HomeMy WebLinkAboutSW8920215_HISTORICAL FILE_20220823 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8 9 2 b 215
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
® HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE 2 o 2 2 0 8 2 3
YYYYMMDD
Burd, Tina J
From: Burd, Tina J
Sent: Monday, August 15, 2022 9:27 AM
To: Barraco CIV Talia M
Subject: SW8 920215 - FC286 Field Maintenance Complex SWP 57
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505,00 fee for the subject project on August 10, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http://deg.nc.gov/about/divisions/enerpy-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COVED-tg, the Department of Environmental Quality has adjusted operations to
protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these
staffing changes,all DEQoffire locations are limiting public access to appointments only. Please check with the appropriate staff before
visiting our offices, as we may be able to handle your requests by phone a,-email. We appreciate your patience as we continue to serve the
public during this challenging time.
1
�' Non-Transfer Application Completeness Review Checklist
� F
Project Name: �G
!a F—Ln, MA rA)Iet)Qlct% Col✓IA-Z Z Date Delivered to WIRO: $ / p/Q,1b,ZZ.
Project County/Location: GO BIMS Received/Accepted Date: bj /0
Date Given to Admin: p a2 a.
O
Permit Action: New New Permit#': BIMS Acknowledged Date' /5 a a
Not located in the ETJ of the following delegated
and functioning programs:
NHC:Carolina Beach/Kure Beach/Wilmington/Wrightsville Beach
Bruns: Leland/Navassa(?)/Oak Island Q /
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City 1 20Z1 6
\p
Major Mod / Minor Mod Renewal ®Existing Permit#: <S(,JS
Applicant&Permittee are the same?' Expiration Date°: Z
Permit Type: HD/ D/LID Overall/HID&LD Combo 122 Z Sloe Z/
General Permit/Offsite/Exempt + Redevelopment �Offsite to SW8:
Development Type: Commercial/Residential<Other F-1Is Offsite Lot approved in Master Permit?s
Subdivided?: Subdivision o ingle Lot
Rule(s): 1:12017 Coastal 2008 Coastal 1995 Coastal
Phase II Universal 1988 Coastal
Permittee Type&Documents Needed:
Property Owner(s) Purchaser Lessee =HOA Developer
Viable? =Viable? =Viable? =Viable? =Viable?
=Deed =Purchase Agmt =Lease =Election Minutes
Paperwork
Application
=$505(within 6mo) Check#(s): J E� =No Fee
®Fee:
Supplement'(1 new form or for alder forms:1 original per SCM)
F-1 O&M 2
❑Soils Report(Infil or PP)
Calculations(signed/sealed)
Deed Restrictions,If subdivided'
Project Narrative
FTSGS Map(or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N
Plans(2 Sets)
NOTES:
Enter BIMS Acknowledged Date on this Sheet
'For New Projects-Enter New Permit#on Supplements&Deed Restriction Templates.
'If permittee is different,STOP.Needs to be transferred first.
°If w/in 6 months and they are requesting a mod,STOP. Needs a renewal first.
slf Lot not approved in master permit,STOP. Master permit needs mod.
EMAILED ENGINEER DATE: C ( Comments:
REVIEWER NAME: -A JYl Lr
GMQ%Reference Library\Procedures\Checklists\Completeness Review Checklist 2021 09 08