Loading...
HomeMy WebLinkAboutSW8920215_HISTORICAL FILE_19920423 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 9 2 a 215 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS fl HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE o1423 YYYYMMDD Cg� . State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James G. Martin, Governor Bob Jamieson William W. Cobey, Jr., Secretary April 23, 1992 Regional Manager DIVISION OF ENVIRONMENTAL MANAGEMENT Ms. D.L. Riddle, P.E. Section Head, Stateside Branch Acquisition Project Management Office Department of the Navy Atlantic Division Naval Facilities Engineering Command Norfolk, Virginia 23511-6287 Subject: Certification of Compliance with Stormwater Regulations Stormwater Project No. 920215 Field Maintenance Complex, III Contract M62470-88-C-8110 Onslow County Dear Ms . Riddle: This Certification is pursuant to the revised application for Field Maintenance Complex, III, Contract M62470-88-C-8110, received on February 24 , 1992, with additional information received on April 15; 1992 . Based on our review of the revised project plans and specifications, we have determined that the Field Maintenance Complex, III stormwater control system complies with the Stormwater Regulations set forth in Title 15A NCAC 2H. 1003( i) . Revisions to the previous approved plan include eliminate the vegetative filter, expanding the pond sutface area, and elevation changes. The runoff will be treated in a detention pond sized to achieve 90% reduction in Total Suspended Solids . This Certification shall be effective from the date of issuance until rescinded and accordingly rescinds project No. 910209 issued to you on April 5, 1991. The project shall- be constructed and maintained in accordance with the plans and specifications approved by the Wilmington Regional Office. A professional engineer must certify that the stormwater system has been installed in accordance with the approved plans and specifications upon completion of construction. The attached certification should be received by this Office within 30 days of completion of construction. -continued- 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 •Telephone 919-395-3900• Fax 919-350,2004 An Equal Opportunity Affirmative Action Employer Ms. Riddle April 23, 1992 Stormwater No. 920215 --------------------- If you have any questions concerning this matter, please call Ms . Alexis Finn or me at (919) 395-3900 . Sincerely, ALE Dave Adkins Water Quality Supervisor DA/aif: 920215.APR cc: G.R. Horne, P.E. Marshall Batchlor, Onslow County Inspections Alexis Finn CWi-Tmington—Regional—Office Central Files 2 DIVISION OF ENVIRONMENTAL MANAGEMENT Evaluation of Stormwater Treatment and Disposal System Draining to Waters Other Than Class SA PROJECT DATA Project Name: Field Maintenance Complex, III Contract M62470-88-C-8110 Project Number: 920215 Location: Onslow County Applicant: Ms . D.L. Riddle, P.E. Mailing Address : Department of the Navy Atlantic Division Naval Facilities Engineering Norfolk, Virginia 23511-6287 Submittal Date: February 24, 1992 Water Body Receiving Stormwater Runoff: Cogdells Creek Classification of Water Body: "SC" WET DETENTION POND EVALUATION 1. Yes No The design storage is for the runoff from all impervious surfaces resulting from 1-inch of rainfall and is located above the permanent pool . 2 . Yes No The -permanent pool is designed for 90% total suspended solid (TSS) removal. Therefore, no vegetative filter is required. 3 . Yes No The runoff completely draws down to the permanent pool in 5 days, but not less than 2 days . 4 . Yes No The mean depth of the permanent pool is a minimum of 3 feet. 5. Yes No The inlet structure is designed to minimize turbulence and short circuiting. 6 . Yes No An appropriate operation and maintenance plan has been provided for the system. -continued- 3 WET DETENTION POND EVALUATION CONTINUED 7 . Yes No THIS PROJECT MEETS THE STORMWATER CONTROL REQUIREMENTS OF 15A NCAC 2H. 1003 (g) , (i) , (k)', and ( 1) (For Yes, 1 through 7 must all be circled Yes. ) Brief Explanation: This detention pond is designed to remove 90% total suspended solids without the aide of a vegetative filter. DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN-OFF Wilmington Regional Office Date Individual Evaluating Form/Plans 2� 199 -L - -- - - Date v Regio Water Quality Supervisor cc: Applicant/WiRO/AIF/CF 4 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for the hereby state that, to (Project Owner) the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications . Signature Registration Number Date 5 Engineer's Certification / I, /17icua� Ly vC�� as a duly registered Professional Engineer in the Rh Carolina, having been authorized to observe periodical) weekly/full time) the construction of the project, �2r'-T, No . 'IZ�L�S i Lr�Zn � (61/�/i h.�til�Y�Lcr (LY�7P�6� LL' (Project) i✓(,zy10-Sg-C-�/U QNSu�w Nzy for the MCfS C`A"'VP Ce-76UNGr hereby state that, to (Project Owner) the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications . Cd'27, P7'0 ZZ3 APei - I'19Z Signature _""/'L"'Y � Registration Number /8 S/3 Date Z-1 J &J 6 3 STPRIAWATER i'i L G k � 1�l Is { ; ; I�nU( JEAN 1 ? 1993 U DIM -�,1 4A q Z0 215 5 DEPARTMENT OF THE NAVI 4QR 1 Jr ' OFFICER IN CHARGE OF CONSTRL,�CTION �rmrry�ry RESIDENT OFFICER IN CHARGE OF CONSTRUCTION O ,, 'lpy�� NAVAL FACILITIES ENGINEERING COMMAND CONTRACTS �M ftc4, CAMP LEJF-UNE, NORTH CAROLINA 28542-5000 IN REPLY REFER To: 919-451-2583 Y N62470-88-C-81t' JAX/MCV/vm 13 APR 92 Ms. Alexis I. Finn Environmental Engineer Division of Environmental Management State of North Carolina Department of Environment, Health and Natural Resources 127 Cardinal Drive Extension Wilmington, N. C. 28405-3845 Re: Stormwater Project No. 920215 Field Maintenance Complex, III, Marine Corps Base, Camp Lejeune, North Carolina (Onslow County) Dear Ms. Finn Pursuant to your letter dated March 23, 1992 please find enclosed the revised plan for the Stormwater Detention Pond for the referenced permit. This office agrees with your evaluation that deletion of the vegetative filter requires enlargement of the pond. This has been accomplished by simply extending the pond to a total bottom length of 358 ft. We trust that these changes meet with your approval and would request that such action be accomplished as soon as possible. For further information, please contact the undersigned at 919-451-2583. Sincerely, VANN MARSHBURN P.E. Supervisory Assistant Resident Engineer in Charge of Construction Copy to: LANTDIV Code 0525 APR 1 5 1992 U D. Eih .oj #9aozc5 -- Oita State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James G. Martin, Governor Bob Jamieson William W. Cobey, Jr., Secretary March 23, 1992 Regional Manager DIVISION OF ENVIRONMENTAL MANAGEMENT Mr. G.R. Horne, P.E. Department of the Navy Naval Facilities Engineering Command Contracts Cam?LeJeune, North Carolina 28542-5000 Subject: Additional Information Stormwater Project No. 920215 Field Maintenance Complex, III Contract N62470-88-C-8110 Onslow County Dear Mr. Horne: The Wilmington Regional Office received a revised Stormwater Submittal for the Field Maintenance Complex, III, Contract N62470-88-C-8110, on February 24, 1992 . A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: 1 . North Carolina registered Professional Engineers seal on revised plans which include printed elevation revisions and revised effluent routing. 2 . A result of eliminating the vegetative filter is additional required surface area of the permanent pond. I calculate a deficit of 9867 sf. Please refer to the SA/DA table for 90% total suspended solid removal. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 24, 1992, or the submittal will be returned as incomplete. -continued- 127 Cardinal Drive Extension, Wilmington, N.C. 29405-3845•Telephone 919-395-3900• Fax 919-3502004 An Equal Opportunity Affirmative Action Employer _j Mr. Horne March 23, 1992 Stormwater No. 920215 --------------------- If you have any questions concerning this matter, please call me at (919) 395-3900. SincererYy, Ms . Alexis I . Finn Environmental Engineer DA/aif: 920215 .MAR cc: (2) Alexis Finn Central Files . - •. - 1Ns•..6F�c�EN'r SA also Prod�o6 o..flcF p•P< d�1z::1\ •n ft v.s.o•,s o{ c4..o�ko-r.A .�er...dl ?roject #: 910209 File Hame; DET209 Reviewer:Alexis Finn Project Nave: FIELD HAIHTEHANCE COHPLER Date: 03/23/92 . xwvxuttRrux+ MOETEHTION P0f0 AHALYSISmrxxx�rurm�i�tmrrtrrtri fatal Size Area, TA: TA- 866844 ft'2 tt [TA (acre)] / (43560 ft'2/acrej= TA= 19.9 Acres ioLal Drainage Area, DA; DA- 684976 ft'2 tt (CA (acre)] / (43560 ft"2/aereej= DA- 15.72488 Acres 1HPEE'iIOfJC aLRF6CE AREA CALCULATIONS; Strntura Surface Area, A Runoff Coef,, C sf Euiloin;s: 342125 1 Adjusted Surface Area - A I C 342125 ft-2 #t ParHiig;sidewall:s/streets; 342851 0.95 Adjusted Surface Area - A 4 C 325708.4 ft-2 It Outparcels; 0 03 Adjusted Surface Area - A C 0 ft"2 t# Green Areas: 0 0.2 Adjusted Surface Area A = C = 0 ft'2 It TOTAL; 667833.4 ft'2 It Percent impervious, ti: note: W(HILDING + PARKING.,)- 684976 sf 15.72488 Acres (SA/TA];100- ( 684916 / 866844 ]r100- %I= 79,02%% Note: If %I < 30% check Density Option, If %I > 30%, require engineered system to minimize non-point stream degradation. PO"iD 1I2I,^!6; H�r,imum Required Storage Volume, VOLreq; note: SA has been multiplied by runoff coefficients (SA (ft'2) K (I inch of runoff) 0 (1 ft/12 inch)]- ( 567833,4 ft'2 v 1 inch 0,083333 ft/inch]: VOLreq= 55652.78 ft'3 ## PO'r1L s'ItIHG, dcttom Elevation, Elb: ELb 7 ft It Permanent Poal Elevation, ELpp: ELpp- 10 ft It Arta of Permanent Pool, App. App - __&Wt ft'2 tt bsa93 Storage Pond Elevation, Esp: ELsp= 11 ft t# Area cr Storage Pond, Asp; Asp - —60 ft'2 t# �tbec. Ruoatf Storage Depth, d: (via project engineer's design; d = ELsp ELpp) d= I ft I Storage Volume Provided, VOLpro: Side Slope; 3:1 tilt Volume I, V1= App x d - 54521 ft'2 ; I ft V1- 54521 ft"3 Volume 2, V2= (Asp App) x d v 0.5 _ V2- 5192.5 ft'3 VOLpro : VI + V2 - 54521 ft'3 + 5192.5 ft'3 VOLpro- 59713.5 ft'3 Note: '1OLreq < VOLpro; excess storage is available, therefore Pond Size is Acceptable, <... % Excess Storage -(VOLreq / VOLpro) 1 100 - % Excess Storage 6,805<-,-r----- DETENTION POND ANALYSIS CONTINUED; PAGE TWO III R!iINANT POOL: Perm. Pool at Normal Level= 10 ft Ooitom of Pond = 7 ft Depth Proaided, D = 3 ft <----- okay, depth > OR = 3 ft. SA/DA r,AICULATI0I1: By Chart Y4; @ 90% TSS: Depth, D 3 fti� t Impervious = 19.02% DA - 15.12488 Acres Where DA is the Draninage Area SA/DA t = 9,4 ittl Area of Permanent Pool Required = (SA/DA ti) t DA Area of Permanent Pool Required = 9.4 v 15.33134 Acres Area of Permanent Pool Required = 1.418139 Acres Area of Permanent Pool Required 64387.14 ft"2 Area of PERNAIIENT POOL Required- 64387.74 sf < provided area of 54521 sf <-•WARNING: insufficient ORIFICE / GUILET sI2IhG: VOLpro = 59713.1 Orifice outflow, 2 Day Drawdown Volpro/[(2 day) $ (86400 sec/day)] Orifice outflow, 2 Day Drawdown 59713.5 ft"3 / 172800 sec = Q2= 0,345564 cfs Orifice C.S. Area, A: A= Q/[Cd((2gh)^0.5))j A= 0,345564 / [0.6$((2132.211.0)-0,5))]; A2= 0.071768 ft'2 A2= 10,33468 inch'2 Pipe diameter, d: d2= 3.627468 inch Note: Read, h = naximum pond leveb. permanent pond level = I ft Coeficient of Discharge, Cd = 0.6 Orifice outflow, 5 Day Drawdown = Volpro/[(5 day) 1 (86400 sec/day)] Orifice outflow, S Day Drawdown = 59111.5 ft"3 / 432000 sec = Q5= 0,138225 cis Orifice C.S, Area, A; A- Q/ICd((2gh)'0,5))j A= 0.138225 / (0.V((2t32.2t1.0)-0.5))]= AS= 0,028707 ft'2 A5= 4.133872 inch"2 Pipe diameter, d: d5= 2,294212 inch r,uEry; d5 < dprovided < d2 : 2.3 < 5.0 < 3.6 <------WARNING...; Orifice is sized incorrectly. jR c1 VED DEPARTMENT OF THE NAVY FEB 1 OFFICER IN CHARGE OF CONSTRUCTION JA RESIDENT OFFICER IN CHARGE OF CONSTRUCTION rjminSWn Regional OFfieo NAVAL FACILITIES ENGINEERING COMMAND CONTRACTS DEM CAMP LEJEUNE,NORTH CAROLINA 28842-5000 IN REPLY REFER.o ;t (919)451-2581 N62470-88-C-8110 JAX/A 12/ml 18 FEB 92 State of North Carolina Department of Environment, Health and Natural Resources Wilmington Regional Office 7225 Wrightsville Avenue Wilmington, North Carolina 28403-3696 (Attn: Division of Environmental Management, Mr. Dave Adkins) Re: Contract N62470-88-C-8110, Field Maintenance Complex, Increment III, Marine Corps Base, Camp Lejeune, NC Gentlemen: The referenced contract storm water control system includes the construction of a detention pond with a spillway into Cogdell's Creek. The system was certified by your letter dated 5 April 1991, copy enclosed. WeWrepos-e to raise-the-elevations 6f"thedeCention-pond:and-all-associated) lstructures-West'of marihol.e NSMH=2-1 y_two_feef. The proposed elevation changes are detailed on the enclosed revised plans, sheets C-10A and C-11A. The volume and thus treatment capabilities will remain unchanged. Site observation, as well as topographical measurements indicate that the water level of Cogdell's Creek during a storm would most likely exceed the detention pond outlet elevation as originally proposed. This would allow sediment to enter the detention pond from the Cogdells Creek flow. The entire area from just North of the Outlet Control Structure to Cogdell's Creek should be considered the creek basin. &D ige eefore,-ia=is—recommendecLthe=originally-proposed=drainage-swale=with� ton e�check-dam-in-thi s-are a-be-omitted? Construction as specified in the contract in this sensitive area could prove to be detrimental. It is requested that you promptly review this proposal and provide written approval to raise the detention system two feet and the omission of the outlet drainage swale. Should you have any questions, contact the and s}tnjd. Sincerely, K DU 7. (�� FEB 2 4 1992 G. R. Horne, P.E. D E M Supervisory GeneralcFrigineer�aoz/S' Enclosure Copy to: LANTDIV, Code 0525 State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James G. Martin, Governor Bob Jamieson William W. Cobey, Jr., Secretary April 5, 1991 Regional Manager DIVISION OF ENVIRONMENTAL MANAGEMENT Ms. D.L. Riddle, P.E. Section Head, Stateside Branch Acquisition Project Management Office Department of the Navy Atlantic Division Naval Facilities Engineering Command Norfolk, Virginia 23511-6287 Subject: Certification of Compliance with Stormwater Regulations Stormwater Project No. 910209 Field Maintenance Complex III Onslow County Dear Ms. Riddle: This Certification is pursuant to the application for the Field Maintenance Complex III received on February 15, 1991, with additional information received April 4, 1991. Based on our review of the project plans and specifications, we have determined that the stormwater control system complies with the Stormwater Regulations set forth in Title 15A NCAC 2H. 1003 (i) . The runoff will be treated in a detention pond sized to achieve 85% reduction in Total Suspended Solids. This Certification shall be effective from the date of issuance until rescinded. The project shall be constructed and maintained in accordance with the plans and specifications approved by the Wilmington Regional Office. A professional engineer must certify that the stormwater system has been installed in accordance with the approved plans and specifications upon completion of construction. The attached certification should be received by this Office within 30 days of completion of d s6:-Uctik'i L b Continued �unU( FEB 2 4 1992 D E M 7125 Wrightsville Avenue, Wilmington, NC. 28-f033696 • Telephone 914756-/161 • Fax-913�558STZ�'�� �� � An Equal Opportunity Affirmative Action Employer , ,Ms; •Riddle April 5, 1991 Page Two ---------------- If you have any questions concerning this matter, please call Alexis Finn or me at (919) 256-4161. Sincerely, Dave Adkins Water Quality Supervisor DA/AIF: 910209.APR cc: J. Steven Porter, P.E. Bill Mills Alexis Finn Wilmington Regional Office Central Files DIVISION OF ENVIRONMENTAL MANAGEMENT Evaluation of Stormwater Treatment and Disposal System Draining to Waters Other Than Class SA PROJECT DATA Project Name: Field Maintenance Complex III Project No. : 910209 Location (County, Township/Municipality, Address) : Camp Lejuene Onslow County Applicant Name: Mr. J. Steven Porter, P.E. Mailing Address: Piedmont Olsen Associates Post Office Box 93 Greenville, North Carolina 27835-0093 Submittal Date: February 15, 1991 Water Body Receiving Stormwater Runoff: Cogdells Creek Classification of Water Body: SC WET DETENTION POND EVALUATION 1. Yes No The design storage is for the runoff from all impervious surfaces resulting from 1-inch of rainfall and is located above the permanent pool. 2. Yes No The permanent pool is designed for 85% TSS removal. 3. Yes No The runoff completely draws down to the permanent pool in 5 days, but not less than 2 days. 4. Yes No The mean depth of the permanent pool is a minimum of 3 feet. 5. Yes No The inlet structure is designed to minimize turbulence and short circuiting. 6. Yes No All overflow and discharge flows through a vegetative filter at least 30 feet in length. 7. Yes No A method is used to provide even distribution of runoff over the length of the vegetative filter. Continued WET DETENTION POND EVALUATION CONTINUED 8. Yes No The slope and width of the vegetative filter provides non-erosive flow for the 10-year and 24-hour storm with a 10-year, 1-hour intensity. 9. Yes No The vegetative filter has a slope of 5% or less. 10. Yes No The vegetative filter is natural, grassed or artificially planted wetland vegetation. 11. Yes No An appropriate operation and maintenance plan has been provided for the system. 12. Yes No THIS PROJECT MEETS THE STORMWATER CONTROL REQUIREMENTS OF 15A NCAC 2H. (g) , (i) , (j ) , (k) , and (1) (For Yes, 1 through 11 must all be , circled Yes. ) Brief Explanation: This detention pond is designed to remove 85% total suspended solids and will therefore be operated with a vegetative filter. DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN-OFF Wilmington Regional office Date Individual Evaluating Form/Plans 41L )�-a A&.. Date 'Regional Water Quality Supervisor cc: Applicant/WiRO/Mills/CF � T o ,f7 Q a 1 CAROt SE i 111/11/11/1j 3 r � _ '� -I�N"—���-I-Fitt•—��'i��" I I y N- ��!-.N � ��` I�� .•tea :•.cCS n•A '•`=w > ", t a . . EQ"•J� 5��,,,.