accordance with plans and specifications. 16 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 6.4 SURCHARGE LOADING An additional 5 feet of surcharge fill will be required in the kiosk and canopy area of the proposed gas station and along the west side of the building expansion. The surcharge should be placed such that its in-place moist unit weight is about 120 pounds per cubic foot (pco. At least four settlement plates should be installed at the design subgrade beneath each of the surcharges by the geotechnical engineer. The settlement plates should be surveyed by the project surveyor twice a week from when placement of the surcharge begins until when the surcharge is removed. The survey data should be provided to the Igeotechnical engineer to determine when the surcharge can be removed. 6.4.1 Surcharge Loading — Gas Station The surcharge in the proposed kiosk and canopy areas of the gas station is required to pre-consolidate subgrade soils and soils being impacted by the foundation loading. This preconsolidation will reduce the settlement due to structural loads and allow for the kiosk and canopy to be supported on shallow foundations. Based on our settlement analysis using an assumed column load of 40 kips, we have calculated total settlements on the order of 1.5 inches beneath kiosk and canopy column foundations. In order to meet the Wal-Mart maximum allowable total settlement criteria of inch, the existing soils will need to be pre-consolidated to undergo 3/4 inch of settlement. Based on consolidation test data from the original subsurface exploration report, we anticipate that a waiting period of approximately 30 to 45 days will be required. 6.4.1 Surcharge Loading — Building Expansion The surcharge along the northwest portion of the building expansion is necessary to expedite the required waiting period associated with settlement due to the new fill required on the east portion of the existing pond. Based on our analysis, total settlement associated with new fill will be on the order of 1.5 inches. This settlement must be realized before the footings and slab are constructed in this area. We recommend that the area to be surcharged in the west portion of the building expansion extend 10 feet outside the building footprint to 30 feet inside the footprint along the entire length of the west wall of the proposed expansion. Based on consolidation test data from the original subsurface exploration report, we anticipate that a waiting period of approximately 30 to 45 days will be required. 6.5 BUILDING EXPANSION 6.5.1 Foundations Based on our exploration findings, review of the design drawings for the existing building, and engineering analysis, the shallow foundations for the building expansion should be supported on a Geopier Impact System consisting of vertical displacement 17 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 3n 2008 Rammed Aggregate Pief"m (R.AP). The Geopier Impact System can be constructed in low consistency soils with shallow groundwater levels to increase the allowable design bearing pressure while reducing the total settlements to acceptable levels. Improvement of the bearing soils for the shallow foundations by use of impact piers is recommended due to the following reasons: • We understand the existing building was surcharged to pre-consolidate the subgrade soils to eliminate settlement due to the floor and fill load prior to building construction. The design drawings note that the expansion area was to be surcharged but we are unsure if this was accomplished or if it was done, where it was placed. Surcharging now next to the existing structure could cause additional settlement beneath the existing foundations and possible structural and floor damage. • If surcharge fill was placed and footing overexcavation of 2 feet and replacement with washed stone was performed, as was done for the existing building, approximately 1 to 1 % inch of total settlement beneath the foundations is estimated. This is greater than Wal-Mart's maximum allowable total settlement of 3/4 inch. The Geopier Impact Piers are constructed by pushing a mandrel and tamper foot using a relatively large static force augmented by dynamic impact energy. The tamper foot diameters vary from 12 to 16 inches. As the mandrel and tamper foot are advanced the soils are displaced laterally. A sacrificial cap prevents soil from entering the tamper foot and mandrel. After driving to the design depth, aggregate is installed through the mandrel as the mandrel is lifted. The tamper foot is lifted approximately three feet and then driven back down two feet, to form a one-foot thick compacted lift. Compaction is obtained using static force and dynamic impact energy from the hammer. The impact hammer densifies aggregate vertically and the beveled tamper head assists in transferring force laterally during impact densification, resulting in pushing of aggregate against the confined walls of the cavity. The nature of the soil is to "push back", creating significant lateral pressure buildup in the matrix soil resulting in lateral confinement to the Geopier elements. In addition to increasing shear resistance at the Geopier element perimeter, the increased horizontal stress in the matrix soil improves the matrix soil and snakes it stiffer. The actual spacing, diameter, length, and allowable bearing pressure should be determined by a specialty contractor experienced with this method. A specialty contractor we have worked with and has experience with Geopiers is GeoStructures (919-859- 5535). The specialty contractor should submit a proposed ground modification program with associated cost. We recommend that the system be designed for a minimum allowable bearing pressure of 3,000 pounds per square foot while limiting total foundation settlement to less than inch, including the effect of the floor loading. The specialty contractor should provide 18 Subsurface Exploration Report S&ME Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion-Jacksonville NC June 30 2008 the structural engineer with a minimum distance between the existing exterior foundation line and first line of foundations in the new expansion. This distance will be required to avoid effects associated with vibration and disturbance of existing foundations during construction. Pre-drilling of the upper firm soils may be required to reduce ground vibrations. Vibration monitoring of the existing west wall line should be performed during the installation of the first column line of impact piers. Footings should bear at least 18 inches below finish grade for bearing capacity and frost penetration considerations. Also to prevent punching shear issues the wall and column footings should have minimum dimensions of 18 and 24 inches, respectively. 6.5.2 Floor Slab The building floor slab may be soil supported provided that our site preparation and fill placement recommendations are implemented. A 10 mil vapor barrier should be placed immediately beneath the concrete slab to provide a capillary barrier. We recommend that 6 inches of aggregate base course (ABC) stone be placed beneath the floor slab. ABC stone should conform to the 2006 edition of the NCDOT"Standard Specifications for Roads and Structures." ABC stone should meet requirements under Section 520, pages 5-10 through 5- 15 and Section 1010, pages 10-30 through 10-40. The ABC stone should be compacted to at least 100 percent of its modified Proctor maximum dry density(AASHTO T-180, as modified by NCDOT). Based on laboratory CBR results and our past experience, a subgrade modulus of 150 pounds per square inch per inch (pci) should be available for soil subgrades beneath the floor slab prepared in accordance with the recommendations of this report. We expect no vertical rise of the floor slab, due to soil swelling. Based on a settlement analysis performed with a maximum uniform floor slab load of 325 pounds per square foot (250 psf live load+ 75 psf dead concrete floor load) we anticipate total settlement of the floor slab will be or less. We recommend that the column and wall foundations be separated from the floor slab to allow for relative movement. 6.6 GAS STATION 6.6.1 Kiosk and Canopy Foundations Based on our exploration findings and assuming the surcharge fill is placed in accordance I with section 6.4, the kiosk and canopy for the proposed gas station may be supported on shallow spread footings bearing in the well compacted fill or suitable undisturbed soils. Foundations for the kiosk and canopy may be designed for a net allowable bearing pressure of 2,500 pounds per square foot. In order to achieve this bearing pressure we recommend the footings be overexcavated 2 feet below design bearing elevations, neat- line dimensions of the footings, and the excavated soils replaced with compacted 19 Subsurface Exploration Report S&ME Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion-Jacksonville NC June 30 2008 NCDOT No. 57 stone. The footings should bear as high as possible in the upper firm soils to take advantage of these better soil conditions. Footings should be embedded 18 inches below exterior grade for bearing capacity and frost penetration considerations. As presented in Section 2.2 of this report, there is an approximately 20 foot by 20 foot depression in the northeast comer of this lot. We understand that this area has been sinking over time and filling the depression with material to keep it level with the existing ground surface has not worked. It appears this depression is associated with a storm water yard inlet. The continuation of loss of soil would indicate that there is an open pipe joint or broken section of pipe in this area. This junction box and piping will need to be removed from the building and pavement areas and any voids or unsuitable soils replaced with compacted fill. All foundation excavations should be evaluated by the geotechnical engineer or his representative during overexcavation and prior to placement of the clean stone. This evaluation should include the performance of shallow hand auger borings with dynamic cone penetrometer testing to verify that footings are underlain by suitable bearing materials. If soft or otherwise unsuitable bearing soils are encountered below the 2 foot overexcavation level, additional undercut and stone replacement may be necessary. If surface water runoff collects in any excavation, it should be removed promptly or drained with tail ditch drains to prevent softening of foundation supporting soils. Care should be exercised during construction of foundations in order not to disturb bearing soils and reduce their bearing strength. Concrete for the footings should be placed as soon as practical following excavation. If concrete placement is delayed, placement of a concrete "mud mat" should be considered. 6.6.2 Settlement A settlement analysis for kiosk and canopy foundation was performed using an assumed column load of 40 kips, test boring data, and engineering analysis. Based on our analysis and assuming approximately 1/4 inch of settlement will occur during surcharge loading, total settlements of less than '/4 inch beneath columns and differential settlements of approximately %s inch or less are anticipated for the foundations bearing on the 2 feet of NCDOT No. 57 stone. 6.7 UNDERGROUND GAS TANKS We understand that six underground gas storage tanks will be installed to depths on the order of 16 feet in the proposed gas station. Significant buoyancy forces must be taken into account when designing and installing these tanks. Groundwater levels in this area were encountered at depths ranging from 2.5 to 3 feet below the existing ground surface. Installation of the tanks will require groundwater dewatering and probably a braced excavation due to the very soft soils found from 6 to 16 feet. Design of a braced I 20 I Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 excavation system must take into account the high groundwater, dewatering measures, the very soft soil conditions, the marl encountered at about 26 feet and earth and hydrostatic pressures on the wall. In our opinion an open excavation may not be possible at this site to install the tanks. 6.8 SITE SEISMICITY Based on results of cone penetration testing, shear wave velocity testing, and information provided in section 1615 of the North Carolina Building Code, it is our opinion the site Ishould be considered as Class D with respect to seismic design considerations. 6.9 CORROSION AND REACTIVITY POTENTIAL Laboratory testing of bulk soil samples indicates resistivity values ranging from about 1,395 to 1,524 ohm-centimeters and pH values ranging from 5.1 to 7.1. It has been our experience that soils with the above resistivity values are generally considered to have corrosion potential. As such, it is our opinion that any underground metal pipes will require cathodic protection. Type I Portland cement may be used with sufficient cover to protect reinforcing steel. 6.9 PAVEMENT RECOMMENDATIONS Pavement design procedures are based on the "AASHTO Guide for Design of Pavement Structures, 1993"and associated literature. S&ME also reviewed Wal-Mart's requirements and design criteria for pavement design of a Sam's Club. The following is a summary of pavement design criteria for a Sam's Club and Gas Station that has been provided in the "Geotechnical Investigation Specifications and Report Requirements (including gas station)"dated March 7, 2008. Our analyses were based on these design criteria. Standard Duty Pavement Design Criteria — Parking A design life of20 years, based on an ESAL (18 kip) load of43,800, terminal serviceability=2.0, reliability= 85%, initial serviceability=4.2, standard deviation=0.45 for flexible pavements and 0.35 for rigid pavements. Standard Duty Pavement Design Criteria — Gas Station A design life of 20 years, based on an ESAL (18 kip) load of 73,000, terminal serviceability= 2.0, reliability= 85%, initial serviceability=4.2, standard deviation= 0.45 for flexible pavements and 0.35 for rigid pavements. 21 Subsurface Exploration Report S&ME Project No. 1051-08.173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 Heavy Duty Pavement Design Criteria — Access Drives/Gas Station A design life of 20 years, based on an ESAL (18 kip) load of 335,800, terminal serviceability= 2.0, reliability= 85%, initial serviceability=4.2, standard deviation= 0.45 for flexible pavements and 0.35 for rigid pavements. 6.9.1 Rigid Pavement— Truck Turnaround Area and Sam's Gas Station S&ME has performed a rigid pavement design for the extension of the truck turnaround area and Sam's Gas Station. The rigid pavement design,based on the above traffic volumes, was performed to accommodate heavy vehicle loads in the loading dock and gas station areas. The design is based on a soil subgrade prepared to 98 percent of the standard Proctor maximum dry density. The compressive strength of the concrete was assumed to be 4,000 psi. A modulus of subgrade reaction of 150 Pei was used for design assuming that 6 inches of aggregate base course (ABC) stone will be placed and compacted beneath the concrete pavement. We have also assumed that load transfer along the contraction (saw)joints will be handled by aggregate interlock. Where cold joints exist(construction and expansion joints) and traffic will be crossing these joints, smooth dowels should be installed across these joints. Based upon the supplied traffic data, the following represents our recommendations for design of rigid pavements. Rigid Pavement Heavy Duty Concrete (4,000 psi) 7 inches Aggregate Base Course(ABC) Stone 6 inches Maximum Joint Spacing 15 feet All materials and construction methods should conform to the 2006 edition of the NCDOT "Standard Specifications for Roads and Structures. " The aggregate base course stone should consist of stone meeting the requirements under Section 520, pages 5-10 through 5- 15 and Section 1010, pages 10-30 through 10-40. The base course stone should be compacted to at least 100 percent of the maximum dry density as determined by the modified Proctor compaction test,AASHTO T-180 as modified by NCDOT. To confirm that the base course stone has been uniformly compacted, in-place density tests should be performed by a qualified soils technician and the area should be thoroughly proofrolled under his observation.All saw joints should be cut to a depth of at least '/a the concrete thickness. 22 Subsurface Exploration Report S&ME Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 6.9.2 Flexible Pavement — New Parking Area and Gas Station A pavement analysis was performed based on Sam's Club and Sam's Gas Station design criteria to determine necessary pavement thicknesses for the new parking and gas station areas. A California Bearing Ratio (CBR) value of 5 percent was assumed for this pavement design assuming the in-place subgrade soil is compacted to at least 98 percent of its standard Proctor maximum dry density. Based on the pavement analysis and provided subgrades are properly prepared in accordance with our recommendations, the following pavement and aggregate base coarse (ABC) stone thicknesses should be suitable to support anticipated vehicle traffic: Material Standard Du inches HeavyDu inches Asphalt Surface Course 1.0 2.0 SF-9.5A 5-9.5B Asphalt Intermediate Course 2.0 2.0 5-9.513 5-12.5C Aggregate Base Course (ABC) 6.0 10.0 Stone The most important factors regarding pavement performance are the condition of subgrade soils at time of construction and post construction drainage. We recommend that all pavement subgrade areas be evaluated prior to crushed stone placement. Any areas which deflect or rut during proofrolling must be repaired prior to stone placement. All materials and construction methods should conform to the 2006 edition of the NCDOT "Standard Specifications for Roads and Structures. " The aggregate base course stone should consist of stone meeting the requirements under Section 520,pages 5-10 through 5- 15 and Section 1010, pages 10-30 through 10-40. The base course stone should be compacted to at least 100 percent of the maximum dry density as determined by the modified Proctor compaction test,AASHTO T-180 as modified by NCDOT. To confirm that the base course stone has been uniformly compacted, in-place density tests should be performed by a qualified soils technician and the area should be thoroughly proofrolled under his observation. The asphaltic concrete surface course should consist of Superpave types SF-9.5A or S-9.513 and the intermediate course should consist of Superpave type S-9.5B or 5-12.5C. Asphaltic concrete should conform to Section 610, pages 6-27 through 6-51 in the 2006 edition of the NCDOT"Standard Specifications for Roads and Structures. " Sufficient testing and observation should be performed during pavement construction to confirm that the required thickness, density, and quality requirements of the specifications are followed. Although our analysis was based on a 20 year design life, our experience indicates that an overlay may be needed in approximately 10 to 12 years due to nominal weathering of the asphaltic concrete.Also, some areas could require repair in a shorter time period. 23 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30,2008 6.9.3 Existing Pavement Improvements Based on our site reconnaissance, the majority of the asphalt pavement areas are in relatively good condition. However, in order to meet Sam's Club traffic requirements, an overlay will be required in asphalt pavement areas which are currently in relatively good condition. Some asphalt areas are exhibiting severe cracking and will require repair prior to overlay. We recommend that the distressed areas be repaired first, with the surface of the repaired areas matching the existing pavement. After repairs are completed, the entire asphalt parking area should be overlain. Based on our site reconnaissance, the majority of the concrete paved truck loading areas are in relatively good condition. Some concrete areas are exhibiting distress and will require repair. Both repair and overlay recommendations are provided in the following sections. Asphalt Areas to be Replaced We recommend that the asphalt and stone base in areas labeled in Figure 2 as Moderate to High Severity Fatigue Cracking and Moderate Severity Rutting be removed and replaced. After removing the stone base the subgrade soils should be evaluated by a geotechnical engineer. Evaluation of the subgrade should consist of proofrolling with a fully loaded tandem axle dump truck or other method deemed suitable by the geotechnical engineer. In areas which are observed to rut, pump, or deflect excessively during the proofrolling process and fail to density with continued rolling, we recommend that the unstable subgrade soils be removed and replaced with compacted ABC stone or select sandy backfill. In areas where proofrolling is not possible the subgrade soils should be evaluated by hand augering and performing probing and dynamic cone penetrometer testing of the soils. Based on this testing the geotechnical engineer can determine if subgrade soils need undercutting and replacement with ABC stone. Based on the hand auger borings performed through the corings in existing pavement, undercutting of subgrade soils is anticipated near test locations C-3 and C-7. Undercut depths should not extend more than 2 feet below existing subgrade elevations to avoid undercutting below groundwater levels. Asphalt areas to be repaired should be replaced with the design sections described in section 6.9.2. Asphalt Areas to be Repaired Prior to Overlay Moderate severity asphalt longitudinal cracking outside of the wheel path was observed in areas 8 and 10 shown on Figure 2. These cracks range in length from approximately 435 to 570 feet. The longitudinal cracks appear to exist along paving joints between 24 Subsurface Exploration Report S&ME Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion-Jacksonville NC June 30 2008 asphalt paving runs. Pictures 12, 13, 16, and 17 in Appendix III show the moderate severity longitudinal cracking in asphalt pavement. Prior to overlay, these cracks should be cleaned of soil and debris using compressed air, and then sealed with rubberized asphalt sealant. Larger cracks may require a sand asphalt mix to fill the crack. Asphalt Areas to be Overlaid For the remaining pavement areas in relatively good condition an overlay will be required in order to meet Sam's Club requirements for a twenty year design life. The success of the overlay will depend on the quality of the existing asphalt (i.e., amount of cracking in the existing asphalt). Prior to overlay, we recommend that the entire paved area be proofrolled with a loaded tandem axle dump truck under the direction of the geotechnical engineer. Any areas which deflect or pump should be removed and replaced as described in "Pavement Design-Areas to be Replaced". Some areas of the existing pavement have age cracking,but we anticipate that they will be stable during proofrolling (i.e. area 6 on Figure 2). In these areas, we recommend placement of the overlays listed below. Our experience has been that unless overlays are at least 3 to 4 inches or greater and crack relief layers are installed, some reflective cracking can be expected. Thus with the overlays recommended to meet Sam's Club structural requirements, some reflective cracking can be expected. I In order to satisfy Sam's Chub requirements for a twenty year design life, overlay of the existing parking and access drive areas should consist of the following: Material Standard Duty inches Heavy Duty inches Asphalt Overlay 1.0 2.0 SF-9.5A 5-9.513 In the areas to be overlaid the existing pavement will need to be cleaned with power brooms and tacked in accordance with NCDOT standards to provide a proper bond with the new and old pavements. The new pavement lanes should overlap previous paving lanes (which are noticeable where longitudinal cracking has occurred) so that the existing I joints do not line up with the overlain paving lane joints. Where overlays must tie into existing structures we recommend that existing asphalt be milled so that the full depth overlay can be placed. "Feathering" of the overlay is not recommended since the feathered edge usually ravels and does not perform satisfactorily. The impact of the overly to site drainage must be considered during site design. Sufficient testing and observation should be performed during pavement construction to confirm the required thickness, density, and quality requirements of the specifications. 25 Subsurface Exploration Report SWE Project No. 1051-08-173 Sam's Club Store#6573-04 Expansion—Jacksonville NC June 30 2008 Concrete Areas to be Repaired High severity longitudinal cracking and concrete spalling is present in the concrete turnaround area. Where joints are sound but openings of%4 inch or greater exist, we recommend placement of a backer rod in the joint before a suitable elastomeric sealant is placed. The joints should be cleaned with high pressure water or compressed air and allowed to dry before placement of sealant. Where spalling exists along joints, the loose concrete should be removed and the repaired area cleaned of all soil and dust before placement of sealant. A sound and clean concrete surface is paramount for sealant bonding to occur. An epoxy sealant with some rigidity would appear to be best in this situation to provide joint support and load transfer. A backer rod may also be needed in this situation. If a rigid sealant is used to repair this area, the joint should be re-cut so it can once again work with thermal changes. Where significant spalling has occurred, we recommend that the distress areas along the joint be cut out and replaced with the rigid pavement section provided in section 6.9.1. This will be a judgment call made in the field. 7.0 LIMITATIONS OF REPORT This report has been prepared in accordance with generally accepted geotechnical engineering practice for specific application to this project. The conclusions and recommendations contained in this report were based on the applicable standards of our profession at the time this report was prepared. No other warranty, express or implied, is made. Analysis and recommendations submitted in this report are based, in part, upon the data obtained from the geotechnical exploration. The nature and extent of variations between and outside of the soundings made may not become evident until construction. If variations appear evident, then it will be necessary to re-evaluate the recommendations of this report. In the event that any changes in the grades, nature, design, or location of the proposed development are planned, the recommendations contained in this report should be reviewed and modified or verified in writing. We strongly recommend that our firm be provided the opportunity for general review of final design specifications to verify that geotechnical recommendations are properly interpreted and implemented. 26 GEOTECHNICAL INVESTIGATION FACT SHEET PROJECT LOCATION: 1170 Western Boulevard; Jacksonville,NC Engineer: John Browning,P.E. Phone#: 919-872-2660 Geotechnical Engineering Co.: S&ME. Inc. Report Date: June 30, 20OR Ground Water Elevation: 2 to 4 feet Fill Soils Characteristics: See report - Date Groundwater Measured: 'rime of drilling/After 24 hrs. Maximum Liquid Limit: 40 Topsoil Depth: 3 inches typical Maximum Plasticity Index: 19 Undercut(If Required): Soft soils in pavement and Specified Compaction: 95-98%Std. Proctor floor slab areas and foundations for eas station Standard Proctor Results: Plots are attached Moisture Content Range: -3%to+3%of opt pH: 5.13 to 7.13 Corrective actions required for construction based on pH level noted: None Resistivity: 1,395 to 1,524 ohm-cm Corrective actions required for construction based on resistivity level noted: Cathodic protection required for underground metal pipes Cement Type: Type I for Above-Grade Structures Recommended base material:NCDOT Aggregate Base Course(ABC)Stone Recommended Compaction Control Tests: I Test for Each 5 000 Sq. Ft. each Lift(bldg. area) 1 Test for Each 10 000 Sq. Ft. each Lift (parking area) Structural Fill Maximum Lift Thickness: 8 inches(Measured loose) Subgrade Design CBR value=5 percent As halt Concrete Component StandardDut Heavy Dutv Heavy � inches inches (inches, Base Material(ABC Stone) 6 10 6 Asphalt Base Course - - - Asphalt Intermediate Course 2 (S-9.513) 2(S-I2.5C) - As halt Surface Course/Concrete 1 (SF-9.5A) 2 S-9.5B) 7* "Concrete thickness assumes load transfer handled by aggregate interlock except at construction and expansion joints where load transfer dowels are recommended. NOTE: This information shall not be used separately from the Subsurface Exploration Report dated June 30, 2008. FOUNDATION DESIGN CRITERIA PROJECT LOCATION: 1170 Western Boulevard: Jacksonville,NC Engineer; John Browning, P.E. Phone#: 919-872-2660 Geotechnical Engineering Co.: S&ME, Inc. Report Date:June 30, 2008 Foundation type: Building Expansion: Shallow Spread Footings supported on Geopier Impact System; 5 feet of surcharge fill for 30 to 45 days alone west wall of expansion Gas Station: Shallow Spread Footings after 5 feet of surcharge fill placed for 30 to 45 days; undercut and replace with 2 feet of NCDOT No. 57 stone Allowable bearing pressure: Building Expansion: To be designed by Geopier specialty contractor Gas Station: 2,500 Pounds Per Square Foot Factor of Safety: 3 Minimum footing dimensions: Individual: 24 Inches Continuous: 18 Inches Minimum footing embedment: Exterior: 18 Inches Interior: 18 Inches Frost depth: 12 Inches Maximum foundation settlements: Total: 3/4 Inch Differential: 112 Inch Slab: Potential vertical rise: 3/4 Inch or Less Capillary Break describe: 10 mil vapor barrier immediately beneath concrete slab Subgrade reaction modulus: 150 psi/in assuming 6 inches of ABC stone on top of subgrade Method obtained: Correlation with CBR values Active Equivalent Fluid Unit Weight: 50 pounds per cubic foot(pcf) Passive Equivalent Fluid Unit Weight: 382 pounds per cubic foot(pcf) Perimeter Drains (describe): Building: None Required Loading Dock Walls: At-Rest Equivalent Fluid Unit Weight: 69 pcf Coefficient of friction: 0.36(Ultimate) COMMENTS: I FOUNDATION SUBSURFACE PREPARATION FOR SAM'S CLUB PAGE I STORE #6573-04,JACKSONVILLE,NORTH CAROLINA JUNE 30,2008 UNLESS SPECIFICALLY INDICATED OTHERWISE IN THE DRAWINGS AND/OR SPECIFICATIONS, THE LIMITS OF THIS SUBSURFACE PREPARATION ARE CONSIDERED TO BE THAT PORTION OF THE SITE DIRECTLY BENEATH AND 10 FEET BEYOND THE BUILDING EXPANSION, GAS STATION KIOSK AND CANOPY, AND APPURTENANCES. APPURTENANCES ARE THOSE ITEMS ATTACHED TO THE BUILDING PROPER (REFER TO DRAWING SHEET SP1), TYPICALLY INCLUDING, BUT NOT LIMITED TO, THE BUILDING SIDEWALKS, GARDEN CENTER, PORCHES, RAMPS, STOOPS, TRUCK WELLS/DOCKS, CONCRETE APRONS AT THE AUTOMOTIVE CENTER, COMPACTOR PAD, ETC. THE BASE AND VAPOR BARRIER, WHERE REQUIRED, DO NOT EXTEND BEYOND THE LIMITS OF THE ACTUAL BUILDING AND THE APPURTENANCES. BUILDING EXPANSION ESTABLISH THE FINAL SUBGRADE ELEVATION AT 10 INCHES BELOW FINISHED FLOOR ELEVATION TO ALLOW FOR A 4 INCH SLAB, OR AT 11.5 INCHES BELOW THE FINISHED I FLOOR ELEVATION TO ALLOW FOR A 5.5 INCH SLAB TO ALLOW FOR THE SLAB THICKNESS AND A 6 INCH SUBBASE. THE SUBBASE SHALL CONSIST 6 INCHES OF AGGREGATE BASE COURSE. AGGREGATE BASE COURSE SHALL MEET THE REQUIREMENTS UNDER SECTION 520, PAGES 5-10 THROUGH 5-15 AND SECTION 1010, PAGES 10-30 THROUGH 10-40 OF THE NCDOT 2006 "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES"A 10 MIL VAPAOR BARRIER SHOULD BE INSTALLED IMMEDIATELY BENEATH THE CONCRETE SLAB. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ACCURATE MEASUREMENTS FOR ALL CUT AND FILL DEPTHS REQUIRED. DRAIN PORTION OF POND IN BUILDING EXPANSION PLUS 10 FEET AND TO THE TOE OF NEW FILL, REMOVE SURFACE VEGETATIONS, TOPSOIL, ROOT SYSTEMS, ORGANIC MATERIAL, AND SOFT OR OTHERWISE UNSUITABLE MATERIAL FROM THE BUILDING EXPANSION AREA. PROOFROLL EXPOSED SUBGRADES WITII LOADED RUBBER-TIRE EQUIPMENT (MINIMUM LOADED WEIGHT OF 20 TONS), PROOFROLLING SHOULD CONSIST OF TWO COMPLETE PERPENDICULAR PASSES OF THE EQUIPMENT OVER THE SUBRADE. REPAIR UNSUITABLE OR UNSTABLE AREAS BY SCARIFYING/DRYING/RECOMPACTING, UNDERCUTING TO FIRM SOILS AND REPLACING WITH SUITABLE/WELL-COMPACTED FILL, PLACEMENT OF A GEOTEXTILE, OR COMBINATION OF ABOVE. STRUCTURAL FILL SHALL BE PLACED IN LOOSE LIFTS NOT EXCEEDING 8 INCHES IN THICKNESS AND COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) AT A MOISTURE CONTENT WITHIN 3 PERCENT BELOW TO 3 PERCENT ABOVE THE OPTIMUM. THE UPPER 12 INCHES SHOULD BE COMPACTED TO AT LEAST 98 PERCENT. PLACE 5 FEET OF SURCHARGE FILL ALONG THE WEST WALL OF THE PROPOSED EXPANSION EXTENDING 10 FEET OUTSIDE THE BUILDING FOOTPRINT TO 30 FEET INSIDE THE FOOTPRINT. FOUR SETTLEMENT PLATES SHOULD BE INSTALLED BY GEOTECHNICAL ENGINEER ON DESIGN GRADE PRIOR TO PLACEMENT OF THE SURCHARGE. SETTLEMENT PLATES SHOULD BE SURVEYED BY THE PROJECT SURVEYOR TWICE A WEEK AND DATA PROVIDED TO THE GEOTECHNICAL ENGINEER TO DETERMINE WHEN SURCHARGE MAY BE REMOVED.A WAITING PERIOD OF 30 TO 45 DAYS IS ANTICIPATED. FOUNDATION SUBSURFACE PREPARATION FOR SAM'S CLUB PAGE 2 STORE #6573-04,JACKSONVILLE,NORTH CAROLINA JUNE 30,2008 THE FOUNDATION SYSTEM SHALL CONSIST OF ISOLATED SPREAD FOOTINGS AT COLUMNS AND CONTINUOUS SPREAD FOOTINGS AT WALLS SUPPORTED BY A GEOPIER IMPACT SYSTEM. GAS STATION KIOSK AND CANOPY ESTABLISH THE FINAL SUBGRADE ELEVATION AT 10 INCHES BELOW FINISHED FLOOR ELEVATION TO ALLOW FOR A 4 INCH SLAB, OR AT 11.5 INCHES BELOW THE FINISHED FLOOR ELEVATION TO ALLOW FOR A 5.5 INCH SLAB TO ALLOW FOR THE SLAB THICKNESS AND A 6 INCH SUBBASE. THE SUBBASE SHALL CONSIST 6 INCHES OF AGGREGATE BASE COURSE. AGGREGATE BASE COURSE SHALL MEET THE REQUIREMENTS UNDER SECTION 520, PAGES 5-10 THROUGH 5-15 AND SECTION 1010, PAGES 10-30 THROUGH 10-40 OF THE NCDOT 2006 "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES"A 10 MIL VAPAOR BARRIER SHOULD BE INSTALLED IMMEDIATELY BENEATH THE CONCRETE SLAB. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ACCURATE MEASUREMENTS FOR ALL CUT AND FILL DEPTHS REQUIRED. REMOVE SURFACE VEGETATIONS, TOPSOIL, ROOT SYSTEMS, ORGANIC MATERIAL, AND SOFT OR OTHERWISE UNSUITABLE MATERIAL FROM THE BUILDING EXPANSION AREA. REMOVE PIPING AND YARD INLET AND LOOSE SOILS FROM AROUND THESE STRUCTURES. BACKFILL AS STATED BELOW. PROOFROLL EXPOSED SUBGRADES WITH LOADED RUBBER-TIRE EQUIPMENT (MINIMUM LOADED WEIGHT OF 20 TONS). PROOFROLLING SHOULD CONSIST OF TWO COMPLETE PERPENDICULAR PASSES OF THE EQUIPMENT OVER THE SUBRADE. REPAIR UNSUITABLE OR UNSTABLE AREAS BY SCARIFYING/DRYING/RECOMPACTING, UNDERCUTING TO FIRM SOILS AND REPLACING WITH SUITABLE/WELL-COMPACTED FILL, PLACEMENT OF A GEOTEXTILE, OR COMBINATION OF ABOVE. STRUCTURAL FILL SHALL BE PLACED IN LOOSE LIFTS NOT EXCEEDING 8 INCHES IN THICKNESS AND COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) AT A MOISTURE CONTENT WITHIN 3 PERCENT BELOW TO 3 PERCENT ABOVE THE OPTIMUM. THE UPPER 12 INCHES SHOULD BE COMPACTED TO AT LEAST 98 PERCENT. PLACE 5 FEET OF SURCHARGE FILL IN THE PROPSED CANOPY AND KIOSK FOOTPRINTS. FOUR SETTLEMENT PLATES SHOULD BE INSTALLED BY GEOTECHNICAL ENGINEER ON DESIGN GRADE PRIOR TO PLACEMENT OF THE SURCHARGE. SETTLEMENT PLATES SHOULD BE SURVEYED BY THE PROJECT SURVEYOR TWICE A WEEK AND DATA PROVIDED TO THE GEOTECHNICAL ENGINEER TO DETERMINE WHEN SURCHARGE MAY BE REMOVED. A WAITING PERIOD OF 30 TO 45 DAYS IS ANTICIPATED. THE FOUNDATION SYSTEM SHALL CONSIST OF ISOLATED SPREAD FOOTINGS AT COLUMNS AND CONTINUOUS SPREAD FOOTINGS AT WALLS. THE FOUNDATIONS SHOULD BE UNDERCUT 2 FEET NEAT LINE DIMENSIONS AND REPLACED WITH NCDOT WASHED NO. 57 STONE. THIS FOUNDATION SUBSURFACE PREPARATION DOES NOT CONSTITUTE A COMPLETE SITE WORK SPECIFICATION. IN CASE OF CONFLICT, INFORMATION COVERED IN THIS PREPARATION SHALL TAKE PRECEDENCE OVER THE WAL-MART SPECIFICATIONS. REFER FOUNDATION SUBSURFACE PREPARATION FOR SAM'S CLUB PAGE 3 STORE #6573-04,JACKSONVILLE,NORTH CAROLINA JUNE 30, 2008 TO THE SPECIFICATIONS FOR SPECIFIC INFORMATION NOT COVERED IN THIS PREPARATION. THIS INFORMATION WAS TAKEN FROM A SUBSURFACE EXPLORATION REPORT PREPARED BY S&ME, INC., DATED JUNE 30, 2008 (SUBSURFACE EXPLORATION REPORT IS FOR INFORMATION ONLY AND IS NOT A CONSTRUCTION SPECIFICATION). Email Address for Geotechnical Engineer: ibrowning(a�smeinc.com SITE SUBSURFACE PREPARATION FOR SAM'S CLUB PAGE 1 STORE #6573-04,JACKSONVILLE,NORTH CAROLINA JUNE 30,2008 THE SUBSURFACE EXPLORATION INDICATES THE SITE IS GENERALLY UNDERLAIN BY NATURAL COASTAL PLAIN SOILS. SITE PREPARATION AND GRADING WILL BE SIGNIFICANTLY INFLUENCED BY WEATHER CONDITIONS AT TIME OF CONSTRUCTION. SITE GRADING SHOULD BE PERFORMED DURING THE TYPICALLY DRIER SUMMER MONTHS AND EARLY FALL MONTHS, IF PRACTICAL. LIGHT TRACKED EQUIPMENT SHOULD BE USED DURING THE SITE PREPARATION AND GRADING. REMOVE TREES, VEGETATION, ORGANIC LADEN TOPSOIL, AND OTHER UNSUITABLE MATERIAL FROM THE NEW PARKING AREAS. PROOFROLL EXPOSED SUBGRADE WITH LOADED RUBBER-TIRE EQUIPMENT (MINIMUM LOADED WEIGHT OF 20 TONS). PROOFROLLING SHOULD CONSIST OF TWO COMPLETE PERPENDICULAR PASSES OF THE EQUIPMENT OVER THE SUBRADE. REPAIR UNSUITABLE OR UNSTABLE AREAS BY SCARIFYINGIDRYING/RECOMPACTING, UNDERCUTING TO FIRM SOILS AND REPLACING WITH SUITABLE/WELL-COMPACTED FILL, PLACEMENT OF A GEOTEXTILE,OR COMBINATION OF ABOVE. STRUCTURAL FILL SHALL BE PLACED IN LOOSE LIFTS NOT EXCEEDING 8 INCHES IN THICKNESS AND COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) AT A MOISTURE CONTENT WITHIN 3 PERCENT BELOW TO 3 PERCENT ABOVE THE OPTIMUM. THE UPPER 12 INCHES SHOULD BE COMPACTED TO AT LEAST 98 PERCENT. THIS SITE SUBSURFACE PREPARATION DOES NOT CONSTITUTE A COMPLETE SITE WORK SPECIFICATION. IN CASE OF CONFLICT, INFORMATION COVERED IN THIS PREPARATION SHALL TAKE PRECEDENCE OVER THE WAL-MART SPECIFICATIONS. REFER TO THE SPECIFICATIONS FOR SPECIFIC INFORMATION NOT COVERED IN THIS PREPARATION. THIS INFORMATION WAS TAKEN FROM A SUBSURFACE EXPLORATION REPORT PREPARED BY S&ME, INC., DATED JUNE 30, 2008 (SUBSURFACE EXPLORATION REPORT IS FOR INFORMATION ONLY AND IS NOT A CONSTRUCTION SPECIFICATION). Email Address for Geotechnical Engineer: ibrowningPsmeinc.com CLIMATIC DATA Sam's Club Store No. 6573-04 .Jacksonville, North Carolina S&ME Project No. 1051-08-173 Data Month Precipitation (inches) Mean Total Annual 50.01 — 70.00 Annual 3.51 —4.00 IJanuary 1.01 — 1.50 February 1.01 — 1.50 March 1.01 — 1.50 April 1.01 — 1.50 May 1.51 —2.00 Mean Maximum Daily June 1.51 —2.00 July 2.01 — 3.00 August 2.01 — 3.00 September 1.51 —2.00 October 1.01 — 1.50 November 1.01 — 1.50 December 1.01 — 1.50 Median First Freezing Temperature—October 16 through October 31 Median Last Freezing Temperature—April 1 through April 15 Source: U.S. Department of Commerce Climate Maps of the United States http-/%clo ncdc noaa gov/cei-binlelimaps/climaps pl?directive=quick search&mbrnum Sam's Club Expansion (Store#6573-04) Jacksonville, North Carolina SWE Project Number 1051-08-173 Vfth _. CPT Sounding Location Sheet I SW&M EM CPT Sounding Latitude t [I Longitude 1°WI Elevation B-1 34.784856 77.396136 N/A B-2 34.784675 77,396342 N/A B-3 34.784606 77.396500 N/A B-4 34.784444 77.396683 N/A B-5 34.784369 77.396936 N/A B-6 34.784347 77.397717 N/A B-7 34.784236 77.397603 N/A B-8 34.784119 77.397475 N/A B-8A 34.784119 77.397475 N/A B-9 34.784219 77.397442 N/A B-9A 34.784219 77.397442 N/A P-1 34.784008 77.394931 N/A P-2 34.783628 77.395400 N/A P-3 34.783383 77.395767 N/A P-4 34.782983 77.396039 N/A DP-1 34.783308 77.395750 N/A DP-2 34.783497 77.395458 N/A DP-3 34.783650 77.395203 N/A DP-4 34.783825 77.394986 N/A DP-5 34.784033 77.394753 N/A Existing ground surface elevations were not available at the time of this report. SUMMARY OF CPT SAMPLES Project Name: Jacksonville Sam's Club Store#6573-04 Job No.: 1051-08-173 tt z. TEST- ,' DEPTH FE ET DESCRIPTION ." IPTIO. 0 - 0.3 Topsoil 5/19/2008 B-2 0.3- 0.6 FILL: Tan Clayey Fine SAND (SC), Moist 0.6 - 3.0 1Brown Sandy CLAY (CL), Moist to Wet 3.0 -3.7 Gray Clayey SAND (SC), Wet 0 - 0.3 Topsoil 0.3 - 1.2 FILL: Tan Clayey Fine SAND (SC)With Organics, Moist 5/19/2008 B-4 1.2 -2.2 Brown Clayey SAND (SC), Moist 2.2 - 3.2 Gray Sandy CLAY (CL), Wet 3.2 - 3.6 Orange-Gray Sandy CLAY (CL-CH), Wet 0 -0.3 Topsoil 5/19/2008 DP-1 0.3 - 1.5 Brown Sandy CLAY (CL)With Organics, Moist 1.5-2.5 Orange-Gray Sandy CLAY (CL), Wet 2.5- 3.5 Orange-Gray Silty CLAY (CL), Wet 0 - 0.5 Topsoil 5/20/2008 DP-4 0.5 - 1.5 Orange-Gray Sandy CLAY (CL), Moist 1.5 - 3.5 Orange-Gray Silty CLAY (CI), Wet 08-173 CPT Sample Summary.xIs CPT Soil Classification Legend Normalized Friction Ratio Classification Chart 4 p fit '-�tl ic• �.- p f tlhe; lb v e z 100 ¢ e \ F � t- z O to H \ \ \. Z � 1 8.1 0.5 1.0 5.0 10 I FRICTION RATIO, f X100% NORMALIZED (ReC Robertson, 1990) Robertson's Soil Behavior Type (SBT), 1990 Group# Description 1 Sensitive, fine grained 2 Organic soils - peats 3 Clays - silty clay to clay 4 Silt mixtures -clayey silt to silty clay 5 Sand mixtures - silty sand to sandy silt 6 Sands -clean sand to silty sand 7 Gravelly sand to dense sand 8 Very stiff sand to clayey sand (High OCR or cemented) 9 Very stiff, fine grained (High OCR or cemented) Soil behavior type is based on empirical data and may not be representative of soil classification based on plasticity and grain size distribution. Relative Density and Consistency Table SANDS SILTS and CLAYS Cone Tip Stress, Cc (tsf) Relative Density Cone Tip Stress, qc (tsf) Consistency Less than 20 Very Loose Less than 5 Very Soft 20 -40 Loose 5- 15 Soft to Firm 40 - 120 Medium Dense 15- 30 Stiff 120 - 200 Dense 30 - 60 Very Stiff Greater than 200 Very Dense Greater than 60 Hard CONE PENETROMETER TEST RESULTS $S&ME Project Name: Jacksonville Sam's Club Expansion (Store# 6573-04) Sounding: B-1 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 4.3 feet Sounding Date: 5116/08 Tip Stress,q.(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,uz(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0 0 5 5 5 5 - 10 10 10 ( 10 _ - 3` s 15 z is t 15 ,c 15 (20 20 2020 ( 25 25 25 25 - -- -`_-: • SBT Gqp N,rtrber 30 30 30 30 .Rra cortanr 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Sal Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 26.95 rt. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS #S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: B-2 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.2 feet Sounding Date: 5/16/08 Tip Stress,q,(ter) Sleeve Stress,t,(tsf) Pore Water Pressure,or(tso SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0 0 00 5 5 5 1 5 j / 10 10 10 I 10 ,= 15 t 15 ,= 15 r 15 4--- ti n a a •- 0 0 20 20 20 20 , 25 25 25 25 ♦ sBT Group Number 30 30 30 30 _."—Eu.rm�cmlem 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 27.54 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS v,=" Project Name: Jacksonville Sam's Club Expansion(Store#6573-04) Sounding: B-3 SBME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.6 feet Sounding Date: 5/16/08 Tip Stress,q,(tso Sleeve Stress,f,(tsf) Pore Water Pressure,u,(lsf) SET Group Number' 0 50 too 150 200 0.0 2.0 4.0 0.0 2.0 4.0- 2 3 4 5 6 7 0 0 ,•r 0 I•-� 0 r 5 5 5 5 • :. 10 10 10 , 10 :r z x r s 15 t 15 ,= 15 .c 15 '-`- at w u I I o 20 20 20 20 1 25 25 y 25 a 25 ♦ SBT Coup Number 30 30 30 30 -..-Est.Rnes Content 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Roberlson(1990) Termination Depth 27.00 it. Cone ID 2437.104xx 1 11 11 11 • 11 11 .11 11 :11 •11 111 11 11 11 • 11 11 •11 1 -�__-=-_� -----C-aCamaaaaaCCCC -® _ MEE ---------s--------s- ---- -------------- --------- --------- ------------ ------ -----mmaa aamaaaaamemm=am-mm®® ----- -- ----- ---- =_e tea®=_ -------- -------------------- - EE_�e_e3'-..e==mama= - no On ---------------- -------- -- ------®--®a---m-comma®amm---- ------------------------E-=E 1 Ca=CamCaamaaaaamC aCaaaam-come ma-===mama---®--s-mms-a_=_==_=_Ca_- ---------------------e---- --_--------ma-�----a-- --_- ME wiiiiiiitm --- -----mmm----=-----5®®s-- aamm-eCCamm-aa= =EECMCEMEMO miiiiiiIiii OEM M ME-aCCmmaa-vme-�aamm=aammm =ome--mmmmmmm=mmmm eCCOEM aCCCEE aammCaaCCmm-Om--aammaammaa-a ------®-----------EE ----®---em ®—_—_ —_ -------_---- --®---®-__--- ----0--=- -a-_M------ :1 ----------------- EEEe -®- eeEEEEEeeemmEEEEEE=Eec E -_-_ ----_--------_s_-_--_--_-_ _ - - ----ammmCma=----- ---------------------------- •1 --m.-rCCEaa----CCEEaC®Caammmm- ---------------------------- eEEEee�==EEseeee ME ammMaaCCC ---------- - _ _ --------------m-o--��ammms -------------- 1 ----------------------------- 2006 North Carolina Building Code Criteria Average Shear Wave Velocity, V,: 921 fps Seismic Site Class:CPT Sounding: B-3 • •, -• • 11• • • • • ••- ,• - • - O- SHEAR WAVE VELOCITY PROFILE 'r�73 4, 7y 4,�, • # . 14 •• 11: JACKSONVILLE, NORTHR ' ENVIRONMENTAL •• • 1 1' CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: B-4 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 5.8 feet Sounding Date: 5/16/08 Tip Stress,q,(tsf) Sleeve Stress,f.(tsf) Pore Water Pressure,uz list) SET Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0 0 5 5 5 5 1 � 10 10 10 10 — — x71t 15 t 15 t 15 s 15 20 20 20 20 25 25 .-,, 25 25 Y. . ♦ GBT Group Number 30 30 30 30 .Flr.Content 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction mlio(F,),Robertson(1990) Termination Depth 27.75 ft. Cane ID 2437.104XX i CONE PENETROMETER TEST RESULTS $S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: B-5 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 4.1 feet Sounding Date: 5/16/08 Tip Stress,q.(tst) Sleeve Stress,fa(tsf) Pore Water Pressure,uz(tsf) SET Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 }F 0 — 0 5 5 I 5 5 10 10 10 t 15 z 15 t 15 t 15 a c $ a O 20 20 20 20 r • 6 25 'I 25 25 25 • SET Group Nwrber 30 -—Ell.Final Content 30 30 30 100% 80% 60% 40% 20% 0 Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),.Roberson(1990) Termination Depth 26.35 ft. Cone ID 2437.104xx AL Jacksonville Sam's Club Pore Pressure Dissipation Jacksonville, INC "" SWE Project No: 1051-08-173 Date: May. 16, 2008 Depth: 21.5 ft Estimated Water Depth: 4.1 ft Termination Criteria: Maximum React Rig/Operator: Marooka Cone Size: 1.75 100 1 1 I I I I IIII I I I I I I-[ III I I I I I I fill I I I I-I I I I I I I I I I I I III I I I IIIlilt I I I IIIIIII I I I IIIfill I I I IIIfill I I I IIlilt I I I IIIlilt I I I IIIIIII I I I III Ili I I I I I I I I I I I I I I IIIIII I I I IIIlilt I I I IIIfill I I I IIIfill I I I IIIfill I I I IIIIII I I I II [ lilt I I I II [ fill I I I IIIfill I I I IIIIIII I I I IIIIII I I I I IIlilt I I I I IIIIII I I I I Ilfill I I I I I11111 1 1 1 111111 I I I IIIlilt I I I IIIlilt I I I IIIfill I I I IIIlilt I I I IIIIII I I I I IIIIII I I I I I IIIII IIII I I I I I IIIII I I I I I IIII I I 1111IIII 1 1 1 I I I 11 1 1 1 1 1 11111 1 1 1 1 1 1111 I I I lo I I IIII �4 i 1 11III I I I I I I I I I I l l [ ill I I I I I I III 80 —I-1-f-14 —F--#—H-1+-+i—+-i—+4+H+F I I I IIIlilt I I I IIIfill I I I IIIfill I I IIIlilt I I I IIIIll I I I IIIlilt I I I IIIfill I I I IIIfill I I IIIlilt I I I II [ Ill I I I I IIIIII I I I I IIfill I I I I llfill I I I IIlilt I I I I IIIll I I I Illlilt I I I Illlilt I I I IIIfill I I IIIlilt I I I IIIIll I I I IIIlilt I I I IIIlilt I I I IIIlilt I I IIIlilt I I I IIIIll I I I IIIlilt I I I Illfill I I I IIIlilt I I IIIlilt I I I IIIIll I I I I I hill I I I I I hill I I i I I IIIII I I I I Illlt I I I I I IIII I I I I I I lilt I I I I I I lilt I I I I I I lilt I I I I I I IIII I I I I I I I I I d 1 1 1 IIIIIII 1 1 1 IIIfill I I I IIIHit I I I Illlilt I I I llfill 60 I I I I I IIIII I I I I I IIIII I I I I I IIIII i t I I Bill I I I I I IIII 1-i-1-1-i7r-9-T--T77TiT1T-rr-rrri- FF-1-r -Ii-Tnr-T-i-TZTnTi w i I I l l l i l l I I I I I l l l t I I I I I I IIII I I I I IIII I I III I i l i i l l I I I i i l Ill I I I I I I I I I I 1 1 1 l l l Ill I I I I I I I I I d I I I IIIIII 1 1 I I I I IIII 1 1 I I I IIIII 1 1 1 111Ill I I I I I I III I I IIIIIII I I IIIIIII I I IIIIIII 1 1 1 IIIfit I I I IIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I llllll I I I IIIIII I I llllll I Iillll I IIIIII I I I hilt I I I I I I I I I I I I IIIIIII I I I IIIIIII I I I IIIIIII I I Ii IIIII I I I IIIIII 1 1 I I IIIIII I I I I IIIIII I I I I IIIIII I I I I Illl I I I I IIIII i i I I IIIIII I I I I IIIIII I I I I I IIIII i l I I I IIII I I I I IIIII 40 - - -I-1-1-1J444-+-F-1-1-t I-14"-1-4--1-1-W4Wf- - --1-1- -IJ4--1--4---444-141 1 1 1 1111111 1 1 1 111lilt I I I I IIIIII I I I I I III I I I I IIIll I I I II [ lilt I I I IIIIll) I I I IIIfill I I I III II I I I IIIIll I I I I I I I I I I I I I I I I IIII I i I I I I IIII 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Ill I I I I I I lilt I I I I I I lilt I I I I l l fill I I I IIIIll 1 I I I I I Ill I I I I I I I I I I I I I IIIlilt I I I IIIlilt I I I Illlilt 11 1 lllIll I I I IIIlilt I I I IIIIIII I I I IIIlilt I I I IIIIIII I i I I I I I I I I I I I I I I I I I I I I IIIIll] I I I IIIlilt I I 1 IIIlilt I I I lllIll I I I I I IIIII I I I I I IIIII I I I IIIfill I I I I I I fill I I I I I I I I I I I I I I I lilt I I I I I I I I I I I I I I I I I III I I I I I I IIII I I I I I I Ill I i I I I Ililt I I I I I IIIII I I I I I IIIII I I I I I Ililt I I I I I IIII 20 --1-I- 1-1-1-Tri n-T-1 7 -t7r1YIT-177 -rr I-Tn 7-I--i-1-1-71"ITI-T"I-T-I -I rim t I I IIIIll I I I IIIlilt I I I IIIlilt I I I IIIlilt I I I IIIIll I I I I I IIIII I I I I I I lilt I I I I I I lilt I I I I I I lilt I I I I I I Ill m I I I I I I IIII I I I I I I Ill I I I I I I fill I I I I I I IIII I I I I I I Ill I I I I I I lilt I I I I I I lilt I I I I I I lilt I I I I I IIIII I I I I I I Ill I I I IIIIII] I I I IIIIIll I I I IIIlilt I I I IIIIIII I I I IIIIll I I I I I I I I I I I I I IIIlilt I I I Illfill I I I IIIlilt I I I IIIIll 1 1 1 IIIlilt I I I IIIlilt I I I Illlilt I I I IIIlilt I I I IIIIII I I I IIIlilt I I I IIIlilt 1 I I IIIlilt I I I IIIIIll I I I IIIIII I I IIIIIll I I I I I I I I I I I I IIIlilt I I I IIIlilt I I I IIIIII m 0 l f l l 111 s i l l Ili I II I I I I I I III I I I I I I II 0.1 1 10 100 1,000 10,000 Time z (seconds) 0 a w S w rc N N W K 2 W K a R— V � Page 4 of 5 Electronic Filename: a16y0802d.21 CONE PENETROMETER TEST RESULTS #S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: B-6 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 2.6 feet Sounding Date: 5/16/08 Tip Stress,q.(tsf) Sleeve Stress,f.(tsf) Pore Water Pressure,ui(tsf) SET Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 L�«• 0 0 5 5 5 10 10 10 10 1 L 15 L 15 L 15 15 , (- n 1 20 20 20 20 y "• •« •• 25 25 "` 25 •" 25 ♦ Sei Croup Number 30 30 30 30 —--—Ezt.Fn.z comart 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Sal Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 25.11 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS 'tS&ME Project Name: Jacksonville Sam's Club Expansion (Store# 6573-04) Sounding: B-7 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.1 feet Sounding Date: 5/16/08 Tip Stress,q,(tso Sleeve Stress,fa(tsf) Pore Water Pressure,u,(tsf) SET Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0 0 5 - 5 5 5 I _ 10 10 10 i 10 • • - _ p c a a n • _ 20 20 20 20 25 25 2s 25 --�► _--=�=— ♦ SST Croup Number 30 —Est.Final C°ntenl 30 30 30 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 25.43 ft. Cone ID 2437.104Xx Jacksonville Sam's Club Pore Pressure Dissipation $S&ME Jacksonville, NC S&ME Project No: 1051-08-173 Date: May. 19, 2008 Depth: 14.0 ft Estimated Water Depth: 3.1 ft Termination Criteria: Target Depth Rig/Operator: Marooka Cone Size: 1.75 100 1 1 - I IIII I I I I I I lilt I I I I 111111 1 1 1 1 1 hill I I I I I IIII I I I I I IIIII I I I II [ lilt I i I I I IIIII I I I IIIlilt I I I I I I III I I I I illilt I I I I IIlilt I I I I IIlilt I I I I IIlilt I I I I IIIII I I I I I IIIII I I I I IIIIII I I I I I IIIII I I I I IHill I I I I I IIII I I I IIIlilt I I I Illilt) I I I IIIIIII I I I III [ III I I I IIIIII I I I I II ] III I I I I IIIIII I I I I IIlilt 1 1 1 Il [ lilt I I I I IIIII I I I I IIlilt I I I I IIIIII I I I I Ililll I I I I I I I I I I I I I I IIIII 11 1 IIIlilt I I I IIIIIII I I I IIIlilt I I I II11111 1 1 1 IIIIII I I I I I I IIII I I I I I I I I I I I I I I I I HII I I I I I I I I I I I I I I I I I I I I I I IIIlilt I I I I IIIIII I I I IIIlilt I I I It I' 11 I I IIIII 80 -I---;-t-IH�-I+i-+-t-;-4+i-l+l+-I-+-I-1-1-14H i-r -hi-F fi+i-+H-+4-+-H+I- I I I I I I l l l l I I I I IIIIII I I I I I I I I IIIIII I I I I IIII I I I I IIIIIII I I I IIIIIII I I I it ill I I I IIIII I I I Ililll I I I I I Iliil I I I I IIIIII I I I I IIII I I I I ' IIII I I I I IIIII I IIIIII I I I IIIIII i t IIIII I I I I ' III I I I I I I I I I I I I I I IIIII 1 1 I I I I Iill I I illlll I I I I I II I I i t IIIII I I IIIII I I IIIIII I . IIIIIII I I I I II I I I I I I I I I I I I I IIIIIII I I I IIIIIII I IIIIIII I I I IIII I I I I IIIIII I� I i l l l l l l l I I I I I I I �' i i I I IIIIII I I I I IIII I I I I IIII I � I I I I I I Ii � 1� i1 I I I I IIIIII I I I I IIIII I I I I IIIII I Iill Ilia 1 1 IIIIII I I IIIIII I IIIII I IIIII 3 60 - —F —I 71 —T I—T7TrITIT—rT—rT 1177r —1—I I- 1-17 TH—T7TTITI I I I I I IIIII I I I I I I IIII I I I I I IIIII I I I I I I I I I IIIIII 1 1 1 1 11lilt I I I I I lilt[ I I I I I IIIII I I I I I IIIII I I I I IIII IL I I I IIIlilt I I I I I I I I I I I I I IIIlilt I I I Illlilt I I IIIIII I I I IIIlilt I I I I I I I I I I I I I IIIlilt I I I IIIlilt I ' I I I I I I I I I I Illilll I I I IIIIIII I I I IIIlilt I I I IIIlilt I I IIIIII I I I IIIlilt I i I IIIIIII I I I IIIlilt I I I Illilll I I IIIIII I IIIIIII I I IIIIIII I I IIIlilt I I I IIIlilt I I I IIIIII I I I Illlilt I I I IIIlilt I I I IIIlilt I I I III ill I I I I IIIIII I I I I IIIIII I I I I I IIIII I I I I I IIIII I I I I I I I I I I 11 I IIIHit 40 -4-1-4 -I14-4L-4-4-444--144 I I I I IIIIII I I I I IIIIII I I I I illlll i t I I IIIIII i t I I IIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIII I I I I Ililll i l l I IIIIII i t I I illlll I I I I IIIIII I I I I I 1 1 I I l i I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIII I I I I illlll I I I I IIIIII I I i t IIIIII I I I I IIIIII I I I I ( III I 11 I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII I I I IIIIIII 11 I IIIIII I I I I I I I I I I I I I IIIIIII I 111IIIIII I I I IIIIIII 11 I IIIIII 11 Illilll I I IIIIIII I I IIIIIII 11 IIIIIII 11 IIIIII 20 --I-I-7-1-I-lt-iTl-T7-T-1"7i"It IT-t-T-l-i-rl7 til 7-I--I-I'-17 IIII-T"1-T-(Ti"I?I` 1 1 1 1 1 1 lilt I I I I I I lilt I I I I I I lilt I I I I I I IIII I I I I I I 1 11 I I I I I I Ili I I I I I I IIIII I I I I I I lilt I I I I I I I I I I I I I I I I III I I I IIIIIII I I I IIIlilt I I I IIIlilt I I I IIIIIli I I I IIIIII I I I III III I I I I IIlilt I I I I IIlilt I I I I IIIIII I I I I IIIII I I I I III I I I I I I I III I I I I I I lilt I I I I I I I I I I I I I I I III I I IIIIIII I I I IIIlilt I I I IIIlilt I I I IIIIIII I I I IliIII I I I I III 1 1 1 1 1 1 1 111 1 1 1 1 1 1 lilt I I I I I I IIII I I I I I I I w I I I I I I I I I I I I I I I I I I I I lilt I I I I I I I III I I I I I I III I I IIIIIII I I I I I I I I I I I I l l lilt I I I I I I IIII I I IIIIII w 0 I 1 H i l l Ili I I I 1 1 1 1 III I I I I I 1 1 I 1 1 1 1 1 1 1 I 1 H 1 11 0.1 1 10 100 1,000 10,17)00 Time (seconds) z 0 a a N O W K J N N W K a w K B-7 a aJ Page 5 o/5 Electronic Filename: a 19y0805d.14 U CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: B-8 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 2.9 feet Sounding Date: 5/16/08 Tip Stress,q.(tsf) Sleeve Stress,f,(tso Pore Water Pressure,uz(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 I1I{1IrrF 0 0 0 1 M • - - - '. 5 5 5 5 — •��. f — 10 10 10 I 10 Nil r z c t 15 z 15 t 15 s 15 r 20 ---�-fl-= —- — — 20 20 20 25 25 2s 25 ♦ SBT Group Number 30 30 30 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)0roup Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 25.08 A. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS Project Name: Jacksonville Sam's Club Expansion(Store# 6573-04) Sounding: B-8A S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 5.2 feet Sounding Date: 5/29/08 Tip Stress,q,(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsr) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 � , 0 0 0gel ' 5 5 5 5 10 - 10 10 10T s _ r r - t 15 15 z 15 15 _ a a o ' .�,• , o 0 o ur 20 r•• I 20 20 20 _ .. 25 25 25 zs -o - ♦ sBT Croup Number 30 Flnas Canlent 30 30 30 - 100% 80% 60% 40% 20% 0 Estimated Fines Content 'Sail Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Roberson(1990) Tenninalion Depth 25.23 f. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS 'N` Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: B-9 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 2.9 feet Sounding Date: 5/16/08 Tip Stress,q.(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 p 0 0 0 ) ♦ e —j t Irr ♦ _ 10 1 10 1 10 ' 10 z 15 ♦• t 15 a 15 15 a a n . �- • — d 0 0 0 � 20 20 20 20 , 25 25 25 d 25 • ser crow NVMer 30 30 30 30 —.._�".Fm�rAmam 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Sal Behavior Type(SBT)Group Number based on rannalized friction ratio(P,),Robertson(1990) Termination Depth 25.34 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS Project Name: Jacksonville Sam's Club Expansion (Store# 6573-04) Sounding: B-9A S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 4.9 feet Sounding Date: 5/29108 Tip Stress,q.(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4, 5 6 7 0 0 0 0 5 5 5 5 10 10 10 10e _.._..�.-.—._ -—-—-—-—-— 615 n15 615 a15 o f u < ❑ I4 O G ❑ f 20 20 20 20 jam• M 25 25 25 — J • SBT Groip Number 30 30 30 30 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SET)Group Number based on normalized friction ratio(F,),Roberson(1990) Termination Depth 24.45 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion (Store# 6573-04) Sounding: P-1 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 2.4 feet Sounding Date: 5/16/08 Tip Stress,qc(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 71 0 0 0 1 5 5 5 0 Jr E- 10 10 10 110 0 L 15 1 1 1L 15 L 1S = 15 — 20 20 20 20 25 25 25 25 ♦ seT cxo�v M,moa, 30 130 1 1 1 1 1 1 30 30 ----E�'Fnascamtenl 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 17.11 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS Project Name: Jacksonville Sam's Club Expansion (Store 4 6573-04) Sounding: P-2 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.5 feet Sounding Date: 5/16/08 Tip Stress,q.list) Sleeve Stress,f.(tsf) Pore Water Pressure,ur(tst) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 % 0 0 rr f' 5 5 5 5 10 10 10 10 �`- I � r 15 £ 15 t 15 t 15 ---s' n a n o — O Oa 00 • �.._•._.. 20 20 20 20 00 un25 25 25 25 ♦ SBT Croup Member 30 30 30 30 U —..—�.rm.c Wm t 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Sail Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 17.18 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: P-3 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.3 feet Sounding Date: 5/16108 Tip Stress,qc(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0It 0 5 5 5 5 =• r' • or 10 10 10 10 • t�— r r r r m 15 t 15 t 15 t 15 C3 0 CI u O 20 20 20 20 25 25 25 25 ♦ SBT Gat,NwOx 30 —Est.Fines Content 30 30 30 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 10.08 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: P-4 SBME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 2.3 feet Sounding Date: 5/16/08 Tip Stress,q.(ter) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 � � 0 0 � 0 0 5 5 5 ( 5 =ls 10 10 10 ( 10 R r z z 15 t 15 t 15 r 15 a n a �- Cl O G C) 20 20 20 20 25 25 25 25 — � —SBT Group NwMer 30 30 1 1 130 30 Eet cinee content 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 10.33 It, Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion(Store#6573-04) Sounding: DP-1 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 2.1 feet Sounding Date: 5/16/08 Tip Stress,q,(tsf) Sleeve Stress,fs(tsf) Pore Water Pressure,u2(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0 0 5 5 5 5 ' -- 10 10 10 10 -- x Ri. L 15 L 15 L 15 L 15 0 20 20 20 20 25 25 25 25 ♦ SBT Group Numeer 30 30 30 30 _..—Est,Fines wmem 100% 80% 60% 40% 20% 0 Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 16.26 ft. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: DP-2 SRME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.8 feet Sounding Date: 5/16/08 Tip Stress,q.(tsf) Sleeve Stress,fg(tsf) Pore Water Pressure,ui(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 r 0 0 g8® 5 5 5 � 5 10 10 10 10 = - x. z 15 r 15 t 15 t 15 ` 20 20 20 20 25 25 25 25 ♦ set croup rvumear 30 30 30 30 ---ss.Fu,�comam 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Sol Behavior Type(SBT)Group Number based on normalized friction ratio(p,),Robertson(1990) Termination Depth 16.03 rt. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion (Store# 6573-04) Sounding: DP-3 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.3 feet Sounding Date: 5/16/08 Tip Stress,q,(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,ur(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0 0 5 5 5 5 ® 9 10 10 10 1 1 1 1 110 -`.--r ,. r r t 15 t 15 t 15 t 15 y 6 6 N • == 20 20 20 20 25 25 25 25 • Zr-coup wu,near 30 30 30 30 in.eonlw 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Sal Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 17.67 It. Cone ID 2437.104XX CONE PENETROMETER TEST RESULTS *S&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: DP-4 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 3.2 feet Sounding Date: 5/16/08 Tip Stress,q,list) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsf) SET Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 0 0 0 0 5 5 5 5 10 10 10 110 �'— I t 15 t 15 t 15 t is .-_---- 6 — ❑ 20 20 — 20 20 25 25 25 25 set oruov W.ber 30 30 30 30 —-'—6n.Fir.cwv,m 100% 80% 60% 40% 20% 0% Estimated Fines Content 'Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 16.13 ft. cone ID 2437.104M CONE PENETROMETER TEST RESULTS fS&ME Project Name: Jacksonville Sam's Club Expansion (Store#6573-04) Sounding: DP-5 S&ME Project No.: 1051-08-173 Ground Surface Elevation: - feet Project Location: Jacksonville, NC Water Level Depth: 2.7 feet Sounding Date: 5/16/08 Tip Stress,q,(tsf) Sleeve Stress,f,(tsf) Pore Water Pressure,ui(tsf) SBT Group Number' 0 50 100 150 200 0.0 2.0 4.0 0.0 2.0 4.0 2 3 4 5 6 7 p 0 0 0 5 5 510 5 e �. s; _y t 15 t 15 t 15 t 15 _ a 20 20 20 20 25 25 25 25 ♦ SBT Graup Number 30 30 30 30 100% 80% 60% 40% 20% 0% Estimated Fines Content Soil Behavior Type(SBT)Group Number based on normalized friction ratio(F,),Robertson(1990) Termination Depth 16.50 ft. Cone ID 2437.104XX ProieCl Name'. Jacksonville Wal-Mart Project Numbe[ 1051-08-173 Project Lolam n. Jacksonville.NC Evaluator A.Browning Date: 51912008 *S&ME Pavement Temperature Before('F): 75 Pavement Temperature After ff): 90 Distress Seim , Lemon th Linear Feet Aver�a a Notes Locatlan Code WItl�flJ ll Area ft' u Number Depth la Picture N's 1 7,9 L 9 48 432 - - 12 to 314 1 Possible storms sewer patch 2 1 L 15 26 390 - - 2.3 3 1 L 17 31 527 - - - 4.5 4 1 L 17 25 425 - - - 0 5 1 L 32 44 1,408 - - - 6 1 L 35 218 2.630 - - - 8,9 Main enhance 7 1 L M 18 28 504 - - - 10,11 Stop area 8 4b L H - - - 568 1 - 12,13 Pavingjolat 9 1,13 L M 5 15 75 - - - 14,15 10 4b L H - - - 437 1 W,17 Paving joint 11 roatiine L M - - 110 6 18,19,20 12 mmOki long. L M H - - - 53 1 - 21.22 Joint spi 1T:Typical spad,13 In 15' cou,13 oo L M H 14 L M H 15 L Al H 16 L M H 12 L M H 18 L M H 19 L M H 20 L M H 21 L M H 22 L M H 23 L M H 24 L M H 25 M IT AC Surface Distress Codes: 1.Fatigue cracking,sq.If 6.Transverse ouckJng,number(BS=Sealed).number and linear feet 12.Pdished aggregate,sq ft. 2.Block craclung,sq.ft, ➢.Patches,number and sq ft. 13.Raveling.aq K 3.Edge cracking.I'mear it. 8.Potboles,number and sq ft. 14,Average lane to shoulder drop-oH,death 4a.Longitudinal tracking-wbeelpalh-unsealed(4aS.-Sealed),linear g. 9.Rutting,lengm and average depth 15.Water bleeding and pumping,number and in ft, 4b.Longitudinal cracking-non-wheelpaN-unsealed(4b5.-Stated).Meer IL 10,Shoving,number and sq R 16.Other.desalbe in notes 5.RelleCtion Cracking at joints of concrete pavement,In feet between cracks 11.Bleeding,sq ft 'From FHWA LTTP Distress Identification Guide Publication No.FHWA-RC-05-001(August 2005) *S&ME Sam's Club Store A 6573-0 Jacksonville, North C.,.11O. S&ME Pi-opi,t Number 1051ANI-173 R.. .I.nd.dN-1....d MR mStAESLan_(rnrtxndl a. ue Dow ti(tpor, DP2 1-1 115A 119 190 13.2 76 SI 0.1 S—q of Utoretar,Test ft-ults Or.W,PH,orW R.M11 Is ma LtbEom uses �.,.oap.ma!...... nx eq 2H 15 �2 67 Ge 2t i s 1 §S6 ce NWVY M.4.1.S—I..Aft,�wg Umft,G,Jn Si—1lytl,URS..-*"ution ATTERSEROUd ff a I ...... LkpAd tamtegq MraLkaM37 pbuf0lRa.i[p Gi 0515 1297 15-25 21.7 35 is 1. CS 095 M 195 127 (W) C4 0-095 64 ABC STONE .7 1.5-M U,6 OL) ca OS 1.5 159 0. Cos 21 300 21.8 33 15 is 0.1 8-1 1A-3 1 27.9 37 21 is 41 DP.2 100 30 1e 12 57m4 426 CL OP 2 3 0 m 33 234 40 21 19 Laboratory Report Version 4.2 Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass it b IL Project#: 1051-08-173 Report Date: 05/23/2008 Project Name: Sam's Club - Jacksonville Test Date(s): 05/14 - 05/23/2008 Client Name: Client Address: Sample by: S&ME, Inc. Sample Dates: 05/12 - 5/19/08 Sampling Method: Bulk Bag Sampling Drill Rig : NA Boring# Sample # Sample Tare# Tare Tare Wt.+ Tare Wt.+ Water Wt. Percent Depth Weight Wet Wt Dry Wt Moisture ft. or m. grams grams grams grams % C-1 Bag 0.5' - 1.5' 010 98.46 339.05 311.91 27.14 12.7% C-3 Bag 1.5' - 2.5' 128 116.23 403.67 352.37 51.30 21.7% C-5 Bag 0.5' - 1.5' 018 1 118.10 347.99 322.01 25.98 12.7% C-7 ABC Stone 0 - .5 ft. 034 107.46 413.92 395.38 18.54 6.4% C-7 Bag 1.5' - 2.5' 035 147.96 331.13 274.67 56.46 44.6% C-8 Bag 0.5' - 1.5' 024 118.92 437.05 393.49 43.56 15.9% C-8 Bag 2.5' - 3.0' 031 114.20 414.94 361.05 53.89 21.8% DP-2 Bag 1.0' - 5.0' 026 118.88 493.68 433.84 59.84 19.0% DP-2 Tube 3' - 3.5' 010 98.27 196.63 178.01 18.62 23.4% B-4 Tube 3' - 3.5' 012 94.45 188.86 168.29 20.57 27.9% Notes: References: ASTM D2216: Laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass AASHTO T 265:Laboratory Determination of Moisture Content of Soils Technician Name: Kacie Lowder Certifirnrion B Technical Responsibility: Mal Kraian Laboratory Manager Signnm.o Posirioo S&ME, INC. 3201 Spring Forest Road, Raleigh,NC.27616 Nloisture Table.xls Laboratory Record Version 4.2 Liquid Limit, Plastic Limit, and Plastic Index tSWE Project#: 1051-08-173 Report Date: 5/23/2008 Project Name: Sam's Club - Jacksonville Test Date(s): 5/21 -5/23/08 Client Name: Client Address: Boring #: B-4 Sample #: Tube Sample Date: 5/19/2008 Location: Site Borehole Offset: N/A Depth (ft): 3 - 3.5 ft. Sample Description: Gray-Brown Sandy CLAY(Visual) Prot # Liquid Limit Plastic Limit Test# 1 2 3 4 5 6 1 2 3 Tare# 6 9 10 23 26 A Tare Weight 12.99 12.99 13.02 13.07 12.87 B Wet Soil Weight+A 22.81 23.63 24.30 19.72 20.26 C Dry Soil Weight+A 20.12 20.72 21.29 18.57 19.01 D Water Weight(B-C) 2.69 2.91 3.01 1.15 1.25 E Dry Soil Weight(C-A) 7.13 7.73 8.27 5.50 6.14 F % Moisture Content(D/E)*100 37.7% 37.6% 36.4% 20.9% 20.4-A N #OF DROPS 18 27 34 Moisture Contents determined LL LL=F* FACTOR by ASTM D 2216 Ave. Average 20.7% 42.0 41.0 - 400 - One Point Liquid Limit N Factor N Factor o 39.0 20 0.974 26 1.005 U 38.0 21 0.979 27 1.009 v 37.0 y =-._ - 22 0.985 28 1.014 ° 36.0 =__ 23 0.990 29 1.018 3 .0 = 24 0.995 30 1.022 34.0 25 1.000 33.0 32.0 ---- 10 100 15 20 25 30 35 40 I#of Drops 90 Notes: Estimate the°%Retained on the#40 Sieve Special Sampling Methods: Sample Preparation: Wet Preparation ❑ Dry Preparation ❑p Air Dried 0 NP,Non-Plastic ❑ Liquid limit Test: Multipoint Method ® One-point Method ❑ Liquid Limit 37 Classification: ASTM D 2487 © AASHTO M 145 ❑ Plastic Limit 21 Liquid limit Test: ASTM D 4318 O AASHTO T 89 ❑ Plastic Index 16 Plastic limit Test: ASTM D 4318 ❑x AASHTO T 90 ❑ Group Symbol Technician Name: Kacie Lowder Con jn,ron a Technical Responsibility: Mal Kraian Laboratory Manager S&ME, INC. 3201 Spring Forest Road,Raleigh,NC. 27616 B-4 Tube P.L.As Laboratory Record Version 4.2 Liquid Limit, Plastic Limit, and Plastic Index E Project#: 1051-08-173 Report Date: 5/21/2008 Project Name: Sam's Club -Jacksonville Test Date(s): 05/14 - 05/19/2008 I Client Name: Client Address: Boring#: C-3 Sample #: Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: N/A Depth (ft): 1.5' - 2.5' Sample Description: Tan-Gray Sandy CLAY(Visual) Pan # Liquid Limit Plastic Limit Test# 1 2 3 4 5 6 1 2 3 Tare# 11 3 17 22 6 A Tare Weight 12.49 12.99 12.99 13.12 13.01 B Wet Soil Weight+A 24.31 25.54 24.56 19.51 20.03 C Dry Soil Weight+A 21.28 22.28 21.67 18.52 18.93 D Water Weight(B-C) 3.03 3.26 2.89 0.99 1.10 E Dry Soil Weight(C-A) 8.79 9.29 8.68 5.40 5.92 F %Moisture Content(D/E)*100 34.5% 35.1% 33.30o 18.3% 18.6% N #OF DROPS 26 23 35 Moisone Contents determined LL LL=F * FACTOR by ASTM D 2216 Ave. Average 18.5% 37.0 - One Point Liquid Limit 36.0 N Factor N Factor 20 0.974 26 1.005 U 3s.o 21 0.979 27 1.009 E 22 0.985 28 1.014 34.0 -- 23 0.990 29 1.018 24 0.995 30 1.022 33.0 -_ 25 1.000 32.0 10 15 20 75 30 35 40 #of Drops too Notes: Estimate the%Retained on the#40 Sieve Special Sampling Methods: Sample Preparation: Wet Preparation ❑ Dry Preparation t7 Air Dried ❑x NP, Non-Plastic ❑ Liquid Bunt Test: Multipoint Method ❑O One-point Method ❑ Liquid Limit 35 Classification: ASTM D 2487 ❑O AASHTO M 145 ❑ Plastic Limit 19 Liquid limit Test: ASTM D 4318 El AASHTO T 89 ❑ Plastic Index 16 Plastic limit Test: ASTM D 4318 ® AASH,r0'r 90 ❑ Group Symbol Technician Name: Kacie Lowder G.+rPcnnorr n Technical Responsibility: Mal Kralan Laboratory Manager Slgrrmwc Paid... S&D1E, INC. 3201 Spring Forest Road, Raleigh,NC. 27616 C-3 Bag-1 P.L.xls Laboratory Record Version 4.2 Liquid Limit, Plastic Limit, and Plastic Index tswE Project#: 1051-08-173 Report Date: 5/21/2008 Project Name: Sam's Club -Jacksonville Test Date(s): 05/14 - 05/19/2008 Client Name: Client Address: Boring#: C-8 Sample #: Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: N/A Depth (ft): 2.5' - 3.0' Sample Description: Gray-Tan Sandy CLAY (Visual) Pan # Liquid Limit Plastic Limit Test# 1 2 3 4 5 6 1 2 3 Tare# 1 6 9 26 28 A Tare Weight 12.96 13.00 12.98 12.87 13.04 B Wet Soil Weight+A 23.73 24.99 23.75 19.32 19.54 C Dry Soil Weight+A 21.13 22.02 20.95 18.50 18.68 D Water Weight(B-C) 2.60 2.97 2.80 0.82 0.86 E Dry Soil Weight(C-A) 8.17 9.02 7.97 5.63 1 5.64 F %Moisture Content(D/E)*100 31.8% 32.9% 35.1% 14.6% 1 15.2% N #OF DROPS 33 26 19 Moisture Contents determined LL LL=F * FACTOR b1,ASTM D 2216 Ave. Average 14.9% 36.0 35.0 i One Point Liquid Limit v - N Factor N Factor c 34.0 _ _ 20 0.974 26 1.005 U - - 0.979 27 1.009 3 33'0 22 0.985 28 1.014 - -_ 23 0.990 29 1.018 32.0 24 0.995 30 1.022 31.0 25 1.000 30.0 -- 10 100 15 20 25 30 35 40 #of Drops Notes: Estimate the%Retained on the#40 Sieve Special Sampling Methods. Sample Preparation: Wet Preparation ❑ Dry Preparation El Air Dried El NP, Non-Plastic ❑ Liquid limit Test: Multipoint Method ❑x One-point Method ❑ Liquid Limit 33 Classification: ASTM D 2487 O AASHTO M 145 ❑ Plastic Limit 15 Liquid limit Test: ASTM D 4318 O AASHTO T 89 ❑ Plastic Index is Plastic limit Test: ASTM D 4318 p AASIITO T 90 ❑ Group Symbol Technician Name: Kacie Lowder Technical Responsibility: Mal Kraian Laboratory Manaiter Signn.... Poaid S&ME, INC. 3201 Spring Forest Road, Raleigh,NC.27616 C-8 Bag-2 P.L.xis Laboratory Record Version 4.2 Liquid Limit, Plastic Limit, and Plastic Index ts&ME Project#: 1051-08-173 Report Date: 5/23/2008 Project Name: Sam's Club - Jacksonville Test Date(s): 5/21 - 5/23/08 Client Name: Client Address: Boring #: DP-2 Sample#: Tube Sample Date: 5/19/2008 Location: Site Borehole Offset: N/A Depth (ft): 3 - 3.5 ft. Sample Description: Gray-Brown Sandy CLAY (Visual) Pan # Liquid Limit Plastic Limit Test# 1 2 3 4 5 6 1 2 3 Tare# 3 14 17 22 28 A Tare Weight 13.01 12.97 12.94 13.14 13.04 B Wet Soil Weight+A 22.71 24.27 23.56 19.88 19.65 C Dry Soil Weight+A 19.90 21.06 20.57 18.72 18.50 D Water Weight(B-C) 2.81 3.21 2.99 1.16 1.15 E Dry Soil Weight(C-A) 6.89 8.09 7.63 5.58 5.46 F % Moisture Content(D/E)*100 40.8% 39.7% 39.2% 20.8% 21.1% N #OF DROPS 23 27 33 Moisture Contents determined LL LL=F *FACTOR by d.STMD 2216 Ave. Average 210% 45.0 44.0 One Point Liquid Limit 43.0 __= N Factor N Factor 0 42'0 20 0.974 26 1.005 U aLo 21 0.979 27 1.009 40.0 0.985 28 1.014 0 39.0 38.0 -_= 24 0.995 30 1.022 37.0 --_ 25 1.000 36.0 35.0 10 100 15 20 25 30 35 40 #of Drops Notes: Estimate the%Retained on the#40 Sieve Special Sampling Methods: Sample Preparation: Wet Preparation ❑ Dry Preparation ❑x Air Dried O NP, Non-Plastic ❑ Liquid limit Test: Multipoint Method O One-point Method ❑ Liquid Limit 40 Classification: ASTM D 2487 t7) AASHTO M 145 ❑ - - Plastic Limit 21 Liquid limit Test: ASTM D 4318 t7 AASHTO T 89 ❑ Plastic Index 19 Plastic limit Test: ASTM D 4318 El AASHTO T 90 ❑ Group Symbol Technician Name: Kacie Lowder Cort�[[I(100 b Technical Responsibility: Mal Kraian Laboratory Manager Signnmre Porawn S&ME, INC. 3201 Spring Forest Road, Raleigh,NC.27616 DP-2'1'ube P.I..xls Laboratory Record Version 4.2 Liquid Limit, Plastic Limit, and Plastic Index fS&ME Project#: 1051-08-173 Report Date: 05/21/2008 Project Name: Sam's Club - Jacksonville Test Date(s): 05/14 - 05/20/2008 Client Name: Client Address: Boring#: DP-2 Sample#: Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: NA Depth (ft): 1.0' - 5.0' Sample Description: Gray-Brown Sandy CLAY(CL) Pan # Liquid Limit Plastic Limit Test# 1 2 3 4 5 6 1 2 3 Tare# 1 10 14 23 26 A Tare Weight 12.96 13.02 12.96 13.01 12.87 B Wet Soil Weight+A 24.13 27.60 28.01 19.78 19.86 C Dry Soil Weight+A 21.58 24.20 24.46 18.78 18.79 D Water Weight(B-C) 2.55 3.40 3.55 1.00 1.07 E Dry Soil Weight(C-A) 8.62 11.18 11.50 5.77 5.92 F %Moisture Content(D/E)*100 29.(,0/. 30.40% 30.9% 17.3% 18.1% N #OF DROPS 30 24 19 Moisture Contents determined LL LL=F * FACTOR by ASTM D 2216 Ave. Average 17.7% 33.0 32.0 One Point Liquid Limit - N Factor N Factor c 31.0 _ 20 0.974 26 1.005 21 0.979 27 1.009 30.0 _ - 22 0.985 28 1.014 c -29.0 23 0.990 29 1.018 r_� 24 0.995 30 1.022 28.0 25 1.000 27.0 - 10 too li 20 25 30 35 40 #of Drops Notes: Estimate the%Retained on the#40 Sieve Special Sampling Methods: Sample Preparation: Wet Preparation ❑ Dry Preparation EI Air Dried ❑x NP, Non-Plastic ❑ Liquid limit Test: Multipoint Method O One-point Method ❑ Liquid Limit 30 Classification: ASTM D 2487 ❑x AASHTO M 145 ❑ Plastic Limit 18 Liquid limit Test. ASTM D 431 S l) AASHTO T 89 ❑ Plastic Index 12 Plastic limit Test: ASTM D 4318 O AASHTO T 90 ❑ Group Symbol CL Technician Name: Kacie Lowder cmif,nnon# Technical Responsibility: Mal Kraian Laboratory Manager Signnnmc Position S&ME, INC. 3201 Spring Forest Road, Raleigh,NC.27616 DII-2 Rag-I Classification.sis Laboratory Record Version 4.2 Particle Size Analysis of Soils tUME ASTM D 422 S&ME Project#: 1051-08-173 Report Date: 05/21/2008 Project Name: Sam's Club - Jacksonville Test Date(s): 05/14- 05/20/2008 Client Name: Client Address: Boring#: DP-2 Sample#: Bag Sample Date: 5/12/2008 Location: Site Borehole Depth (ft): 1.0' - 5.0' Sample Description: Gray-Brown Sandy CLAY (CL) "1.5 "1.0"3/4 "1/2"3/8 #4 #10 #20 #40 #60 #100 #200 100% 90% 80% 70% - — en .y 60°/6 R — a — 50°/r u V L i 40% - 30% -- -- 20% 10% --- 0„/r III 100 10 1 0.1 0.01 Particle Size(trim) Cobbles <300 mm(12")and>75 mm(3") inc land <0.425 man and>0.075 min(#200) Gravel <75 mm and>4.75 mot(#4) Silt <0.075 and>0.005 mot Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 man Medium Sand <2.00 mm and>0.425 man(#40) Colloids <0.001 mm Maximum Particle Size 3/8" Gravel 0% Medium Sand 2% Silt& Clay (% Passing#200) 57.4% Coarse Sand 0% Fine Sand 41% Apparent Relative Density 2.653 Moisture Content 13.7% Organic Content ND Liquid Limit 30 Plastic Limit 18 Plastic Index 12 ND=Not determined Description of Sand& Gravel Rounded ❑ Angular ❑ Hard&Durable ❑ Soft ❑ Weathered&Friable ❑ References: ASTM D 422: Particle Size Analysis of Soils Hj,drometerportion of test method not utilized. ASTM D 421:Dry Preparation of soil Samples ASTM D 854:Specific Gravity of Soils ASTM D 4318: Liquid Limit,Plastic Limit,&Plastic Index of Soils ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) Technical Responsibility: Mal Kraian Laboratory Manager Signnrure Posirion S&ME,INC. 3201 Spring Forest Road, Raleigh,NC.27616 D11-2 Bag-I Classillcation.xls Laboratory Report Version 4.2 Moisture - Density Report E S&ME Project#: 1051-08-173 Report Date: May 21, 2008 Project Name: Sam's Club-Jacksonville Test Datc(s): 05/14 -05/15/2008 Client Name: Client Address: Boring #: DP-2 Sample#: Bag Sample Date: May 12, 2008 Location: Site Borehole Offset: N/A Depth(ft): 1.0' -5.0' Sample Description: Gray-Brown Sandy CLAY(CL) - Maximum Dry Density 115.8 PCF. Optimum Moisture Content 12.9 % Moisture-Density Relations of Soil and Soil-Aggregate Mixtures) Soil Properties 130.0 Natural Moisture Content: 19.0%t 2.653 1000 rSato ation Curve Liquid Limit: 30 125.0 Et -- Plastic Limit: 18 Plastic Index: 12 120.0 Specific Gravity: 2.653 -- - - _ -1 —I— % Passing U - -I - - I" Q 115.0 _ _ #4 100.0 IlO.0 I i I —JJL — I—— I— --� 105.0 100.0 Oversize Fraction I i Bulk Sp.Gravity 95.0 —� /o Moisture 0.0 5.0 10.0 15.0 20.0 25.0 Oversize Fraction Moisture Content(%) MD1) Opt.MC _ Moisture-Density Curve Displayed: Fine Fraction ❑O Corrected for Oversize Fraction(ASTM D 4718) ❑ Sieve Size used to separate the Oversize Fraction: #4 Sieve O 3/8 inch Sieve ❑ 3/4 inch Sieve ❑ Mechanical Hammer ❑ Manual Hammer ❑x Moist Preparation ❑x - Dry Preparation ❑ References: ASTM D 698:Laboratory Compaction Characteristics of Soil Using Standard Hurt ASTM D 2216:Laboratory Determination of water(Moisture)Content orsoil and Rock by Mass ASTM D 422:Particle Size Analysis or Soils ASTM D 854:Specific Gravity of Soils As'rM D 4318:Liquid Limit.Plastic Limit.&Plastic lndcx of Soils ASTM D 2487t Classification of Soils for Engineering Purposes(Unified Soil Classification System) Technical Responsibility: Mal Kraian Laboratory Manager SIR......... PovdO S&MEJNC. 3201 Spring Forest Road,Raleigh,NC.27616 DP-2 Bag-1 Procntr.xls Page I Laboratory Report Version 4.2 CBR (California Bearing Ratio) of Laboratory Compacted Soil S dam ME ASTM D 1883 Project#: 1051-08-173 Report Date: 05/21/2008 Project Name: Sam's Club -Jacksonville Test Date(s): 05/16 - 05/21/2008 Client Name: Client Address: Boring #: DP-2 Sample #: Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: N/A Depth (ft): 1.0' - 5.0' Sample Description: Gray-Brown Sandy CLAY (CL) - ASTM D 698 Method A Maximum Dry Density (PCF): 115.8 Optimum Moisture Content: 12.9% Compaction Test performed on the Fine Fraction only %Retained on the 3/4"sieve: 0.0% Uncorrected CBR Values Corrected CBR Values' CBR at 0.1 in. 7.6 CBR at 0.2 in. 5.6 CBR at 0.1 in. 7.6 CBR at 0.2 in. 5.6 100.0 90.0 I 80.0 1 � - - Corrected Vnlne aLl" „r Corrected value all" - I 70M 60.0 TT I -i 4 5o.0 40.0 1 30.020.0 T T r IT T 0.00 0.10 0.20 0.30 - Strain(inches) CBR Sample Preparation: Grading was in accordance with the above method and compacted using the G' diameter CBR mold. Before Soaking After Soaking Compactive Effort (Blows per Layer) 35 Final Dry Density(PCF) 107.3 Initial Dry Density (PCF) 110.2 Average Final Moisture Content 16.10/o Moisture Content of the Compacted Specimen 13.2% Moisture Content(top I" after soaking) 15.37A Percent Compaction 95.1% Percent Swell 0.1% Soak Time: 96-hr Surcharge Weight 10.0 Surcharge Wt. per sq. Ft. 50.9 Liquid Limit 30 Plastic Index 12 Apparent Relative Density 2.653 References: ASTM D 1993:CDR(California Bearing Ratio)of Laboratory-Compacted Soil ASTM D 4318: Liquid Limit,Plastic Limit,&Plastic Index of Soils ASTM D 698: Laboratory Compaction Characteristics of Soil Using Standard Effort ASTM D 422:Particle Size Analysis of Soils ASTM D 2216. Laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass ASTM D 2487: Classification of Soils for Engineering Purposes(Unified Soil Classification Technical Responsibility: Mal Kraian Laboratory Manager srx,,m Penh'.,: S&ME, Inc. 3201 Spring Forest Road,Raleigh, NC. 27616 DP-2 Bag-1 CBR.xls Laboratory Report Version 4.2 Revision Date: Demcembcr 10,2005 WI-4972-SF s PH of Soil = ASTM D4972 Project#: 1051-08-173 Report Date: 05/21/2008 Project Name: Sam's Club - Jacksonville "Test Date(s) 05/14 - 05/20/2008 Client Name: Client Address: Boring No. C-1 Sample No. Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: N/A Elevation: 0.5'- 1.5' Sample Description: Tan-Gray Clayey Fine SAND (Visual) Equipment: Balance (GPI/GI): S&ME ID# 1024 pH Meter(Method A): S&ME ID# 1365 Sieve No. 10: S&ME ID# 1046 pH Calibration Buffer Solution Results pH buffer 7.0 7.05 pH buffer 4.01 4.02 pH buffer 10.0 10.04 Buffer Temperature °C 23.3 Measuring pH of Soil Measurements Weigtht of Air Dry Soil (g) 30.07 Distilled Water(ml) 30 Temperature 0C 23.9 pH Readings 7.13 Reference: ASTM G51: pI-I of Soil for Use in Corrosion Testing Remarks: Technician Name: Kacie Lowder a.nf��no„a Technical Responsibility: Mal Kraian Laboratory Manager 3201 Spring Forest Rd. S&ME, Inc. Raleigh,NC. 27616 C-1 Rang-1 pH.As Laboratory Report Version 4.2 Revision Date: Demcember 10,2005 tsamd" M WI-4972-SF pH of Soil ASTM D4972 Project#: 1051-08-173 Report Date: 05/21/2008 Project Name: Sam's Club - Jacksonville Test Date(s) 05/14-05/20/2008 Client Name: Client Address: Boring No. C-8 Sample No. Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: N/A Elevation: 0.5' - 1.5, Sample Description: Gray-Tan Sandy CLAY (Visual) Equipment: Balance (GPI/GI): S&ME ID# 1024 pH Meter(Method A): S&ME ID# 1365 Sieve No. 10: S&ME ID# 1046 pH Calibration Buffer Solution Results pH buffer 7.0 7.05 pl-I buffer 4.01 4.02 pH buffer 10.0 10.04 Buffer Temperature 0C 23.3 Measuring pH of Soil Measurements Weigtht of Air Dry Sail (g) 30.41 Distilled Water(ml) 30 Temperature°C 23.9 pH Readings 6.56 Reference: ASTM G51: pFl of Soil for Use in Corrosion Testing Remarks: Technician Name: Kacie Lowder Technical Responsibility: Mal Kraian Laboratory Manager 3201 Spring Forest Rd. S&ME,Inc. Raleigh,NC.27616 C-8 13ag-1 pll.xls Laboratory Report Version 4.2 Revision Date: Demcember 10,2005 WI-4972-SF pH of Soil tSWE ASTM D4972 Project #: 1051-08-173 Report Date: 05/21/2008 Project Name: Sam's Club-Jacksonville Test Date(s) 05/14 - 05/20/2008 Client Name: Client Address: Boring No. C58 Sample No. Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: N/A Elevation: 2.5' - 3.0' Sample Description: Gray-Tan Sandy CLAY (Visual) Equipment: Balance (GPI/GI): S&ME ID# 1024 pH Meter(Mahod A): S&ME ID# 1365 Sieve No. 10. S&ME ID# 1046 pH Calibration Buffer Solution: Results pH buffer 7.0 7.05 pH buffer 4.01 4.02 pH buffer 10.0 10.04 Buffer Temperature 6C 23.3 Measuring pH of Soil Measurements Weigtht of Air Dry Soil (g) 30.04 Distilled Water(ml) 30 Temperature°C 23.9 pH Readings 5.13 Reference: ASTM G51: pH of Soil for Use in Corrosion Testing Remarks: Technician Name: Kacie Lowder Ccn frniiou p Technical Responsibility: Mal Krajan Laboratory Manager Sibrinmre Poii,ion 3201 Spring Forest Rd. S&N1E, Inc. Raleigh,NC.27616 C-8 Rag-2 p1l.xls Laboratory Report Version 4.2 Revision Date: Demcember 10,2005 WI-G57-SF Soil Resistivity tsam iil ASTM G-57 Project#: 1051-08-173 Report Date: 5/23/2008 Project Name: Jacksonville Sam's Club Test Date(s) 5/22 - 5/23/08 Client Name: Client Address: Boring No. C-8 Sample No. Bag Sample Date: 5/12/08 Location: Site Offset: NA Depth (ft): 0.5 - 1.5 £t. Sample Description: Gray-Tan Sandy CLAY (Visual) Equipment: Balance (GPI/GI): S&ME ID# 1024 Standard Box S&ME ID# 13240 Oven: S&ME ID# 1046 Antp-Meter S&ME ID# 13239 Moisture Content Determination As Received Condition 17.9% After 247hr Condition 22.6% Resistivity (ohms- cm) As Received Condition 4582 After 24-hr Condition .1524 Remarks: Technician Name: Mal Kraian Cerr fmrion n Technical Responsibility: Mal Kraian Laboratory Manaeer Slynmure Porirlon 3201 Spring Forest Rd. S&ME, Inc. Raleigh,NC.27616 C-8 Bag-I Resistivity.sls Laboratory Report Version 4.2 Revision Date: Demcember 10,2005 W I-G57-SF SE Soil Resistivity AS'rM G-57 Project#: ]051-08-173 Report Date: 5/23/2008 Project Name: Jacksonville Sam's Club Test Date(s) 5/22- 5/23/08 Client Name: Client Address: Boring No. C-8 Sample No. Bag Sample Date: 5/12/08 Location: Site Offset: NA Depth (ft): 2.5 - 3 ft. Sample Description: Gray-Tan Sandy CLAY (Visual) Equipment: Balance (GPI/GI): S&ME ID# 1024 Standard Box S&ME ID# 13240 Oven: S&ME ID# 1046 Anip-Meter S&ME ID# 13239 Moisture Content Determination As Received Condition 23.7%, After 24-hr Condition 27.4% Resistivity (ohms - cm) As Received Condition 3154 After 24-hr Condition 1395 Remarks: Technician Name: Mal Kraian frnfrnrion n Technical Responsibility: Mal Kraian Laboratory Manager signmur Po+iion 3201 Spring Forest Rd. S&MR, Inc. Raleigh, NC. 27616 C-8 Bag-2 Resistivity.xis Laboratory Report Version 4.2 Revision Date: Demecrober 10,2005 W I-G57-SF tSME Soil Resistivity ASTM G-57 Project #: 1051-08-173 Report Date: 5/23/2008 Project Name: Jacksonville Sam's Club Test Date(s) 5/22 - 5/23/08 Client Name: Client Address: Boring No. C-1 Sample No. Bag Sample Date: 5/12/08 Location: Site Offset: NA Depth (ft): 0.5 - 1.5 ft. Sample Description: Tan-Gray Clayey Fine SAND (Visual) Equipment: Balance(GPI/GI): S&ME ID# 1024 Standard Box S&ME ID# 13240 Oven: S&ME ID# 1046 Amp-Meter S&ME ID# 13239 Moisture Content Determination As Received Condition 12.5% After 24-hr Condition 17.2% Resistivity (ohms - cm) As Received Condition 3567 After 24-hr Condition 1447 Remarks: Technician Name: Mal Kraian Cnr fnrtion p Technical Responsibility: Mal Kraian Laboratory Manager Sgrmture Posiion 3201 Spring Forest Rd. S&b1E, Inc. Raleigh,NC. 27616 C-1 Bag-1 Resistivity.xls Laboratory Report Version 4.2 Revision Date: November 19,2004 w1-2974-sr• Moisture, Ash, and Organic Matter tSWE ASTM D-2974 Project#: 1051-08-173 Report Date: 05/21/2008 Project Name: Sam's Club -Jacksonville Test Date(s) 05/14 - 05/16/2008 Client Name: Client Address: Boring No. C-7 Sample No. Bag Sample Date: 5/12/2008 Location: Site Borehole Offset: N/A Elevation: 1.5' - 2.5' Sample Description: Black Organic Sandy CLAY (Visual) Equipment: Balance (GPI/G1): S&ME ID# 1024 0.01 g.Readability, 500g. Minimum Capaccity Oven: S&ME ID# 1046 Muffle Furnace: S&ME ID# 0026 Method A: Moisture Content Determination Oven Temperature: 105 + 5 °C Tare# 035 t Tare Weight(Dish plus Aluminum Foil Cover) grams 147.96 a Mass of As-Received Specimen +Tare Wt. grams 331.13 b Mass of Oven Dry Specimen +Tare Wt. grams 274.67 w Water Weight (a-b) 56.46 A Mass of As-Received Specimen (a-t) 183.17 B Mass of Oven Dry Specimen (b-t) 12G.71 %Moisture Content as a % of As Received or Total Mass (w/A)*100 30.8°/r %Moisture Content as a % of Oven-dried Mass (w/B)*100 44.60/o Method C(440°Q or D (750°Q:Ash Content and Organic Matter Determination Muffle Furnace Temperature: 440 "C Tare# Big Cup t Tare Weight(Dish plus Aluminum Foil Cover) grams 55.14 b Mass of Oven Dry Specimen +Tare Wt. grams 111.33 C Ash Weight+ Tare Wt. grams 107.57 C Ash Weight c-t 52.43 B Mass of Oven Dry Specimen (b-t) 56.19 D "%A.sh Content (C/B)*100 93.3'% % Organic Matter 100-D 6.7'%t %Moisture Content as a % of Oven-dried Mass = Reproved per ASTM D2974-01 Remarks: References: ASTM D2974: Standard Test Method for Moisture,Ash, and Organic Matter of Peat and Other Organic Soils Technician Name: Kacie Lowder CurI,f... n n Technical Responsibility: Mal Kral Laboratory Manager Signnnve l'osiriori 3201 Spring Forest Rd. S&ME, Inc. Raleigh,NC. 27616 C-7 Rag-1 Organic Content.zls 3201 Spring Forest Road *S&ME Raleigh, NC 27616 Project Information Date: 24-May-08 Site:iSam's.Clfib:Sf6-re'#657'�m04�4-- a 01 Location:fJa&lZgcnviII6,iN6fth�C-a-ro'li'n'*a'*' Project No.:JI051-08-173 4 Asphalt Pavement Asphalt MM Stone Subbase Design Criteria CBR Design Value ' iL6 X CBR 7,500 psi Resilient Modulus= _ A ; , Standard Duty Heavy Duty Equivalent 118 kip)Single Axle Loads'ESAIL 421,800 Equivalent 1111 kip)Single Axle Loads IESALsi,-335;100 Design Life(yrs) r 20r Design Life(yrs) 20� Terminal Servicalbility Terminal Servicability ZO Reliability Reliability 85%, Initial Serviceability l 4*2 Initial Serviceability v 4.2 Standard Deviation Standard Deviation Required Structural Number(from Asphalt 2.0 Required Structural Number(from Asphalt 2.8 Structural Number Tab) Structural Number Tab) Required Flexible Pavement Section Try Wal-Mart's minimum required asphalt thicknesses of 3 inches and 4 inches for standard and heavy duty,respectively. Minimum recommended stone base by Wal-Mart is 4 inches. Standard: Asphalt Binder 0.44- inches Stone Subbase 0.14* inches 2.2 > 2.0 Heavy Duty: Asphalt Binder 0.44* 74 inches Stone Subbase 0.14* 8 inches 2.9 > 2.8 AASHTO Guide for Design of Pavement Structures, 1993. 3201 Spring Forest Road #S&ME Raleigh,NC 27616 Project Information Date: 24-May-08 Site: Sam's Club Store#6573-04 Location: Jacksonville,North Carolina Project No.: 1051-08-173 Asphalt Pavement Light Duly Heavy Duty R 85% - R 85% - ZR -1.04 - ZR -1.04 - Sa 0.45 - Sp 0.45 - A psi 2.2 - A psi 2.2 - MR 7,500 psi MR 7,500 psi SN 2.0 - SN(input) 2.8 - W1e 49,820 ESALS Wa 416,696 ESALS Wle(Needed) 43,800 ESALS Wle(Needed) 335,800 ESALS AASHTO Guide for Design of Pavement Structures, 1993. 3201 Spring Forest Road #S&ME Raleigh, NC 27616 INPUT,CELLS q Project Information Date: 17-Jun-08 Site:ISam's',Club,Store';#l6573=04.:,QasStahon 's ..„. _a1W -=.`;";� Location [J2ck9d6ytl1e;Nortlirt,arolma Project No.:�,105:1_08173 '-, Asphalt Pavement Asphalt Stone Subbase Design Criteria CBR Design Value Resilient Modulus SOOO X CBR = 7,500 psi Standard Duty Heavy Duty Equivalent It kip)Single Axle Loads(ESAL 73 OUO"' Equivalent(18 kip)Single Axle Loads(ESALs) 335 800.! Design Life(yrs) +x"20 Design Life(yrs) 2041 !21 Terminal Sewicability n`2 D"y 7 Terminal Servicability Reliability 4 +'85% Reliability Initial Serviceability "4 2 ;c Initial Serviceability 4.2 Standard Deviation +r:0 45 ;° Standard Deviation Required Structural Number(from Asphalt Required Structural Number(from Asphalt Structural Number Tab) 2-2 Structural Number Tab) 2_8 Required Flexible Pavement Section Try Wal-Mart's minimum required asphalt thicknesses of 3 inches and 4 inches for standard and heavy duty,respectively. Minimum recommended stone base by Wal-Mart is 4 inches. Standard: Asphalt Binder 0 44 inches Stone Subbase 0.1 I ,,j6 ;.;}inches > 2.2 Heavy Duty: Asphalt Binder 0 44 "7q7,7T , ° inches Stone Subbase 0 14 ",r„8 M ':inches 2.9 > 2.8 AASHTO Guide for Design of Pavement Structures, 1993. 3201 Spring Forest Road Raleigh,NC 27616 Project Information Date: 17-Jun-08 Site: Sani s Club Store#6573-04-Gas Station Location:Jacksonville,North Carolina Project No.: 1051-08-173 - Asphalt Pavement Light Duty Heavy Duty R 85% R 85% za -1.04 ze -1.04 - So 0.45 - So 0.45 A psi 2.2 - 4 psi 2.2 - Ma 7,500 psi Ma 7,500 psi SN 2.2 - SN(Input) 2.8 - Wre 89,575 ESALS W18 416,696 ESALS Wra(Needed) 73,000 ESALS W,a(Needed) 335,800 ESALS AASHTO Guide for Design of Pavement Structures, 1993. 3201 Spring Forest Road #S&ME Raleigh, NC 27616 Project Information Date: 24-May-08 Site: Sam's Club Store#6573-04 Location: Jacksonville,North Carolina Project No.: 1051-08-173 Concrete Pavement ONIII P Concrete Stone Subbase Standard Duty Heavy Duty Equivalent(18 kip)Single Axle Loads(ESALs) 43N800i}; Equivalent(18 kip)Single Axle Loads(ESALs) 335 800 Design Life(yrs) ' t�20), y Design Life(yrs) Terminal Servicability 2 0� Terminal Servicability 2 0 Reliability ; i85% Reliability Initial Serviceability ' 4 2 y;, Initial Serviceability Standard Deviation 0 35 ..!i Standard Deviation Api 2.2 eps; 2.2 Concrete Elastic Modulus Load Transfer Cofficient(J) From II-25 AASHTO Eo=57000 (fcp5 where Pc=4000 psi J Ec=57000'(4000)^0.5 = 3.6E+06 psi Drainage Coefficient Concrete Modulus of Rupture From II-25 AASHTO S'c=8.5' (fcp5 where f c=4000 psi Cd = -'.1.0 S'c=8.5' (4000p5 = 538 psi Subgrade Modulus_ k ;150 `-"pci(based on design CBR value) Stone Thickness ;�^,�,_ � Ly6;,;. ! inches(thickness necessary to reach desired k value) Required Pavement Section from Concrete Thickness Tab Try Wal-Mart's minimum required concrete thicknesses of 5 inches and 6 inches for standard and heavy duty,respectively. Minimum recommended stone base by Wal-Mart is 4 inches. Standard: 5 inches Concrete 6 inches CABC(stone base) Heavy Duty: 7 inches Concrete 6 inches CABC(stone base) AASHTO Guide for Design of Pavement Structures, 1993. 3201 Spring Forest Road *S&ME Raleigh,NC 27616 Project Information Date: 24-May-08 Site: Sam's Club Store#6573-04 Location: Jacksonville,North Carolina Project No.: 1051-08-173 Concrete Pavement Light Duty Heavy Duty R 85% - R 85% - zR -1.04 - ZR -1.04 So 0.35 - So 0.35 A psi 2.2 - A psi 2.2 Pi 2.0 - Pi 2.0 ' k 150 pci k 150 Pei E, 3,604,997 psi E, 3,604,997 psi S.� 538 psi S'� 538 psi J 3.8 - J 3.8 - Ca 1.0 - Ca 1.0 - Thickness5,00 " inches Thickness i!"' '1T.00 inches log IN, 4.88 - log W,s 5.64 - W,e 76,0$7 ESALS W18 43 f$ ESALS W,a(Needed) 43,800 ESALS W,a(Needed) 335.800 ESALS "Change Thickness so that W,a is greater than W,s Needed(Green Shade) AASHTO Guide for Design of Pavement Structures, 1993. 3201 Spring Forest Road *S&ME Raleigh, NC 27616 Project Information Date: 17-Jun-08 Site: Sam's Club Store#6573-04- Gas Station Location: Jacksonville,North Carolina Project No.: 1051-08-173 Concrete Pavement { I t. Concrete --- Stone Subbase Standard Duty Heavy Duty Equivalent(18 kip)Single Axle Loads(ESALs) 73,OOOC' Equivalent(18 kip)Single Axle Loads(ESALs)L 35,800"dz; Design Life(yrs) 20�' .' Design Life(yrs) Terminal Servicability 2:0� - Terminal Servicability Reliability r, ;85%h. Reliability 85p/o Initial Serviceability Initial Serviceability Standard Deviation '. �„0.35--+ Standard Deviation Opsl 2.2 Apsl 2.2 Concrete Elastic Modulus Load Transfer Cofficient(J) From II-25 AASHTO E�=57000 (fcP,s where fc=4000 psi J = Ell Ec=57000'(4000)A 0.5 = 3.6E+06 psi Drainage Coefficient Concrete Modulus of Rupture From II-25 AASHTO S'c=8.5' (fcp5 where Pc=4000 psi Cd S'c=8.5'(4000f = 538 psi Subgrade Modulus k ,u ti i r 150; r ` - pci(based on design CBR value) Stone Thickness a + � %6't Jinches(thickness necessary to reach desired k value) Required Pavement Section from Concrete Thickness Tab Try Wal-Mart's minimum required concrete thicknesses of 5 inches and 6 inches for standard and heavy duty,respectively. Minimum recommended stone base by Wal-Mart is 4 inches. Standard: 5 inches Concrete 6 inches CABC(stone base) Heavy Duty: 7 inches Concrete 6 inches CABC(stone base) AASHTO Guide for Design of Pavement Structures, 1993. 3201 Spring Forest Road #S&ME Raleigh, NC 27616 Project Information Date: 17-Jun-08 Site: Sam's Club Store#6573-04-Gas Station Location: Jacksonville,North Carolina Project No.: 1051-08-173 Concrete Pavement Light Duty Heavy Duty R 85% - R 85% zR -1.04 - zR -1.04 - So 0.35 - Sa 0.35 - A psi 2.2 - A psi 2.2 - Pi 2.0 - Pi 2.0 - k 150 PC! k 150 pci E, 3,604,997 psi E, 3,604,997 psi S., 538 psi S.� 538 psi J 3.8 - J 3.8 - Ca 1.0 - Ca 1.0 - Thickness [7 5 00, f:,;7 inches Thickness =7 00 ,' t w` 9 inches log W,a 4.88 - log W,a 5.64 - W,e NOMW7,61057 ESALS W,a 438^=186 ESALS W,a(Needed) 73,000 ESALS W,e(Needed) 335,800 ESALS `Change Thickness so that W ra is greater than W,s Needed(Green Shade) AASHTO Guide for Design of Pavement Structures,1993. GEOTECHNICAL INVESTIGATION REPORT SAM'S CLUB JACKSONVILLE, NORTH CAROLINA S&ME PROJECT NO. 1051-93-211 TABLE OF CONTENTS Section Page 1.0 Summary 1 2 . 0 Project Description 2 3 . 0 Area Geology 3 4 . 0 Exploration 3 4 . 1 Field 3 4 . 2 Laboratory Testing 4 5 . 0 Site Description 4 5. 1 Surface Features 4 5 .2 Subsurface Conditions 5 6. 0 Laboratory Test Results 6 7 . 0 Conclusions and Recommendations 6 7 . 1 Site Preparation 7 7 . 2 Foundation Design and Construction 6 7 . 2 . 1 Shallow Spread Footings 9 7 . 2 . 2 Pile Foundation 10 7 .2 .3 Floor Slab 11 7 . 3 Retaining Wall Parameters 11 7 . 4 Flexible and Rigid Pavement Designs 12 7 .4 . 1 Flexible Pavements 13 7. 4 .2 Rigid Pavements 14 7 . 5 Corrosion Potential 15 8 . 0 Quality Control Testing and Inspection 15 9 . 0 Qualifications of Report 16 Appendix 1. 0 - SUMMARY For your convenience, this report is summarized in outline form below. This brief summary should not be used for design or construction purposes without reviewing the more detailed information presented in the remainder of this report. 1. The exploration for this project included the performance of 12 test borings in the building area and 13 test borings in the pavement areas. Routine laboratory testing was also performed on representative soil samples. 2 . The site is located in the Coastal Plain area of North Carolina. Topsoil overlies this site to depths of approximately 6 to 8 inches and is underlain by soft to firm silty clays, sandy clays, and clayey sands to depths of approximately 22 to 23 feet. Below this depth, firm to very dense limestone Marl, sands and shells were encountered to the boring termination depths of 30 feet. 3 . Site preparation ' prior to building and pavement construction should include removal of the topsoil materials. The exposed subgrade should be proofrolled with a partially loaded pan or dumptruck to identify areas requiring subgrade repair. Due to the soft near surface soils found at many of the boring locations and their high natural moisture conditions, some undercutting and/or aeration and recompaction is anticipated. 4 . Due to the high groundwater conditions and moisture sensitive clayey soils, this site should be graded only during the drier summer and fall months. If this site is graded during the wetter winter and spring months, significant undercut of near surface soils should be anticipated. Also the excavated soils from the retention pond will be practically unusable during this wetter period. 5 . A shallow spread foundation system may be utilized for support of the building structure, however, significant settlement concerns exist. Surcharging of the building area will be necessary to allow shallow spread footings to be utilized. A fill surcharge thickness of 5 feet applied for a period of 2 to 3 months is recommended. Page 2 6. Another alternative for foundation support for the building is use of a pile foundation system. Treated timber piles having 10 inch tips, driven into the dense Marl formation, can be used to support this structure. Piles should be designed for a working capacity of 20 tons, however, due to negative skin friction (downdrag) concerns the piles should be driven as 30 ton piles. Differential settlement between the structural frame and _ adjacent floor slab of 1 inch or less may occur. This differential settlement can be reduced by pile supporting the floor slab or surcharging the building area. 2 . 0 - PROJECT DESCRIPTION The following project information is based on our review of standard Wal-Mart geotechnical investigation's specifications as well as our review of the preliminary grading plan provided by McKim and Creed which shows the topographic features and locations of the building, parking lot and roadways. Wal-Mart Stores, Inc. is planning construction of the Sam's Club to be located on Western Boulevard (NCSR 1470) in Jacksonville, North Carolina. Construction of the project will involve approximately 134 , 000 square feet of building area including the 20, 000 square foot proposed expansion. The proposed Sam's Club has plan dimensions ofapproximately 300 x 350 feet with a tire mounting area on the east side of the building and a loading dock to the rear. A retention pond, having a depth of approximately 6 feet, is to be excavated on the west side of the store and will have approximate dimensions of 100 x 410 feet. We understand that this pond will retain surface stormwater from the pavement areas. Automobile parking will be provided to the south of the store with entrance roads off of Western Boulevard located near the east and west property boundaries. Based on present topographic and preliminary grading information, fills of 2 to 2- 1/2 feet will be required in the building area to obtain the design finish floor elevation of 47 . 9 feet. In the pavement areas, minimal fill depths will be required, generally less than 1 foot. A cut on the order of 1 to 2 feet will be required for the rear loading dock area. As mentioned above, a cut of approximately 6 feet will be required for excavation of the retention pond. Because of minimal on-site borrow, we anticipate that soils excavated from the retention pond will be needed for structural fill in the building area. Page 3 Detailed structural information has not been provided, however, we have assumed that typical structural loading information as provided in Wal-Mart's geotechnical investigation and report specifications would be applicable for this store. Accordingly, typical bay spacings between columns and walls would be approximately 60 feet by 40 feet. Exterior columns will be typically spaced 40 feet apart. Typical gravity loads to the interior columns will be 105 kips with an estimated maximum gravity load that could occur due to severe live loading of 145 kips. The estimated typical exterior column gravity load will be 60 kips. Maximum column uplift forces from wind is estimated at 30 kips. Estimated uniform loads on continuous footings for load bearing concrete block walls will range from 4 . 5 to 6 kips per linear foot. Estimated maximum uniform floor slab loads will 250 psf with maximum concentrated floor slab load of 16 kips. 3. 0 - AREA GEOLOGY The site is located within the Coastal Plain physiographic and geologic province of North Carolina in Onslow County. The Coastal Plain geologic region has been formed during past transgressive and regressive movements of the ocean into and out of North Carolina. As such, the Coastal Plain province is characterized by subdued topographic features in flat, low-lying terrain. The primary geologic formation within the depth of exploration at this site is the River Bend formation. The River Bend formation is a marine deposit typically consisting of limestone overlain by and interbedded with hardened sandy limestone. 4.0 - EXPLORATION 4.1 - Field our field exploration consisted of the performance of twelve (12) test borings in the building area to depths of 20 to 30 feet below existing ground surface. Also thirteen - 10 foot test borings were performed at random locations in the proposed pavement areas. Test borings were performed at the site on August 30, 31, and September 1, 1993 . The approximate locations of the test borings are shown on Figure 1. Boring locations were staked in the field by S&ME personnel and referenced to existing property boundaries and corners. Ground surface elevations at the boring locations have not been obtained, however, the site is relatively flat with little difference in elevation between test borings. Page 4 The borings were performed using a CME 750 drill rig mounted on an all terrain carrier. Standard splitspoon samples of subsurface soils were taken in the borings at approximately 2-1/2 foot intervals above a depth of- 10 feet and 5 foot intervals below a depth of 10 feet. Standard Penetration Tests were conducted in conjunction with the splitspoon sampling in general accordance with ASTM D-1586 . In addition, bulk samples of near surface soils were obtained in the pavement areas and relatively undisturbed Shelby tube samples were obtained of softer clayey soils in the building area for laboratory testing. The borings were observed for groundwater levels at completion of drilling and at least 24 hours thereafter. 4 .2 - Laboratory Testing The splitspoon soil samples obtained from the borings, as well as the bulk samples, were transported to our laboratory where they were visually classified by a geotechnical engineer. Splitspoon samples and bulk samples of the upper soils were subjected to natural moisture content, grain size distribution and Atterberg Limits testing. Also pH and resistivity testing were performed of upper soils in the building area. Three (3) bulk soil samples were subjected to Standard Proctor compaction test (ASTM D-698) and remolded California Bearing Ratio (CBR) testing. The CBR tests were performed on soil samples compacted to approximately 98% of the Standard Proctor maximum dry density. Consolidation testing was performed on four (4) relatively undisturbed Shelby tube . samples for evaluation of settlement potential of these soils under the structural loading conditions. Also, Unconfined Compression tests were performed on undisturbed Shelby tube samples at borings B-5, B-8 and B-12 . The results of the laboratory testing are presented on data sheets contained in the Appendix. 5. 0 - SITE DESCRIPTION 5. 1 - Surface Features The proposed Sam's club is located on the north side of Western Boulevard (NCSR 1470) adjacent to an existing Lowe's store. The site is characterized by relatively flat topography with shallow ditches along the east and west property boundaries and the highway shoulder ditch to the south. The site has been recently cleared of trees and stumps grubbed. After the grubbing operation, it appears that the site has been leveled by blading or backdragging with a dozer. At the time of site drilling, the drill rig and support pickup truck was able to traverse the site with no difficulty. However, drilling was performed at a time when an extended period of dry weather had existed. Page 5 5.2 - Subsurface Conditions A generalized subsurface profile prepared from the test boring data is shown on- Figures 2A and 2B to illustrate the subsurface conditions encountered at the site. The attached individual test boring records provide more detailed subsurface information at individual test boring locations. A general description of the subsurface conditions encountered at the site is described below. Topsoil overlies the project site to depths of 5 to 8 inches. For stripping purposes, an average topsoil depth of 6 to 8 inches should be considered. This depth of stripping should remove the majority of the rootmat and organics associated with the previous clearing and grubbing operations. Underlying the topsoil materials, generally very soft to firm silty clays, clayey sands and sandy clays were encountered to depths of approximately 8 feet below existing ground surface. These soils having Standard Penetration Tests (SPT) values ranging from 2 to 10 blows per foot. The upper 2 to 3 feet of soils generally have SPT values ranging from 4 to 6 blows per foot with softer soils encountered at borings B-4, B-10, B-12 , P-7, P-11 and P-13 . Underlying the above soils, very soft to soft silty clays, clayey sands, and sandy clays were encountered to a depth of approximately 22 to 23 feet. These soils had typical SPT values ranging from 1 to 4 blows per foot. The compressibility characteristics of this soil layer and the overlying clays were evaluated by performing consolidation tests on relatively undisturbed Shelby tube samples. Results of this testing are presented in a later section of this report. A firm to very dense layer of Marl (limestone) , shells and cemented sands were encountered below a depth of 22 to 23 feet at the four borings drilled to depths of 29 to 30 feet. SPT values in this layer range from 18 to in excess of 100 blows per foot. This strata is part of the River Bend limestone formation. Groundwater was encountered at depths ranging from 2 to 4-1/2 feet below existing ground surface. Water levels were observed in the boreholes at least 24 hours after drilling. Groundwater levels will change with seasonal and climatic changes and may occur at higher elevations during the wetter winter and spring months. The drilling of this site was performed after a relatively dry period of time thus the water table recorded should be considered to be at approximately its seasonal low level. Because of the relatively high groundwater levels, earthwork operations could be impacted, especially if excavations occur below 2 to 3 feet. Page 6 6. 0 - LABORATORY TEST RESULTS Representative soil samples including splitspo undisturbed Shelby tube sa , and bulk samples were obtained on samples, mples during the field exploration for testing verify field classifications of the soils and laIn our boratory to engineering design parameters . Laboratory testingestablish moisture contents, Atterberg Limits included natural and resistivity, unconfined compression, and consolidationze testing' In addition, Standard Proctor moisture density relationships were conducteddonnbulkaked Ca samples lfrom bo lringsnp-Zatio (CBR) tests were laboratory tests were conducted in gen7 accord ca, anr dance All applicable ASTM test procedures. Results of er1 the laboratory testing are presented in the Appendix to this report. Based on the laboratory testing, the upper clayey soils are classified as fine sandy low plasticity clays having percent fine sand ranging from approximately 30 to 38$. Liquid limits of these soils range from 28 to 33% with plasticity indices of l0 to these Natural moisture contents varied from .1ty n 30s compared t. Standard Proctor optimum moisture contents of 14 . 1 to 15. 9%. Based on these natural moisture conditions, the soils are considerably wet of their Standard Proctor optimum moisture values. Standard Proctor maximum dry densities of these upper soils range from 110.9 to 114 .9 pounds per cubic foot at optimum moistures of 14. 1 to 15. 9%. Bulk samples obtained from borings P-2, t and P-12 were subjected to soaked CBR tests. on samples recompacted to approximately 98% of their standard Proct or maximum dry density. Samples were recompacted on the wet and dry side of optimum moisture. This testing revealed CBR values of 9 . 3 to 7. 9g with pmpercent swells ranging from 0 to 1. 21. Consolidation tests were ed on pperrclays andeunderllln undisturbed Shelby tube s. samples of the Of 0. 060 and 0. 094 were recorded clayey for g soft the Compression indices upper indicating moderately low compressibility tvalues. The a underlying soft clays had compression indices of 0. moderate to highly compressible soils. 217 and 0. 265, indicating 7. 0 - CONCLUSIONS AND RECOMMENDATIONS The following recommendations are based upon review of the test boring data, our understanding of the and past experience with similar Proposed construction susurface conditions. If structural loads or site g ad sects arehsignificantly different from those presented in this report, we should be notified in order that we can review and comment upon our recommendations so that they may be confirmed, extended or modified as necessary. Additionally, if subsurface conditions adverse to those indicated by this report are encountered during construction, I these differences should be reported to us for review and comment. Page 7 7.1 - Site pre aration The site has been cleared of all trees and been grubbed of all stumps. Site preparation should be removal of all to appears to have Based on the boring material within the constructioin n with the depths on the order go data, we anticipate that topsoil stripping remove soils containing suffici nt organics inches will bander of mat n orderlto materials should be stockpiled or utilized in non-structural These Following the strippingareas. to receive fill should be operation, the exposed subgrade soils or receive f to proofrolled with a Partially Based on the test boring any areas re Y loaded pan Of the site 5 information, we nticipateuthat d some areas undercut and soil backfillinrequire subgrade repair, involvin areas represented g• Such areas could include hallow lieu of undercutting B-q B-1o, B-12, P-7, P-11 and p_ those drying of the u g in some areas in-place repair b 13 In moisture conditioning to 12 inches of soil and recompactionlaf or The method nd subgrade stabilize Yieldingafter 4 repair will have to be ear surface soils. field at the time of grading operationsunde. determined depths of groundwatersite, Because of the inllow the to maximum depths of 2 to 3hfeet below he existicut ng g be restricted Depending on the stability of the near surface soils surface. conditions at the time of site grading, the use dozers to stripmoisture minimize subgrade disturbance lieu of of wide track large scrapers could help The grading contractor should be equipment to aerate and dry near surface soils toto their optimum moisture content in order to stabilize areas that are ede due to moisture optimum over weak subgrade Indiscriminant use deflecting undercut on his e areas could of large scrapers Project greatly increase the amount of performed after a drysite. -increase should or below period of time when the surface soils are be at operation should Of moisture content. The experienced soils engineerbe . Ion under the proofrolling supervision of an Because of high groundwater conditions sensitivity of the and site be grading during clayey soils, it is Paramount that tture hisNovember. Typically the typical drier from December months of May through amounts are greater and dryingthrough April, when rainfall surface soils will be conditions are vet rubber tired traffic, extremely wet and will rut poorand ' the near Pump If wet winter grading is attempted, it nder I' i I Page 8 should be anticipated that considerable undercutting and use of select off-site granular borrow will be necessary in order to prepare subgrades adequately for construction. With the present soil moisture conditions already wet of optimum moisture, additional rainfall or poor natural drying conditions would compound the subgrade problems at this site. Upon completion of the necessary subgrade repairs, areas requiring fill may be brought to design finish grade utilizing on- site or off-site borrow. We anticipate that a significant volume of on-site borrow can be obtained from the retention pond to the west of the building. These excavated soils will consist of silty clays, sandy clays and clayey sands, at moisture contents typically wet of optimum moisture. This would especially be true in excavating at or below the groundwater table. The unit weight and plasticity characteristics of these soils are suitable for use as structural fill in the building area, however, the grading contractor should be made aware that drying of these soils through discing and aeration will be necessary in order to obtain. the desired compaction levels. If the site is graded during the wetter months of the year when drying of soils is impractical, these excavated soils may need to be wasted. Off-site borrow placed in building or pavement areas should consist of sandy soils having plasticity indices less than 15%. All structural fill should be placed and spread in 6 to 8 inch uniform lifts and compacted to at least 95% of the Standard Proctor maximum dry density except within the final foot of design subgrade where the requirements should be increased to at least 98% of the Standard Proctor maximum dry density. In pavement areas receiving less than 12 inches of fill, we recommend that the existing subgrade soils be uniformly compacted to the 98% compaction level. This will most likely require that the virgin soils be disced and compacted in-place with the use of a sheepsfoot roller. Site preparation, including fill placement and compaction, should be monitored by an experienced soils technician. Density tests should be conducted to verify that compaction is in accordance with the plans and specifications. 7 .2 - Foundation Design and Construction The subsurface conditions found within the proposed building area are marginal for support of this structure on shallow spread footings without consideration being given to settlement concerns resulting from fill, floor and structural frame loading. Consolidation test results on samples of the softer clays within' Page 9 the major stress influence of the foundations and building floor loads reveal that excessive post construction settlements could occur without proper planning and foundation considerations. The following sections 7.2 . 1 and 7 . 2 . 2 of this report provides geotechnical considerations and recommendations for use of shallow spread footings or piles for support of this structure. 7.2 .1 - Shallow Spread Footings our bearing capacity analysis reveals that the upper clayey soils could support a net allowable bearing pressure of 1500 psf with a safety factor of 3 . 0. However, use of a shallow spread footing foundation for support of the walls and column footings must also take into account settlement considerations. Our settlement analysis reveals that total settlement due to the floor load (250 psf) , fill weight (approximatley 300 psf) , and structural loading resulting from wall and column footings, will produce total settlements on the order of 3 to 3-1/2 inches beneath interior columns. These magnitudes of settlement are obviously unacceptable for a structure of this type. In order to reduce total settlements to a more acceptable level, settlement due to the fill and floor loading must be eliminated prior to column and wall footing construction. Settlement associated with the fill and floor loadings is estimated to be approximately 2 inches, leaving approximately 1-1/2 inch settlement due to column loading. In order to eliminate the floor and fill loading settlement, placement of structural fill for obtainment of finish grade and placement of an additional 5 feet of surcharge fill will be necessary. Since the surcharge fill will only serve as providing dead weight to allow preconsolidation of the underlying subsoils prior to floor slab construction, this material can be placed in an uncompacted state. The 5 feet of surcharge is necessary in order to provide sufficient load to cause the estimated 2 inches of settlement calculated for the fill and floor loading to occur within a reasonable time period. our consolidation time-rate analysis indicates that the surcharge may have to be left in-place for a period of 2 to 3 months in order to cause sufficient settlement and preconsolidation of the underlying soils. To monitor the settlement during surcharge loading, settlement plates will need to be placed at the base of the surcharge fill. We recommend a minimum of 9 settlement plates be installed at the base of the surcharge fill. After removal of the surcharge fill, excavation of the column and wall footings can occur. Due to the differential settlement constraints, we further recommend that the individual column and wall footings be over-excavated 2 feet neat line footing dimensions Page 10 and excavated soils replaced with #67 washed stone.. Over- excavation and stone replacement will reduce total settlements beneath interior columns to 1 inch and differential settlements between adjacent columns to 1/2 inch. Along the wall footing, a similar total and differential settlement between column locations can be anticipated. Differential settlements between the floor slab and interior columns and floor slab and exterior walls of 1 inch or less should be anticipated since the settlements associated with the floor settlement have already occurred due to the surcharge loading. The surcharge fill should be placed within the building area and approximately 10 feet outside the building limits. It is also recommended that the surcharge fill be placed over the 20, 000 foot square foot expansion area. It is recommended that the surcharge fill consists of soils suitable for use as fill in she pavement areas. The removal surcharge fill could be placed and compacted in these areas. Excess fill may need to be stockpiled on-site or trucked off-site. 7.2.2 - Pile Foundation Another alternative for support of this structure is the use of treated timber piles driven into the dense Marl formation. we would recommend that a 10 inch tip timber pile be utilized driven to a depth of 25 to 30 feet below existing ground surface into the dense Marl and sand layer. The timber piles should be designed for an allowable capacity of 20 tons, however, they should be driven to a capacity of 30 tons, assuming that approximately 10 tons of negative skin friction (downdrag) may occur due to fill and floor slab loading. Because of the dense Marl layer, care should be taken that the piles are not overdriven which could cause pile breakage. The piles should be driven with a pile hammer delivering a rated energy of approximately 15, 000 foot pounds. Pile driving criteria should be established using the NC Building Code pile driving formula. In accordance with the NC Building Code, a pile load test will not be necessary since the allowable capacity is less than 40 tons. Prior to production driving, we recommend at least 12 indicator piles be driven across the building area to allow determination of production pile lengths. Based on the test boring information, we recommend that the indicator piles have a length of 30 feet. It is anticipated that production piles will require lengths of 25 to 30 feet. All pile driving activity should be monitored by an experienced soils engineer or senior engineering technician who should record all blow counts during driving activities and verify that each pile has obtained its design working capacity. Page 11 Settlement beneath columns or walls supported on the timber piles should be less than 1/4 inch. In order to minimize differential settlements between the structural frame and floor slab, settlement due to the fill loading must stabilize before floor slab construction. Thus, fill should be placed as early as possible and monuments established on top of the fill to monitor settlements. We anticipate that 2 to 3 months of waiting will be necessary before fill settlements will fully stabilize. The monuments at the fill surface should be monitored on a weekly basis and this information provided to an experienced soils engineer. Provided the fill settlement stabilizes prior to floor slab construction, differential settlements between the column footings and floor slab and wall footings and wall slab should be less than 1 inch. Obviously, the floor slab should be structurally separated from the wall and column footings. If this magnitude of differential settlement is unacceptable, then surcharging of the site will be necessary prior to pile driving activities or the slab will need to be pile supported. 7.2 .3 - Floor slab The on-site borrow soils or an approved granular off-site borrow source will provide suitable support for a properly designed floor slab. Assuming 'that the on-site soils are utilized as structural fill within the building area, we recommend that a 6 inch layer of compacted CABC stone be placed beneath the floor slab to provide an all weather construction surface and greater uniformity in slab subgrade support. Ede recommend the 6 inches of stone consist of NCDOT aggregate base course specified in section 1010 on page 651 of NCDOT, "Standard Specification for Roads and Structures" . We recommend that the CABC stone be compacted to at least 95% of its Modified Proctor maximum dry density. Provided the subgrade soils are compacted to at least 98% of the Standard Proctor maximum dry density and the CABC stone is compacted to 95% of its Modified Proctor maximum dry density, the floor slab may be designed utilizing a subgrade modulus of 150 pci. Use of a vapor barrier is not considered necessary fnr this site. 7 .3 - Retaining Wall Parameters Retaining walls should be designed to resist a triangular lateral earth pressure distribution. Lateral earth pressures resisted by the walls will be partially dependent on the method of construction. If the walls are relatively rigid and structurally braced against rotation, they should be designed for the at rest lateral earth pressure condition. If the walls are free to deflect during backfilling, such as exterior walls that are not restrained or rigidly braced, the active pressure will be applicable for design. The following ultimate lateral earth pressure coefficients are recommended for design, assuming a level backfill and no buildup of hydrostatic pressures. Page 12 Lateral Earth Pressure Value Conditions At Rest Coeffient (Ko) 0.5 Active Coefficient (Ka) 0. 35 Passive Coefficient (Kp) 1, 000 psf for footings embedded in undisturbed upper clays - 2 . 5 for footings embedded in granular backfill Unit Weight of Soil (moist) 120 pounds per cubic foot Friction Coefficient Between 0. 4 for footings bearing on Foundation & Bearing Soils granular. fill - 500 psf for footings bearing on undisturbed clayey soils To avoid hydrostatic pressure buildup behind the walls by saturation from surface water or leaking utilities, backfill should be separated from the walls by a free draining crushed stone or concrete sand or pre-manufactured drainage product such as Enkadrain or Miradrain. The wall drain should be tied to a footing drain or weep hole system. Lateral earth pressure arising from surcharge loading should be added 'Co the above earth ,pressures to determine the total lateral pressure. Soil backfill placed behind the retaining wall should be compacted to at least 95% of the Standard Proctor mdximum dry density with exception of the upper 12 inches beneath the floor slab which should 'receive 98% compaction. Operation of heavy compaction equipment within 5 feet behind the retaining structures could create lateral earth pressures for in excessive of those recommended for design. Thus far, relatively light compaction equipment, such as hand operated equipment, should be used within 5 feet of the walls rather than heavy compaction equipment. Only granular soils should be placed as backfill for retaining walls for this project. 7.4 - Flexible and Rigid Pavement Design Based on the soil test boring data, the existing subgrade soils within the pavement areas will typically consist of silty clay and sandy clay. California Bearing Ratio (CBR) testing performed on representative samples of these soils compacted to approximately 98% of their Standard Proctor maximum dry density Page 13 exhibited CBR values ranging from 4 .3 to 7.9%. Based on our experience with these soil types and our laboratory test results, a design CBR value of 5. 0% is recommended. This design CBR value is - based on the subgrade soils being uniformly compacted to at least 98% of their Standard Proctor maximum dry density at approximately optimum moisture content. The most important factors affecting pavement life are the condition of the subgrade immediately prior to base course placement and post construction drainage. Exposed subgrades should be proofrolled immediately prior to base course placement. Any areas which yield, pump or rut excessively during the proofrolling should be removed and replaced with properly compacted soils. In addition, the subgrade soils should be relatively dry and at or near optimum moisture content prior to base course placement. To promote proper post construction drainage, pavement surfaces should be constructed to provide positive site drainage and prevent ponding and excessive water on the pavement surface, at the edge of the asphalt pavements, and at any planters located within pavement areas. 7.4. 1 - Flexible Pavement Based on the provided traffic volume estimates for Sain's Club, ,it is our understanding that a standard duty pavement section should be designed for a 20 year design period and subjected to 14 , 600 eqivalent 18 kip single axle load applications with a terminal serviceability of 2 . 0 and a reliability of 85% . A heavy duty pavement section should be designed for 335,800 equivalent 18 kips single axle load applications. Utilizing the AASHTO Guide for Design of Pavement Structures - 1986, the above loading conditions and a design CBR value of 5. 0%, the following pavement sections are recommended. FLEXIBLE STANDARD HEAVY DUTY STRUCTURAL PAVEMENT DUTY COEFFICIENTS Asphaltic Concrete 2" 1-1/2" 0.40 Surface Course (Type I-1 or I-2) Asphalt Binder - 2" 0. 40 Course (Type H) Crushed Aggregate 6-1/2" 10" 0. 14 Base Course Stone (CABC Type A or B) Page 14 All materials and construction methods should conform to the current North Carolina Department of Transportation (NCDOT) "Standard Specifications for Roads and Structures" . The aggregate base course stone should consist of stone meeting the requirements under Section 520, pages 281 to 290 and Section 1010, pages 651 to 656 . The base course stone should be compacted to at least 100% of the maximum dry density as determined by the Modified Proctor compaction test, AASHTO T-180 as modified by NCDOT. To confirm that the base course stone has been uniformly compacted, in-place density tests should be performed by a qualified soils technician. The asphaltic concrete surface course should consist of type I-1 or 1-2 and conform to Section 645, pages 368 to 372 in the NCDOT, "Standard Specifications for Roads and Structures" . The asphaltic concrete binder course (type H) should conform to Section 640, pages 365 to 368 of NCDOT. Sufficient testing and inspection should be performed during pavement construction to confirm that the required thickness, density and quality requirements of the snecifications are followed. Although our analysis was based on a 20 year design life, our past experience indicates that an overlay may be needed in approximately 7 to 10 years due to weathering and oxidation of the asphalt surface. ' A 1 inch overlay can he applied to the proposed asphalt pavement at that time. 7.4.2 - Rigid Pavement A rigid pavement analysis was performed based on the previous traffic volumes. The flexural strength of the concrete was assumed to be 538 psi which is approximately equivalent to a compression strength of 4000 psi. A modulus of subgrade reaction of 150 pci was used for design assuming that 4 inches of ABC stone will be placed and compacted beneath the concrete pavement. Based upon the traffic data, the following rigid pavement sections are recommended. PAVEMENT COMPONENT STANDARD DUTY HEAVY DUTY Concrete Thickness 5" 7" Crushed Aggregate 4" 4" Base Course Stone - (CABC Type A or B) Jointing 8 - 10, 12 to 151 Page 15 It is recommended that the subgrade beneath the concrete pavement be uniformly compacted to at least 98% of the Standard Proctor maximum dry density. The aggregate base course stone layer should be compacted to at least 100% of the Modified Proctor maximum dry density. 7.5 - Corrosion Potential Resistivity and pH analysis were performed on three representative soil samples obtained during the field exploration to evaluate the corrosion potential of the on-site soils. The results of the pH analysis indicate that the soils are neutral to slightly acidic with pH values in the range of 6. 2 to 7. 1. The resistivity values were measured to range from 7, 534 to 10,696 ohm ' - centimeters. These values indicate that Type 1 cement can be used in concrete structures and buried utilities can be placed unprotected with a low potential for corrosion. 8.0 QUALITY C014TROL TESTING AND INSPECTION Testing and inspection during site grading of this project will be very important to verify that the means and methods used to grade the site are in accordance with the specifications and drawings and produce results as required by these documents. Ct is our recommendations that a senior soils technician working under the direction of a geotechnical engineer be present during these activities to verify that subgrade soils are properly. prepared prior to foundation installation and slab-on-grade and pavement construction. During the field placement activities, we recommend that a senior soils technician be present on-site to provide random testing to verify that fill is being placed in accordance with the plans and specifications. Because of the soft near surface soil conditions, it is very important that proper repair of these soils be done under the supervision of an experienced geotechnical engineer or soils technician. Also we recommend that all footings be inspected prior to concrete placement to verify that adequate bearing conditions exist. As recommended in this report, if shallow spread footings are utilized, all footings should be over- excavated 2 feet and placed with clean #67 stone. The need for any additional over-excavation should be determined in the field by the soils engineer or senior soils technician. If a pile foundation system is utilized, a geotechnical engineer should be present during the indicator pile installation to witness the driving activities. During the production pile driving, a senior soils technician working under the direction of a geotechnical engineer should be present to record the driving resistances to verify that piles are being installed as designed and in a similar fashion as the indicator piles. Page 16 9. 0 QUALIFICATIONS AND REPORT This report has been prepared in accordance with generally accepted engineering practice for specific application to this project. The conclusions and recommendations contained in this report are based on the applicable standards of our profession at the time this report was prepared. No other warranty, expressed or implied, is made. Analysis and recommendations submitted in this report are based, in part, upon the data obtained .from the subsurface exploration. The nature and extent of variations between the borings made may not become evident until construction. If variations appear evident, then it will be necessary to re- evaluate the recommendations of this report. In the event that any changes in the nature, design, or location of the building are planned, the conclusions and recommendations contained in this report should be reviewed and conclusions. of this report modified or verified in writing. We strongly recommend that our firm be provided the opportunity for general review of final design specifications to verify that earthwork and foundation recommendations are properly interpreted and implemented. GENERALIZED SUBSURFACE PROFILE BUILDING AREA B-1 8-2 8-3 B-4 B-5 B-6 B-i 6-8 B-9 B-10 B-II B-12 6 6 5 4 5 7 M 6 5 2 7 4 t- 8 9 6 0:9 : 8 7 10 6 4 4 6 w a 5 5 3 5 5 5 6 6 6 4 � 10 2_ 2_ ;;• 3 2 1_ 2_ 2_ 3_ —2 — 2 _ c ' 0 3 6 2 4 4 2 3 4 2 3 4 4 02 3 -- 3 2— 1 — 4-- 3— .••. 2 — 4— 3— 3— 4 2 m g 55 50/6" a 51 IL 50/6" 016 30 30 53 LEGEND TOPSOIL CAVED DEPTH CIL T Y CLAY I _ UNDiSTUR_=D S-,-lM:.=__ OLAY v SAND: SANDY CLAY -_' -�- _,N^ARD =EN�TRAT':CN '..ARL, SAND 8 SHELL PROJECT SCALE . M I" = 10' SAM'S CLUB J 0 B N0: 1051-93-211 WESTERN BOULEVARD S&ME JACKSONVILLE, NORTH CAROLINA FIG NO. 2 A a O GENERALIZED SUBSURFACE PROFILE PARKING AP,FA r P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-II P-12 P-13 3:W o -- oQ 5 5 5 6 5M736 6 5 4 5 4 m� 6 7 5 8 109 7 7 7 7 9�0 4 4 6 4 44 5 6 5 3 4 10 Z 3 2 O LEGEND SEE. FIGURE 2 A PROJECT SCALE : (V) 1" = 10' SAM'S CLUB J 0 B NO: 1051-93-211 WESTERN BOULEVARD * S&ME JACKSONVILLE, NORTH CAROLINA F IG NO. 2 6 yx �,Vr Re/ i"a-• 1 h.e.ti +<-+' i�R'�yy+'�iir'�kx�*.al� �s.'w✓a r • .� ,k A }C +n '.+.� Ruvv fitbS�ro` '`7y"S 71, ? A� +sS,9'ga` '" s `'^e'„4 M Gi ," �1 4•�r y.�er - z' .e•N '6r' .1 n tiwySE}"�* Ysrj i'' °y`�'' h``v R Y s,✓r*i yy-S�rryy�_''t;a Yr ' "'4.x'rJ. iA `.. a`I f i5k s ,'S'P'- M Cy, �� f 4 � _ � µ �`., .• M '3i ,ds.� "n ✓@� �+ Ai.. ,!' i2 -v...ry� 'A � p o-.+/ Y Mh 4 5{R ,�"' ♦MA.rr +.�,.,. w�Es.. �r ,,'J,. s� ."�> r Z �L�` ,a, e..cs a �j.>f � S wn . 4` "` a ,r+i G���h.g +,.y'y` p����}' r9d�4'"S�t t. �•y�'�t4�`i �"'+�'}^4 LA�pl ��^'Ao-,+`�'_°}j•���" 1A�,t,� ��� . �''4`'�i�e Ar>�b'•},.r.;r�--, 1 �"t�° 1 k � #ri 2 A ai .TS:1.d�"'Y+_'� �e� "'"'Y.^yr x `R` R P �r7a� .'l �t �d��},, r• .y�' sM'.ni i off.'.�y♦4`:Sq"L Y"`�. e"1,? .�ryr✓}r rti`� �i:4�N'rv ^rit}'�Y> J„n.• R'Y��`^r ��fc.. � + N..:b ��R�� 7��1; .� �.�`. �tti { J,.+lrr� /X '+YPE-}„3.�'1} 3� rv�c b r r • a' ' h s� G �,.r"2�''T +v� �9 �,.�.;o- cM Az+. 'r ,L•. _ . ^b �S"�GS"SI•.' '� i"�xm.-'Jidm"lG�, 'P'.�siey..y �V o��x��°�tNK�J1�tis��Tya9 ,v�"$`^' ,t r 7,� fi.�l e-7N. + r ,y"b"k.•�w spa-`�� r.t'•��-' aµF:?��„�,�"..rk"Y:� ,}."4 _- wS «sNzr+Ys`,.., -6,'giy ,`b"'s.'Gy`.• � :lf>�}(l,{yq<[ �Y' � - e y� d�J'�ry• w�� iltiro &�7 r �' ]"pj, yw ' + -c"J5a r a M u„�i . •K'.r ,� '�,. c J �f _� , w.i'„.�wv� "aG ' ""S +1' Y5 J r e§h ,+•' e�" • t Yam $. q -SJX -}�k'0.' V--r 5 • n v� h.• .e+�'�s..lfta ` ""1'�rt�i _,,� `A1'm'r}�d�4`k'.✓< �y' a.�c+ fpp r + m � �c � � rl �d• ,AaY `N � , e ��''+� •.r 4yj}„a °>n�'*Gift �,9y: �� e y' �'�S.�t`•^' �" �vt{h"� �' rs 9���"..,rta�' ,�`��'.: i?,e.�u''A'y�!-�y�?+v'r„�,�'s�^' E '� A,�,,'Fidn t•$ a�.' .��'." v R�.��� K-Y4yw.4v �+'�iL�xf R.15rJf�r3`�a. �ra.gr W4ir� ram, ra n• .. a:- ' ��� '.yd � p ^-T$J rffi atTy+,"�'�jyi` G �1�'pS ,•°' � ��r."a�•�Yir*' ��. 5���y ��• l N �` 2pv f.{,�1�� r�i i' {(t��' ��.vLy 4�1•.l>+ ... /�r� < d .'F 1 �A 1 bfu ( Yft f �G.Y� -M�YAIM� 'F•� �,�' fY.f .bs ti'�c' �: �V.J.qWN -Vt. •P yh? r �A tii�*^ - '.N•k� rJ 'f r ��t. y....+•i ,•,r 7 1' .e" sL ,v ..f,i`v�yff .Ns. . w•k'}P, L".kA..r ..y � - e�' 3 ti "'•� '{tGK�i3' yiP#rt.t��t�rS ^�M1'. AV— n ^rt,- Sµ . a/F r ♦a �A�^'yy ,��•�..• • •Z4� '"!�' pj�i. ✓{;S � 1 tlkj .S�'� �c���,jnw..•-���tP y •• JI'Yp ♦ _ .SA{{`%% .I' � � Y^'�',�..,,'�S'r�r�` .Slv Y av ry.M rw�r .y., •���' �. Cs,� �'i p�.:i'a� r rr� �•a°ry'� I s'ft'.1�d^ rxa+ aKyp�t i rxw A t ../q.rr Sr 4�" 'r wL4N/ ti W}':h•w yyk�C""S'a 5.. � ' ! ', > ?�."'"'` ff 4, * e�I t'`a..N hk' �•r?�-''� WgFS��'^'�'1'+kr{+ir,. "Y!" .d t a -' .•" ,+'r+ pr r , r , a **t��.. ,.a'.,3��l. ✓ 1 }• ' '� ?w / L.r".iT# Ca':' �'rSY'� ri•'*"' {� �4�" .- 1 fir �"+i�. rq� �4ro Y,f � �Rny�,w� .K ,��s1♦rur � .{r � e 1,a3 d�r'arxw w„�FN`t'.Y F..dry,+ - � �""tal� .C�Y.��7w?r'�f 2 fi;�X3• vRNn>' lY C iT"'�� lGF` 'h^S$`p .Jy, t� v*'�n�w.M^�or 1u.+'.ai� b� L�' .Y -t.,. .e•'� ..�9 { .k � ♦' �~E.ut'♦'-+n�w..�i ��"�jyic^"^���t'ysy`��"� �• • AF.'F>� �,.,.i .yy ..• !.l. � at �� �.°r 4-rrr•P"'"-av � �'�SF'I'=P.kl#�s'+rSL �,b,�r� �P t •a� � '' ` 's.'s w".'fir-°'�f yc'.L4',.vs�^�'tx-'- ?'i Z •• •• "j.f :./ 7'. i+ ^t J'.y�Y�r� +ter+rr-a•fk��t�"�/ l�,C "may ' iM o-a ' � 4,tr6'3r'r'r�a� R���t+p� t � � �' • 2�'A r � r� �' x.. . 4 � a�� � �i�r�J,t'Y a dL� u^t yS3✓�, i ,�r3♦�,rf ` .. �. y.. y�,�v'r.,. i;•:'�'`.-.0 f' . ':+.s,.u ?� . i���i tw S""?�ar,.C`-� .'"!':��^. �w-.•�w2 ,�3hti,. ' .`^'.-�. ±� • T e r r$ + .Pii^�re'���>'� :.per ✓. e::'�..ti• ''TiL"'..re,v.,ww-�. '^�, l E x '••lnv�„+r rrt..a. '''L„+`r'Y' if r "dC 5 -a•+ �+i'�r�.a��.^�'� a'•.kfr�agt••4:2""a`�, � tL� Hb'• "^F v'� >• aas Ty yr „�,.,y a S,^�p .„pJ ���er w,q.�' a '°�' •+'.R°r^ , .,�-R' A, �mr'�4'^ y�s.�ikr'� .o .'S�iY`r,�d'v�.' .""i>;""' , y�i�3`•�r��-wv" ..,�+� ,fir F" �w ^4� � _ `Wt' � ,, a.r�':a.r- .-a Y✓ � r"r i"nSY.a ^.u. � a i �IwC a d^""e, r`ee :��f„5�� ib��,� �. r z r ,u3' �+'S-,•4 Ev}+ aa"`T4�' ^ Y i l �f. f n R �� 1�� _ s+'�^ 8"'"ar3,etY"r � � r rP`�^�m'a•-� yr+"' �t'"IcA'- t.frr4•++. � � ./.e�n'd' �'r '�`1"�"" _"'� •if '+y, w„-G ft ••w�-� ��.r x r�JL.�T!� 'a �5 ..4"`.r,. i�t�"f��,r.;a w�. J {e y-te✓3^,- .r.Y�'+,. r':3�.'S' ��Yr.:�wsa'��.F,e Jwr��ua w•;.s,�fj' `r'�. �?.�R^ w .�T:•y. -�5"}� Y.,•?' +�,w.V,,,,ry wM.� .r n Fi' {y" :f�" "F'"''aP'lrtscu s r.Py Sl"`AV is ; NNKr'S'k' n�� tpn` � �-,;! pq x•,,v R !� 'E:'1 t r �'ES.S N"/.�;� d'y�?�'4, }x X�.nMp✓�Y Sl/i �` r7n�n� ��r^t"�nYs' �3V'�!'�y•, ,t � ❖b Fa'xyN; n `.�tn��,..� Y�L' .yL r':q.=.rt Y r A� '] {�.aq�J 7�F. d / 'ta�. 4 "rv- y n '(rr r T t^• tF,. S BSI 6� !2? �w' 'a `t 'fi, / `H`Efl y . `3 i�h - , r•`4�, .. bra">"vr tiP ,.+t^�$'• <: t"" ��-s�.m+ !.. � k s'' h*,'�'+�ia'� ze`^�" `+�yra��y`h-�� �'y '���e..�'".1r✓g"r: ;J�,P, � .t .e �5 c�' �'s. .'a,, x?' ,,. ,a�-"• rFrr-Ft�� x"Lt Ttr say 04 > _ .;u t°` K," P5 yr KSJsrow ✓ " 3 '' y"�"tr,_ y "$ �'�ie t8a '� y„ (`� ( "a�'2y v�ri °�t ti�� •i��e�i :1' ms. 1� �ry �5 Y«N uVS Vri'. ,; •. g vd r,' < i� �< � ` defy+^5iz Fr r ✓ a} r, � • • r F�`'��!'�1�'d n rwr""i C •r�a d'� i.�w,f' `e'�♦ N �/a Y?E,a d Nti s �. bt�fr 67? E �'] Y `fr w Y P <'� .rod .� Yti.> r f A " pT .r o- Gfir4 rf A T r i r '-i:.ti ai`�,�1 har��Ny�r4 •Y� �,.r^ I A.,w�'w3�"•E j { + + 'F �n'e�F l ?d � �d d I I � ✓ Y dr ^" �fj '�"�ityy s.e Y'� Pa .. � J,�}t4 A r . 1 ..r i J e- � � A/ �Y ! ✓�.La �'�! +r'��iF'f' aid � � I r �kSM .'.f r ✓ ,-P .Ad' 1T�,,E..�f� -0rnr��:� fff Yr �]"�C� �'7�}` F�1 �p'�FE °w y ,[��5�. "�7�, ,�••'v � "•. �. � aw r �i ya ri.y kz I E n K� N.�rs,•. �.+��y��`�.a,'✓Fyn l�y`y i r � fyPd LY•• d r •,�s-p¢E��M�`,:;'r�'x,�j � )�,J ��q n-�� �;`��. n.,,,�rrf: ,. w �e;,,.i�vw4'. � t�4+ � l3T.e r b. • ;y,�*C�"iµ.. nYi., 1'T � ' eS,�Fs� . r es3�fi'";.40� !p( �,�+� R� �d TN"ihi' N� �..; • ld f I 4 ' 7 Sa r t +. - �w yla1.y �,/c..7.f � ,t�iE t�•zr 'F"ff a� ;r�� /AF,rr�3d r'd'� ��4t y • a:y�1 �•� k`JF et`yy,+ 3,+��, r Y,7.. Y54 o- d Y �j�><a y�`irlA+�i I P'e.a♦ �Yrt $�'�{ l 44�t,F"q fr�a ,� r eF-}�3 v+KS` 4tyd�Faha l.[rM r c�I • w7 7+ 43 • ,f+: $ x t Yi"'°J"'f"'1'R + 6 i � u x4,ar d' tF4dr{t ''Z�t,H M v r rrL' 1m ttt$ c {•+, \ 1+4r k!' i`at'"a R a+7'{�i�' .a '1 f � } GS SIT Ark t t�,,tw�7�r 9'I+ T�r�h ➢[q4��t�� f�q ii '.� , F t ffil.' .R•(,2r A !a'.Yii* �+ i'.'' ` f s v.d'd•l Y"{5 N.4 " ! , g pp�"25 ��hss ./-wr +d.kl/Y'lf�F $ a • -•�• i jbr ; ' Pik �rFd\M trf �' N}��"•. J 5 � ,• • • ll't•�' 3xpp; axC, 'it' , 'L a " .§ tf �e R 'SS ds1Y i }s l! irk' Ikµ 'L• Ni rI�CA 'itT uia�'+EP d trJ. StJ' 'S a tT i�• ! 4�" '^`M1�"a^ r S; t `k Y ^'^ h'b n r kj`"' -x•t A 1 F M C• w p ;�' a'r+� n fix;^{•.�� �Y yp +rtvt nls�+y�f-.�idt ++ t T• Jl -rinw rfn u rv .4 r s t §F r, A a y 1. }("1' tt la kJB t/ ' u Fi l A t+yp, 5•• v. '' it.}p.",�� + �l u.,a.� + sY;t� � w.jfab �,,,A.•,�,•�. �l1 \ ,tt,��dktf ��'�yY%'" .5' k�t"ju 3;St. �u',�h "t�i � ;6 tuft •;�.��7i~�`"' ��' )?.l��: ;'S;tt. �"'o-+`w•Y'4�'Y� > •�F.iFwd } �'Jnr3 yP,x. ® tE s 4+lr •t`P' r.ad 1 e w t:,( {w fY {r r ��' a.� t p � "�' ''3, < � ''� ' d•l'Pr` . ;i'. y J• S'f�Y a++ �s k l b x S <c -v 3t"�m (+ ' p7,.7. )x n t �.a4 k �V il`k. t-\'7e5+ r��4.¢e+t� 3fr1. icy eR SI?'a ya'�1ry�lyyt lyj i 'Jp ( 1 J.1 y t +.t'' k s rc' y ry �4A .1T�¢+.��•ItA..rr .(l'�%,.'r 1 � a}� l'F Y '' 4 !Y 4 !Y LI P tom.' tn/ la y.,. + t Ff Ct"'e �+ * Y� F s � . .. `b. ++Ea:�}'v .4'+•9'L�%��. ♦^r' 4 rf� �1 +�. .�"'7 ro�4w ✓'{7s�.5 a � �q � ji rF i Y apr�`!.p.+b Yd;'s'k G„fnlln' n"6,x•a J }. 1 w6�',14,}Y4� • � }(�,h ''�.�Y�M � �'/ * # aI�5f ai t iw q4:{�'�S$`"ac.�i, �,\. A�t'y t f�j,rit' �4"'�$y'�Y yb+✓��Y�'MaaY'T�I �k F 1 r.. Oti � .8 �� -'r•nF' r„t If �� /,ig,� � �� n+t Pa 1 J {Rld Wi.�99��� Wt�j�ry�)ly � f y p .(tiWf�+ t S,t .ICtS ��y��iT'';i`•�r"�#fit �' +51� � ;`�'r�� ✓,' a�rt�"Lk i "Ft f�;+• >, t453 r 3 ^ ^C'' r '� a.t� v}},, P%r R4r }� 4 t Y��h ! e' `+-I`�s+r;'�i �>� �• C < 'F °�g tdhiA dt' „hu }c Cn .{ < R�C l'�t �f rY �i Yl'''S''., I S 1l 'rt � 4 ♦ k sk +j V �r I ( rr .+.tY ij '{• t2�KJ - tf l t'r +{ 7 ��Si rY � Yy l,t k1 taM'y� y",�'C'�' ,v+tief4- ^r.lk ,"� + � •„�;p..f4. `,f't fy iYR• iwlrsf \'1 a ,,yyyyv't11 �rt� f}'ity�(44 fjr"'{y�'m'SaS�. •i { L yYx� Fe`i yeY'.!S" 6f y i won A .�4 S t F 4 N•l.?''� J''�F ^R 'Y`Zk � w MO dt'' 4)<' ^t + t � 1' a s+ . si'r i�al Y r �'�'.{.x^t gam,4e ✓R�- T� y.�ii.,��'�<yi �tw r;W�^�! # „ P,a �' - !�F: .,. �� + Y ;� Y,d��I�Y} hl � a`,9 (� �=��-y4 ,'.1�$�'+F�'a#•'rF�k ''�',<`q.�,�cri 1.+��#Xi�+�'`�`` F�'�Ilw^S�•'p ",�" - 'f .Fk t"t�) r>�,�+P q t a��t`t�ft y"s s,�••ty.v ,-. a+5. r t 7 4.•dr{.piy%`{ 41,Z •§'4.•i�Ysfa��'a5�`.�' a'7y;'t ixiSyu°� PN4J,�j!1Z' •- r5 }1�� 1! '�x,cY`k f ykY .1 ^'M;.k� w 'yr r f f •�+f.f P'1 •ark 7 r t✓��F r I `M w„�,^M to Y' � � tt{3Qi�. '�. ,�' v iW rH� _ . ,I+ e'���i?r ?oA i tri�t{y aFt`"PiIF��„•,�5'C?H��.,�..I,FIp•� N�,a.a diY+t lily c' �h d 1"�yi'+" .+ ""+��� �it�` •^4t Fp�yl�'tin�`wf + I 'I�t ,�r+ x ✓�'�^4 a.Yr+b.".yyf`A t p 4 u $2-J xyy Aa a P V ++`ea�f�+: iSR �..,� \ 1 e •n4"�....J.d�F{�a{"'55••°yy",,!"�T2 s r2r'�d'u ! ��fc rY+"$.�P .rLr�n $ 1 ' ry f R � a5.�.l,+'�`�W"',�.•.'• *w�Y.aa.'"l.tt^w�� a< eKF 4 atc *s'tr� r:"Y�?�tr;+7- x�t�iJ+'ts� fr4F�s''.eG.4[,IJ SI� +�'°s�,s ��f�,�� y ;� ,.,,a LC`°• �`M' .*i',r'S�i fC `+a;Pu s'h 4r e� t j„'e� aY' t 7+ t t r q��. -ac '�sh!r.!q t'+•' "1 $ °.. a-•., ;�'k�f�l y'���>t. ' a!: �� "fl"r a'�YY 4l��;.��� osr 3<..r��+'� Y 4Sy\r � `. # , y. w 'L ° Sit' .l: '+ F' D �J F 7 :. f,.d r tSr f�„,•^.• !+y .. ibr F^'Qy� tJ . .: � foci e� NyP; y 3�r.k?ie"��Win YJ.A`,�•��.a. a�"�a4r+r�"'�I�Vf, .i .:a ' • � f'�j- r ., it a"=a XtiS I+R� TM ' a ti•tiZ' DLLIv "gr �5. if . • SHOPPIN � 1 Y. }i y� a�} a!: � q� " NaYi �� a.•,� ' !:i GEOTECHNICAL INVESTIGATION FACT SHEET Include this form in the Geotechnical Report as an Appendix. PROJECT: Sam's Club LOCATION: Jacksonville, NC ENGINEER: John Browning Phone No: 919-872-2660 FIRM: S&ME, Inc. Report Date: September 20, 1993 Ground Water Elevation (If Encountered) : 2 to 4.4 ft. below ground surface Date Measured: September 2, 1993 Topsoil/Stripping Depth: 6 to 8 in. Undercut (If Required) : Maximum 2 ft. in parking and building areas; 2 ft. overexcavation of footings if spread footings used. Standard Proctor Results: Attach Plots. Recommended Compaction Control Tests: 1 Test for Each 5000 Sq. Ft. each Lift (bldg. area) 1 Test for Each 5000 Sq. Ft. each Lift (parking area) Structural Fill Maximum Lift Thickness 8 in. (Measured loose) Subgrade Design CBR value = 5% _ COMPONENT ASPHALT CONCRETE Standard Heavy Standard Heavy Stabilized Subgrade (If applicable) Base Material 6.5" 10" 4" 4" (Stone, Sand/Shell , etc) Asphaltic Base Course N/A N/A Leveling Binder Course 2"_ N/A N/A (H Binder) Surface Course (I-1 or I-2) 2" 1 .5" 5" 7" T4-26.afr FOUNDATION DESIGN CRITERIA Include this form as an Appendix to the Geotechnical Report. LOCATION: Jacksonville, NC ENGINEER: John Browning COMPANY: S&ME Inc. DATE: September 20, 1993 PHONE NO. 919-872-2660 Foundation type: Shallow spread footings if building site surcharged and footings overexcavated and stone replaced. Pile foundations if surcharge not used. Allowable bearing pressure: 1500 Psf for spread footings Factor of Safety: 3 Minimum footing dimensions: Individual : 24" Continuous: 18" Minimum footing embedment: Exterior: 18" Interior: _ 18" Frost depth: 12" Maximum foundation settlements: Total : Refer to foundation recommendations Differential : Slab: Potential vertical rise: 0 - I/4" Vapor barrier or capillary break (describe) : Use 6"CABC beneath floor slab and 4" beneath pavement, no vapor barrier Subgrade reaction modulus: 150 -psi/in Method obtained: Subgrade compacted to 98% Standard Proctor with 6" CABC beneath slab Perimeter Drains (describe) : Building: Yes Retaining Wall : Footing drain or weep holes Cement Type: Type I Retaining Wall : At rest pressure: 0.5 Use of granular backfill Coefficient of friction: 0.4 for footing bearing on granular soil . 500 p.s.f. for footing bearing on virgin clayey soil COMMENTS: Refer to geotechnical report for specific information regarding considerations for shallow footings and pile foundations. NOTE: This information should not be used separately from the geotechnical report. T4-26.afr TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.5 -3-3 Firm Gray-Brown-Orange Mottled Fine Sandy CLAY 3.1 2-3-5 6.0 Loose Gray Clayey Fine SAND 4-9-3 8.0 Very Soft to Soft Gray Silty CLAY 2-1-1 1-2-1 17.0 Soft Gray Fine Sandy CLAY Firm Co Dense Gray 22.5 Marl. Sand & Shell i 7-13-5 � 23-13-26 3( .0 Boring Terminated at 30.0' . Undisturbed sample obtained from 2.5 to 4.5 and 9 to 11' . Groundwater encountered at 3.1' after 24 hours REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 E'ORING NUMBER B-1 DATE 8-31-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 0.4 Topsoil 2-3-3 Firm Gray Orange Silty CLAY 2.7 _ 3.0 ' ' _ Firm Gray Fine Sandy CLAY 7.-3-5 6.0 Loose Gray Clayey Fine SAND 3-2-3 8.0 Very Soft to Soft Gray Fine Sandy 2.-1-1 Silty CLAY i 2-1-5 14.5 Very Loose Gray Clayey Fine SAND 2-1-2 20.0 �Poriag 'terminated at 20.0' . — Groundwater encountered at 2.7' after 2.: hours . I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-2 DATE 8-30-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.6 2-2-3 Firm Gray Orange Fine Sandy CLAY - 2.8 _ 3-4-5 6.0 Loose Cray Clayey Fine SAND 3-2-3 8.0 Soft to Very Soft Gray Fine Sandy CLAY I 1-1-1 i iP.0 Very Loose Gray Very Clayey Fine SAND 3-1-1 0 goring Terminated at 20.0' . Groundwater encountered at 2.8' after 24 hours E� l I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-3 DATE 8-31-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.G 2-1-3 Soft Orange Gray Silty CLAY 3.0 Firm Gray Fine Sandy CLAY 3-3-3 6.5 3-.1-2 Soft Gray Fine Sandy CLAY 8.0 Very Soft to Soft Gray Silty CLAY 1-1-1 z-2_z u Very Loose Very Clayey Fine SAND 2-1-0 Boring Terminated at 20.0' 1 I I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS C NUMBER 1051-93-211 T,ORING NUMBER B-4 DATE 8-31-93 S&ME PAGE 1 OF 1 ' TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 F Topsoil Firm "allow Gray Silty CLAY 2.5 — 3.0 Firm Gray Fine Sandy CLAY 2-3-6 i 6:0 2-3-2 'e irm Gray Clayey Fine SANG 8,0 Very Soft Gray Silty CLAY 1-0-1 12.5 Soft Gray Fine Sandy CLAY 2-2-2 17.0 I--- SoPt Grav Fine co Coarse Sandy CLAY 2-2-'.. 20,Q r_ Poring Terminated at 20.0' Groundwater encountered at 2.5' after 24 hon rs. 'Jndisturbed sample obtained I ' frcbn 3 t,. i. l i' I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-5 DATE 8-30-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. o.o 0 10 20 40 60 100 Topsoil 0.5 2_2-3 Firm Gray Orange Silty CLAY 2.7 3.0 Firm Gray Fine Sandy CLAY 3-3-5 6.0 Firm Gray Clayey Fine SAND 3-2-3 8.0 Very Soft Gray Fine Sandy Silty CLAY 2-1-1 17.0 Loose Gray Very Clayey Fine SAND ' 2-1-2 23.0 L — Very Dense "ray Marl. Sand and Shell 3-11-44 I I I � N50/6.O-' 29.0 1--- — I Borinq Terminated at 29.0' Groundwater encountered at 2.7' after 24 hours. Undisturbed sample obtained Prom 9 to 11' f REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS E :OB NUMBER 1051-93-211 BORING NUMBER B-6 DATE 8-31-93 S&ME PAGE 1 OF 1 _J TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0:0 Topsoil 0.6 2-3-9 Firm Orange Gray Silty CLAY 3.0 Firm Gray Fine Sandy CLAY 3-3-4 3-3-2 3.0 eery Soft Gray Fine Sandy Silty CLAY 1-7-1 12.0 Soft to Very Soft Gray Fine Sandy CLAY t-1-2 1 1 1 22.0 ery Oense Gray Mari, Sand & Shell r I i 60/6.0" 12-29-24 30.0 --'— Boring Terminated at 30.0' REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-7 DATE B-31-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0.0 0 10 20 40 60 100 Topsoil 0.5 3-2-4 Firm to Stiff Orange Gray Silty CLAY 2.3 _ 4-4-6 5.s Firm Gray Clayey Fine SAND 3-3-3 0.0 — Soft Gray Silty CLAY 2-1-2 12.0 Soft Gray Fine Sandy CLAY 2-2-2 Borinq 'P=rminated'at 20.J' rroundwater encountered at 2.3' after 24 hours. ..rdisturbed sample obtained Tram .1.5 to 9.5'. I I I i I I I I I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-8 DATE 8-30-93 S&ME PAGE 1 OF 1 FTEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0.0 0 10 20 40 60 100 Te�aeil 2-2-3 Firm Gray Orange Silty CLAY .0 2.7 0.6 _ Firm Gray Fine Sandy Silty CLAY 3-2-9 6.0 Firm Gray Clayey Fine SAND 3-3-3 3.0 Very Soft to Soft Gray Fine Sandy 1-1-1 Silty CLAY 2-1-1 —I— 2-1-2 20.0 Boring Terminated- at '0.0' Cronndwater encountered at 2.7' after 24 hours I III REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-9 DATE B-31-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0.0 0 10 20 40 60 100 0;6 Topsoil 2-1-1 Very Soft Gray Silty CLAY -Possible 2.9 3.0 Fill - 2-2-2 Soft Gray Silty CLAY 6.0 Loose Gray Clayey Fine SANG 2-3-3 8.0 Very Soft Gray Silty CLAY 1-1-1 12.0 Soft Gray Fine Sandy CLAY 2-1-2 3-2-1 ,. 20%1) Boring Terminated at 20.0' i Groundwater encountered at 2.9' after 74 hours, tln disturbed sample ohtained � � from 3 ro 5' . I i I j REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS j'OB NUMBER 1051-93-211 BORING NUMBER B-10 DATE 8-31-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0.0 0 10 20 40 60 100 0:6 Topsoil 3-}-¢Firm Gray Orange Silty CLAY I 2.8 3.0 _ Soft Brown Gray Fine Sandy CLAY 4-2-2 f 2-2-2 3.0 Soft Gray Silty CLAY 1-1-2 12.0 Soft Gray Fine Sandv CLAY I 2-2-2 i it i 2-2-2 Boring Terminated at 20.0' . —� Groundwater =ncountered nt 2.8' utter 24 hours. 1 ' I II REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-11 DATE B-30-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER ( FT. ) ( FT. ) (BLOWS/FT. ) . SIX IN. 0 10 20 40 60 100 00 Topsoil 0.5 1-2-2 Soft Brown Gray Silty CLAY 2.6 3.0 Firm Gray Silty CLAY 3-3-3 6.0 Firm Gray Fine Sandy CLAY 2-4-2 7.0 Soft Gc ay Silty CLAY 1-2-1 12.0 Soft to Very Solt Gray Fine Sandy CLAY 2-2-2 1 2 1 l 23.0 Very Dense Gray Marl, Sand F Shell r -�- 8-11-40 50!6.0" Boring Te rminaC ed at 29,0' . Groundwater eaaegntared at 2..6' after 24 hours. Undisturbed sample obtained From 2.5 to 4.5' and 8.5 to 10.5' I L REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER B-12 DATE 8-30-93 S&ME PAGE 1 OF 1 TEST BORING RECORD , DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.6 a-2-3 Firm Gray Brown'Fine Sandy Silty CLAY 2-3-3 6.0 Very Loose Gray Clayey Nine SAND 2-2-2 8.0 Very Soft Gray Silty CLAY ].-1-.1 10.0 Boring Terminated at 10.0' Borehole caved at 4.2' aft er 24 hours I f---- ---i--i , I I I I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-1 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRAYPION BLOWS PER (FT. ) (FT. ) (BLOWS/'FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.6 Firm Gray Brown Silty CLAY 3.0 Firm to So EC Gray Fine Sandy CLAY 2-3-4 4.6 2-2-2 C.0 S nft grey Pine Sandy CLAY 1-2-1 Boring Terminated at 10.0' Groundwater encountered at 4.6' after 24 hours. ]lag sample obtained from 1 to d' I I I III ' REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211. BORING NUMBER P-2 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) ( FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 0.6 Topsoil 2-2-3 Firm Gray-Orange Silty CLAY 3.0 Firm Gray Fine Sandy CLAY 3-2-3 6.0 Loose Gray Clayey Fine SAND 2-3-3 d:0 Very Soft Gray Fine Sandy CLAY 2 1 1 ].0.0 i Boring Terminated at 10.0' Ij Borehole caved at 2.2' after 24 hours. I I I I � � I I � I I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-3 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0.0 0 10 20 40 60 100 0.6 Topsoil 3-3-3 Firm Gray Orange Silty CLAY 3 SO Firm Grey Fine Sandy CLAY 3-3-5 4.4 6.0 - Very Loose Cray Clayey Fine SAND 2-2-2 0.0 Very Soft Fine Sandy CLAY 10.0 Boring Terminated at 10.0' Groundwater encountered at 4.4' after 24 hours I I � I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-4 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0;0 0,6 Topsoil 3-2-3 Firm Gray Orange Silty CLAY i 3:0 Stiff brown Fine Sandy CLAY 3.7 = 2-9-6 - 6.0 Very Loose Gray Clayey Fine SAND B.O I Very Soft Gray Fine Sandy CLAY 10.0 Bo ri ng .Te rmi.n at ed at 10.0' ' Groundwater encountered at 3.7' after 24 hours I r , REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-5 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.5 3-3-4 Firm Gray Orange Silty CLAY 3.1 2-3-4 6.0 Firm Gray Clayey Fine SAND 3-3-2 8.0 Soft Gray Fine Sandy Silty CLAY 1-1-2 v.0 Boring 'Fermin eted at 10.0' Groundwater encountered at 3.1' after 24 hours I I ' i I I I l I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-6 DATE 9-1-93 S&ME FAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.5 2_1_2 Soft Orange Gray Silty CLAY 310 3.0 — Firm Gray Fine Sandy CLAY 2-2-4 6 0 -- Very Loose Gray Silty Fine SAND 2-2-1 8.0 Very Soft Gray Fine Sandy Silty CLAY 1-1-1 10.0 Boring Terminated at 10.0' Groundwater encountered at 3.0' after 24 hours. Bag sample obtained from 1 to 5' I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-7 DATE 9-1-93 S&ME PAGE 1 OF 1 �ST BORING RECORD DEPTH DESCRIPTION IIIIIILLLLLL����� ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0:0 0:6 Topsoil 2-3-3 Firm Gray Orange Silty CLAY 3.:0 3.2 Firm Gray Fine Sandy CLAY 2-9-3 6.0 Very Loose Gray Clayey Fine SAND 2-2-2 0.0 Very Soft Gray Fine Sandy Silty CLAY 1-1-1 10.0 — Bocing Terminated at 10.0' Groundwater encountered at 3.2' after 24 hours I i 1 I l REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS 3OB NUMBER 1051-93-211 'BORING NUMBER P-8 DATE 9-1-93 S&ME PAGE 1 OF 1 I TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0.0 0 10 20 40 60 100 Topsoil 0.6 3-3-3 Firm Cray Orange Silty CLAY 2.9 3-3-4 6'0 Loose Gray Clayey Fine SAND 2-2-3 8.0 Soft Gray Fine Sandy Silty CLAY 1-2-1 1010 Boring Terminated at 10.0' Groundwater encountered at 2.9' after 24 h,irs REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-9 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENTRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.6 2-2-. Firm Gray Orange Siltv CLAY p 3-2-5 f 6'.0 Firm Gray Silty CLAY 3-3-3 8.0 Very Soft Gray Silty *,LAY 2-1-1 10.0 Boring Terminated at 10.0' Borehole caved at 2' after 24 honrs, Bag sample obtained from 1 to 5' I I � I I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-10 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER ( FT. ) (FT. ) (BLOWS/FT. ) SIX IN. '0 0 10 20 40 60 100 0. Topsoil 0.6 z-z-z Soft Gray Broom Silty CLAY 3.0 Firm Gray Fine Sandy CLAY 2-3-4 6.0 Loose Gray Clayey Fine SAND 3-2-3 8.0 Soft Gray Fine Sandy Silty CLAY 1-2-1 10.0 Boring Terminated at .10.0' Borehole caved at 2' after 24 hours I I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-11 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 0.6 Topsoil 2-2-3 Firm Gray Orange Silty CLAY 3.0 3.2 _ Finn Grey Pine Sandy CLAY _ 2-3-4 6.0 Very Loose Gray Slightly Clayey Pine 3-1-2 SAND 8.0 Very Soft Gray Silty CLAY 1-1-1 10.0 Boring Terminated at 10.0' Groundwater encountered at 3.2' after 24 hours. Bag sample obtained from 1 to 5' I I I I i I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-12 DATE 9-1-93 S&ME PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT. ) (FT. ) (BLOWS/FT. ) SIX IN. 0 10 20 40 60 100 0.0 Topsoil 0.5 2-2-7. Soft Brown Gray Fine Sandy Silty CLAY 2.0 3.0 Possible Pill _ 3-4-5 Firm Grey Silty CLAY with Roots 6.0 Very Loose Gray Clayey Fine SAND 3-2-2 6.0 — Very Soft Gray Silty CLAY 1-1-1 10.0 Poring Terminated at 10.0' Groundwater encountered at 2.8' after 24 hours I _ I I I REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 1051-93-211 BORING NUMBER P-13 DATE 9-1-93 S&ME PAGE 1 OF 1 Table 1 TABULATION OF NATURAL MOISTURES SAM'S CLUB JACKSONVILLE, NC BORING # DEPTH FT. ) MOISTURE Yo B-3 1-2.5 21.0 B-5 1-2.5 24.3 B-6 1-2.5 20.0 B-8 1-2.5 23.6 B-10 1-2.5 26.2 B-12 1-2.5 30.1 P-1 l 2.5 16.5 -- P-2 1-5 18.3 — . P-6 1-2.5 19.9—r------------- I . . P-7 — 1-5 _ 25. 1 -- P-7 -- 2.5 -- - 25.5 -- —I _ P-10 1-5 �— 22.8 P-12 - --1-5 23.9 P-12 1-2.5 26.6 TABLE 2 TABULATION OF CBR TEST RESULTS SAM'S CLUB JACKSONVILLE, NC STANDARD PROCTOR DATA RECOMPACTED SAMPLE CBR DATA BORING DEPTH MDD OMC d WC % COMP. 1" .2" SWELL UNIFIED (%) (%) SOIL CLASS. i P-2 1-5 114.9 14.1 112.6 12.4 98.0 7.9 7.5 1 .2 CL P-2 1-5 114.9 14. 1 112.6 15.5 98.0 5.4 6.1 0 CL P-7 1-5 114.5 14.3 112.4 12.9 98.2 5.7 5.7 1.0 CL P-7 1-5 114.5 14.3 112.2 15.9 98.0 5.8 6.9 0 CL P-12 1-5 110.9 15.9 108.4 14.1 97.7 5.7 6.0 1 .2 CL P 1Z 1-5 110.9 15.9 108.0 18.0 97.4 4.3 4.7 0 CL MOISTURE- DENSITY *MAE 140 RELATIONSHIP JOB NUMBER 1051-93-211 JOB NAME SAM'S CLUB 3! JOB LOCATION JACKSONVILLE, N.C. BORING NO. P-2 SAMPLE NO. no DEPTH I' - 5' METHOD OF TEST ASTM D-698 MAX. DRY DENSITY 114.9 PCF OPT. MOISTURE CONTENT 14.1 % NAT. MOISTURE CONTENT 18.3 % 2! ATTEREERG LIMITS LL 28 PI 12 SOIL DESCRIPTION DARK BROWN SANDY LEAN CLAY (CL) 0 LL 120 u i u I s W � #44CURVES Of 100 4.e SATURATION FOR o SPECIFIC DP dVI TIES EDDdL TO' i 2.70 y 2.en 110 a 1 w c y I K - 0 10IEFT I 1I I I I I I 100 I I I I e3 - II I I I I I I I 90 I I I I I I I I I I I I I I I III ' I I I i as 0 ! 10 IS 20 25 30 35 NOISTU0.1 CONTENT - PERCENT OF DRY WEIGHT 169A AD MOISTURE- DENSITYtsm RELATIONSHIP JOB NUMBER 1051-93-211 JOB NAME SAM'S CLUB ss JOB LOCATION JACKSONVILLE, N.C. BORING NO. P-7 SAMPLE NO. ISO DEPTH I' - 5' METHOD OF TEST ASTM D-699 I MAX. DRY DENSITY 114.5 P F OPT. MOISTURE CONTENT 14.3 0/, HAT. MOISTURE CONTENT 25.1 0/0 26 ATTERBERG LIMITS ILL 33 Pit_ N IV SOIL DESCRIPTION DARK BROWN 8 BLACK SANDY LEAN CLAY (CL) o 120 W e u I � I W CURVES OF 100% SA7URAfION 'ON N IIS c � SPECIFIC GRAVITIES EQUAL T0, o i /—2.7o m 110 / 2.60 — C 1 os I I I I I I I I I 100 I � I i I I i I I I I I I 9s III I � I IIII I I I I I I II II 90 I I I I I I I I I I I I IIII I I IIII II I I II I II it I I es 0 s 10 Is 20 28 70 36 MOISTURE CONTENT - PERCENT OF DRY WE17NT 169A MOISTURE- DENSITY *SWE 140 RELATIONSHIP JOB NUMBER 1051-93-211 JOB NAME SAM'S CLUB 16 JOB LOCATION JACKSONVI F N. .. BORING NO. P-12 SAMPLE NO. DEPTH I' — 5' 130 METHOD OF TEST ASTM D-698 MAX. DRY DENSITY 110.9 PCF OPT. MOISTURE CONTENT 15.9 NAT. MOISTURE CONTENT 23.9 _q xs ATTERBERG LIMITS LL 33 PI15 SOIL DESCRIPTION DARK BROWN FINE SANDY LEAN CLAY (CL) 0 � 120 u u u CURVES OF iOO% SATURA710N FOR j H I15 SPECIFIC GRAVITIES E9WI. Tn: ZI 0 2.10 2.70 r 2.60 w IIO x w o 0 t � IOy 1 100 � I 93 I I 90 I I es O y 10 Iy 20 25 30 ]e MOISTURE CONTENT - PERCENT OF DRY WEIGHT 169A tw■■■ntui'■e":'�:� a..■�n':.. :G�_•imnan�:■i■7i ■ .■ ■N ■■ a M■MEMdN■N■■ n ■■p ■ ■■o o■ 6 : m ■. wME M■■twn■E.M: ■ S : ■W.NE■.a. ■d ■.■■■. E■ nm.NE■n ■ ■■.M■■N■■■■■■■■W.■■u■■aE;■ MEt ■Mn.EUN.■MNUE■nE ■■■■■o ■■t■.M d t■■■d■E■aMM r MAIL d ..'::::att :tj . • ■w'■■iii:ui'C;:■■:e�■;�wn�tt;■■nnm;OEM=■■p■.G :■■■'::■.:■■n■■N:■■ ■ MOM : ■ ■ -ii ' ■ Nitt■t■■ai::■■■ so lMWMMM mnwM■■t■■■■■■■■.nnEtt■.■;;■;■-win';� =fit. ■■ l►An■;;.■■■■tOtt=� ■■■■■d■MENONEdnd■Nwt■ ; .■■■ ■ ■ � O.■ w■■t ■r ■a■t■nNm■■;■■;;M;■Maa■■■.■■M a■ ■■.n■■■t■t .tt■■■t■■ �mn momnlwTi on • ,.;:; ■��i u�a■ddnMtiwaitt■dt.Mpd■.u ■■a ■t■■■d■nit mt■■e■I■tn i■�■:■u■►.■=iNnatmw ■■ ■■■uN■ w� N M► �■ rON e■y EPA No td■■Nu.■■d■ ■t■■t.d■■ataw■tttt■. t t n■■Wpp■■t ■ SOONnMa■M■■ .. MW :■■■u■■'n■i:�'t':■'■n■■w:t■■■■■■■ea■■�t■■En■td■mtttntt■■■■■t■■■tan td:Mmwa■Md � :.td■■.■■■ n •• :■d■N"::::::A::::::O::e„'Vi ■■wa ■NW■■'■'tOdMd■■p' :�:: eddNW::■■ ts::■t■ M ■ : ■■M.Nt0 tt■ ■t ■■■ IN. ; no mmmo ■■ ■■ ■ ■ ■ ONE Mt:nt:■■�■■■■:u■:te■■■d■;t■p■N■•Nmmmmm SEE MM:; ii'.■■■■ nt.aMM■td■u►. itM■�Np■�■�;;■;:■a■;;;::1::dp':w■■■.■ ;.■u ■■:N■■ww■u■■A ■d■.d.t ■ 'om ■ .■■■■d■■ ■w tw■■Nat■WE■.M■ Iw■■ MEud MENE t■ta■=mom Emig EFORMNIONESPOM, ME ■N awn■au.■tN MEN;;. ;�.wn■■■■ M onNONE! u Sam sommom no ONE MEMMUR IS in ■ n�■ ..����n■■�■�Neu■■■■ mo Imilm .::::;;■..; � :C't:iei::t�■ ttt'�iC:ii ■■■■Ewa■ ■ no wt.■ ing ■■u..■f No MEN n ■■■ ■;t MN :"' Natt t■■ ■ a:■:a■ ■ ■■ /■d ■ ■■■■■■■.■ OMENgoommus ■ ■ OEt m aMwa Elmo,nommum SEEM ommonomminum SAMPLE NO—P-2 MORE SOON m watt■::: :?: ■; ■ diet;:: • CORRECTED CBR ':::8. .:■:C:. :: VALUES LPROJECT OB NO:1051-93-211 SAM'S CLUB fa". ♦ �. JACKS • _._. . p_ out■ n■■mu■ t/ ■ ■/ n ■/ „„: ■ ■/ SEEM ■/ /EEBEE MnW/oBBmEE■uBugEEMHBu:' H.■■EEon■■■uNW■■EEO■t ::::EEtSEE:mi'u' MHt■'�::" '■ /i ■n �Iu::CC: ■gi■son I: ""■ US M Mn■:Ct•:"u ■•:•/ti:/inEEC'. i:CC'C CpMii:C:C qn Hq on EESSMB MS :S tEEEE::tt nEEB ::Bnnmu SEE■ . �'i' MMB.'C: MMB ■/■ B:'.: CNoCBBEEM EEt::n BEE:nEEnCiEEEEMMBWBBCM■M ■ Bn '�■■ :■uEEC:EEMnMEENEEMC/MBH■■'C'EE:■Wi■Cu'iuitu:■'C • ■StNMM■o■gEESu�•n CiiuBB■MB■BBwotn m MHWBBHMHHBtB ON .W.. ms Hnt�■:■EEEE ..m.mom tin MIN ■W■m�on.:..■:: H�::■ mmmm .W...q.m�m WE ONE m�mm ....Wq=. n■Bn■nMHM/n■m NUHntMMM/BNBBS■ON •�■:i C'MMMMMONEEEE■nttmB Emmalmon 01,pp■uEEMnMtMnEEnENNESS MBUHBBB■BBtnB/B= B �■M 9mu■■BB■uMBnnoHMMMo■SEE�pp��Mt ■ MmM min nBBuono N■BBHB■/ ■ttWBon HBn/B■ooHooutoon■o■nuU■ConC•nu:NOMS■Bo■■nMONO ►■YBWnB/ •9m Et EEtumommumm.uEEM■�BMn �momm BBBMBBEE=nBEEEE ton/ nraEEMn BqM■=BHB tBEE■oEEMgHgBB BonBBBHBBNB/NEEBOBBn/SOMME St/./ou■non■ ■EE�t ■DEER/MonHq MB/EEnoBnoMBB MEN loom■EEnn IPNEEBEEHMo■u/■:q■H/:B Admimmm SOMEONE 0 MEMO '■a•MEE:tUMM M0 momCH■BnmmMMEMMEM MENEM mtMBMBBM BBCMBrIC'q':u:'-iGaGieal ii:C:C:::::BH :C'uso p :t■■:ion':pp"mommiumm MEB�o:pmoomm■:'MCCCMEMMEN :CC ' B■nm�n�C:EEUMmUWMme- 11IMMOM tHWM ■m::B 11 tnMMn:/MBNB EMU�MMI ■■on:goognHWd'NgW■Nq mommul 0 M MENU loom low2ma MIME 11 WE CC:n•EE:CEEM""itEEBmi/"w" ■■■mfi" Mj! ■ :HtnEE■B now BEEEE •EE ::CCnnB�• WBBWEEEE BCMr�B::B.■::::� ■ ■ pH�HnqutCC • :BS■BN'I■BBMBM/u/MBtMOMMMMEMENSEE ■'gWpWptEE�EEop��.M.pt�gnon Mtoutt ME mom BEEso SEE nn nSMBB : ::=::C'EE�'q■' : :.mpC :.. '::::'■:' a WE P-2 NO C... tut::::::nn DEPTH . MEMO �P.' IN C'. .:CC :OJECTVALUES , . CLUB •'I JACKSONVILLE, mlow tt::m■,wit:C uM.w':C""tnun■C,■t■:utt■■■„M ��■9��"pp�!tiGim::CC o swum n�■n soon ■�pui=iC■■�p �"p"mi=mm n mom on MEN ME KRONOR ME n ,,,:txnttu„m„M,nn■ ■ tt■■t,,,/, ■ ■xt ,n,ri n�:: :::u:� „itwi,: ,iu ta,:_:_�,u„ t:: ,ttt t■,t n, : ■C' : Ci t,■ ■■ tttttt/ w ■ n ■ ,t■„ ,t, ■,tnn,ttd„t■tuu ■ ■ „ ,w■wdt ; . �nn,::tn't'.C'w■wtt■u■t,,,Cu„CC,',::n■tt„■■ntn,dt: t,■omttw■, „nN Ntw■tt d ■■tt■„tu ..� ■ ,d,d�tvdxt■:•/ ■■:M„tt■,,,�, tt N, N ,,,■,txt d ■.n..�.■ox/tN■: Nunn ri '::tC:::'�:C:C:L',di:u:oIII ':',:Maui mand■ot tutu■NN■,■ttCntdu■t■,t,n„■du„xtt■t,■N■ttC: ■ . :M:M '■tn..dw,dtttt,t NttttwtMtwN p■ Mddtt- ■ ,tt■n ■t■wttttttt�.. .■...■t......t■■.:■■■:MN■t .d. . aCM�.::::'.:i.:tnudta: itttt:::MuCt„dt■■twtWtt,■d, ■ ■■■,N■■■■tdmm=mml nd td. MEMMEMEMMEM so gq tttnt0 tt/■td■ttttt■,tt, ■ t■i,x ■ ■ a ■■tttt■NtN, ,■,tnttNttttt tt m O■t ■►�ttndnnm, ■ :Nn■t■,t■N■d ■■tM, t„ttd ■ ttMntt:•.Nt■xtttt tnt NN■tdtt�Mpt■ :,■NN�:ttt�t = d■tttt��Mttttt,t:•d,: • • 'v�Mtwtt::i:M,tNONO tNp■m:�::::::t:::u ■■■.. t:MM::�•�/Vt■t■tt:■"t:::::': ,.d,tttwdttt■■td ,�M,m■t:: ■■ t:�tit„tp■■,,,N■ttttttt■,■tt .ttttttm■■t■ , N'i■::i M:::i":■:I./�t■,tttxttd t■■ttdN au:�:�'n�pt p■'■M, �� �"u:�i'd'u::'■�i' t�i/i:::C'i�:�::u'::C::t'■�t�:MMu"�yMpA CMtdw,::a'tMxtM�MM■:M:::Y�:::::.'C:::::'.C.C:M:'t't::::u:uu , ■�tttt i ti:'M :::'tt'�ia:'ua:Ma:t■ttun"'CCt'n'nt dNM.pm■M:j��■■r,M�.::��nM.::::'.���d�.:pN�p...pd .■ mmN. Is ME on 0 .,N:M,.■: ::■■.■■,Mtt.�C� �tNY�:■N::■■�tpN,:tNtt ■p■ ■ tuntt■ .. ►, tPiTi .■■■ ■t,unu:t-�. �ME.■■t:•� , do ■ ■■ ►fit . ,■Nt ■■t, ■ tx■■,t, ■ : � .p wM'w �t tt dtwttxt ■Ndt,M ■■tttMttt ■ ■■wN,■tttNtt■tMtnntx w ,■C::::, tT0 on u,n■unM■■t: 'C,tt ,t a :'.:"",'.�M'i: n,,,,:NNdt tC,tt,nt ■ ao ■■t�Cu tCT�.. ■ Cutg■■�■■■■: ■■,w, Nu , iii■� ■ u ttt, twn d ■ w „ ■, � „dt■n,t „ tt n ■ w ■ .:..HIM......:.°.3...M.. "tTitTi-'-t�■ ,tt�.d,■ttt,up�C" ,on et ... n..N. . to ........ . t■ii�a . . .m .. ... ... :SAMPLE NO.- .. n. MENEM M.� .....a.. nC .■ t3�:3?a98E°E�:=�.'iMim' uCORRECTEDLUES COR i ::uC 's ■ 'i0. 11 SAWS : ■ :i'id i -JACKSONVILLE, N.C. � � ■�■: MN■M ■ N■■■■�■M N. :m O:CpN : EMMMlMMMMMM■Emm / NM nGmC■Y■E' I. NNN■■■MN■■■■ EE■m NmuN/M /E nEMEMEmENMomm�no NONE EE . mEEE EM■ E■MY■E■MN i ■■■■■■■M:MEWEEn■nNGNMnEEg�MENMMEMi:E:MY ■ua/M■YMEEMu gg=:■'::::■':"■■:3�,:::::u 3�3u=i■'g'■ri::::�:■:3333� :C'■gN N■gggG' • ■ CEum■m■■ m■MY■■MnME ME N ■ ■ ■■�W■�i ����■■■MYMME■Nm■■ ■■■ ■ q ■Mm//■■■■m■uu■■■■■■■■nNY/ m ■■■■■mnq..YN... gggg.■■■N:...g...■gN■.... .. :"y.::3333:N�. ■■■ ■■■EumEu■■■■ ■ nmE ■■■■ ■ SO �y■gq■■■■■■■■■■GG:G■ iGG■u■�'n::■":i ::■■■G■■:g■■■■T ■: n■N■u ■ ':' 'iGiN'G:uu:GCaNN■ ■■■■■ E ■■::: ■in:: M on ■ ■i■ME%�ii::uu:■='i3 _ ...nNMEMEE■MMMMNgEa::M::M■CGMEMEEMEMEEMMEEEEN�.a■gMMMMMnEE q ■■ ■Mm■■■ ■MNME■■■■■■■ Y ■u■■ME 0 ■■N■EM►. ■■ ■■■■Mm■ ■ • :'■NGg■ME■■■ ■ G::Cgg N3gg■q� �■■NN■N■N::'■.::�■ gE MEN ■N■Y■Wm ■u■ ■■■■� ■■ on MEN NYMM■ENMYW MEEN■E■q ■■■■■■■■■■nYe ■■■■■■■q■N■s■■■■■ EgE■MEMmMW■C Y/.■NY:■n■■■■■UA■N■■■■■■■N■■■■u-Y.N =3E gYENM ■:■CCC■■ N■■■■■■mN■■■�■j,■■ASSUME Y■■■■■■■■■■■■■■/■■■ ■■n■■�■■/ amommu■ ■�!!�■■■ n ■ N�a N■Egg `smomomms :Mn■■ ■ N n ■ ■/■MIME■MMEMMEW■■ ■■ n■■ ■■■■■■ ■� MnME ■Mnp■■■/MENWNNEu ME MOMMOMMIN " :vm� mu�..MEN :3n.3933 '::E333BE3 are= : 33E3�333333 =g mommmumm MUM:annp'in:::MMMgMNE'i":'GG:Cown WEEK:u:ONE:�::::'M�'iMM'G:::ii":::E NM ENEEgEC■M�p■■■■■■MNI.�Eq ■EE■ MOSMON ■■■u■■■■ENnm■M■ENNY n ■■E:::mM■gnEEEEE■■uMnE�.IMEnECN■E■■■■■■N■■EgY■■E■N■■ ■■m■C ■/M ii ■ EYME MOMEM M■ �i ON ME EMYME:M'g:MMCG:q�gYngggE�uBEEN �MNM:MEE:ma:'E:G'uEi uEG■i�r�r:3:'::CM■'� 'C:■:::::'Mi ggggggEEEE • n EMMYNMEM ■:N■ ■ ■:EN'GEq ■:::C:N�s n■mGi� GE EM:i=r : :GG:ON:G:3Gu i:EM SO MESEE ■iG::GGEn_iG .• ____�� MO M n■EWEMWYM �Ena Eggs ggggg:YEai:E 'sn:'■'■E� - m ■ EEEMM gE■ gMY■gg .■ Eg■Y■gEE p EEME EEEEM Y■. on- IM■ iE.iE.MEgggqMMEE■E■ g'Egg3EE CC:E■N:■EN■"��■G' MEM'■E'■n■'��N: E■�■�����MEE/ YME EMEE ME NEE/ ■ • �■iMq:MGmuG:M:E'Mam iiYM uMEE': E�Ni :MnmEE:ECMN:GEMM:MM■:nuE 3:uEumN IMMMIM C.3G C� SAMPLE NO.- P-7 ■ GEM �:E WN■E maYM MmEME::� CORRECTED CBR == ggg■ ■ : . • . . • • NO: • SAWS CLUB c. JACKS • Mom ,■q ■m■,Nmm■ pge■■ ■m■u■n■gq■, ■■■■,n ■ Nuw■■■■■u■■■■■ �p ■u■q■■n• N■.■■■■ w■■N,q■■■ ■,u„nu=e■:■nmN■m,n■mnnN ■gN■■■gq.,■■■,■,■■■ ■■■,ww nq■N■■qN„p■■■ ■■m■■■w,N■q■■■■■■ ��n■■N■„N■,■m„ m■,■■:q::■m,■:■ ,■■■N■■w■,■■■■■■■■�■■�m ■■■■„■,■■■■q■■■■,■■ ■MEN ■■■n■,■■w■■u■■qq ■p,■p■■ ■pq■■■■,nMEMNON ■,■,■ ■:■n,n ■■■ • NN ■■ ■u■ ■■■■■N n,■■■■,■■■■, ■■■ ■ ■■ ■q■ ■■■■■■■,N w■ ■q■Nn■.Mason 0 on SON .�:N■■■q■N...q..gw ■C. q■N.m.�. q ■wqN■■■ ,■,Nn ■■■,■■ ■e„ qN„ ■ : ■■, e ■ NO Now ■n■ ■■■■■■oq■:■gro ■nCC:'N' i::::■=On■��iNC:: N■■N■■■■ ■,■■■ ■uN■n■ :■,■ ,■■n ■■■ ■,■ N■■ MR■■■N■■■■,■ ..■■■■■■■NNq■�■n■■■■■■■,■■■■u■■■nm■■� ■■■NN■,N■■�w■, ..■■■n■■■Nwq .MEMO N■■,■■■■■■■. ........ 0 on mmomommum summon :p ■■�:Simms�■■•:�■�••■Y:■■■�■�11mono =0 ■q:N••■■�N..■ son ■■NNN■�i ■■■ ■ ME MM1 ■■■■ ■q ■■■.■■■n��,p■■■■■■■,■■ ■n, .n NOON MEMO ■ .Np.............N .■. ■■nN■■IL■■ ■.■■q ■■.CC■■■ LnNMMMMjrAlM ■■■osEMSEM ON n■■■■ ,p■■■■■■ ■N■■••■■■■■, n■■■■ n■■■N■■Nn■■� ::MIPA :::■N•■u M ■ ■::m::::■N .. ■w,■■■N.n■N,m■=n■■n■■■wq ■N:::::::■N■•_■ ■n■ :■M:::: ■■■ ■•�■Emp2 �ommu:u::N:::■w■■:::: ■■q ■■ ■■, ■■■■■ ■..■■■■,■■,■„■■ ■■r.Wn■Nq■usonommummmm ■m ■■ ■■■N■ ■■■qn,w■■■u■ ■■ ■ ■ .i■ ,■■■,■■■■,N■ ■■■■■Nu■ q ■, ■■■,.■■,N■■■,■■ q.n■ ■ ■„i■■■ ,nnn■■■ ■■■■■■N, n :'■•�N•nN■■NN•::NMI■•i■•:::■ni■ ■,quui, ■u■►•i�::■■•e■■■•q■■■w■■,■■■e■n,m■■ ,mmsEEM ■■ ■.■■■■■■■,■■,■■■■■asor ■wn�,mm ,�■ .mom NN m■q■■ ��■■■:C :C:su.C.■■N. NNN■■ .MMM1�nnq"G■MENw ■■N::Ni: ii,�i�i■■■■Ni,4i■■iG■■■■■■MARNMENSOM mn.N'Gi::�■■ ::■•,■: N�■�. ,■ w■n■MENE:■ ■ ■ ■N■■m■,qm■■ ■::Qi■, ■•■:•n■ww■ •�i" ME:i■M 0H1nm■■n■m=■■�• :::p': . . :■'■N,Nq,N■NN■ n■ N ■ ■ ■NNNmN■■w ■NN,■ n■■■ q� ■N ■pp■rr pp��qpp Nm■,N,■N ■N■■■nN: ■ ■ ■ mom■■q■■■:ME :•�,■■::N ■ ■ •m,■ SEE M 111� ���mor ■■■■■■■■ N■■■■■■Nu■■ ■ ■■. ,w■p■■o�■■N■�e■wNp w■■N,■■■■�CN■N■■, ■q■ IF MWENMEW sun n■ ■ ■ ■i:■nlW$Fjmnnm an ONE Ems ;SAMPLE NO. P-12 • ■■ ■■: : ■:,■ n DEPTH sm ONE �■ ■■ ■■ ■ w,u ::?■N■:riCORRECTED. CBR JOB NO: . N CuttutnioNnCCiCCCCmiiun C■=CCw■N■!■tt■nn■../■ti ■ NNw■nNtnlu■■.■i u■imnnuwi■tnCC CCCCuNCCCCCII C■■Nit■C■/ NON Ctui■iiitCCCC ■nn■■!Nu■w mmmm Ott■■t■nCC�■NtYW�UN/�nt.� r ■wnNototnnNmnnnmt ■NN■Ci■u■C of u■CCCCCCCC.t■li�u�Cp/C�n!�■�i■i t■tEMSECntnuMEMOpnw■tN■C9011111, ■t!■■tt■nN ■■C ■q■�unC�■!t■in■ ■■ ■mmmmmommom■mnt�.nC/■C:CCCt CGGCCCCCCommoso .C■■■nntC C■■■■=EMMN stt■/o!■■n■■� '. N=■■■N■CC■'�CC■/■n■!■NCINCC'wu ■�CCiiiuitu■CCu■pN■ im■i CC�CC■Nmman �/■■■CCuitnnt■C■Nni mn o■tmmn■C:'CCC�oCCCtnoCC IM NCi N■■ ■ ■ ■■■t CCii�_ nCnnnma ■ ■ w ■ NNN■N ■ ■t unntnn■tnn ■■■mmiii/NCCCCCC'�iC■ni'i=i'iICC■t■■t■t it a■um■■tt■m■C� ■NpN■■■■/Nn'CC■CCC■Ntt■■wt■!nC■■■nt/■N■■■■■�u�.�■�mttCtt ' ■CEamiuC■wC=■tC■Ni■iiiinCCCCCNi■�CCCCCCCUCB CC ■u■ ■C ■■w ■it■■■=�moot■■ ■N■N■■■tt■u■u■�■w■■■■■■t■■w/■t■!■■■■t■■■■■ ■ ■ wnNmtNmno omNmN twNmtmmttmN/■/■tCnlNt■■t- �ttntem■o■■n ttmwntoo���■/.t■■■ m■mnmtmmmm�tn■ ■■ ■Oman �CCii�CC■prom munnnNtmiiiiCCCWOMMO ■Ns�■N ommmumnsmmCtitiwC=CaiC�' ■tmm�lt■nNmm■ mittmt.■ ■mmm C�n�uCt HCuOCCCC■Bt■■■Ci' ONt/CNm■■Not■N wt ®®■t■■m to■/■tN NN■t/w.roL ■ tntCC�t CoCCCCCi■CCC■Nit ■���//wmNmamamn ■■ENC/p■ solo ■ p� ■p. ■ma■CCNt/Ctnit'Ct�■Cp .CCCN.CCCCCCtN■� MEMO: q�■■:CCCC■::CCC�C� ■N■tt/■/■NN■■■tBCN/Nn■■!Nt/■.■ C■■omot■■/■■u■■s!■■mt ■ • • mommmmmmm/n OmaNN■tot/t■ltmtttmmmt■Nt■■■■■n ■N/mmN■/m=nNN■■n■n■■mmn ONtttnn■nwN■Nnmm�■/N /t ■/■■■m11►!!m■not■/ Oman N mntmntm■mmwnmwtn tt tntt■N/mat■mama■n./■t!m■m ■maontnt tNn■■NnN/t■tmm/m■tm tmnmm■■n=ntnnnn►�!■NNN/■ ■mannmt■Nntnnm/mmmn nw t■m/ ■■■ u■m■ /N■�.■■/■n tCm nn ■■ �ituiliCNiaoiiCotiiiu� III ONNE CCCti CCC litiinCCYp■ttp■ O ■wnu■ mntnt�p mmNC�C•m■m■NNnCnt./■!■m■mmmlt..nt■/m■ 1N■nnnnn�CC■man■■nCCatnm■p■.� pptntnmm■mmNm iinNNnm■nn■nn■■mmn'. ■Hann■NnnN■■Nmm■tmnn■nnCB■nmtmtmnni�mNntm■R■■nttlt/mmC. ma■■■NNtmtn ■mammon mnnn■ ■y■/■/.�Ntmn■ma!n�■m■w ■�■� munnC�■py■pC■■HH■��C . C•GinaGCCCCCoiCnisoonC:in CCa�■ nw��mmnmNEI ■ masC■NmN■Us soon HIM tN tt ■ ■n ■ u■mNtNn ■ow �t t►N�■.■■.CmC/NConCICCan ■n mama■man■mnnm tN OEM " m■.maR'itC■umt■mMEMOmNt■■ENlmm�nN maolwmummNmt O / ■ mama■ mama/■nmt ■ ma tm w■Nt two■n�nwmmml lmmi ' Cn fuCCma■■NmmN m■■mmnn■CmaCmai'' ■ ■mNNt■nNmNossottI an ,■//n��■. tmom t/pt � nn CommNm■■.�■mmt E OO■ CCC CCC n■■mtC�C nO��ppp ■NN■ mmNNn► pp ppp ■ CERGEu�/■■■■n■■■n■■■Ntt nt■n■ot'p■�Cnm qt imirm ■ ■ C � iCC■nC..CCC �ninln��wp�CCmC■ u:CC Nnpni m■ ,..' . • ■�N�Cmmttwwy� tmnntmni■C/■� ONt�otBo■n�■CYWNmN' ■ N■ NM■mp /tnmmwt ■ "an ■nt■tntmmtut■t/mmnmmmm ■ ■ttmmmt/Oman■ u Mumm��GGCCNmmmr �CB:C CCC� N on pip ■�Y�.�t' Cwnt�i'Nnnw CC'■.C�t� OEM n0 DEPTH. n ■ RRECTED CBR 11191 E.m �0 . 11 • ■ mia o �tnNowat n tit a a TEST I • PROJECT JOB NO: 1051-93-211 SAWS CLUB y U S STANDARD SIEVE SIZES 3" tVY' t' 3ri" I/('7v8" 10 16 20 40 80 100 200 270 100 Fr too 90 90 1 80 70 70 Z —{ I 60 w 60 m I 50 � � I � 50 -— w _ 3 I I I 40 40 - I H _ w I 30 a — 20 20III L 1 ,I 10 10 � I I I 0 0 100 10 - - L0 0-1 0.01 O.ODI GAA,IrI SIZE iN MILLIMETERS lI FINES ea U� GRAVE LO .^6BLES COARSE LFINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES BORING NO. ELEV/ DEPTH NAT. WC L.L. PL PI DESCRIPTION OR CLASSIFICATION BRAIN SOME DISTRIBUMN P-2 I' - 5' 18.3 28 16 12 DARK BROWN FINE SANDY LEAN CLAY (CL) tssm fib am JOB No 1051-93-211 US STANDARD SIEVE SIZES 3" 1-iK t' 34 I/f3VEt' 10 16 23 . 40 60 100 200 270 100 100 I 1 90 90 I 60 60 t 7O 70 I J z 1 60 w 60 I 3 � > I 50 50 m -- w z 40 _ , t I I I 40 — I z _ w t , , I 30 rc I w a 20 20 1 10 to 1 I — I 0 t t 0 100 10 1.0 0.1 0.01 0.OD1 GRAIN SIZE IN MILLIME FERS soul GRAVEL SAND FINES COBBLES _�----r Dena COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZEaS,y BORING NO. ELEV/ DEPTH NAT. WC LL. PL PI DESCRIPTION OR CLASSIFICATION BRAIN SIZE DISTRIBUTION P-7 I' - 5- 25.1 33 18 15 DLEARK AN BROWN 8 BLACK FINE SANDY CLA .. E . JOB NO 1051-93-211 US SfANDARO SIEVE SIZES 3" Ihle 1' 111'30 10 16 20. 40 60 100 zoo 270 100 100 I BO 60 80 — + I 70 1 I 70 — F t z I 60 — w 60 � I m I 50 ¢ 5D I I I Z I 1 40 w 40 —— I z - I 30 w V -- ¢ W - d 20 20 — - I 10 10 I --- - 1 +- — 1 I I1110 O 100 10 1.0 03 0.01 0.001 GRAIN SIZE IN MILLIMETERS eo UL GRAVEL : SAND FINES COBBLES COARS E FINE COARSET MEDIUM FINE SILT SIZES CLAY SIZES IOf R! BORING NO. ELEV/ DEPTH NAT. WC LL. PL PI - DESCRIPTION OR CLASSIFICATION _ GRAIN SIZE DISTR1��N P-10 I' - 5' 22.8 29 19 10 DARK (L)WN FINE SANDY LEAN GRAIN i a 1 R vV tVR 1051-93-211 E JOB NO — L a STANDARD �9:EVE SIZES 10 I6 20 40 60 -100 ZOO 270 100 100 1 90 90 I - I - - - I — 1 60 80 F 70 70 — — F r 1 60 w 60 $ I I r I 50 50- -- . .b - — { - w w — = I I 40 li 40-- -. .. I I � i I 30 U -----_ 1 D= I I I I 20 10 10 I +— I I O 0P I 100 - 10 1 1.0 0.1 0.01 O.ODI GRAiN SIZE IN MILLIMEYERS - a UL GRAVEL SAND FINES DERS COBBLES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES BORING NO. ELE-A(/ DEPTN NAT. WC L.L. PL PI DESCRIPTION OR CLASSIFICATION ^ GRAIN STYE DISTRIBUTION P-12 I- - 5- 23.9 33 - 18 15 DARK 'BROWN FINE SANDY LEAN. i I JOB IJO CLAY (CL SE 1051-93-211 _ 0.1 .2 .3 .4 .5 .6 .8 1 2 3 4 5 6 8 10 20 30 40 I.O 2.0 I . I I 1 I i I I j I I f- . w 100. W 1.1 I W Q Z UOw 2 .y li� J EL :1 00 Ow 0 .7 wz Y. oLL a a� 0 �� ff5 z 0 W Li of 3 ¢Q -j 09 A0 az u 0.1 .2 .3 .4 .5 ,6 .8 1 2 3 4 5 6 8 10 20 30 40 VERTICAL PRESSURE IN KIPS PER SQ. FT. COMPRESSION INDEX " .060 CONSOLIDATION TEST UNIT WEIGHT 1215 7 WET/108.7 DRY P.C.F. BORING NO. B-1 SAMPLE N0, LID. WATER CONTENT 18.4D/D ELEV. OR DEPTH2.5'-4.5' JOB NO.1051-93-211 SATURATION 93.6% INITIAL VOID RATIO 521 sm 0.1 .2 .3 .4 .5 .6 .8 1 2 3 4 5 6 8 10 20 30 40 I.0 3.0 14, 5. TJ I � r. 1 i ;n I !3,0 F w 100 U } O Q W O � W U W Z L n o zoo5 50 voiz _ w w ~W J Q O .3 z � �w s wQ ¢ � o� I 0 aZ c) 0.1 .2 .3 .4 .5 .6 .8 1 2 3 4 5 6 810 20 30 40 VERTICAL PRESSURE IN KIPS PER SO. FT. COMPRESSION INDEX •217 CONSOLIDATION TEST UNIT WEIGHT1154 WET/84.6 DRY P.C.F. BORING NO. B-1 SAMPLE NO. UD. WATER CONTENT 36 5% ELEV. OR DEPTHS' - 11' JOB NO.1051-93-211 SATURATION 100% INITIAL VOID RATIO .989 0.1 .2 .3 .4 .5 .6 .8 1 2 3 4 5 6 8 IO 20 30 40 1.0 2.0 3.0 4.0 I �.o I \ I } x 10.0� � I i .. y too � o w$ w o JW Z w J J a oW 5)a bt 50 w w r- w J .4 a 0 ow o ~ J W W J Q Z :D N Q F 111111 1 millillo O S W Z 0.1 .2 .3 .4 .5 ,6 .8 1 2 3 4 5 6 8 O 20 30 40 VERTICAL PRESSURE IN KIPS PER SQ. FT. COMPRESSION INDEX .265 CONSOLIDATION TEST UNIT WEIGHT 117,5 WET/85.8DRY P.C.F. BORING NO. B IS SAMPLE NO. UD. WATER CONTENT 36.9% ELEV. OR DEPTH 9' - 11' JOB NO. 1051-93-211 SATURATION 100% INITIAL VOID RATIO 1.043 0.1 .2 .3 .4 ,5 .6 .8 1 2 3 4 5 6 8 10 20 30 40 1.0 3.0 5.0 1 I I 7.0 1 —+— 1 1 I Z 100 w FL } .9 ,.._ o W� _ a W oZ U w Z 7 LL J J EL 0 50 o O .5 w 0 w aic-j I a 0 0 cn .3 w J W �( Z 0 w Z . 30 40 o � a — C) 0.1 .2 .3 .4 .5 ,6 .8 1 2 3 4 5 6 8 10 20 VERTICAL PRESSURE IN KIPS PER SO. FT. COMPRESSION INDEX 094 CONSOLIDATION TEST UNIT WEIGHT1258 WET1102.3 DRY P.C.F. BORING NO, B-10 SAMPLE NO. UD. WATER CONTENT 23.0% ELEV. OR DEPTH 3' - 5' JOB NO.1051-93-211 SATURATION 99 2% INITIAL VOID RATIO .615 MOISTURE- DENSITY MIME 160 RELATIONSHIP JOB NUMBER 1051-93-211 JOB NAME SAM'S CLUB Iss JOB LOCATION JACKSONVILLE, N.C. BORING NO. P-2 SAMPLE NO. DEPTH I - 5 — 130 METHOD OF TEST ASTM D-698 MAX. DRY DENSITY 114.9 PC OPT. MOISTURE CONTENT 14.1 NAT. MOISTURE CONTENT 18.3 9'0 125 ATTERBERG LIMITS LL 28 - PI 12 SOIL DESCRIPTION DARK BROWN SANDY LEAN CLAY (CL) 0 LL 120 u I u i CURVES OF 100:b.SATUh ATIJN fOA (is CPECIFIL 6N A41 TIES fOVAL T0! o s. o' r 1:' o 2. 0 7 1 2. 0 I 1 I 2.60 11.0 z _ r j - JE 1001 106 Ir I I I 1 G6 I I I I 9U 1 65 0 9 10 IS 20 23 30 36 MOISTURE CONTENT - PERCENT OF OR1' WEIGHT 169A MOISTURE- DENSITY 140 RELATIONSHIP *SME JOB NUMBER 051-93-211 JOB NAME SAM'S CLUB JOB LOCATION ss JACKSONVILLE, N.C. BORING NO. P-7 SAMPLE NO. no' DEPTH 1' - 5' METHOD OF TEST ASTM D-698 MAX. DRY DENSITY 114.5 PCF OPT. MOISTURE CONTENT 14,3 % NAT, MOISTURE CONTENT 25.1 % ra . ATTERBERG LIMITS LL 33 PI- 15 SOIL DESCRIPTION DARK BROWN 8 BLACK SANDY LEAN CLAY (CL) 0 �- 1 2 0 2 m _ J I � , CURVES Of 100% SATURAl'ION FOR . IIS 1 � iPE LIFIL GRAVITIES EOOAI, f0+ � I 2.70 7.60 IIO a 1 I 105 100 I i I 9S 90 BS p S 10 Is 20 25 30 !! MOISTURE CDNTENT - PERCENT Of DAY WEIGHT 169A MOISTURE- DENSITY *SWE 140 RELATIONSHIP JOB NUMBER 1051-93-211 3s JO B N A M E SAWS CLUB JOB LOCATION JACKSONVILLE. N.C. BORING NO P-12 SAMPLE NO. DEPTH ISO METHOD OF TEST ASTM D-698 MAX. DRY DENSITY 110.9 PCF OPT. MOISTURE CONTENT 15.9 %fl NAT. MOISTURE CONTENT 23.9 % 26I I I I I I t ATTERBERG LIMITS ILL 33 PI 15 SOIL DESCRIPTION DARK BROWN FINE SANDY LEAN CLAY (CL) 0 0 ITO u � I a I CURVES OF I00-4 SATURA11014 FOR II! ,'.PFCIFIC. ;MAVITIES EOUJI 73: o. i o � 2.41) a 2 TO 2.60 F � 2 1 W — i os I - I I I � — r IDD �-I I - _ I 95 90 Ilr IITiI �I 1 I I es 0 ! IO ❑ 20 26 30 36 MOISTURE CONTENT - PERCENT OF DRY WEIGHT 169A �•: ■ :GG: a :;';.::.y■G:.;;GG;E�3=°�ES°'aEG CEEE EEGaCEC ENOWN I �:a■■.. .■■■■G; :■:.■...;;. ;.. . .. ma; . .... . ;■■■n ... . ... . . .. ... .. . ... . . . ■■ .. ' _; G�aG:TE:� "; EG"a:�■GC;;;GG:'� � EE a G::G.;:GEg �; ■Eg'° ■::n:: aE■ : ii: ■i GC: in ■C Gi■: G■:G::CG■G•:G :■G� ■ C■::■C ■■■E: ■r.■■■■■■ :C;. ;G�m :;aEa:E:G:G:G:a aE: .. .. :G :■ ■GG;.:GC.;G;G� .y ...... .....a;; ...G • •••••C••Gaaaa�EE. : :: mEE..;;.�;. :�;GG:. . .:�:GG•G ::: 'Ca;C:::";; ;...;..�; .G:;;: ::C C..■.G n.GaESEa....;C�C a. am . :.aE.:EE ;.Ea■�. ■_G=;:; ECG;:;'G:G;C;GE:GGaa:aG .; aG■G:■■■■■■.' n■.�:''i wi�i■■■ ■ ■ ■ ■■■ ■■ ■G■ a:a■■■■■;mGG■ GG:■■■��'i.:'� •':••.::C:::G:.G.;•:::E G.;;��,G, ; , C CE�aEaaE'.'.EE pp: GpGG'a G'p:.G GEaG°: .:G:aaaGGG:'GEGCG: ' . ■■■Go ■■ ■ E: E::G:Ea.'9�.:E �::..C. ■..■■..:..G■C■;MEN ■■:.; . ■ ;■G ■■;■;■;■■■;■ ■■n ::■■:■e■■ ■■■■■■ ■■■■n :;.:.GG.. =Gc=•• aC'G' ' G E�aa a 'a • G 'aa n■GGG■ GG■y :G■G ■:■�■ : on MORE ■:GGG: ■;•:• : °'::GG :a:C� a :: : �: mC: EG • ■•:a :::ON GG•;Gy.'G •• •• • •• G GGN ;�EaGC ;G:am:: ■� " ■■ ::G _■.�� � ■y■ � EaG a: aEGE:G; G�C�: G� G� CGEEGGG; GG::" G G:CGG'�C.G.Ga � •• iC� CEG ;• •;E;�;•a: �"�' aE� .mGE• ;SAMPLE NO.. P-2 VALUES TEST I i } i • f • G• ; ! PROJECT SAWS JACKSONVILLE, N.C. i i ■ gnu:■:■■::■ ■ ■E°EEEEI::NUNN■" ME n■1"'::1mole I HES:E' •• .Ea.EL. ..=1n•�':ngEEmS�EgC.°••nCEg�;.E E..n . EEI:E ' :::E���E�E EE:S��maEE:�m gg:g�::° m�E� ■E•m;g��;gggg:. .■ . ■■1■IEg °E� . .■emu;■ ■u ■■ : ..;;gg aE:e°•: e:m gg•;g::B:Egg°° °:m;•° m:E E:Ea�:EEEEE'E :'•�°`. •::••°:31E:e • 1 �mm..E am ....E: C::.E . ....E .E, • n :I1■■ ■■■■■■ ■ ■ ■■■ ■■■:■■■■ ■■ ■■■■ ■ E■■■mn■■■■1■� E■E■■:■E nl■■■;■■■■�■auNo ME ■■u■::n=■ k ■ ■ ■■■: ■ m ■■ ■■■■■■■■■ ■ ■ G ■ ■■ ■ ■ C:� ° :CmSCI m:n IIm :.■mg . '•:.Se:.■:::':gg■°E�:'E l.::m nu■■■■■u■■:I:Em:: ■■■a■■■:�usE■:■ a ■Ean n■ n■■u■ ■n■ • • ■m'm::m::m':�.::'SmE�:: g::�:a':::': C:�'°':::IS':::Immm:m::.:■:mm:' g gg .. .. .°:• ::::gE�Em:•g::••E:eeE:• g .�mmgmE:'@��::� :. :maul::: :: � �;°::: • m:gEg °' E = E ag:�.��eg� � EIE�gE:: gggEgggE:°E°:.. ° : 1 • :.::. E gmu :..�. uEgg�:g ; ■ •EEEEa E � E :ml 5. . :u�EE��E3�ElEn :.. • .. . nNNW No ON tit . E: ::m:E:�E::lm ■■ 9 ::p Ml I IN SAMPLE NO. P-2 it lj� VALUES E9mglme��:°■ m • �� TEST I ®® ' ' PROJECT • NO: • r Gi ro 'lis 4 • 4 JACKS • �-_ _. , , � G■ m:GG■GG GGu • ■ :C■ n■■■ ■ u■ n ■ ■ `_CEr g�■■■■ ■■n■■■ n■ • :EEaEEEGEEEEEME . . •g�3■ �'g:■■g° gE� E E� g .ggEm�sms•cg• �: CT :T .. .C:Eg : ggmg:G.:gG . G .g° ■pG:::a G E::E EE • .••. :': s s .G :CG: HillE i r :gg,Eggg.g EE•E:;•G...��:•::g.:.E.Eg .EE9 E..g.... . r 'Gg• • .... .:■C:: G:: G=.G. C GGGm n. C.C. .■■ � C s ': .■g . m:�Ggg ':g:'ggEG•gEGgEC=EGEE�C:�EC:�CCCEE�'.:::C - ! E' E'm'CCE"■ �' E �: GGEC . ■■■■■G■ ■■ ■■ ■■■ ■■■ ■n■ C • ...::.::.::::::::.gE:a G��mG::m:.EsE.::::..G:::::::::E •: MEME G : G :T ss:::::: : :•ggs .. E • gm:: Ggm :a:Ca :::::G:::Egg::g::: s ■■��j■■:::aGEGsggg�gg•;g■ Eg; gg.ggggg:EEE3Eg:gg:os=�=•::E•ggg° ■ ■ ■m ■m ■C■:C : ::■C :. . . . I- Ig....g . .G: .aa a G m sg C ■■■C■:EG■ a.m.a .g .g.■ low •� . ....... . n . • • 'GE CG�:'::TGs:'G • ••:. E:ois . ■G:EC :z:TssssGE•EEGGECE C• :: �E:::EG:ss...m. �:gGm:�.■■.g.E=�.g■..a.a;..gg..n.■sg...... .:$ '�■ ■:C■ mmC■■.g■g� : m: m n ■■n■C■n : ■ n C ■ :G :: .'gg:E:•:::::G:'•:� g:: ••gGC: �S.a ' •:::E:E:sE::EGEE■■gpE�E■■■ 'm■ : :••ppCT••C::gg•■gEg :■ :9gE.:G��.a:mG�E�E•": ••'::::GG•T•::a�: .■: G.am:G. :GG■.. .. .. .....',i.....n■.GCG.E:sG....g■ C ...:� . ' .m ngugnggEr g ■ ; �g;ia'�!i■ gg■gEEE•■■■■ �EE�EE:EE:EE:• g� ° � : mE :E�3EE� �• E E`. CT • .■ggss g :g►� � mE °�EE:9E:E�EE�EEGE��9EEE. . g • C... on EGg� � �a E. .n.:...:CG.■C..� :�ES:•:E• �E�- . g; gggg�gg��■ �g� :G E'Cm�:��EE �E��E E ••mEG: E C �E:: E• ii•■ - g •••�gg• �s-ggg � E■ G : ::� E�mmE: ���G����E ��a�.� Gw SAMPLE NO. P-7 CORRECTED CBR . • ;mii�Gi u E u■ • ?�E E . . g m : giVALUES • TEST I i g �PROJECT v 1051-93-211 SAM'S CLUB JOB NO: E °EEE E° : �ENMEEE�'. : EEm■'3. MIN ' a` i usa CEE=aC : aE a : a : miam:mam. EE :■: .:Ea 'Eppp. ...•:a'a:mm:N�nma: • . Ea:: •:E N No 0 a �� E �. :� •:: :m .��:.E�a:.: :....�a.nE■.. ...a.. ��m■■■■■ No ■ ■■n .. .. �E■■i u■ . C. . ... .; i■ ■a: :�•..:a ::" . . . . . a : m as��:. :a : :■■■ .m.... ■ ■ ■■ ■ ■■■■■■■■■■■■:■■ ■ .o�:� m:: :... . m ..... .. n... Em:aEm. . a �m.•:a ::•m:■■■■•E•:E:�mm• yamamE.E.E■:..: . .. ■... ■:� a:■ .. ... •� ..... . . ...... . ... ....u.. : :::aaE E"EEa'YY::: m a:;i3mE eammmE a ._;..'. ..n=��•aa•�•�j E oem�'. a..� .C:a..=� ;:.EC.m.��■a:Ca � E ■i�■:■"i'ii■ a ■; gma�E�.=... . E E..= E••a:aE..m.m: �mme.:a.mm...::m::•�3:�:: � �■mE m ;E :E:E:�.�.�.:ma� . . C... ...m..m.�Em ......n.........a .�..■.: m :mCEa .. ....... ....m SAMPLE NO. P-7 ' am..E...��..m.....a.'�n.:::::a�•'Eaa..........:ama�:g€C•m�mm:'•' •'iaC 'aa.''i'a'i�'m'�aE:" . a■■.■m : mm: C : a:m:aa�m: mE:•::� • •�■ ■ ��"a��'EE�E■•mmm::�;:' a••:: :'_' ■ .::::::::� .mE E• � a�EE�� 5E . • •n•••• • =E:EEm:�:�E��E6�� .. . ......... .. 'aE':Ea.EEaE E.■ : :••_, :■ ...Em aE� Ea �: � :E�: � m•�' n EE ■ $� :�..m.E � � � : .m � . �a � . m::ma• EE:E��E � ��ea����6�a9 . _ � E:mr�;:•;.•; •�. a �� EE �EmE...a ; a� �'' a , as s.53 ESECORRECTED CBR .: .:► a a:.a 5 '■ I ■ ■■ �' • ! i • TEST I i i WAS _ .. . ._. 4 •: i 1PROJECT a • NO: . SAWS CLUB A . y log IMMUNE :n:N•:•••m : •■■ :: •• ■ ::::••m::: ' : :m m• : 3 ■.u■ ■ .■ ■ no m EE.. .No M : m. 3:...:E.m3. E::�E:3 •E.3m: mQ a:..a . N .. . N ■■. ■ . .. mE :: E:3EE EEE , :3E::::: ::: : 3:E:a ■ mmm :�m3e : ■$ ■ ..ME I an ■ N ■ ■ .� G ■u. ■ m33 ON ■ iME ii ■ .n. _ . �E3.. :3 �B ��E�m'3'�' •Em°■.. .N'E E' E ' 33�E' . . .... .... .. . . . .. °. mom M .� ;C 3..3.■ EEE9 IN 3. .. .n3wi E E:■.EE 3°'' E_. ... . ■ :C a' 'C :3' C°' Em E ':' ' M .a.■... ■Nm■ ■■. . .. . ... ■ . ■■■m: 3 p . . ........:..=..a::::m..:.. :mmmC:.:::. ..CC: .... ��° ■.■3.■ a:.■ ■ ■ .N ■ ■ ...■... N ■ .. ■..■► ■ ..■ ■ ■...■N■.■.N■ . C .. .■.... ■. .m C . C....a:.:... . ........... 3:3 :m33. ........'m...E...3:.�.�E3E.3.... .3�E .�.':.N........:3 .. ■ ■■ ■ ■ .■ N.. ■ ■.. ■ ■ ...►A.■■ ■ .. .. ..■. ..... ..:. ..m.:a. ..33..E: %�E: ::' ' • 33 3 �3��EEE'E :m:�':Nma:C: •• mill Emm3=° oil:E .: E::3a■.: ... .� .. .. .... ... .. .. . ON C ■.E.u.N...■ • : .:��mE3�: .3; � �a 3■ 3R�g3E3= :3 EeE3�a�o =° °ma °��EE �••• a �� '� 3 '�m� 333E � �33 :3�' •::�:E:33 . . . � .... ... . . . . 3� . :� DE MPLE NO. PTH. @ CBR 0�3� 6■ �' E [ AL , ® . . i P; a y 1 r i s ! PROJECT • •3-211 I , Twe 99 r�xi 5.y 1 "+F Ykfs' Ilion MI : i G .. ..... .. .. . . SON m. ■ . .. . ■ .u.n own In on ■ •. IS on .E66.;6C �E :EE. :: :•mi:3G•62•G:• :ai:Eaaa: ai:::a:IS:ON MI MEN aCGGG6 .. . ;.... ... . .. .6 EIn ��m: :•: 6:::32E� :aa 33� n:G •• ••; :E. .; ;;. i nGG•.3•:.G a ; ■ •.......uin.G6nn �ia: 663am.mEEa i2i.3e•.:. ■:_ �: :�222..•s..m�EE2�C..$•.•E•.••aC.Gm.:o'i.;:.':.:EGa■ a.6:C.G2.G:�:■6"CC•.■. .. .�:.i:.:..;..G■..6;;�..'.$..:i • In :.i.;EC..ii:•i.�i.i..G mmaC3 on ; ■ •.. •..•..••u.. ... •. .;a;;;Gm::3:G:�•::EE::mi2:83:6m:•a ;ai '': 3 :3 E 66E•:.m::3:::_ Zam.ii.....•......;:...............•G. .3E. .. ..�.o...i.....•....m • • ,••••�;• ■••;■;• G'a 'GGC:CG'■••;•;• ;;■• ■a■:� on ME . ....... .In ..... �E; a:a::G:: i • 3..$;3;:eE$ .. ; 1 . a =' .: 2. a.i�j::::::•G::3:�$�3�$�Gme..G. ai a E $eE 3aE�6E $iE66E i. In G••�gggga ;E y'�9.E. .a•: iE6 "�' �m8 : ;EEE2 ; ON: Gn .Ga F: a ■ ■ i ■ ••m •r �: $® gs�...;_ mad�. • : 6 . . ��■�22 !SAMPLE NO. P-12 E■ �. �on :CORRECTEDEPTH A iVALIJES TEST I PROJECT JOB NO: 1051-93-211 I it 1 f f i 1 • 1 . ,NVILLE, N.C. 1 V N > u s srndDARe saEVE slzEs I/2.'3i9' 10 16 20 40 100 200 270 too16.0. 100 I , 90 90 B 80 O I 70 70 a — �+ 60 60 w I I 50 50 z i I � � t z 4O 1 I 40 F i 1 i I z w o I 20 1 10 o I 0 ° 100 10 1.0 O.i 0.01 0.001 GRAIN SIZE IN MILLIMETERS eOUL I COBBLES GRAVEL SAND FINES U�aa COARSE I FINE ICOARSEI MEDIUM 1 FINE SILT SIZES CLAY SIZES y Q �y/�p� BORING N0. EIEV/ DEPTH NA2 WC LL. PL PI .DESCRIPTION OR CLASSIFICATION GRAIN SIZE DIe7RI -� I17FW P-2 I' - 5' 18.3 28 16 12 DARK BROWN FINE SANDY LEAN CLAY (CL) JOB NO. 1051-93-211 $S&ME > U S STANDARD SIEVE SIZES 10 16 20 - 40 60 100 200 270 100 100 90 80 so I 70 70 � � 1 1 60 60 ® I 50 a s0 I 40 40 I Z I 30 w w � it 20 20 ' 10 10 I 0 .0 100 10 f.p 0.1 0:01 O.ODI GRAIN SIZE IN MILLIMETERS - SOUL COBBLES l-- � GRAVEL SAND FINES �nEnsl COARSE FINE COARSE MEDIUM FIN£ SILT SIZES CLAr sects BORING N0. ELEV/ DEPTH NAT. WC . LL. PL. PI _ DESCRIPTION OR CLASSIFICATION GRAIN SIZE DISTRIBUTION P-7 I- - 5- 25.1 33 18 15 DARK BROWN 8 BLACK FINE-SANDY b LEAN CLAY (CL) J013 NO. 1051-93-2lI J n U S STANDARD SIEVE SIZES 10 16 20 40 60 100 200 270 100 too , � , I 94 so � � 1 64 I 1 7 70 0 v i 60 u+ 60 I m I SO 50 I ? I I 40 40 I F , , 3p U w 1 I a 20 20 1 , 10 10 1 I � 1 0 0 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS soul GRAVEL SAND FINES ocaa COBBLES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES BORING NO. .ELEV/ DEPTH NAT. WC LL. PL PI DESCRIPTION OR CLASSIFICATION BRAIN SIZE DISTRIBUTION P-10 I' - 5' 22.8 29 19 10 DARK BROWN FINE SANDY LEAN Q` 9 i� CLAY (CL) * SWE JOB NO 1051-93-211 v > U S STANDARD SIEVE SIZES 100 10 16 20 40 60 100 200 270 100 I 90 90 80 SD 70 1 70 X I 60 w 60 — $ I 5G 50 fill 40 I 1 LILL 40 F I z -0 30 20 1 I I I 20 I 10 10 I 1 1 0 0 100 10 1.0 W 0.01 0.001 GRAIN SIZE IN MILLIMETERS _ "UL GRAVEL SAND FINES oEas COBBLES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES BORING NO. ELEV/ DEPTH NAT.. WC LL. PL PI DESCRIPTION OR CLASSIFICATION GRAIN SIZE DISTRIBUTION i P-12 I' - 5' 23.9 133 18 15 DARK BROWN FINE SANDY LEAN CLAY (CL) JOB NO 1051-93-211 g n z o CONSOLIDATION COEFFICIENT SQUARE FEET PER DAY D A m (SOLID LINE) STRAIN Zai Z n — W O O O O 0 O o m W � l0 O -- lD b+ ou ' n 5 N N 'O Ul W m < Z n C Vl o Z O o (n -{ is co -gyp Q o O D 0 U O m b � mcn Z 0 Z0 0 o 0 °' c PEMENTAGE OF ;o IN111AL CONSOLIDATION W N (BROKEN LINE) 0.1 .2 .3 .4 .5 .6 .8 1 2 3 4 5 6 B 10 20 30 40 1.0 2.0 3.0 4.0 6.0 cn 8.0 9 Z r- 12.0 -i-1 Hill w 100 U > Z LLJ 8 w o� w o ? UwZ wow J Z a owo 6 Lion U o N z m OCL 2 - U Q ?� _I 1 C w � o a 0.1 .2 .3 .4 .5 ,6 .6 1 2 3 4 5 6 6 10 20 3C 40 CL VERTICAL PRESSURE IN KIPS PER SO. FT. COMPRESSION INDEX .265 CONSOLIDATION TEST UNIT WEIGHT 117 5 WET/B5.BDRY P.C.F. BORING NO. B-6 SAMPLE NO. LID. WATER CONTENT 36.9% ELEV. OR DEPTH 9' - 11' JOB NO. 1051-93-211 SATURATION 100% INITIAL VOID RATIO 1.043 0.1 .2 .3 .4 .5 .6 .B 1 2 3 4 5 6 8 10 20 30 40 411T I.0 3:0 5.0 7.0 0 9.0 z a ;n z w 100 Eg 9 LD w ~ W a Uw z .7 u a o0 z our o .5 , wZ w < W J a U O O .3 z m JW `-' W J O� U a V) a c O a v 0.1 .2 .3 4 .5 .6 .8 1 2 3 4 5 6 B 10 20 30 40 VERTICAL PRESSURE IN KIPS PER S0. FT. COMPRESSION INDEX .094 CONSOLIDATION TEST UNIT WEIGHT125 13 WET/IO2 3 DRY P.C.F. BORING NO. B-10 SAMPLE NO. LID. WATER CONTENT 23.0% ELEV. OR DEPTH 3' - 5' JOB N0. 1051-93-211 SATURATION 99.2% INITIAL VOID RATIO .615 I. 0.1 .2 .3 .4 .5 .6 .8 1 2 3 4 5 6 8 10 20 30 40 I.0 2.0 3.0 4.0 c I 0 Z_ Q U) N w 100 wI.I _ ram- w O ¢ W J UW Z 9 � � J OO ozw o 7 50 w< w a of o �w o 5 Z oZ L) a �_ 3 ` z a 0.1 .3 .4 .5 ,6 .8 I 2 5 6 3 1C 2v 30 40 VERTICAL PRESSURE IN KIPS PER S0. FT. COMPRESSION INDEX .060 CONSOLIDATION TEST UNIT WEIGHT 128 7 WET/108 7 DDRY P.C.F. BORING NO. B-1 SAMPLE NO. LID. WATER CONTENT 18.4% ELEV. OR DEPTH2.5'-45 JOB N0.1051-93-211 SATURATION 93.6% INITIAL VOID RATIO 521 I .� Moderate severity rutting and patching(Location 1) High severity fatigue cracking(Location 2) igh severity fatigue cracking(Location 2) igh severity fatigue cracking(Location 3) 5&ME Sam's Club Store No. 6573-04 S&ME Project# 1051-08-173 Jacksonville, North Carolina Taken by: JAB r Date Taken: May 9, 2008 High severity fatigue cracking(Location 3) igh severity fatigue cracking(Location 4) t , • r J High severity fatigue cracking(Location 5) oderate severity fatigue cracking(Location 6) S&ME Sam's Club Store No. 6573-04 S&ME Project# 1051-08-173 Jacksonville, North Carolina Taken by: JAB Date Taken: May 9, 2008 Moderate severity fatigue cracking (Location 6) 10 (High seventy fatigue cracking(Location 7) 1 11 High severity fatigue cracking(Location 7) 12 (Moderate severity non-wheelpath longitudinal cracking (Location 8) S&ME Sam's Club Store No. 6573-04 S&ME Project# 1051-08-173 - Jacksonville, North Carolina ITaken by: JAB Date Taken: May 9, 2008 13 Moderate severity non-wheelpath longitudinal cracking 14 igh severity fatigue cracking(Location 9) Location 8) 15 High severity fatigue cracking and raveling(Location 9) 16 Moderate severity non-wheelpath longitudinal cracking Location 10) �S&ME Sam's Club Store No. 6573-04 S&ME Project# 1051-08-173 �r Jacksonville, North Carolina Taken by: JAB I Date Taken: May 9, 2008 7 Medium severity non-wheelpath longitudinal cracking ( 18 igh severity concrete spilling (Location 11) 9 High severity concrete spalling(Location 11) 1 O High severity concrete spalling(Location 11) i I S&M E Sam's Club Store No. 6573-04 SSME Project# 1051-08-173 Jacksonville, North Carolina Taken by: JAB I Date Taken: May 9.2008 r F' w M1. .� Moderate severity longitudinal cracking(Location 12)) 2 Moderate severity longitudinal cracking(Location 12) I31 _I 4I S&ME Sam's Club Store No. 6573-04 SSME Project# 1051-08-173 Jacksonville, North Carolina Taken by: JAB I Date Taken: May 9,2008 *S&ME Project Name: Jacksonville Sam's Club Store Pro ect Number: 1051-08-173 Project Location: Jacksonville North Carolina Test Location: C-1 Existing Surface i e - Elevation View of Core Plan View of Core Asphalt Thickness inches 3.0 ABC Stone Thickness inches 11.0 Estimated Structural No.of Existing Pavement 2.6 Top Bottom Average Depth' Depth' $OB Type CBR % Z 0.0 1.6 Tan-Gray Clayey Fine SAND SC Moist 6 1.6 2.0 Tan-Gray Sandy CLAY CL ,Wet 2 Depth is referenced from bottom of ABC stone ZDetermined using Dual-Mass Dynamic Cone Penetrometer(DCP)Testing(ASTM D 6951) tS&ME Project Name: Jacksonville Sam's Club Store Project Number: 1051-08-173 Project Location: Jacksonville North Carolina Test Location: C-2 11 Existing Surface I � Elevation View of Core Plan View of Core Asphalt Thickness inches 2.25 ABC Stone Thickness inches 7.0 Estimated Structural No.of Existing Pavement 1.8 Top Bottom Average Depth' Depth' Soil Type CBR % 2 0.0 0.3 Black-Tan Sandy CLAY CL Moist to Wet 5 0.3 2.4 Black-Tan Sandy CLAY CL Wet 2.5 Depth is referenced from bottom of ABC stone 2Determmed using Dual-Mass Dynamic Cone Penetrometer(DCP)Testing(ASTM D 6951) , SWE Project Name: Jacksonville Sam's Club Store Project Number: 1051-08-173 Project Location: Jacksonville,North Carolina Test Location: C-3 Existing Surface • t Elevation View of Core Plan View of Core Asphalt Thickness inches 1.75 ABC Stone Thickness inches 4.5 Estimated Structural No.of Existing Pavement 1.2 Top Bottom Average Depth' Depth' Soil Pe CBR % _ 0.0 0.9 Tan-Gray Sandy CLAY CL Wet 2 0.9 1.3 Tan-Gray Sandy CLAY CL Wet 1 1.3 2.3 Tan-Gray Sandy CLAY CL ,Wet 3.5 Depth is referenced from bottom of ABC stone Determined using Dual-Mass Dynamic Cone Penetrometer(DCP)Testing(ASTM D 6951) RtS&ME Project Name: Jacksonville Sam's Club Store Project Number: 1051-08-173 Project Location: Jacksonville North Carolina Test Location: C-4 Existing Surface Elevation View of Core Plan View of Core Asphalt Thickness inches 1.75 ABC Stone Thickness inches 4.0 Estimated Structural No.of Existing Pavement 1.2 Top Bottom Average Depth' Depth' Soil Type CBR % z 0.0 0.4 Gm -Tan Clayey Fine SAND SC Wet 0.7 0.4 0.6 Gray-Tan Clayey Fine SAND SC Wet 4.5 0.6 1.3 Gray-Tan Clayey Fine SAND(SC),Wet 7.5 1.3 1.9 Tan-Gray Sandy CLAY CL Wet 2.5 1.9 2.6 Tan-Gray Sandy CLAY CL ,Wet 3 Depth is referenced from bottom of ABC stone 2Determined using Dual-Mass Dynamic Cone Penetrometer(DCP)Testing(ASTM D 6951) t, S&ME Project Name: Jacksonville Sam's Club Store Project Number: 1051-08-173 Project Location: Jacksonville,North Carolina Test Location: C-5 Existing Surface Elevation View of Core Plan View of Core Asphalt Thickness inches 3.0 ABC Stone Thickness inches 3.0 Estimated Structural No.of Existing Pavement 2.0 Top Bottom Average Depth' De thl Sou Type CBR % a 0.0 0.4 Tan Clayey SANDS Wet 7 0.4 1.2 Tan Clayey SAND(SC),Wet 10.5 1.2 1.7 Tan-Gray Sandy CLAY CL Wet 5 1.7 2.5 Tan-Gray Sandy CLAY CL Wet 1 Depth is referenced from bottom of ABC stone ZDetennined using Dual-Mass Dynamic Cone Penetrometer(DCP)Testing(ASTM D 6951) S&ME Project Name: Jacksonville Sam's Club Store Project Number: 1051-08-173 Project Location: Jacksonville North Carolina Test Location: C-6 Existing Surface 7 Elevation View of Core Plan View of Core Asphalt Thickness inches 2.25 ABC Stone Thickness inches 5.0 Estimated Structural No.of Existing Pavement 1.5 Top Bottom Average Depth' Depth' SOB Type CBR % 2 0.0 0.5 Tan Fine SAND SP Wet 1.5 0.5 1.2 Black-Tan Clayey SAND SC Wet 11 1.2 1.8 Black-Tan Clayey SAND SC Wet 8 1.8 2.2 Tan-Gray Sandy CLAY CL Wet 2 Depth is referenced from bottom of ABC stone ZDetermined using Dual-Mass Dynamic Cone Penetrometer(DCP)Testing(ASTM D 6951) Q 569 Q KLSV)Sullsa.L(,IOU)lalamoAauod ouoo onueuSQ sseyg-ien(I su[sn poumualaQZ ouols DaV 3o mouoq mog paoum;ai st glcbU 91 1sloNl 'IO AVID spues O!Tm i0}[ou[a 07 Co £ lsloW some .ip gl[m Z3 AV'I0 Apues 3I081fi L'0 0'0 Z % HH3 a o iql aQ 11O aQ aSeaanVI Q S monog doy 9'Z luamaeed Supsga 10'oi\i 18anpn4S polumllsa 0,11 sagaal ssamlo. U auolS DHV 0•£ sagaul ssaunalgy;lsq sV a.mD;o^salA nsld aao,D;O balA nogeeald . . . If i aaalmS sngspa L-D :aogeaoZ lsay eagoieDquOX allrnuoqoef :uogsaorllaa old £LI-80-1501 :jagmnNpo oad aiolS gnla s,umS alpnuognf :amvm pa,old 3wvs* S&M E Project Name: Jacksonville Sam's Club Store Project Number: 1051-08-173 Project Location: Jacksonville North Carolina Test Location: C-8 Existing Surface Elevation View of Core Plan View of Core Concrete Thickness inches 7.25 ABC Stone Thickness inches 8.0 Top Bottom Average Depth' Depth' Soil Type CBR % 2 0.0 0.6 Black-Gray Sandy CLAY CL Wet 7 0.6 1.0 Gray-Tan Sandy CLAY CL Wet 4 1.0 1.5 Gray-Tan Sandy CLAY CL Wet 3 1.5 1.7 Gray-Tan Sandy CLAY CL Wet 5 Depth is referenced from bottom of ABC stone 2Determined using Dual-Mass Dynamic Cone Penetrometer(DCP)Testing(ASTM D 6951) Proposed Sam's Club Expansion area Detention pond west of proposed expansion roposed Sam's Gas inkhole(proposed Sam's Gas) *S&ME Sam's Club Store No. 6573-04 S&ME Project# 1051-08-173 Jacksonville, North Carolina Taken by: JAB I Date Taken: May 9, 2008 x 36" Diameter RCP a s� ..z H i Proposed detention pond utlet point for stormwater sewer in proposed detention pond I S&ME Sam's Club Store No. 6573-04 S&ME Project# 1051-08-173 Jacksonville, North Carolina Taken by: JAB I Date Taken: May 9. 2008 ■ I� ■� C-7 c o u 12 zo ♦ - vLL EXISTING SAMS U a FR` - ♦ r 10 go ft r -.^" W ' y LEGEND v z - �� E ' 2A Fe B w • } o°o MODERATE SEVERITY FATIGUE CRACKING Z c HIGH SEVERITY FATIGUE CRACKING Q z w �+ ® °o ® MODERATE SEVERITY RUTTING J O z 3 � • �°o o + MODERATE SEVERITY LONGITUDINAL W 5 C4 a°oo ;� �i ��= (NON-WHEELPATH)CRACKING v Z `, 4o° r HIGH SEVERITY SPALLING ALONG JOINTS W ¢ y t» °c °°°° • CBR TEST W E - GRAPHIC SCALE -Olt 1 WESTERN BOULEVAR rI FEET ) FIGURE No. DATA SOURCE-2 NCONE MAP- IMAGERY(4387-1 &4388-3)DATED MAY 2006 CAD DATA-KIMLEY-HORN &ASSOCIATES (PROJ#15476084) a VI I[i.Ul- fYFtCtIMM Q l£IYG LYS Cif -_.. ® > m K Q I DP5E �WIWI i 7� I o 0 ti DP-4 iNG EXIS In I� I I In S110PPNG IN s pp CENTER IN mg z EXISTING STORM � I♦I 'TlION � � rc o � WATERPOND DETEN , f DP-3 I m a o (AREA REDUCED BY 9.05 SF) I ( ® r rt t L RR-135R RL SMAS EXPANSION - I P-2 UA O 1 f 26.065 SF(APPROX) 639 IS SPACES �P-2 z EXISTING SAMS -' T i i1 SF �, W PROPOSEDED EXPANSION) I I I ® I N 137,442 SF I _ 270 ACRES TO BE DP_l PURCHASED BY wAL wtrr tl_VQ �_ f •c.6-- =it z Q Ij a ® -- - II ■nOS�&SP -- F - _ EXISTING O flROP $ WET POI i F•- Q o _ o � is n O if F— CJ 0 U ., .. . . iFET Imo. O z q EXSTNG TIRE • ) _ - _ c SNSS LEGEND coU m RUSNEsS �e I � ,: uE. 3 >0 CPT SOUNDING N zO PAVING • CBR TEST z U z N L U U) E _._— _ __-__ __-- _- -. _---.--------- GRAPHIC SCALE H URI d 60 0 30 60 120 r, WESTERN )HD WESTERN BOULEVARD ° WESTERNBLVD IN FEET ) GUREra. a , (4-LANE) h - -- DATA SOURCE: 1 - - - CAD DATA-KIMLEY-HORN&ASSOCIATES (PROJ#15476084) 0 z n