Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8920215_HISTORICAL FILE_20160203
STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 9 2D 215 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2-o1\,v O2-D3 YYYYMMDD PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary Energy,Mineral and Land Resources TRACY DAVIS ENVIRONMENTAL QUALITY Director February 3, 2016 Commanding Officer MCB Camp Lejeune c/o Neal Paul,Deputy Public Works Officer 1005 Michael Road Camp Lejeune,NC 28457 Subject: State Stormwater Management Permit No. SW8 920215 FC286 Field Maintenance Complex SWP 57 High Density Wet Detention Pond Project Onslow County Dear Mr. Paul: The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for FC286 Field Maintenance Complex SWP 57 on January 27, 2016. Staff Express review of the plans and specifications has determined that the project, as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding modified Permit No. SW8 920215 dated February 3, 2016, for the construction, operation and maintenance of the BMP's and built-upon areas associated with the subject project. This permit shall be effective from the date of issuance until August 25,2021,and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), certification of the BMP's, and the procedures for changing ownership,transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system,to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. The following minor modification is included and covered by this permit: An additional 814 sf building is being added within the existing drainage area in support of the on-going Steam Decentralization project. A portion of this building(353 sf) will be built over existing BUA, resulting in a net increase in BUA of 461 sf. The existing pond can accommodate the increased surface area and volume requirements as is. If any parts,requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes,and must be filed with the OAH within thirty(30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter,please contact Linda Lewis in the Wilmington Regional Office of DEMLR, at(910) 796-7215. Sincerely, arTracy Da 1s, P�or Division of Energy, Mineral and Land Resources GDS/arl: \\\Stormwater\Permits&Projects\1992\920215 HD\2016 02 permit 920215 cc: Jennifer Williams, P.E.,Cape Fear Engineering Wilmington Regional Office Stormwater File State of North Carolina I Enviromnemal Quality I Energy,Miners)and land Resouroos 127 Cardinal Dave Extension I Wilmington,NC 28405 910 796 7215 T 1 910 350 2004 F I hero://oortal.ncdem.org4eb/Ir/ State Stormwater Management Systems Permit No. SW8 920215 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Marine Corps Base Camp Lejeune FC286 Field Maintenance Complex SWP 57 Near the intersection of Gonzalez Boulevard and McHugh Boulevard, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until August 25, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The runoff from all built-upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control measure. The permitted stormwater control measure has been designed to handle the runoff from 1,570,799 square feet of impervious area. 3. The 41.0 acre drainage area will be limited to the amount of built-upon area indicated in Sections 1.2 and 1.5 of this permit, and per approved plans. The built-upon area for the future development is limited to 0 square feet. 4. The wet pond is designed for 85% TSS removal, therefore, the discharge from the wet detention pond must be directed into a 30-foot vegetated filter strip designed to pass the peak flow from the 10 year storm in a diffuse, non-erosive manner. Page 1 of 6 State Stormwater Management Systems Permit No. SW8 920215 5. The following design criteria have been permitted for the wet detention pond and it must be provided and maintained at the design condition: a. Drainage Area, acres: 41.0 Onsite, ft2: 1,785,960 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 1,570,799 Onsite, ft2: 1,570,799 Offsite, ft2: 0 C. Pond Design Depth, feet: 5.0 (1988 rules) d. TSS removal efficiency: 85% e. Design Storm, inches: 1,570,338 sf @1" / 461 sf @1.5" f. Permanent Pool Elevation: 94.15 (relative) g. Permitted Surface Area @PP, ft2: 107119 h. Permitted Temporary Storage Volume, ft3: 132.790 i. Temporary Storage Elevation: 95.28 (relative) j. Predevelopment 1 yr-24 hrdischarge rate, cfs: n/a k. Controlling Orifice: 5"0 pipe I. Orifice Flowrate, cfs : 0.45 M. Permanent Pool Volume, ft3 : 383,183 n. Forebay Volume, ft3: 40,592 o. Maximum Fountain Horsepower: 1.0 P. Receiving Stream / River Basin: Cogdels Creek /WOK02 q. Stream Index Number: 19-23 r. Classification of Water Body: "SC NSW" II. SCHEDULE OF COMPLIANCE 1. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 2. The stormwater management system shall be entirely constructed, vegetated and operational for its permitted use prior to the construction of any built-upon surface. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 2 of 6 State Stormwater Management Systems Permit No. SW8 920215 7. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1 horsepower. 8. All stormwater collection and treatment systems must be located in either public rights- of-way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights-of-way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Redesign or addition to the approved amount of built-upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 10. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed. to date will be required. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 3. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. Page 3 of 6 State Stormwater Management Systems Permit No. SW8 920215 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; C. Bankruptcy; d. Foreclosure; e. . Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 6. The permittee grants DEQ / DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re-issuance or termination does not stay any permit condition. 8. Approved plans, calculations, supplement forms, operation and maintenance agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater control measure must follow the guidelines_established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee. Permit modified and reissued this the 3rd day of February 2016. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION acy Dav , P.E., Directo Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 920215 Page 4 of 6 State Stormwater Management Systems Permit No. SW8 920215 FC286 Field Maintenance Complex SWP 57 Stormwater Permit No. SW8 920215 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Page 5 of 6 State Stormwater Management Systems Permit No. SW8 920215 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDEQ-DEMLR Wilmington Regional Office Page 6 of 6 DEMLR USE ONLY Date Rece'ved Fee Paid Permit Number 6 � Applicable Rules: ❑ Coastal SW-19Sf5 ❑Coastal SW-2008 ❑ Ph II- Post Construction (select all that apply) ❑ Non-Coastal SW-HQW/ORW Waters ❑ Universal Storm water Management Plan ❑Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original L GENERAL INFORMATION 1. Project Name(subdivision,facility, or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): n ,•.. on. c:elfl.[V�IIiic - --� FIiLD(P F�LP #AlbrEOM" CoMeLEX 2. Location of Project(street address): sWps T Building FC286,Camp Lejeune City:Camp Lejeune County:Onslow Zip:28547 3. Directions to project(from nearest major intersection): Project located at intersectin of Sneads Ferry Road and Main Service Road approximately 0 5 miles southeast of intersection with Holcomb Blvd. 4. Latitude:34'39' 24" N Longitude:77° 19' 10" W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102—Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 920215 , its issue date(if known)August 25,1999 ,and the status of construction: [—]Not Started ❑Partially Completed* ®Completed* *provide a designer's certification 2. Specify the type of project(check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Y 20� If yes, see S.L. 2012-200, Part VI:http://portal.ncdenr.org/web/lr/rules-and-regulations �A� Form SWU-101 Version Oct.31,2013 Page I of III. CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title(specifically the developer, property owner, lessee, designated government official,individual,etc. who owns the project): o��/��j� Applicant/Organization:USMCB Camp Leieune / ccmina o(,Aq filcee- Signing Official &Title:Thomas Bradshaw,PE, Public Works Design,Civil Branch b.Contact information for person listed in item 1 a above: Street Address:1005 Michael Road City:Camp Lejeune State:NC Zip:28457 Mailing Address (if applicable):1005 Michael Road City:Camp Leieune State:NC Zip:28457 Phone: (910 ) 451-3238 ext 3285 Fax: (910 ) 451-3300 Email:thomas.bradshaw@usmc.mil c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official &Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official &Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: Email: JA 22 7 1201%6 4. Local jurisdiction for building permits: Point of Contact: Phone #: --- Form S WU-101 Version Oct. 31,2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be collected on site and piped to a wet detention basin. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW-1995 ❑ Ph II-Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 18 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) -Total Coastal Wetlands Area(5)-Total Surface Water Area (6)=Total Project Area`: 18 acres Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHW)line or Mean High Water (MHW)line, and coastal wetlands landward from the NHW(or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW(or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area)X 100 =88 9. How many drainage areas does the project have?l (For high densihj, count I for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole properhj area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area Drainage Area_ Drainage Area_ Receiving Stream Name Cogdels Creek Stream Class * SC NSW Stream Index Number* 19-23 Total Drainage Area(so 1,785,960 On-site Drainage Area (so 1,785,960 Off-site Drainage Area(so Proposed Impervious Area"(so 1,570,799 increased by 461 Impervious Area total 88% Impervious"Surface Area Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_ On-site Buildings/Lots (so 351,908 increased by 814 On-site Streets (so 40,158 decreased by 353 On-site Parking (so 1,056,765 On-site Sidewalks (so Other on-site (so 121,968 Future (so JAP 9 7 I Off-site (so Existing BUA*** (so BY; Total (so: 1,570,799 increased by 461 * Stream Class and Index Number can be determined at: http://portalmcdennorg eb/wq/ps/csu/classificntions `* ]mpervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks,gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new B UA. Form SWU-101 Version Oct. 31,2013 Page 3 of 6 11. How was the off-site impervious area listed above determined?Provide documentation. N/A Projects in Union County: Contact DEMLR Central Ofj<ce staffto check ifthe project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from h2pJ[portal.ncdenr.org/web/wq/ws/su/bmp-manual. V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hu://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at h!W://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wg/ws/su/statesw/forms does. itr IS 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions &Protective Covenants Form. (if required as per Part VII below) \ 3. Original of the applicable Supplement Form(s) (sealed,signed and dated)and O&M ` m W agreement(s) for each BMP. ��� 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review, refer to hqp://www.envhelp.org/pages/onestopexi2ress,htm] for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) rm ' 1 5. A detailed narrative(one to two pages) describing the stormwater treatment/managementfor JI„ w the project. This is required in addition to the brief summary provided in the Project Information, item 1. A 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius the map. 1 7. Sealed,signeded d and dated calculations(one copy). Jmo 8. Two sets of plans folded to 8.5" x 14" (sealed,signed,& dated),including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers,and the MHW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings&distances. G j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours,spot elevations,finished floor elevatio V 1. Details of roads, drainage features,collection systems,and stormwater contro easure'�s. 1 �016 m. Wetlands delineated,or a note on the plans that none exist. (Must be delineat by AA% qualified person. Provide documentation of qualifications and idenfify the per who made the determination on the plans. n. Existing drainage(including off-site), drainage easements, pipe sizes, runoff calc ns. o. Drainage areas delineated (included in the main set of plans,not as a separate document). Form S WU-101 Version Oct. 31,2013 Page 4 of 6 p. Vegetated buffers(where required). 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"xl l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DEMLR to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations(LLC): Provide documentation from the NC Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item la,2a,and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. hgp://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/Ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below,the permit holder(s) certify that the recorded property restrictions and protective covenants for this project,if required, shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Jennifer Williams, PE Consulting Firm:Cape Fear Engineering,Inc. Mailing Address:151 Poole Road,Suite 100 City:Belville State:NC Zip:28451 Phone: (910 ) 383-1044 Fax: (910 ) 383-1045 Emad:iennifer.wflliams@capefearengjneering.com IX. PROPERTY OWNER AUTHORIZATION (if Can tact Information, item 2 has been filled out, complete this section) I, (print or hype name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application,and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item In) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. ECEIVEIN JAN272016 BY: Form SWU-101 Version Oct. 31,2013 Page 5 of 6 As the legal property owner I acknowledge,understand,and agree by my signature below, that if my designated agent(entity fisted in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement,or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, a Notary Public for the State of County of do hereby certify that personally appeared before me this_day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Thomas Bradshaw, PE certify that the information included on this permit application form is, to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will b?recorded,and that th ropos eject complies with the requirements of the applicable stormwater rule ttder 15A NCAC 2 . � 0 and [her applicable state stormwater requirements. Signature: Q �\ Date(: 1111116 I, Ilr-` 1 •�Y�?Ur a Notary Public for th�e^State\of �� \ 6�onGCounty of do hereby certify that \NN��� 1 ! t"pG1 7 personally appeared before me this day of ` `&QP 19 r�`X5[(P ,and acmowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, �11\ 1 0"'.,, // SA, /"' A,yF SEAL Notary Public pnsi,,w County _My Co ,fnissioi Expires= ? ;,012 612 0 1 9 c My commission expires rN C ARC �///IIIIIIIIIHII ECEIVE JAN 21 201 BY: Form SWU-101 Version Oct. 31,2013 Page 6 of 6 MEMORY TRANSMISSION REPORT TIME :02-04-2016 13:15 FAX NO.1 NAME FILE NO. 676 DATE 02.04 13:12 TO n 919104513300 DOCUMENT PAGES 8 START TIME 02.04 13:12 END TIME 02.04 13:15 PAGES SENT 8 STATUS OK —SUCCESSFUL TX NOTICE"' Stvro of Nnrtb Cvrvuva Dlpar4ncnt r,l EaH�mmcala)QuYfIY WOmfvBron lto�onW OA4'a lM McLYory, C.ovcrnor FAX COVER SiiF.ET DoneldR..nn do V K Soc+srary Pa .(w I.covcr): i C lu 10)796-7336 (210)3 0�004 117 C�a 1i+vl DAvc L,atmrloa WI6ni�,pt®.NC 38�03-(9l0)796-131,�Au Nqual a-llslw�h�,uty hMrmvuvo nmiou FS���Dloya State of North Carolina Department of Environmental Quality Wilmington Regional Office PatllfcCrory, Governor FAX COVER SHEET Donald van der Vaar4 Secretary Date: No. Pages (excl. cover): To: L L d � d��/l�li.)rom: Jo Casmer Co: �0� /lL/// � ` l ///7�/> GG%Pv�p Phone: (910)796-7336 Fax: ���� % J Fax: (910) 350-2004 Re: t. 127 Cardinal Drive Extension,Wilmington,NC 28405 a(910)796-7215 e An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :02-04-2016 13:17 •� FAX N0.1 NAME FILE NO. 677 DATE 02.04 13:12 TO n 93831045 DOCUMENT PAGES 8 START TIME 02.04 13:16 END TIME 02.04 13:17 PAGES SENT 8 STATUS OK `SUCCESSFUL TX NOTICE— St�tc of Nortb CvoRno . DCPortiosot of E'm'ironmer(oi Q��Yity Wiiminginn Rcidoo�l 0R1cc ANMKY�', C.ovctvor FAX C®V@-R 9RF@T D.weld l¢wo dsr Vm•r 9ceircmry To: ✓��i/il f GL� �/A'r 5 Nrovn: (91O)796-7336 ' ]2'/ca+aiml[b;au P.Mmlm.Wiimiilpta4 Nc ab+os.(9 io)'loQ-n.ls.wn ay.w oypmiunLLr A*8+•n.uPo k4m,n.oPloye ' State of North Carolina Department of Environmental Quality Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET Donald R van der Vaart, Secretary Date: // No. Pages(excl. cover): 1_ To: ✓�/7//i«/ Clei/11�417 3 From: Jo Casmer Co: �J%<<' �PCl/ ��'/��� �""J Phone: (910) 796-7336 Fax: j /D f�/ ✓ Fax: (9100)))3350-2004 Re: 127 Cardinal Drive Extension,Wilmington,NC 28405 a(910)796-7215 o An Equal Opportunity Affirmative Action EmPloyer FME .FEAR � EERI Nynvd ICY=1VE 151 Poole Road,Suite 100 Belville,NC 28451 m\'n� I TEL(910)383-1044 _ ! S` s V JAN 17 2016 r FAX(910)383-1045 v .capefearengineering.com a Tra mittal BY:Sw 1�ZoZItS�M00 To: INCDENR Date: January 27, 2016 Water Quality Section - Stormwater File: 558-296 "36" 127 Cardinal Dr. Ext subject: 43P884 Field Maintenance Complex Wilmington, NC 28405 FCIWASW8 920215) Minor Modification Attn: Linda Lewis $WP6-4 ®As Requested ❑ For Your Files ❑ For Distribution ® For your Review/Action/Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Original $2000 Minor Stormwater Modification 2 Original & Stormwater Application Form Copy 1 Original P-804 Pond Supplement 1 Original O&M Agreement 2 Copy Plan Revision Narrative 2 Copy P-804 Drainage Area Exhibit 2 Copy Construction Plans for FC286 (Part of P1445, P1447, and P1448 Steam Decentralization Project) REMARKS Please let me know if you have any questions or need any additional information. Thanks. CC: Cape Fear Engineering, Inc. File 558-296 "36" Signed:, Jenn er Williams, PE Received By: Date: P1558%S58-296 P1,t451"7 1418 Steam Decent EngV DMIMStormwater1FC28612016-01-27 Trans_NCDENR Stormwmer.doc STORMWATER EXPRESS SUBMITTAL NARRATIVE -c-( CALC S For P14459 P14479 & P1448 STEAM DECENTRALIZATION MODIFICATION TO P-804 FIELD MAINTENANCE COMPLEX (SW8 920215) TO-INCLUDE_EC28-67 Camp Lejeune,North Carolina Prepared for Marine Corps Base Camp Lejeune Public Works Division Date: January 27, 2016 SEAL 041512 - Prepared by =; f7� .2 15" Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 1R M. 0,011 Belville,NC 28451 (910) 383-1044 NC License No. C-1621 CC EGE1 V G JAN 2 7 2016 BY: S(.tJ�RZCIZ(I DESIGN NARRATIVE GENERAL: The subject permit modification is for the existing P-804 Field Maintenance Complex Permit (SW8-920215)to incorporate a new mechanical building at FC286. This building is being constructed as part of the P1445, P1447, & P1448 Steam Decentralization Project. FC286: FC386 will construct a new mechanical building which will result in net increase of approximately 461 SF of impervious area. According to our review of the existing NCDENR Permit File, FC286 is located in existing permitted Pond#1 drainage area. The existing pond has sufficient capacity to handle the added impervious area without a modification to the previously permitted pond geometry, elevations, or outlet configuration. P-604 Field Maintenance Complex Pond (FC28G) 01/27/201 G Stormwater Pond Modifoation for P 1445/1447/1448 558-29G "30 r. Steam Decentralization Project JMW FIREVIOU5Y PERMITTED DRAINAGE AREA (Ad) = 1 ,785,9GO SF IMPERVIOUS COVERAGE: PREVIOUSLY PERMITTED IMPERVIOUS = 1 ,570,338 SF PROPOSED IMPERVIOUS = 4G 1 5F TOTAL IMPERVIOUS = 1 ,570,799 5F PERCENT IMPERVIOUS AS PERMITTED = 87.93 % AS PROPOSED = 87.95 % POND SURFACE AREA ORIGINALLY PERMITTED POND CALCLUATIONS CACULATED REQUIRED SURFACE AREA USING AN SA/DA VALUE OF 4.G8% FOR 88% IMPERVIOUS AT A DEPTH OF 5.0'. BECAUSE THE PROPOSED DE51GN DOES NOT INCREASE THE PROJECT PERCENT IMPERVIOUS BEYOND 88%, THE PREVIOUSLY CALCULATED REQUIRED SURFACE AREA OF 83,504 5F CAN STILL APPLY. PROVIDED SURFACE AREA = 107, 1 19 5F 107, 1 19 5F > 883.504 5F OKAY STORAGE VOLUME REQUIRED STORAGE ORIGINAL REQUIRED + ADDED VOLUME FROM VOLUME VOLUME ( 1 .0" STORM) NEW IMPERVIOUS (1 .5" STORM) USE SIMPLE METHOD Rv = 0.05 + 0.009 (1) VOL = STORM DEPTH ( 1 .0" OR 1 .5") x Rv x Ad ORIGINAL REQUIRED VOLUME I = 1 ,570,338 5F = 87.93% 1 ,785,9GO 5F Rv= 0.05 + 0.009 (88.93) = 0.8413 VOLUME (ORIGINAL) = 1 .07 12 x 0.84 13 x 1 ,785,9GO 125,217 CF PAGE I OF 2 P-804 Field Maintenance Complex Pond (F628G) 01/27/201 G 5tormwater Pond Modifoation for P 1445/1447/1448 558-29G "3G" Steam Decentralization Project JMW ADDED VOLUME FROM NEW IMPERVIOUS I = 4G I SF = 1 00% 4G I SF Rv = 0.05 + 0.009 (100) = 0.95 VOLUME (ADDED) = 1 .571 2 x 0.95 x4G I 55 CF REQUIRED STORAGE VOLUME = 125,2 17 CF + 55 CF 125,272 CF PROVIDED STORAGE VOLUME = 132,790 CF (PER PERMITTED CALCULATIONS) 132,790 CF > 125,272 CF OKAY fORf 13AY SIZING - THE PROPOSED MODIFICATION DOES NOT MODIFY THE PROVIDED PERMENANT POOL VOLUME AND THEREFORE MAKES NO CHANGE TO FOREBAY REQUIREMENTS. ORIFICE DRAWDOWN - THE PROPOSED MODIFICATION DOES NOT MODIFY THE PROVIDED TEMPORARY POOL VOLUME OR OUTLET STRUCTURE ELEVATIONS. NO CHANGE TO ORIFICE DRAWDOWN RATE IS PROPOSED. PAGE 2 0f 2